Coastal Protection & Restoration Authority Quarterly Progress Report

July 2014

Committed to our Coast Focus On...

Bayou Dupont Marsh and Ridge Creation

The Bayou Dupont Marsh and Ridge Creation project (BA-48) will use sand from the Mississippi to create marsh, re-establish the Barataria Landbridge, and create approximately 2.1 miles of ridge along Bayou Dupont.

The project area, south of Bayou Dupont and southeast of The Pen, has been particularly vulnerable to rapid land loss due to altered hydrology, wind , and subsidence.

In total, this project will create 277 acres of marsh, nourish another 93 acres, and create 20 acres of ridge at a total estimated cost of $37.6 million.

The anticipated completion date for this project is December 2015.

2 3 QUARTERLY PROGRESS REPORT - JULY 2014 PROJECTS IN ENGINEERING & DESIGN

Project 3Q 4Q 1Q 2Q Federal Acres / Miles Project Name Tier Parish ID 2014 2014 2015 2015 Sponsor Benefited CDBG BA-82 Lafitte Area Repair 1 D C C C HUD Jefferson 4 Miles BA-83 Rosethorne Wetland Assimilation Project 1 D C C C HUD Jefferson 334 Acres TE-78 Cut-Off/Pointe Aux Chene Levee 1 D C C C HUD Lafourche 8 Miles TV-60 Front Ridge Chenier Terracing / Protection 1 D C C C HUD Vermilion 40 Acres TV-67 Bayou Tigre Flood Control Project 1 D D C C HUD Vermilion N/A CIAP Water Reintroduction into Assumption, BA-161 1 D D D D USFWS Not Avail. Bayou Lafourche - BLFWD Lafourche MR-16- Mississippi River Delta Strategic Planning - 1 D C C C USFWS East Baton Rouge N/A SSPM SSPM Expansion Orleans, PO-73-2 Central Wetlands - EBSTP to A2 1 D C C C USFWS 473 Acres Saint Bernard PO-73-3 Central Wetlands Demonstration Expansion 1 D D C C USFWS Orleans 17.2 Acres PO-148 Living Shoreline 1 D D C C USFWS Saint Bernard 5,340 Acres TE-63 Falgout Freshwater Enhancement 2 D C C C USFWS Terrebonne 5,000 Acres Acadiana Regional Airport Street TV-31 2 D C C C USFWS Iberia N/A Improvements - Admiral Doyle Drive CWPPRA Phase I Hydrologic Restoration and Vegetative Plant- Lafourche, BA-34-2 2 D D D D EPA 5,134 Acres ing in the Lac des Allemands Swamp Saint James West Pointe a la Hache Marsh Creation BA-47 1 D D D D NRCS Plaquemines 357 Acres Project BA-125 Northwest Turtle Bay Marsh Creation 2 D D W W USFWS Jefferson 407 Acres Bayou Dupont Sediment Delivery - Marsh Jefferson, BA-164 1 D D W W EPA 383 Acres Creation 3 Plaquemines Caminada Headlands Back Barrier Marsh BA-171 1 D D D D EPA Lafourche 430 Acres Creation Bayou Grande Cheniere Marsh and Ridge BA-173 1 D D D D USFWS Plaquemines 264 Acres Restoration BS-24 Terracing & Marsh Creation South of Big Mar 2 D D D D USFWS Plaquemines 383 Acres CS-49 Cameron-Creole Freshwater Introduction 1 D D D W NRCS Cameron 473 Acres CS-53 Kelso Bayou Marsh Creation 1 D D D D NRCS Cameron 274 Acres CS-59 Oyster Bayou Marsh Creation and Terracing 1 D D W W NOAA Cameron 489 Acres Cameron Meadows Marsh Creation and CS-66 2 D D D D NOAA Cameron 265 Acres Terracing

Key:

P Feasibility & Planning C Construction D Engineering & Design F Construction Complete W Awaiting Additional O O&M Funding for Implementation

4 BA-159 BA-158 BA-156 BA-154 BA-109 GNO-HSDRRS TE-72 TE-32A PO-104 ME-21 ME-20 BA-27C BA-04C PhaseII CWPPRA TV-63 TE-117 TE-112 TE-83 TE-66 PO-133 PO-75 ME-32 ME-31 ME-18 Project * ID ability tobeconstructed ormeetitsintendedgoals. have experiencedsignificant Tier 3: projects withthe2012MasterPlan. Tier 2: agreed tomovetheprojectforward. Tier 1: Rockefeller Shoreline RefugeGulf New Orleans toNew Orleans Venice Mitigation -Fed Plaquemines Non-Fed toNew Orleans Venice Mitigation - Mar -Big Scarsdale Plaquemines TFU Mitigation -Braithwaite to Previously Authorized Mitigation WBV HSDRRS Mitigation - WBV Restoration Lost Lake MarshCreation andHydrologic Introduction andHydrologic Management Lake BoudreauxFreshwaterNorth Basin Bayou MarshCreation Bonfouca Grand Lake Shoreline Protection - Tebo Point Grand Chenier MarshCreationSouth Project &8 3-CU7 Barataria Landbridge SP-Phase Basin West Pointe Management alaHacheOutfall Cole's Bayou MarshRestoration Island RoadMarshCreation &Nourishment Catfish North Lake Marsh Creation Nourishment Terrebonne Bay MarshCreation & Central Terrebonne Freshwater Enhancement LaBranche Central MarshCreation LaBranche East MarshCreation Tract Grand Chenier MarshCreationSouth -Baker Freshwater Bayou MarshCreation (CWPPRA) Stabilization While potentiallybeneficial, theseprojectsaretheleastconsistent withthe2012MasterPlanand While stillapriority, theseprojectshavelikelyexperienced delaysorarenotasconsistent Tier 1 Projects areahighpriorityandeither consistentwiththe2012MasterPlanorCPRA has Project Name delays orpotentially insurmountable issuesthatwilllikelyaffect theproject’s Tier 1 1 2 1 1 2 3 1 1 2 1 1 2 2 1 1 1 2 2 2 2 2 2014 3Q D D D D D D D D D D D D D D D D D D D D D D

D 2014 4Q D D D D D D D D D D D D D D D D D D D D C D 2015 1Q W D D D D D D D D D D D D D D D D D D D C

D 2015 2Q W D D D D D D D D D D D D D D C C C C C C

USFWS USFWS USFWS NRCS USFWS NRCS NRCS NOAA NOAA NRCS USFWS NRCS NRCS NRCS NRCS NRCS NOAA USACE USACE USACE USACE USACE Sponsor Federal

Saint CharlesSaint Cameron Vermilion Cameron Plaquemines Plaquemines Plaquemines CharlesSaint Jefferson, Jefferson, Lafourche Terrebonne Terrebonne TammanySaint Cameron Cameron Jefferson, Lafourche Plaquemines Vermilion Terrebonne Lafourche Terrebonne Terrebonne CharlesSaint Parish

715 Acres 393 Acres 279 Acres 198 Acres 303 Acres 230 Acres 24 Acres 1,217 Acres 1,540 Acres 749 Acres 265 Acres 424 Acres 45 Acres 414 Acres 5,587 Acres 646 Acres 398 Acres 383 Acres 666 Acres 353 Acres 456 Acres 731 Acres Acres /Miles Benefited

5 QUARTERLY PROGRESS REPORT - JULY 2014 PROJECTS IN ENGINEERING & DESIGN

Project 3Q 4Q 1Q 2Q Federal Acres / Miles Project Name Tier Parish ID 2014 2014 2015 2015 Sponsor Benefited Orleans, PO-121 HSDRRS Mitigation - LPV 2 D D D D USACE 1,089 Acres Saint Tammany NFWF 68,000 BA-153 Mid-Barataria Sediment Diversion 1 D D D D N/A Plaquemines Acres TE-118 East Timbalier Island Restoration 1 D D D D N/A Lafourche Not Avail. NRDA TE-100 NRDA Caillou Lake Headlands 1 D C C C N/A Terrebonne 1,272 Acres State BA-75-2 Rosethorne Tidal Protection 1 D D D C N/A Jefferson 5.3 Miles Bayou LaFourche Salt Water Control BA-91 1 D C C C N/A Lafourche 0.04 Miles Structure BA-168 Grand Isle - Fifi Island Breakwaters 2 D D D C N/A Jefferson Not Avail. BA-169 Kraemer Bayou Boeuf Levee Lift 1 D D D D N/A Lafourche 6 Acres Saint James, Saint 45,126 PO-29 River Reintroduction into Maurepas Swamp 1 D D D D N/A John the Baptist Acres North Shore Hurricane/Flood Protection and Saint Tammany, PO-74 1 D N/A 0.21 Miles Restoration Plan Tangipahoa Hydrologic Restoration of the Amite River Ascension, PO-142 1 D C C C N/A 1,600 Acres Diversion Canal Livingston TE-113 Houma Navigation Canal Complex 1 D D D D N/A Terrebonne Not Avail. TE-116 St. Mary Backwater Flooding 1 D D D D N/A St. Mary, Terrebonne 1.72 Miles TV-55 Morgan City/St. Mary Flood Protection 1 D D D C N/A Saint Mary 4.5 Miles TV-57 Delcambre-Avery Canal (E&D) 1 D D D D N/A Iberia N/A

Key:

P Feasibility & Planning C Construction D Engineering & Design F Construction Complete W Awaiting Additional O O&M Funding for Implementation

6 Projects tobeAdvertisedforBidintheNext6Months f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f Barataria BasinLandbridgeSP - Phase3-CU7&8(BA-27-C) Acadiana Regional Airport StreetImprovements- Admiral DoyleDrive(TV-31) Rosethorne Wetland Assimilation Project(BA-83) NRDA CaillouLakeHeadlands(TE-100) Morgan City/SaintMaryFloodProtection(TV-55) Mississippi RiverDeltaStrategicPlanning-SSPMExpansion(MR-16-SSPM) Lafitte AreaLeveeRepair(BA-82) Hydrologic Restorationofthe Amite RiverDiversionCanal(PO-142) Front RidgeChenier Terracing/Protection (TV-60) Falgout CanalFreshwaterEnhancement(TE-63) Cut-Off /Pointe Aux CheneLevee(TE-78) Central Wetlands DemonstrationExpansion (PO-73-3) Central Wetlands -EBSTP to A2 (PO-73-2) Bayou Tigre FloodControlProject(TV-67) Bayou LaFourcheSaltWater ControlStructure(BA-91)

7 QUARTERLY PROGRESS REPORT - JULY 2014 PROJECTS IN CONSTRUCTION

Project 3Q 4Q 1Q Federal Acres / Miles Project Name Tier 2Q Parish ID 2014 2014 2015 Sponsor Benefited CDBG Bayou Lafourche Freshwater District - BA-84 Walter S. Lemann Memorial Pump Station C F HUD Ascension N/A Renovations PO-87 Madisonville Bulkhead Project C F HUD Saint Tammany 0.1 Miles Franklin Floodgate Sinkable Barge and TV-52 C C C F HUD Saint Mary 0.2 Miles Pump Station CIAP AT-05 Morgan City Industrial Road C C F USFWS Saint Mary N/A Jefferson, BA-43 Mississippi River Long Distance Sediment C C C C C USFWS Lafourche, 371 Acres (EB) Pipeline Plauqemines Caminada Headland Beach and Dune BA-45 C C F USFWS Lafourche 303 Acres Restoration PO-73 Central Wetlands Demonstration C C C C C USFWS Orleans 17 Acres PO-73-1 Central Wetlands - Riverbend C C C F USFWS Saint Bernard 346 Acres TV-11B Freshwater Bayou Bank Stabilization (CIAP) C C F USFWS Vermilion 223 Acres (EB) CWPPRA Demo Non-rock Alternatives to Shoreline LA-16 C F NRCS Iberia N/A Protection Demo CWPPRA Phase II BA-42 Lake Hermitage Marsh Creation C C F USFWS Plaquemines 599 Acres Bayou Dupont Marsh and Ridge Creation BA-48 C C C C C NOAA Jefferson 317 Acres Project BA-68 Grand Liard Marsh and Ridge Restoration C C C C C NOAA Plaquemines 502 Acres South Lake Lery Shoreline and Marsh BS-16 C C C C C USFWS Plaquemines 652 Acres Restoration CS-28 Sabine Refuge Marsh Creation Cycles 4 & 5 C C C F USFWS Cameron 460 Acres GNO-HSDRRS Jefferson, Orleans, BA-66 West Bank and Vicinity C C C C C USACE 71 Miles Plaquemines, Saint Charles BA-67 New Orleans to Venice C C C C C USACE Plaquemines 58 Miles

Key:

P Feasibility & Planning C Construction D Engineering & Design F Construction Complete W Awaiting Additional O O&M Funding for Implementation

Note: Construction begins when a project is advertised.

8 PO-57 BA-74 TE-65 TE-64 PO-72 ME-25 SF CS-33 BA-85 BA-75-1 State BA-141 NRDA BA-143 NFWF PO-146 PO-145 PO-63 PO-60 Project ID Protection Larose to Meadow Golden -Flood Morganza to theGulf Biloxi Marsh Marsh Creation Near Freshwater Bayou Cameron Parish Shoreline Restoration Levee St. Charles West Protection Hurricane Bank Jean Lafitte Tidal Protection NRDA Lake Hermitage Marsh Creation INCR2 Restoration INCR2 Caminada andDune Headland Beach Marsh Creation LPV Mitigation Project, Manchac WMA Sauvage LPV Task Force Guardian Mitigation -Bayou Lake Pontchartrain & Vicinity Stations Permanent Canal Closures andPump SELA Stations Storm-Proofing ofInterior Pumping Project Name Tier C C C C C C C C C C C C C C C 2014 3Q C C C C C C C C C C C C F F F 2014 4Q C C C C C C C C C C F F 2015 1Q C C C C C C C C F F 2Q C C C C C C C F N/A N/A N/A N/A N/A N/A N/A USACE USACE USACE USACE USACE USACE N/A USACE Sponsor Federal

Orleans Jefferson, Orleans Jefferson, Orleans Jefferson, Lafourche Terrebonne Lafourche, BernardSaint Vermilion Cameron CharlesSaint Jefferson Plaquemines Lafourche Jefferson, Baptist St. Johnthe Orleans CharlesSaint Bernand,Saint Orleans, Jefferson, Parish

0.34 Miles Acres 20,000,000 N/A 23 Miles 18 Miles 110 Acres 96 Acres 523 Acres 9 Miles 2.9 Miles 101 Acres 489 Acres 110 Acres 191 Acres 128 Miles Acres /Miles Benefited

9 QUARTERLY PROGRESS REPORT - JULY 2014 PROJECTS IN CONSTRUCTION

Projects in Construction

1. Morgan City Industrial Road (AT-05): The project will construct a new roadway along the protected side of the Morgan City Floodwall beginning at the floodgate on 2nd St., connecting to 2nd St. and Federal Ave., and ending at the tie into Industrial Rd. 2. Lake Hermitage Marsh Creation (BA-42): The project creates wetlands and reduces tidal exchange in marshes surrounding Lake Hermitage by using material dredged from the Mississippi River. 3. Long Distance MS River Sediment Pipeline (BA-43 EB): The goal of this project is to use material dredged from the Mississippi River and transported via a pipeline across the Barataria Basin to create marsh and/or a ridge. 4. Caminada Headland Beach and Dune Restoration (BA-45): The project will restore and protect beach and dune habitat across the Caminada Headland by the direct placement of sediment from offshore borrow areas. 5. Bayou Dupont Marsh and Ridge Creation Project (BA-48): This marsh and ridge creation project is intended to nourish approximately 118 acres of marsh and create 15 acres of maritime ridge by long distance pumping of Mississippi River sediment.

10 10. 9. 8. 7. 6. capped, steelsheet pilefloodwallandflood gates. levee. feet ofconcrete 7600 linear approximately also include The projectwill (BA-75-1): earthen feet ofexisting by raising15,840 linear protection improvements Protection Tidal Lafitte Jean System (HSDRRS). (BA-74): Reduction Risk Storm Damage and the Hurricane under pump stations interior Stations Pumping Jeffersonto theparishes’a varietyofimprovements receive will Parishes Interior of Storm-Proofing and buildapproximately20,000linearfeetofridge. approximately 328acresof marsh, nourish approximately140acresof marsh, Grand Liard Marshand Ridge Restoration (BA-68): stations. Empire Locksandprovidesrepairfrontingprotectionfor several pumping enhancement. Flood Gateand the Empire re-builds and repairs The project 58 milesofmajorlevee consists ofworkingwith7leveereaches,comprising New OrleanstoVenice (BA-67): and T-Walls andotherstructuresto2057protectionlevels. levels totheprojectareathroughleveesconstructed2011 protectionlevels West BankandVicinity (BA-66): protection 100-year provides The project The NewOrleanstoVenice project hs rjc wl poie flood provide will project This Continued onPage12 will create This project Orleansand 11 QUARTERLY PROGRESS REPORT - JULY 2014 PROJECTS IN CONSTRUCTION

Continued from Page 11

11. Bayou Lafourche Fresh Water District - Walter S. Lemann Memorial Pump Station Renovations (BA-84): This project will replace two of the existing pumps and motors at the Walter S. Lemann Pump Station and install an emergency generator to operate the pump station during power outages. 12. St. Charles West Bank Hurricane Protection Levee (BA-85): This project is a system of , drainage structures, and pump stations being constructed to provide flood protection to the communities of St. Charles Parish on the West Bank of the Mississippi River. 13. NRDA Lake Hermitage Marsh Creation INCR2 (BA-141): This project is being constructed in conjunction with the CWPPRA project Lake Hermitage Marsh Creation (BA-42) and will use material dredged from the Mississippi River to construct 101 acres of marsh adjacent to BA-42 to reduce tidal exchange in marshes surrounding Lake Hermitage. 14. Caminada Headland Beach and Dune Restoration INCR2 (BA-143): This project will restore and protect beach and dune habitat across the Caminada Headland through the direct placement of approximately 5.4 million cubic yards of sandy material from Ship Shoal. 15. South Lake Lery Shoreline and Marsh Restoration (BS-16): This project involves dredging sediment to create 396 acres of marsh and to restore approximately 32,000 feet of the southern Lake Lery shoreline. 16. Sabine Refuge Marsh Creation Cycles 4 & 5 (CS-28): This project aims to restore marshes impacted by saltwater intrusion exacerbated by the construction of oil and gas and the Calcasieu Ship Channel.It will also reduce salinity effects on interior emergent marsh, and will create 460 acres of intertidal emergent marsh in shallow open water. 17. Cameron Parish Shoreline Restoration (CS-33): This project re-establishes the dunes and beachhead for 8.7 miles, from the western Calcasieu River to the eastern-most at the Holly Beach-Constance Beach breakwater field. 18. Non-Rock Alternatives to Shoreline Protection Demo (LA-16): Project goals are to demonstrate different alternatives to rock shoreline protection methods by testing several different products along highly erosive shorelines in areas that are not conducive to construction with rock. 19. Marsh Creation Near Freshwater Bayou (ME-25 SF): This 2007 surplus project will construct approximately 96 acres of freshwater marsh near the intersection of Humble Canal and Freshwater Bayou. 20. SELA – Overall (PO-57): The project reduces damage due to rainfall flooding in Orleans and Jefferson Parishes by increasing pump station capacity and improving sub-surface drainage features. 21. Permanent Canal Closures and Pump Stations (PO-60): In June 2006, Congress passed Public Law 109-234 giving the Corps authorization and appropriations of approximately $800 million to design and construct a

12 27. 26. 25. 24. 23. 22. 32. 31. 30. 29. 28. work thatutilized2borrowpitsof about 57acres.It provides fortheelimination (PO-145): Sauvage 147acresduetoemergencylevee project intendstomitigateapproximately Bayou – Mitigation Guardian Force Task LPV and the Tchefuncte RiverattheMadisonvilleMarina. the shoreofLakePontchartrain to theexistingbulkheadalong improvements Madisonville Bulkhead Project (PO-87): Project locatedinSt.BernardParish. Central Wetlands -Riverbend(PO-73-1): Water Board ofNewOrleans. and with theSewerage in conjunction be completed project will demonstration Central Wetlands Demonstration(PO-73): Bernard Parish. Saint Marsh in Biloxi along Borgne in Lake shoreline of thesoutheastern Biloxi Marsh(PO-72): Charles Parishes. 30projectsineastJeffersonThis programinvolvesapproximately andSaint protection programaroundLakePontchartrain. project referstothehurricane Lake PontchartrainandVicinity (PO-63): near thelakefront. Avenuecanals andinstallationof pumps andclosurestructuresat drainage or the Orleans Street, 17th the London and of Avenue, modification include: of project aspects Specific canals. outfall the for system protection permanent of Franklin. the town to preventstormsurgefrom inundating Canal structure onFranklin This project will construct a levee, floodwall, pump station, and sinkable barge Franklin Floodgate Sinkable Barge and Pump Station - Phase 2 (TV-52-2): navigation channel. of theFreshwaterBayou four criticalareas along protection shoreline seven milesofrockrevetment consists ofapproximately Parish, thisproject (TV-11B[EB]): Stablization Bank Bayou Freshwater in Lafourche completed being Parish toinhibitflooding. are modifications and improvements levee Larose to Golden Meadow - Flood Protection (TE-65): T-walls, navigationstructures,watercontrolandfloodgates. levees, againststormeventsbydeveloping Parishes and portionsofLafourche Morganza to the Gulf (TE-64): This projectisintendedtocreatemarshandreduceerosion. material. dredge with areas fill and rock with dikes containment for provides Previously Authorized Mitigation LPV –Manchac(PO-146): native species. trees andshrubsof of upto89,000 trees andthereplanting of non-native This project provides shoreline protection for aportion protection shoreline provides This project The projectprovidesprotectionto Terrebonne andVicinityThe LakePontchartrain This isaWetland Assimilation This projectwillconstruct This waterassimilation Located in VermillionLocated this project, Through The project The This 13 QUARTERLY PROGRESS REPORT - JULY 2014 OTHER PROJECTS

Planning Project 3Q 4Q 1Q 2Q Federal Acres / Miles Project Name Tier Parish ID 2015 2015 2016 2016 Sponsor Benefited CIAP Atchafalaya Long Distance Sediment AT-15 1 P USFWS Terrebonne N/A Pipeline CDBG St. Tammany Parish Watershed PO-151 2 P HUD Saint Tammany N/A Management Study GNO-HSDRRS West Shore-Lake Pontchartrain, Ascension, Saint Charles, PO-62 Louisiana Hurricane Protection 1 P D D D USACE Saint James, Saint John 27 Miles Project Feasibility Study the Baptist NFWF BA-163 Lower Barataria Diversion 1 P P P P N/A Jefferson, Plaquemines 8,960 Acres BS-23 Lower Breton Diversion 1 P P P P N/A Plaquemines 11,976 Acres Increase Atchafalaya Flow to TE-110 1 P P W W N/A Saint Mary, Terrebonne 17,200 Acres Terrebonne Oil Spill Calcasieu River Salinity Control CS-65 1 P P P W N/A Cameron 21,600 Acres Measures State Jefferson, Lafourche, BA-170 Breach Management Plan 2 P N/A N/A Plaquemines, Terrebonne TE-108 HNC Deepening Section 203 Study 2 P P P USACE Terrebonne Not Avail. Iberia, Saint Martin, TV-54 South Central Coastal Plan 1 P P P P USACE N/A Saint Mary WRDA Southwest Louisiana Coastal Calcasieu, Cameron, LA-20 1 P P W W USACE N/A Feasibility Study Vermilion

Ascension, Assumption, Concordia, E Baton Rouge, E Feliciana, Iberville, Jefferson, Lafourche, Livingston, LCA Mississippi River Hydrodynamic Orleans, Plaquemines, Point MR-16 1 P P P P USACE N/A and Delta Management Study Coupee, St Bernard, St Charles, St James, St John the Baptist, St Tammany, Tangipahoa, Terrebonne, W Baton Rouge, W Feliciana

Programs Project Federal Acres / Miles Project Name Tier 1Q 2Q 3Q 4Q Parish ID Sponsor Benefited CIAP

Cameron, Iberia, Jefferson, LA-12 Performance Evaluation 2 O O O O USFWS Lafourche, Plaquemines, St N/A Tammany, Terrebonne LA-13 Coastal Forest Conservation Initiative 1 O O O USFWS Coastwide 40,000 Acres

14 To learn more about how the CPRA is helping to protect and restore To learnmoreabouthowtheCPRAishelpingtoprotectandrestore Louisiana's coastandcommunities,visit: www.coastal.la.gov 15 QUARTERLY PROGRESS REPORT - JULY 2014 RECENTLY COMPLETED CONSTRUCTION PROJECTS

2012 FY 2014 ffBA-40: Riverine Sand Mining/Scofield Island Restoration ffBA-58: Fringe Marsh Repair ffBA-110: Shell Island East - BERM ffBA-162-SPER: Shoreline Protection Emergency Restoration ffLA-09: Sediment Containment System for Marsh Creation Demonstration ffPO-55: Lake Pontchartrain & Vicinity, IHNC Surge Barrier, LPV-IHNC-02 ffTE-43: GIWW Bank Restoration of Critical Areas in Terrebonne ffTE-111: Valentine to Larose ffTV-52-1: Franklin Floodgate Sinkable Barge and Pump Station (Phase 1)

FY 2013 ffBA-38: Pelican Island and Pass La Mer to Chaland Pass Restoration ffPO-36 (EB): Orleans Land Bridge SP & Marsh Creation ffPO-64: Lake Pontchartrain & Vicinity, Seabrook LPV-IHNC-01 ffTE-48: Raccoon Island Shoreline Protection/Marsh Creation Project ffTE-52: West Belle Pass Barrier Headland Restoration ffTV-28: Port of Iberia Bridge Replacement - Port Road over Commercial Canal ffTV-30: Port of Iberia Bridge Replacement - David Dubois Road over Commercial Canal

FY 2012 ffBA-20 CU-4: Jonathan Davis Wetland Protection ffBA-25: Bayou Lafourche Freshwater Introduction ffBA-41: South Shore of the Pen Shoreline Protection and Marsh Creation ffLA-08: Bioengineered Oyster Reef ffLA-12.1: CIAP Performance Evaluation—Rockefeller Refuge Performance Monitoring ffTE-34: Penchant Basin Natural Resources Plan, Increment 1 ffTE-39 CU-1: South Lake Decade Freshwater Introduction ffTE-53: Enhancement of Barrier Island Vegetation

FY 2011 ffBA-30: East Grand Terre ffBA-55: LA-1 Improvements - Fourchon to Leeville Bridge ffCS-04-A: Cameron-Creole Levee Maintenance ffCS-28-2: Sabine Refuge Marsh Creation, Cycle 2 ffCS-34: Black Lake Supplemental Beneficial Use Disposal Area ffPO-61: Saint Bernard Parish 40 Arpent Levee Repairs ffTE-43-EB: GIWW Bank Restoration of Critical Areas in Terrebonne ffTE-65: Larose to Golden Meadow - Flood Protection Quarterly Progress Report July 2014

Coastal Protection & Restoration Authority Project Management Division P.O. Box 44027 Baton Rouge, LA 70804-4027

Phone: (225) 342-7308