Toilet Renovation Work Completed at Lokmanya Tilak Terminus and Kopar Station Platform No
Total Page:16
File Type:pdf, Size:1020Kb
APRIL 2019 1. Toilet Renovation Work:- Toilet renovation work completed at Lokmanya Tilak Terminus and Kopar station Platform No. 1 & 2 Lokmanya Tilak Terminus Kopar Station 1 & 2 2. Improvement to Platform Surfacing :- Improvement to Platform surfacing work at Lokmanya Tilak Terminus PF No. 1 3. Toilet block Construction:- Newly constructed Toilet on PFNo 2 & 3 at KYN end BY station 4. FOB staircase work:- Kurla Station New staircase to CSMT end FOB work completed and opened to public May 2019 1. New public FOB:- Construction of New public FOB at Thurbhe- Sanpada section 2. Construction of New Signal gantry:- Construction of New Signal gantry( 40.50 m long ) at SIN - CLA section at km 14/6-7 3. New Dental check up room at Byculla hospital:- New dental check up room established at Byculla Railway Hospital. 4. Renovation of Physiotherapy department at Byculla hospital. Physiotherapy department renovated at Byculla Railway Hospital. 5. Renovation of Blood department room at Byculla hospital. Blood department renovated at Byculla Railway Hospital. 6. New occupational and fitness therapy Department. New occupational and fitness therapy department established at Byculla Railway Hospital. 7. Renovation of meeting hall of DRM office :- Meeting hall of DRM office renovated and inaugurated on 27th May 19. 8. N e w C l a s 8. room at Kalyan Railway School:- New class room constructed at Central Railway School, Kalyan. 9. Raising and resurfacing of Ulhasnagar station PF no.1 Ulhasnagar station PF no.1 raising and resurfacing work is done. June 2019 1. Closing of Level Crossing:- Level crossing No. 5 closed between Apta- Jite at Km. 89/3-4 2. Platform Resurfacing:- Lokmanya Tilak Terminus Platform No. 4 & 5 and Juichandra Platform No. 2 resurfacing done. Lokmanya Tilak Terminus Juichandra 3. PPGI sheet roofing:- RB/II/6 & 8 nos building PPGI sheets roofing done at Juinagar Railway colony 4. Improvement to Platform FOB. Improvement to Mankhurd Platform FOB done in this month 5. Repairing work to public FOB . Repair to ganesh mandir public FOB at km 48/22-23 near Dombivali. 6. Reparing of Kurla Car shed Kurla Car shed leaky roofing sheet and valley gutters replaced. North light glass and roof sheets replaced in HR Shed of size 213m × 21.30m 7. Platform Roof covering work :- Ghatkopar Platform No. 4 roof covering balance portion of 55 Mtr length Completed July-19 1. Suburban concourse renovation at CSMT station:- Renovation work at CSMT station suburban concourse 2. New Public FOB:- New Public FOB on Platforms in OMB stations, 6meter wide and 24.5meter length. 3. Additional New Staircase:- Additional new staircase to 12m wide FOB on Platform no.1 at Kalyan station. August-19 1. Improvement to circulating area:- Improvement to circulating area at Chembur Station on east side. 2. Renovation of Room:- Newly renovated RPF guard room at GM Bungalow. 3. Shifting of Booking office at Ghatkopar:- Shifting of Booking office from distressed building on west side at CSMT end to on PF no.1 under 12m wide middle FOB . September-19 1. Construction of Bulding:- Construction of Railway claim tribunal building at CSMT. 2. Resurfacing of Platform:- Sahad Platform No. 1 resurfacing completed. 3. New FOB:- New FOB constructed at Sahad 6m wide connecting to PF No. 1 to 2 4. Improvement to toilet Block:- Improvements to general Toilet Block on LTT at BB end side of new station building 5. New Booking office:- At Govandi Phase 1 of Construction of new Booking Office on east side completed. October-19 1. Construction of Deluxe Toilet:- Construction of Deluxe Toilet Block at LTT on Platform No.1 at Vidyavihar end and Deluxe toilet constructed at Panvel station with Jaguar fittings, centralized AC, Lighting and other facilities for ladies and gents, including bathing facilities. LTT Platform No.1 Panvel Station 2. Construction of EMU pathway:- Left hand side pathway along new e m u siding about 200m constructed at Kalyan. 3. Repairs to ladies changing room at Sanpada Carshed:- Repairing of ladies changing room for toilet structure, roofing of toilet, washing place near ancillary building at Sanpada Carshed. November-19 1. New Staircase:- New stair case at Panvel platform No.4. Alongside existing staircase to ease movement of public traffic in Panvel during peak hours. 2. Construction of Rain Protection shed:- Construction of Rain protection shed for Breakdown ART 140 Tonnes capacity Crane in Kurla Diesel Shed 3. Platform Resurfacing:- Resurfacing work at Kopar Platform No. 3 completed during this month. December-19 1. Renovation Work:- Renovation of dental OPD at Kalyan Railway hospital & area training center at Kalyan West. OPD at Kalyan Training Centre at Kalyan 2. Renovation of Dispensary:- Renovation of Juinagar colony Dispensary 3. Improvement Work:- Improvement to ORH 2 and front portion at Kalyan 4. Rehabilitation Work:- Rehabilitation of 40 units RB /1 at Suparibagh colony in Parel staff colony January-20 1. Resurfacing Work:- Resurfacing of Platform No. 1 & 2 at Chunabhatti station 2. Improvement to Gang hut:- Improvement to Gang hut No. 1 near Kopar station 3. Renovation of Toilet:- Renovation and modification work done of toilet at PCE office, 2nd floor GM building February-20 1. Construction of FOB:- 6m wide FOB constructed at Asangoan station Mumbai end 2. Bridge repairing Work:- Bridge No 59/4.repaired work done in DW- BSR Section 3. Renovation of ICCU:- Renovation work completed of ICCU at Divisional Railway hospital Kalyan 4. Repair and Replacement of Steps of FOB:- Repairs and replacement of steps of FOB on PF No 6 at CSMT 5. Provision of Fencing at Neral Station:- Fencing provided at Neral PF No. 2 March-20 1. Electronic interlocking Central cabin :- New Electronic interlocking Central cabin constructed at Titwala 2. Extension of COP :- Extension of COP is done at Reay Road station. 3. Extension of COP:- Extension of COP is done at Sandhurst road station of HB line. 4. Repairs of FOBs :- a) Repairs to 4.88m wide fob of 2 spans at KYN end of Byculla station. b)Repairs to 4.88 m wide FOB of 2 span at CSMT end of Sion station. 5. Establishment of Isolation ward: Established isolation ward in BY hospital for 60 beds by converting Nephrology and Male ward at 1st and 2nd floor with portions in OLD building , 48 bed for quarantine facility at Holiday home Dadar, 24 bed at PR sports ground hostel and 28 at S&T hostel Byculla. .