Hoddle Region Rate Your Road
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
F6 Extension Stage 1 EIS Volume 1A
Chapter 5 – Project alternatives and options 5 Project alternatives and options This chapter describes and analyses the alternatives to the project, as well as the options that were considered as part of the design development process. It explains how and why the project was selected as the preferred option for assessment in this EIS. 5.1 Strategic alternatives to the project The project is the first stage of the F6 Extension. The merits of the F6 Extension were considered in the context of a range of other alternatives based on transport, environmental, engineering, social and economic factor performance. The following strategic alternatives to the F6 Extension were considered: • Alternative 1 – The base case or ‘do nothing/do minimum’ • Alternative 2 – Rail infrastructure improvement options • Alternative 3 – Bus service improvements • Alternative 4 – Motorway option (development of the F6 Extension). These alternatives are described in more detail in section 5.1.1 to section 5.1.4. This base case would involve carrying out only currently planned and funded transport infrastructure improvements on the existing road network, such as routine road network and intersection upgrades that would be provided over time to incrementally improve capacity and traffic throughput to address specific congestion issues. This has been developed by considering the following planned programs to improve road based transport infrastructure in southern Sydney: • Roads and Maritime’s Easing Sydney’s Congestion Program, which includes: – the Pinch Point Programs – the Sydney Clearways Program • Transport for NSW’s proposed Bus Priority Infrastructure Program • Arterial road upgrades. Details on these programs, their relevance to southern Sydney and their assessment as an alternative or complementary program to the proposed F6 Extension are provided below. -
New and Extended Clearways on Taren Point Road
New and extended clearways on Taren Point Road Between Captain Cook Bridge, Taren Point and Kingsway, Caringbah Project Update – November 2017 The NSW Government is funding this project as part of its $121 million Clearways Program, which aims to reduce congestion and delays on Sydney’s roads. Roads and Maritime Services is extending the We are asking for your feedback on the proposed existing weekday clearway hours and introducing alternative business parking arrangements, which new weekend clearways on Taren Point Road could include installing new timed parking during between Captain Cook Bridge, Taren Point and clearway hours on: Kingsway, Caringbah. The new clearway hours • Box Road, west of Taren Point Road – are shown below and on the map (overleaf). six ‘2P’ parking spaces Current New Clearways • Kumulla Road, west of Taren Point Road – Clearways nine ‘2P’ parking spaces. Weekdays 6am – 10am 6am – 7pm We are also discussing with Sutherland Shire Council Northbound (both directions) improvements to existing kerbside parking on the southern side of Box Road (next to Gwawley Park) to 3pm – 7pm increase the total number of parking spaces available. Southbound The map (overleaf) shows both the clearway and the Weekends No clearways 9am – 6pm proposed alternative business parking arrangements. & Public (both directions) Please send your comments to Holidays [email protected] or call 1300 706 232 There will be no changes to existing parking by 20 November. restrictions outside the new clearway hours. Alternative business parking arrangements Roads and Maritime investigated business parking along Taren Point Road and identified that most businesses on Taren Point Road have onsite parking for customers. -
Gibraltar Range Parks and Reserves
GIBRALTAR RANGE GROUP OF PARKS (Incorporating Barool, Capoompeta, Gibraltar Range, Nymboida and Washpool National Parks and Nymboida and Washpool State Conservation Areas) PLAN OF MANAGEMENT NSW National Parks and Wildlife Service Part of the Department of Environment and Conservation (NSW) February 2005 This plan of management was adopted by the Minister for the Environment on 8 February 2005. ACKNOWLEDGMENTS This draft plan of management was prepared by the Northern Directorate Planning Group with assistance from staff of the Glen Innes East and Clarence South Areas of the NSW National Parks and Wildlife Service. The contributions of the Northern Tablelands and North Coast Regional Advisory Committees are greatly appreciated. Cover photograph: Coombadjha Creek, Washpool National Park. © Department of Environment and Conservation (NSW) 2005: Use permitted with appropriate acknowledgment. ISBN 0 7313 6861 4 i FOREWORD The Gibraltar Range Group of Parks includes Barool, Capoompeta, Gibraltar Range, Nymboida and Washpool National Parks and Nymboida and Washpool State Conservation Areas. These five national parks and two state conservation areas are located on the Gibraltar Range half way between Glen Innes and Grafton, and are transected by the Gwydir Highway. They are considered together in this plan because they are largely contiguous and have similar management issues. The Gibraltar Range Group of Parks encompasses some of the most diverse and least disturbed forested country in New South Wales. The Parks contain a stunning landscape of granite boulders, expansive rainforests, tall trees, steep gorges, clear waters and magnificent scenery over wilderness forests. Approximately one third of the area is included on the World Heritage list as part of the Central Eastern Rainforest Reserves of Australia (CERRA). -
Government Gazette of the STATE of NEW SOUTH WALES Number 52 Friday, 13 April 2007 Published Under Authority by Government Advertising
2217 Government Gazette OF THE STATE OF NEW SOUTH WALES Number 52 Friday, 13 April 2007 Published under authority by Government Advertising SPECIAL SUPPLEMENT New South Wales Shoalhaven Local Environmental Plan 1985 (Amendment No 212)—Heritage under the Environmental Planning and Assessment Act 1979 I, the Minister for Planning, make the following local environmental plan under the Environmental Planning and Assessment Act 1979. (W97/00064/PC) FRANK SARTOR, M.P., MinisterMinister forfor PlanningPlanning e03-407-09.p04 Page 1 2218 SPECIAL SUPPLEMENT 13 April 2007 Shoalhaven Local Environmental Plan 1985 (Amendment No 212)— Clause 1 Heritage Shoalhaven Local Environmental Plan 1985 (Amendment No 212)—Heritage under the Environmental Planning and Assessment Act 1979 1 Name of plan This plan is Shoalhaven Local Environmental Plan 1985 (Amendment No 212)—Heritage. 2Aims of plan This plan aims: (a) to identify and conserve the environmental heritage of the City of Shoalhaven, and (b) to conserve the heritage significance of existing significant fabric, relics, settings and views associated with the heritage significance of heritage items and heritage conservation areas, and (c) to ensure that archaeological sites and places of Aboriginal heritage significance are conserved, and (d) to ensure that the heritage conservation areas throughout the City of Shoalhaven retain their heritage significance. 3 Land to which plan applies This plan applies to all land within the City of Shoalhaven under Shoalhaven Local Environmental Plan 1985. 4 Amendment of Shoalhaven Local Environmental Plan 1985 Shoalhaven Local Environmental Plan 1985 is amended as set out in Schedule 1. Page 2 NEW SOUTH WALES GOVERNMENT GAZETTE No. -
Agenda of Strategy and Assets Committee
Meeting Agenda Strategy and Assets Committee Meeting Date: Tuesday, 18 May, 2021 Location: Council Chambers, City Administrative Centre, Bridge Road, Nowra Time: 5.00pm Membership (Quorum - 5) Clr John Wells - Chairperson Clr Bob Proudfoot All Councillors Chief Executive Officer or nominee Please note: The proceedings of this meeting (including presentations, deputations and debate) will be webcast and may be recorded and broadcast under the provisions of the Code of Meeting Practice. Your attendance at this meeting is taken as consent to the possibility that your image and/or voice may be recorded and broadcast to the public. Agenda 1. Apologies / Leave of Absence 2. Confirmation of Minutes • Strategy and Assets Committee - 13 April 2021 ........................................................ 1 3. Declarations of Interest 4. Mayoral Minute 5. Deputations and Presentations 6. Notices of Motion / Questions on Notice Notices of Motion / Questions on Notice SA21.73 Notice of Motion - Creating a Dementia Friendly Shoalhaven ................... 23 SA21.74 Notice of Motion - Reconstruction and Sealing Hames Rd Parma ............. 25 SA21.75 Notice of Motion - Cost of Refurbishment of the Mayoral Office ................ 26 SA21.76 Notice of Motion - Madeira Vine Infestation Transport For NSW Land Berry ......................................................................................................... 27 SA21.77 Notice of Motion - Possible RAAF World War 2 Memorial ......................... 28 7. Reports CEO SA21.78 Application for Community -
2016.09 SHUFFLE STOCKIST Australia
Locality Country Retailer Name Street Address City (State,) Postal Code Telephone Number Website Australia Toys R Us (Aust ) www.toysrus.com.au BIG W (Aust) Aust Wide www.bigw.com.au KIDSTUFF (Aust) Aust Wide www.kidstuff.com.au MR TOYS QLD www.mrtoys.com.au TOYWORLD Aust Wide www.toyworld.com.au TOY MATE STORES NSW 2030 www.toymate.com.au NEWSXPRESS PTY LTD ( 50+ stores nationally) SELECTED STORES Aust Wide www.newsxpress.com.au GAME OZ 155 SHELLHARBOUR ROAD PORT KEMBLA NSW 2505 02 4274 9170 www.gameoz.com.au LEISURE GAMES c/-Kennards Storage FORESTVILLE NSW 2087 02 8964 9460 www.leisuregames.com.au ART 4 U2 730 NEW SOUTH HEAD ROAD ROSE BAY NSW 2029 02 93716651 BAY TOYS (N) TREASURES 30A ORIENT STREET BATEMANS BAY NSW 2536 02-44725673 FRASER CYCLES & TOYS 228 - 232 TAREN POINT ROAD TAREN POINT NSW 2229 02 9526 7722 www.fraserscycles.com.au FRONTLINE HOBBIES 255 HUNTER STREET NEWCASTLE NSW 2300 02-49291140 www.frontlinehobbies.com.au GOLDFISH WAREHOUSE Shop 3/58 ALBERT STREET CAROLINE SPRINGS NSW 2535 02-4464 3332 HITECH MOBILELINK PTY LTD 12 KENNETH AVENUE PANANIA NSW 2213 0 HOBBYCO IMPORTS PTY LTD 429-481 GEORGE ST, SHOP 50 QVB SYDNEY NSW 2000 02 9264 4877 www.hobbyco.com.au JENNY'S CLASSROOM & TOYS 2 113 KITE STREET ORANGE NSW 2800 02 6362 6078 www.jennysclassroom.com.au KIDOODLE 203 CLOVELLY ROAD CLOVELLY NSW 2031 02 9664 3920 www.kidoodle.com.au LAUGH & LEARN 207 AVOCA STREET RANDWICK NSW 2031 02-9326 4444 www.laughandlearn.com.au LITTLE EINSTEIN SHOP 74, CITY CENTRE SQUARE COFFS HARBOUR NSW 2450 02 6651 7777 MAL'S TOY SHOP 66 CHATHAM -
Aged Care Service List
Aged Care Service List - NSW - as at 30 June 2014 Physical Address Physical Address Physical Address Aged Care Planning Home Care Low Home Care High Residential Low Care Residential High Care Transition Care Service name Physical Address Line 1 Physical Address Line 2 Suburb State Post Code Region (ACPR) Care Type Places Places Places Places Places Provider Name Organisation Type ABS Remoteness A H Orr Lodge 27 Clissold Street ASHFIELD NSW 2131 Inner West Residential 60 Ashfield Baptist Homes Ltd Religious Major Cities of Australia Abel Tasman Village 222 Waldron Road CHESTER HILL NSW 2162 South West Sydney Residential 68 The Abel Tasman Village Association Ltd Community Based Major Cities of Australia Abel Tasman Village Community Care Packages 222 Waldron Road CHESTER HILL NSW 2162 Western Sydney Home Care Places 58 The Abel Tasman Village Association Ltd Community Based Major Cities of Australia Abernethy Nursing Home 2 Mount View Road CESSNOCK NSW 2325 Hunter Residential 52 Northern Coalfields Community Care Association Ltd Community Based Inner Regional Australia Abrina Nursing Home 19 Victoria Street ASHFIELD NSW 2131 Inner West Residential 63 The Uniting Church in Australia Property Trust (NSW) Religious Major Cities of Australia ACDMA Aged Hostel 2 First Avenue CANLEY VALE NSW 2166 South West Sydney Residential 45 Australian Chinese & Descendants Mutual Association Inc Community Based Major Cities of Australia Ada Caring Connections CACPs 93-95 Angus Avenue KANDOS NSW 2848 Orana Far West Home Care Places 12 Rylstone Kandos Aged -
Lee Hudson Associate
LEE HUDSON ASSOCIATE AREAS OF EXPERTISE Architectural Acoustics Environmental Noise Impact Assessment (Transport, Mining, Construction, Industrial) Master Planning Studies QUALIFICATIONS EMPLOYMENT HISTORY Bachelor of Applied Science (Env Health) 1986 – Jan 1989 Acoustics Consultant, Peter R Knowland & Associates Principal – Acoustics OH&S / SAFETY OH&S Construction White Card Jan 1989 – Jun 2014 SLR Consulting Australia Pty Ltd (formerly Heggies Pty Ltd) Principal Consultant – Acoustics MEMBERSHIP Jun 2014 – Jun 2015 Rodney Stevens Acoustics Pty Ltd Australian Acoustical Aug 2015 – Present Associate, Wilkinson Murray Pty Limited Society (AAS) The Environment Institute of Australia PROFILE Australian Institute of Occupational Hygienists Lee has over 25 years’ experience in the specialist field of acoustics. She has been involved across a broad spectrum of projects, with specific expertise in architectural acoustics, environmental noise impact assessment for major transportation, mining, construction and industrial projects, land use and Master planning studies, building services noise assessment and control, occupational noise exposure and environmental noise policy development. Lee has prepared and presented expert evidence at Commissions of Inquiry and hearings in the Land & Environment Court. Lee has demonstrated ability in project planning and team management, client liaison and community relations. Having previously conducted lectures in acoustics at the University of Technology, Lee has also been involved with lecturing, -
Viva Energy REIT Portfolio
Property Portfolio as at 31 December 2018 ADDRESS SUBURB STATE/ CAP RATE CARRYING MAJOR TENANT TERRITORY VALUE LEASE EXPIRY Cnr Nettleford Street & Lathlain Drive Belconnen ACT 6.18% $10,180,000 2034 Cnr Cohen & Josephson Street Belconnen ACT 6.22% $3,494,183 2027 Cnr Mort Street & Girrahween Street Braddon ACT 5.75% $4,240,000 2028 Lhotsky Street Charnwood ACT 6.69% $7,070,000 2033 17 Strangways Street Curtin ACT 6.74% $3,933,191 2028 25 Hopetoun Circuit Deakin ACT 6.49% $4,657,265 2030 Cnr Ipswich & Wiluna Street Fyshwick ACT 6.51% $2,840,000 2027 20 Springvale Drive Hawker ACT 6.50% $5,360,000 2031 Cnr Canberra Avenue & Flinders Way Manuka ACT 6.18% $8,100,000 2033 172 Melrose Drive Phillip ACT 6.00% $5,010,000 2030 Rylah Crescent Wanniassa ACT 6.49% $3,120,000 2027 252 Princes Highway Albion Park NSW 6.28% $6,041,239 2031 Cnr David Street & Guinea Street Albury NSW 7.08% $5,273,140 2031 562 Botany Road Alexandria NSW 4.79% $12,178,139 2034 124-126 Johnston Street Annandale NSW 4.25% $4,496,752 2027 89-93 Marsh Street Armidale NSW 8.76% $3,386,315 2028 Cnr Avalon Parade & Barrenjoey Road Avalon NSW 4.51% $4,190,223 2027 884-888 Hume Highway (Cnr Strickland Street) Bass Hill NSW 4.99% $4,225,892 2028 198 Beach Road Batehaven NSW 7.08% $5,374,877 2031 298 Stewart Street (Cnr Rocket Street) Bathurst NSW 6.53% $6,010,223 2029 59 Durham Street Bathurst NSW 7.00% $6,810,000 2033 Cnr Windsor Road & Olive Street Baulkham Hills NSW 4.75% $10,020,000 2028 Cnr Pacifi c Highway & Maude Street Belmont NSW 6.19% $3,876,317 2030 797 Pacifi c Highway -
Rebuilding NSW State Infrastructure Strategy 2014 - Update
Rebuilding NSW State Infrastructure Strategy 2014 - Update FEBRUARY 2015 Education & Health $2 billion Premier’s Message Fixing Country Rail $400 million In June 2014, the Government announced Rebuilding NSW – a plan to Urban public transport turbocharge NSW with $20 billion of new, productive infrastructure. It is a plan that will create more than 100,000 jobs and deliver downward $8.9 billion pressure on electricity prices for consumers. It is a plan that will boost the New South Wales economy by almost $300 billion in just over 20 years. Sport and Culture Releasing capital from leasing the State’s electricity businesses means $1.2 billion projects that improve our quality of life can get moving now, rather than years into the future. In November 2014 the Government presented the recommendations of Regional roads Infrastructure NSW – all of which the Government has adopted – along with high level details of the infrastructure investments Rebuilding $3.7 billion NSW will prioritise. These included: » $7 billion reserved for the Sydney Rapid Transit, to fully fund a second Harbour rail crossing Water security » $1.1 billion reserved to invest in the WestConnex northern and southern extensions, and the Western Harbour Tunnel $1 billion » Increasing the Sports and Cultural Fund from $500 million to $1.2 billion in ensure we capitalise on our iconic sporting and cultural Urban roads precincts and increase the presence of facilities in Western Sydney » Reserve an even greater investment in regional transport of $2.4 billion $4.1 billion to underpin economic growth across the whole State » $1 billion reserved for regional and metropolitan schools » $1 billion reserved for regional and metropolitan hospitals Parramatta Light Rail » $1 billion reserved for water security for our regional communities $600 million » $300 million reserved for regional tourism and the environment Three months later, I am pleased to provide the people of New South Wales with a further update, including projects which are now further Bus Rapid Transit progressed. -
Draft South District Plan
Draft South District Plan co-creating a greater sydney November 2016 How to be involved This draft District Plan sets You can read the entire Before making a submission, out aspirations and proposals draft District Plan at please read our privacy for Greater Sydney’s South www.greater.sydney and send statement at District, which includes the feedback: www.greater.sydney/privacy local government areas of • via www.greater.sydney For more information Canterbury-Bankstown, visit www.greater.sydney Georges River and Sutherland. • by email: call us on 1800 617 681 It has been developed by the [email protected] Greater Sydney Commission. • by post: or email: Greater Sydney Commission [email protected] This draft District Plan is on Draft South District Plan formal public exhibition until PO Box 257, the end of March 2017, and will Parramatta NSW 2124 be finalised towards the end of 2017 to allow as many people as possible to provide input. This document was updated on 21 December 2016 to address typographical errors and production faults. A detailed list of the errata can be found at www.greater.sydney/content/publications Draft South District Plan Exhibition THIS SEPARATE DOCUMENT DOCUMENT Overview Draft District Maps Background Website Plan Material Dashboard Our vision — Towards our Greater Sydney 2056 Summary The requirements A compilation of Data and Reports How the A draft brochure of the legislative maps and spatial used to inform the draft District Plan is amendment to of the draft framework information used draft District Plan to be monitored update A Plan for District Plan to inform the draft Growing Sydney District Plan You can view these supporting components, as well as Our vision — Towards our Greater Sydney 2056, SOUTH DISTRICT our proposed 40-year vision for Greater Sydney, at www.greater.sydney. -
Independent Review Panel
INDEPENDENT REVIEW PANEL SOUTH COAST SENSITIVE URBAN LANDS REVIEW _________________________________________________________________________ REPORT TO THE HONOURABLE FRANK SARTOR MP MINISTER FOR PLANNING OCTOBER 2006 SOUTH COAST INDEPENDENT REVIEW PANEL The Hon Frank Sartor MP Minister for Planning Level 34, Governor Macquarie Tower 1 Farrer Place SYDNEY NSW 2000 Dear Minister, RE: SOUTH COAST INDEPENDENT REVIEW PANEL Following the release of the Draft South Coast Regional Strategy, you appointed me to chair a Panel to investigate the suitability for development of some sixteen sites in the region. We received some 188 submissions and held public hearings over six days in the towns of Nowra, Batemans Bay and Bega as well as in Sydney. Fifty one people appeared at the public hearings. Having given due regard to all the submissions, we present our report, with recommendations, on each of the sites. It is important to read the recommendations along with the body of the report, especially the planning assessment and the environmental assessment sections of each site’s evaluation. We have also suggested some planning issues for further discussion that arose during our investigations and deliberations. My colleagues on the Panel, Mr Vince Berkhout and Dr David Robertson have brought considerable experience and expertise to the task, and we are unanimous in our recommendations. Of the total area already zoned for potential development (about 2200ha) we recommended less than 30% to be developed. Of all the land investigated (about 5900ha) we recommended that almost 30% be for environmental conservation. We were very ably assisted in all the preparations for our meetings and public hearings and preparation of the report by Mr Paul Freeman.