At Coochbehar District

Total Page:16

File Type:pdf, Size:1020Kb

At Coochbehar District _ ~~EALr ~~ o "'._,; I Government of West Bengal ~ (5 Health & Family Welfare Department 1- ~ I National Health Mission ~ ~ WR GN-29, 4th Floor, ~wasthyaSathi Building, SwasthyaBhawan Premises, Sector - V, Salt-Lake, Bidhannagar, Kolkata - 700091 (phore) 033-2333 0238; (Fax) 033-2357 7930 Email: ponhmwb1@gmail.~om I [email protected]; Web: www.wbhealth.gov.in No. HFW/NHM~275/20211 .:lj S Dated. -P--'f/Of/!1.Ol-1 ORDER Administrative approral and financial sanction is hereby accorded for 'Infrastructure Strengthening of 25 (Twenty Five) nos. of Sub-Centres to be upgraded into Susasthya Kendras (Health &:. Wellness Centre) at Coochbehar District' at an estimated cost of Rs. 3,29,74,749.00 (Rupees Three Crore Twenty Nine Lakh Seventy Four Thousand Seven Hundred ts: Forty Nine) only as per the details enlisted in the Annexure - 'A'. 2. The strengthening 10rk will be executed as per the model drawing &: estimate amounting to Rs. 12,21,287.00 (Rupees Twelve Lakh Twenty One Thousand Two Hundred tsx Eighty Seven) only as per Annexure-B'. 3. The implementing agency may change the model drawing and corresponding estimate as per site conditions and for ~ceptional case, the revised amount being restricted within the sanctioned amount. Also, Ion any such case, prior intimation before preparation of B.O.Q is required to be taken from cory-petent authority of State H.Q by submitting relevant justification and documents. 4. The work will be executed by the Engineering Wing of District Health &:. Family Welfare Samity, Coochbeharl any other executing agency as deemed fit by the District Administration in conformity with the norms prescribed in Finance Department G.O. No. 5400~ F(Y) Dated. 25/06/2012 read Jith G.O No. 3060~F(Y) Dated. 11/0712014. 5. Fund will be released after submission of requisition of fund along with the statement of work awarded cost for each facility in favour of District Health &:. Family Welfare Samity, Coochbehar for payment to tfe implementing agency. 6. The implementing arncy shall complete the tendering process within a month positively, but the L.O.NWo~k Order may only be issued after confirmation of the fund source from Sate Engineering Wing. J. 7. No price escalation wi~ be allowed in any circumstances. 8. No other work will be taken up or implemented other than the actual sanctioned scheme. 9. State Team may make periodical onsite visits to review the progress of the work &: check the quality of work being implemented. 10. The tally head and FMR code of these works shall be informed in due course. 11. Senior Accounts Officer, National Health Mission will be the Drawing and Disbursing Officer in this respect. 12. Any change in the nomenclature of the notified Sub-Centre, if required, should be immediately informed to State Project Management Unit (SPMU) for issuance of necessary amendments. B. Detailed photography of the site before commencement of work, during intermediate stages of the work in progress and after completion of the work is required to be kept in record at Engineering Cell of DPMU which may be asked to submit at SPMU, if necessity arises for fu ture verification. 14. This is issued with the approval of the Mission Director, National Health Mission. 15. All concerned are being informed. PrograiRiife"Officer,i NHM &: Deputy Secretary to the Government of West BengaL No. HFW INHM- 275/20211 .2- ~ s:/ / C/;; Copy forwarded for information and necessary action to the:- 1. Director of Health Services, Health &: Family Welfare Department. 2. Chief Medical Officer of Health, Coochbehar. 3. Senior Accounts Officer, National Health Mission. 4. District Nodal Officer, HWC, Coochbehar. 5. Engineer-in-Charge, National Health Mission. 6. Consultant, CPHC (Infrastructure), SPMU, National Health Mission. 7. Assistant Engineer -I &: II, SPMU, National Health Mission. S. Assistant Engineer, DPMU, Coochbehar. 9. Sub-Assistant Engineer, SPMU, National Health Mission. 10. Executive Assistant, SPMU-Infrastructure, ational Health Mission. 11. P.A to Mission Director, National Health Mission tsx Secretary to the Government of West Bengal. 12. IT Cell for upload this order on the website of this Department. 13. Copy for the Guard File. 14. Office Copy. Prograrnare'Officer,i NHM ts: Deputy Secretary to the Government of West BengaL , Annexure -A Name of the Sub- Phase of Centre to be Vetted Estimated SI. No. Name of the BI0Ck HWC upgraded to Amount (Rs.) Upgradation Susasthya Kendras I 1 Cooch Behar-I III Bara Atharokota I" 12,21,287.00 2 Cooch Behar-I III Mowamari GPHQ 12,21,287.00 3 Cooch Behar-I III Pathchara(N) ; 12,21,287.00 4 Cooch Behar-II III Ambari / 12,21,287.00 5 Cooch Behar-II III Baisguri ; 12,21,287.00 6 Cooch Behar-Il III Dhaloquri >' 12,21,287.00 7 Cooch Behar-Il III Echorchala / 12,21,287.00 Kaljani Baneswar 8 Cooch Behar-Il III 12,21,287.00 GPHQ 9 Cooch Behar-II III Khapaidanqa/ 12,21,287.00 10 Cooch Behar-II III Kholta-II / 12,21,287.00 11 Cooch Behar-[l III Kholta-I 12,21,287.00 12 Cooch Behar-II III Mahishbathan / 12,21,287.00 13 Cooch Behar-Il III Pestarjhar / 12,21,287.00 14 Dinhata-I III Kharkharia GPHQ' 12,21,287.00 15 Dinhata-I III Fulbari , 12,21,287.00 16 Cooch Behar - II IV Kalarayerkuthi-II 12,21,287.00 17 Dinhata-I IV Paharganj 12,21,287.00 18 Dinhata-I IV Brohmanir Chowki 12,21,287.00 19 Dinhata-I IV Matalhat GPHQ 12,21,287.00 20 Dinhata-I IV Koalidaha 12,21,287.00 21 Dinhata-I IV Bhoram 12,21,287.00 Monsaf Seuraguri 22 Dinhata-II IV 12,21,287.00 GPHQ 23 Mathabhanga-II IV Baraibari 12,21,287.00 24 Mathabhanga-II IV Nalengibari 12,21,287.00 25 Mathabhanga-II IV Boro Simulguri 12,21,287.00 26 Mathabhanga-II IV Putimari 12,21,287.00 27 Sitalkuchi IV Kursamari 12,21,287.00 TOTAL 3,29,74,749.00 Program1Officer, NHM & Deputy Secretary to the Government of West Bengal 1- MODEL ESTIMATE OF qONSTRUCTION OF NEW SU-SWASTHYA KENDRA BLOCK WITH RENOVATION OF EXISTING SUB-CENTRE (CONSiIDERING RATES OF NADIA AT PWD SCHEDULE) ABSTRACT OF ESTIMATED COST /) Estimated cost (CiYil~ Rs 957473.91 I) Estimated cost (EleC~riCal) Rs 1 I r. (' ," -:- ... II) Total Rs 092~-:f."§l' -. ~ ___ - _ c r>: "it 118 .aruo !' I '.::: _ . L ' nl VAdding.... GST @ 12% Rs Ii) Cess @ 1% Rs 1~~:'{}(r/ ---- Contingency @ 3% Rs ;3-6<!56.00 TOTAL Rs One Hundred and Twenty Six Only (p [J";.Y't, .. ,6"(t',v> V ,/) / " f.) '>" (f J j.~ ..• ,) \. -, t " .•.....rv .•• - , Estimate prepared as per PWD;W B, 3;'::2 schedule of Rates' [ 01 11 (':..v; I 1 1. COST ESTIMATE fOR MAl '-IHQ_;;.ElJ8kJ~hll1.PJNG "-: SL i Description of Items Unit Quantity Rate (Rs.) : Amount (Rs.) No.. i I ; Clsrldrlti:l'g ai' t 00$ of Masoruy excer.:lng i-"':C"'len: corc-e.e c'alQ ::' f\e nf:'''CeC1 stac~j"""'lg i~e'v!cea::;;e rYlatel"'3lS ;-11StZ8 ;';""'c:J rernOV;r1g "'~~o:)!Sh tas crrecteo v :t:l!'-' a lead 0: 75 rn ! la, In couno Iloor rncludmo Reof 1 Sq.ml 0884 447 JC 39:' . 5 , I /1 .: /" / I ! sqrn 93558 348 00 3259298 7 1 P·41 [Orcmary Cement concrete (mix 1:2'4) witn gradedl 11-33 Istone ChiPS (6mm r-orr na Size) eXC'Jo;ng I I ·1 ., J 1'~ -o r (' , ;sru, :lertng a no reir.torcerne r- t if a-iv n gound floer I ' .~" I .6 < "J' c: I ,i:> '>~'" . t as per relevant IS codes . 3 o 74 J;>2C4 00 j 194)7'"1 J.P. 8 I p- 45 E~t·.a 'ate '0' USing water proof.ng ano piasuc.sinq] cum 1 '~l / It-09 r aOrr)lxtumanulacture@:)2°,,;,ers spectneoby '.NE!lgt1i_.orate __"_C_e__forIT1_t-_'n_t_\_:l_f_",_.t..:.lconcretet __ K_G__ l__9_3_6_....l.._1.19 0:) 23038_.1 var.ous araoes Sl I Desc ription of Items Unit Qua tlfy Rate (Rs ) i fl mount (Rs.) No. I 9 !P-f:6 ana 2yIf ,I true :0 .;re anf! level v if 'lee I' lt 36 1,SJPP'Y'19 i - tiles 0 aporovec b ar,d l Size no: less :ha'i 6'::0 j mr'1 x 600 mrn x -o IliM thick) m f;o~r. skvtir.c etc : lse: I" 2C mrn sand ceriem ,ona- r t 4) a~j ~;""1' , IUlId, cerrent Slurry cack side of ucs USIGg ce ......er I (~\ @2.9kg 1M:! o~ .Jsng po'vrrenseu aoncsivc ~,...·3,h .. soecmc 1:0r. ano clrsc Ion 0 F "D.ne ,'- In-O'arge ( Vvr '0 er~H:!nt syntheuc ao-iesrvo c'l:'; °6 ,,~ grout rratena: to be sl;pph~c by t'le contractor I (i: Witt'> apoucanon slur)' @1 75 9iSo rn 20.,.,rri ! i sane cement mcrtrr (1 'I.) & 2mm thlc\ cement l { slurry at back Sldr of tiles, a 2 kg:Sq m wilite ! ! cement for Joint frrIiryg witt'> pigment I is) Ligh colour 1St floo' . sc -n SiS J----4------4---~--~-- I., 10 Ip. 64 Suppiyng fitting s LXlng 1st c;uality Ceramic ules] 1 I: 35 In wa!1 and fioars 1:) match with the eXisting work I, i I ar-c 4 '"IOS of key stones ( 10 mm j nxeo With araldi e at the oat k 0" each tite & 1inls'1ing the! joints With white ee en! Mixed Wilt' colo.mnq OXIC!?I If requtred :0 ria! h II'le cO!OLr c/ tile 1"1c1~IC.r.g! roughening of cone ete su race If necessary 0' OJ, synmeuc aones.ve &.
Recommended publications
  • List of 204 Unbanked Villages Allocated to Banks For
    LIST OF 204 UNBANKED VILLAGES ALLOCATED TO BANKS FOR OPENING OF BRANCH Branch Date of SLNO District Name Block Name Name of GP Village Name Allocated to Banks open opening 1 Alipurduar MADARIHAT Bandapani BANDAPANI Corporation Bank 2 Alipurduar MADARIHAT Lankapara LANKAPARA IDBI 3 Alipurduar ALIPURDUAR 1 MATHURA MATHURA UBKGB 4 Birbhum Rampurhat -I Mashra Tarachua Corporation Bank 5 Coochbehar Tufanganj-II Barakodali 2 Mansai Bandhan Bank 6 Coochbehar Tufanganj-I Deocharai Krishnapur Axis Bank 7 Coochbehar Mathabhanga-II Fulbari Fulbari Union Bank Of India 8 Coochbehar Mathabhanga-II Fulbari ksheti SBI 9 Coochbehar Cooch Behar-II Madhupur Kalapani INDIAN OVERSEAS BANK 10 Dakshin Dinajpur BANSHIHARI GANGURIA BAGDUAR SBI 11 Darjeeling phansidewa Bidhannagar-I Purbba Madati Bank Of India 12 Darjeeling darjeeling pul bazar CHONGTONG Chongtong Tea Garden Bank of Maharashtra 13 Darjeeling darjeeling pul bazar GOKE Goke Bandhan Bank 14 Darjeeling naksalbari GOSSAINPUR Lalman United Bank Of India 15 Darjeeling rangli rangliot PUBONG RAMPURIA Pumong Tea Garden Bandhan Bank 16 Darjeeling darjeeling pul bazar SINGTAM Singtam Tea Garden DENA BANK 17 Jalpaiguri JALPAIGURI Boalmari Nandanpur Nandanpur United Bank Of India 18 Jalpaiguri MOYNAGURI Padamoti-II Baikur Gourgram Axis Bank 19 Jalpaiguri MOYNAGURI Ramsai Jharbaragila UBKGB 20 Jalpaiguri MOYNAGURI Saptibari-I Jabaramli Axis Bank 21 Malda Harishchandrapur-II Doulatpur Mali Pakar INDIAN OVERSEAS BANK 22 Malda Ratua-I Mahanadatola Gadai Maharajpur Canara Bank 23 Malda Harish Chandrapur-I Mahendrapur
    [Show full text]
  • 38 Chapter-Ii Geographical
    CHAPTER-II GEOGRAPHICAL BACKGROUND OF THE STUDY AREA 2.1. Introduction: Study Area is the prime concern of any research especially in a spatial science like Geography. It is the place, based on which, the researcher carries out in-depth study and data collection. A discussion on the study area is fundamental as it helps in understanding the contextual background of the area under investigation. Mead defined study area as “the geographical studies pursued in a well-defined area” (Mead, 1969). Generally, a research is conducted within or beyond an area delimited by political or physical boundaries. However, it is sometimes difficult to delineate a study area as it may stretch beyond either of the boundaries. The study area is the geographic framework within which the field work is conducted, and thus its exact areal extent must be determined to focus and further define the purposes of the research. As the present research is based on the Geo-environmental study of the wetlands of Tufanganj and Koch Bihar Sadar subdivisions within Koch Bihar District, the study area and subsequent data collection have been confined to four community development blocks, namely Tufanganj-I, Tufanganj-II, Koch Bihar-I and Koch Bihar-II. Thus the main focus of the present chapter is on the historical background, physical and socio-economic background as well as the administrative jurisdiction and geographic location of Koch Bihar District. 2.2. Historical Background: Etymologically, ‘Koch Bihar’ or ‘Cooch Behar’ has been derived from two words- ‘Cooch’ and ‘Behar’. While the word ‘Cooch’ is a corrupted form of the word ‘Koch’ that signifies an indigenous mongoloid tribe, the word ‘Behar’ is derived from Sanskrit word ‘Vihara’, which means ‘abode’, or ‘sport’.
    [Show full text]
  • Survey Report of the CSSSC-UNICEF Social Inclusion Cell
    Mapping the Socially Excluded: Beyond Poverty Measurements Report on Primary Survey in Cooch Behar, West Bengal Survey Report of the CSSSC-UNICEF Social Inclusion Cell October 2010 CSSSC Faculty Members Prof. Sugata Marjit (Convenor and Nodal Faculty) Dr. Pranab Kr. Das Dr. Sohel Firdos Dr. Saibal Kar Dr. Surajit Mukhopadhyay Project Associates Ms. Riddhita Banerjee Ms. Dyotona Dasgupta Ms. Srimanti Mukherjee Mr. Mukhlesur Rahman Acknowledgement: The research team at the Centre duly acknowledges substantial support from various members of the district government of Cooch Behar and faculty at Cooch Behar Government College (Dr. Pankaj Kumar Debnath and Sri Subhasis Bhattacharya) and Tufangunj College (Prof. Bijay Som). We are also indebted to Madhumanti Kayal and Anindita Chakraborty for help with the analysis at various stages. Contents Executive Summary 1. Introduction 2. Rationale for the Research Activity 2.1. Social and Economic Exclusion 2.2. Scope and Coverage 3. Survey Methodology Detailed Methodology 4. The Social Exclusion Index for Cooch Behar 5. Analysis at the Household Level (Tables) 5.1 Housing Status I (B1a- B1d/ A1a-A1d) 5.2 Housing Status II (B2a-B2d/ A2a-A2d) 5.3 Drinking Water (B3a-B3d/ A3a-A3d) 5.4 Children and Diseases (B4a-B4d and B6a-B6b/ A4a-A4d and A6a-A6b) 5.5 Mother’s Health (B7a-d and B8a-d/ A7a-d and A8a-d) 5.6 Breast Feeding Status by Mother (B9a-d/ A9a-d) 5.7 Information related to childbirth (B10a-d/ A10a-d) 5.8 Administering Vitamin among Infants (B11a-b / A11a-b) 5.9 Land and Other Assets (B12a-d/ A12a-d) 5.10 Educational Status among Children (B13a-c/ A13a-c) 5.11 Primary source of Household Incomes and Expenditures (B14a-c/ A14a-c) and (B15a-c/ A15a-c) Public Distribution System (B16a-b/ A16 a-b) 5.12 Vaccination among Children (B17a-b / A17a-b) 6.
    [Show full text]
  • 1453Of250416.Pdf
    Physical Verification Report of Polling Stations Name of the District: Cooch Behar Annexure for Booth level Contact Person and Self Help Group Name of the Self Help Group(SHG) Contact No. of Polling Name of the Head of Contact No of engaged for MDMP or the other Contact No. of Name of the the Sl. Station Institution Name of the Key Holder of Name of the Group Name of the PS as per Annexure-III Name of the AC Head of the Contact No. Govt run Programme at the the Group Leader Community Community Remarks No. (PS) where the polling station the Institution Leader of the SHG Institution. institution where the polling station of the SHG Service Provider Service Number is situated is situated Provider 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Chhat Dhulia Baladiahati Aided Primary 1 1 1-Mekhliganj (SC) SUMAN BANIK 8509615815 SUSHIL ROY 9735116728 MAA LAXMI SHG SWAPNA ROY 9002957469 SANEKA ROY 9933872252 School 2 2 Tarun S. S. K 1-Mekhliganj (SC) BASANTI ROY PRODHAN 9932350949 SAMPA ROY DAKUYA 9679751821 SWAMI VIVEKNANDA SHG MAYA ROY 7063612587 SANEKA ROY 9933872252 142 Kamat Changrabandha Fifth Plan 3 3 1-Mekhliganj (SC) NIRMAL ROY BASUNIA 9932644162 NIRMAL ROY BASUNIA 9932644162 MAA BHUBANESWARI SGSY ARATI ADHIKARY 9679050831 KAMALINI ROY 9547298145 Primary School 4 4 Vivekananda S. S. K 1-Mekhliganj (SC) PROTIMA SARKAR (RAY) 9734822626 PROTIMA SARKAR (RAY) 9734822626 MAA BASUMATI SHG KARUNA DAS 9734822662 ANITA ROY 8116092554 5 5 Alokjhari High School SUBIR KUMAR GHOSH 8967563218 PROSENJIT ROY 8670131691 SANGRAMI SGSY JAYANTI ROY 9679967190 KAMALINI
    [Show full text]
  • State Statistical Handbook 2014
    STATISTICAL HANDBOOK WEST BENGAL 2014 Bureau of Applied Economics & Statistics Department of Statistics & Programme Implementation Government of West Bengal PREFACE Statistical Handbook, West Bengal provides information on salient features of various socio-economic aspects of the State. The data furnished in its previous issue have been updated to the extent possible so that continuity in the time-series data can be maintained. I would like to thank various State & Central Govt. Departments and organizations for active co-operation received from their end in timely supply of required information. The officers and staff of the Reference Technical Section of the Bureau also deserve my thanks for their sincere effort in bringing out this publication. It is hoped that this issue would be useful to planners, policy makers and researchers. Suggestions for improvements of this publication are most welcome. Tapas Kr. Debnath Joint Administrative Building, Director Salt Lake, Kolkata. Bureau of Applied Economics & Statistics 30th December, 2015 Government of West Bengal CONTENTS Table No. Page I. Area and Population 1.0 Administrative Units in West Bengal - 2014 1 1.1 Villages, Towns and Households in West Bengal, Census 2011 2 1.2 Districtwise Population by Sex in West Bengal, Census 2011 3 1.3 Density of Population, Sex Ratio and Percentage Share of Urban Population in West Bengal by District 4 1.4 Population, Literacy rate by Sex and Density, Decennial Growth rate in West Bengal by District (Census 2011) 6 1.5 Number of Workers and Non-workers
    [Show full text]
  • Containment Zones of Cooch Behar
    List of Active Broad-Based Containment Zones District: Cooch Behar Date: 12-09-2020 Sl No Sub-Division Block/ Municipality G.P./ Ward Broad-Based Containment Zone Incident Commander AC No Part No Kadamtala Bazar ( Bhelapeta) under Part No. 24 of 8, Natabari Sri. Subhajit Dasgupta, WBCS (Exe.), Block Development Officer, 1 Tufanganj Tufanganj I Natabari-II 8 24 Assembly Constituency Tufanganj I Development Block Jaigir Chilakhana near Saha Brickfield under Part No 72 of 8 Sri. Subhajit Dasgupta, WBCS (Exe.), Block Development Officer, 2 Tufanganj Tufanganj I Chilakhana I 8 72 Natabari AC Tufanganj I Development Block Chilakhana Bazar near Radha Gobinda Temple under Part No 82 of Sri. Subhajit Dasgupta, WBCS (Exe.), Block Development Officer, 3 Tufanganj Tufanganj I Chilakhana I 8 82 8 Natabari Assembly constituency Tufanganj I Development Block Ghogarkuthi near G.P office under Part No 61 of 8 Natabari Sri. Subhajit Dasgupta, WBCS (Exe.), Block Development Officer, 4 Tufanganj Tufanganj I Chilakhana II 8 61 Assembly constituency Tufanganj I Development Block Santoshpur near Deocharai High School under Part No 257 of 8 Sri. Subhajit Dasgupta, WBCS (Exe.), Block Development Officer, 5 Tufanganj Tufanganj I Deocharai 8 257 Natabari Assembly constituency Tufanganj I Development Block Battala near Balabhut Bazar under Part no. 245 of 9-Tufanganj Sri. Subhajit Dasgupta, WBCS (Exe.), Block Development Officer, 6 Tufanganj Tufanganj I Balabhut 9 245 Assembly Constituency Tufanganj I Development Block Balabhut Kadamtala, near Uttar Balabhut Chowrangee near UBKGB, Sri. Subhajit Dasgupta, WBCS (Exe.), Block Development Officer, 7 Tufanganj Tufanganj I Balabhut 9 240 Balabhut under Part no. 240 of 9-Tufanganj Assembly Constituency Tufanganj I Development Block Dwiparpar near Rajarkuthi under Part no.
    [Show full text]
  • LIST of POLLING STATIONS (As on 23/03/2021)
    ANNEXURE- I (CHAPTER-III PARA- 3.2) LIST OF POLLING STATIONS (as on 23/03/2021) For No.3- COOCH BEHAR UTTAR (SC) Assembly Constituency comprised within the No.1 - COOCH BEHAR (SC) Parliamentary Constituency Whether there is a whether for all Maximum distance Polling Area of the Total Number separate entrance voters or for that a voter will Station Locality Building in which it will be located Polling Station Polling areas* of Voter Remarks and exit if not men only or have to travel to Number (in sq. mtr.) assigned reasons women only reach the station 1 2 3 4 5 6 7 8 9 10 BLOCK : COOCH BEHAR-II Section– 1 Putimari Bakshirbosh (Part), GP : PATLAKHAWA PUTIMARI BAKSHIRBOSH NO. 2 C. S. ABOVE 20 Mouza– Putimari Bakshirbosh, JL No. 1, FOR ALL 1 YES 682 WITHIN 2 KM. MOUZA : PUTIMARI PRIMARY SCHOOL (ROOM–1) SQ.MTR. GP– Patlakhawa, PS– Pundibari, PIN– VOTERS BAKSHIRBOSH 736204 BLOCK : COOCH BEHAR-II Section– 1 Putimari Bakshirbosh (Part), GP : PATLAKHAWA PUTIMARI BAKSHIRBOSH NO. 2 C. S. ABOVE 20 Mouza– Putimari Bakshirbosh, JL No. 1, FOR ALL 1A YES 642 WITHIN 2 KM. MOUZA : PUTIMARI PRIMARY SCHOOL (ROOM–2) SQ.MTR. GP– Patlakhawa, PS– Pundibari, PIN– VOTERS BAKSHIRBOSH 736204 BLOCK : COOCH BEHAR-II Section– 1 Putimari Bakshirbosh (Part), GP : PATLAKHAWA PUTIMARI BAKSHIRBOSH 5TH PLAN ABOVE 20 Mouza– Putimari Bakshirbosh, JL No. 1, FOR ALL 2 YES 838 WITHIN 2 KM. MOUZA : PUTIMARI PRIMARY SCHOOL SQ.MTR. GP– Patlakhawa, PS– Pundibari, PIN– VOTERS BAKSHIRBOSH 736204 Section– 1 Putimari Bakshirbosh (Part), BLOCK : COOCH BEHAR-II CHHAT SINGIMARI SPL.
    [Show full text]
  • Minority Concentration District Project Cooch Behar,West Bengal
    Minority Concentration District Project Cooch Behar,West Bengal Sponsored by the Ministry of Minority Affairs Government of India Centre for Studies in Social Sciences, Calcutta R1, Baishnabghata Patuli Township Kolkata 700 094, INDIA. Tel.: (91) (33) 2462-7252, -5794, -5795 Fax: (91) (33) 24626183 E-mail: [email protected] Research Team Faculty: Prof. Partha Chatterjee, Dr. Pranab Kumar Das, Dr. Sohel Firdos, Dr. Saibal Kar, Dr. Surajit C. Mukhopadhyay, Prof. Sugata Marjit. Research Associate: Smt. Ruprekha Chowdhury. Research Assistants: Smt. Anindita Chakraborty, Shri Pallab Das, Shri Avik Sankar Moitra, Shri Satakratu Roy and Shri Abhik Sarkar. Acknowledgment The research team at the CSSSC would like to thank Shri G. C. Manna, Deputy Director General, NSSO, Dr. Bandana Sen, Joint Director, NSSO, Shri Pawan Agarwal, Principal Secretary, MDW & ME, Shri A. Khaleque, Director & E.O. Joint Secretary, MDW, Shri A.A. Siddiqui, Joint Secretary, MDW, Shri S.N. Pal, Director & E.O. Joint Secretary, Madrasah Education, Shri Arfan Ali Biswas, CEO, Board of Wakfs, Mr. Tanvir Afzal, General Manager, and Mr. Raktim Nag, Manager-Systems, West Bengal Minorities Development & Finance Corporation, Bhavani Bhavan, Kolkata and Shri Rajesh Kumar Sinha, District Magistrate and Shri Panna Lal Mahapatra, Additional District Magistrate (Development) of Cooch Behar and other department officials for their generous support and assistance in our work. We are also grateful to Nature Club and its members, especially Shri A. Chakrabarty, Chairman of the club for their generous help to run the survey. 1 Content An Overview…………………………………………………...4 Significance of the Project……………………………………5 The Survey..……..……………………………………………7 Methodology………………………………………………….8 Introducing West Bengal……………………………………9 Cooch Behar………..……………………………………….10 Demography…………………………………………………10 Selected Villages in Respective Blocks……………………..11 Map of the District of Cooch Behar……...………………...12 Findings……………………………………………………....13 1.
    [Show full text]
  • Sitai Assembly West Bengal Factbook
    Editor & Director Dr. R.K. Thukral Research Editor Dr. Shafeeq Rahman Compiled, Researched and Published by Datanet India Pvt. Ltd. D-100, 1st Floor, Okhla Industrial Area, Phase-I, New Delhi- 110020. Ph.: 91-11- 43580781, 26810964-65-66 Email : [email protected] Website : www.electionsinindia.com Online Book Store : www.datanetindia-ebooks.com Report No. : AFB/WB-006-0619 ISBN : 978-93-5293-813-1 First Edition : January, 2018 Third Updated Edition : June, 2019 Price : Rs. 11500/- US$ 310 © Datanet India Pvt. Ltd. All rights reserved. No part of this book may be reproduced, stored in a retrieval system or transmitted in any form or by any means, mechanical photocopying, photographing, scanning, recording or otherwise without the prior written permission of the publisher. Please refer to Disclaimer at page no. 181 for the use of this publication. Printed in India No. Particulars Page No. Introduction 1 Assembly Constituency at a Glance | Features of Assembly as per 1-2 Delimitation Commission of India (2008) Location and Political Maps 2 Location Map | Boundaries of Assembly Constituency in District | Boundaries 3-9 of Assembly Constituency under Parliamentary Constituency | Village-wise Winner Parties- 2019, 2016, 2014, 2011 and 2009 Administrative Setup 3 District | Sub-district | Towns | Villages | Inhabited Villages | Uninhabited 10-17 Villages | Village Panchayat | Intermediate Panchayat Demographics 4 Population | Households | Rural/Urban Population | Villages by Population 18-19 Size | Sex Ratio (Total & 0-6 Years)
    [Show full text]
  • Cooch Behar District
    DISTRICT DISASTER MANAGEMNT PLAN-2020, DISTRICT-COOCH BEAHR DISTRICT DISASTER MANAGEMENT PLAN COOCH BEHAR DISTRICT 2020-21 DISTRICT DISASTER MANAGEMNT PLAN-2020, DISTRICT-COOCH BEAHR INDEX Chapter - 1 : Disaster 1.01: Disaster ................................................................................................................................................................. 1 1.02: Disaster Management............................................................................................................................................ 1 1.03: Objective ............................................................................................................................................................... 1 1.04: Types Of Disasters ................................................................................................................................................. 1 1.05: Overview of the District........................................................................................................................................ 2 1.06: District Profile ....................................................................................................................................................... 2 1.07: Administrative Units ............................................................................................................................................. 3 1.08: Demographic Details ...........................................................................................................................................
    [Show full text]
  • CHAPTER - TII E. Op~.1Eion and Poverty of Cooch Behar
    -42- CHAPTER - TII e._op~.1Eion and Poverty of Cooch Behar. Pro91~ms of. Economic Development; The study of human resource is vital in any discussion on either economic development or rural poverty• It is important because man is ~ot only the creator of resource but ( 1) also its user • The fuuits of economic development are en- joyed by the population of a particular region or by a particular country. There is a close relationship between the growth of population and economic development. If the rate of growth of population of.a particular region is greater than the .rate of growth of income, then the economy of that region will be caught . (2) into a ·."low level equilibrium trap." A rapid growth of popu- lation hinders economic development and aggravates poverty, if the .increased manpower is not _properly utilised into· the develop­ ment process. !n sparsely populated areas; any rise in popula­ tion· is a positive sign for economic development because it · increases exploitation of natural resources. on the otherhand, · in thickly-populated areas, any rise in population hinders· eeon~ mic development if they·are not properly utilised for development process. As development process involves both the individual and society, the growth of population as well as distribution of -43- population of our research area naturally comes into discu$sion. a) A s~udy of the population of the District. It will be interesting to trace the growth of population in the district since 1872 when the first census was taken. The settlement department took the first census in the district o1ver a period extendinq over three months and it coun­ ted 532565 heads (males 278585, females 253980) in 1872.
    [Show full text]
  • Spatio-Temporal Analysis of Urbanisation in Cooch Behar District, West Bengal, India
    International Journal of Innovative Social Science & Humanities Research ISSN: 2349-1876 (Print) | ISSN : 2454-1826 (Online) SPATIO-TEMPORAL ANALYSIS OF URBANISATION IN COOCH BEHAR DISTRICT, WEST BENGAL, INDIA Mithun Ray, Dr. Shasanka Gayen, Dr. P.K. Ryngnga, Junior Research Fellow, Associate Professor, Assistant Professor, Department of Geography, Department Of Geography, Department of Geography, North-Eastern Hill University Cooch Behar Panchanan North-Eastern Hill University, Shillong, Meghalaya, India Barma University, Shillong, Meghalaya, India Cooch Behar, West Bengal, India. ABSTRACT Urbanisation has been viewed as an important factor in the areas of economic, social and environmental transformation of any region. High level of inter district disparity of urban development in West Bengal recommends importance to the study related to district level urbanisation. The main objective of the present study was to evaluate the spatio-temporal phase of urbanisation in Cooch Behar district by analysing census data in the form of level of urbanisation, urban growth differential, scale of population concentration and Eldridge Index. It is found that like other districts of West Bengal, Koch Bihar also has seen a remarkable urbanisation process during last few decades. Although the level of urbanisation is always below the state and country level. The maximum growth was recorded during the decade of independence due to huge amount of immigration. In terms of spatial variation Cooch Behar-I and II blocks are more urbanised than others. The population concentration in and around Cooch Behar town is maximum because of socio-economic and administrative viability. Keywords: urbanisation, spatio-temporal phase, scale of population concentration, Eldridge index. INTRODUCTION population, control of natural environment, technological development and development of social organization (Datta, 2006).
    [Show full text]