MKR Enginerings 2016 A.P65
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Sl No District Name Division Name Mandal Name School Name School
School School School Type No of Sl no District Name Division Name Mandal Name School Name Management Vacancy Type Area Type Post Name Subject Name Medium Name Ncc Name Bharat scout Category Name Name Vacancies Name 1 GUNTUR SATTENAPALLE ACHAMET 28170700103-ZPHS MADIPADU HS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI NO MEDIUM --- No 1 2 GUNTUR SATTENAPALLE AMARAVATHI 28170900805-ZPHS LINGAPURAM HS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI NO MEDIUM --- No 1 3 GUNTUR SATTENAPALLE AMARAVATHI 28170901707-ZPHS MANDEPUDI HS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI NO MEDIUM --- No 1 4 GUNTUR SATTENAPALLE AMARAVATHI 28170900606-ZPHS MALLADI HS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI NO MEDIUM --- No 1 5 GUNTUR SATTENAPALLE AMARAVATHI 28170901008-MPUPS AMARAVATHI UPS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI NO MEDIUM --- No 1 6 GUNTUR SATTENAPALLE AMARAVATHI 28170901602-MPUPS UNGUTUR UPS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI NO MEDIUM --- No 1 7 GUNTUR SATTENAPALLE AMARAVATHI 28170901505-MPUPS LEMALLE UPS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI NO MEDIUM --- No 1 8 GUNTUR SATTENAPALLE AMARAVATHI 28170901302-MPUPS NARUKULLAPADU UPS Local Bodies Co-education Upgraded Vacancy Plain Area SCHOOL ASSISTANT(LANGUAGES) HINDI -
Synthesis and Characterization of Aluminium-Bamboo Leaf Ash Metal Matrix Composite by Stir Casting Technique
International Journal of Mechanical Engineering and Technology (IJMET) Volume 8, Issue 5, May 2017, pp. 351–356, Article ID: IJMET_08_05_037 Available online at http://iaeme.com/Home/issue/IJMET?Volume=8&Issue=5 ISSN Print: 0976-6340 and ISSN Online: 0976-6359 © IAEME Publication Scopus Indexed SYNTHESIS AND CHARACTERIZATION OF ALUMINIUM-BAMBOO LEAF ASH METAL MATRIX COMPOSITE BY STIR CASTING TECHNIQUE Kammuluri.Baburaja, Dhayapulley Sai Chaitanya Kishore, Showri Ravi Teja Dasari, Venkata Sai Alusuri, Mahabub Jani Shaik, Avinash Lingineni, Raju Ravuri Department of Mechanical Engineering; K L University, Green Fields, Vaddeswaram, Guntur District, Andhra Pradesh, India. ABSTRACT This work is done using bamboo leaf ash, in this work the bamboo leafs are gathered and dried for a few days. This procedure is done until the moisture gets removed completely. After this the leaves are burnt and the ash is collected in a box. The ash is placed in the crucibles and heated again upto 700 degree centigrade. The ash is then mixed with graphite and K2TiF6. Totally five samples are made, that is 4 samples are taken by varying their weights of the BLA, Graphite, K2TiF6. The Sample 5 is the pure aluminium. The BLA is taken as 10, 20, 30 and 40 gm. The Aluminium is taken in a batch of 500 gm and BLA samples are added after preheating and stir casting is done. After the Fabrication the samples are collected and named as per the weight % of the added reinforcement. Their Mechanical properties are checked and compared with the sample 5 (i.e Pure Aluminium). And the properties such as Yield Strength and Ultimate Tensile Strength are higher than the aluminium, so this ABLA MMC with the improved strength can be replaced and used in the applications. -
Club Health Assessment MBR0087
Club Health Assessment for District 305 N1 through January 2016 Status Membership Reports LCIF Current YTD YTD YTD YTD Member Avg. length Months Yrs. Since Months Donations Member Members Members Net Net Count 12 of service Since Last President Vice No Since Last for current Club Club Charter Count Added Dropped Growth Growth% Months for dropped Last Officer Rotation President Active Activity Fiscal Number Name Date Ago members MMR *** Report Reported Email ** Report *** Year **** Number of times If below If net loss If no report When Number Notes the If no report on status quo 15 is greater in 3 more than of officers that in 12 within last members than 20% months one year repeat do not have months two years appears appears appears in appears in terms an active appears in in brackets in red in red red red indicated Email red Clubs less than two years old 125909 Faisalabad Lyallpur 10/21/2015 Active 20 20 0 20 100.00% 0 4 N/R 125553 Lahore First Women 08/06/2015 Active 23 21 0 21 100.00% 0 1 2 T 0 123036 Multan Family 09/02/2014 Active 16 2 14 -12 -42.86% 20 1 2 2 126227 Multan Imperial 12/10/2015 Newly 22 22 0 22 100.00% 0 2 N/R Chartered Clubs more than two years old 108273 BAHAWALPUR CHOLISTAN 05/12/2010 Cancelled(8*) 0 2 20 -18 -100.00% 16 2 1 None 13 64852 BUREWALA CRYSTAL 12/11/2001 Cancelled(8*) 0 0 11 -11 -100.00% 6 3 1 None 24+ 117510 FAISALABAD ACTIVE 08/14/2012 Active(1) 18 2 0 2 12.50% 16 1 4 N 1 98882 FAISALABAD AKAI 05/01/2008 Active 9 0 0 0 0.00% 9 2 8 S 2 50884 FAISALABAD ALLIED 08/06/1990 Active(1) 18 0 0 0 0.00% 18 6 -
(Motor Driver) on 04.09.2016
Venue-wise list of eligible candidates for the written test for the post of Technician / Technician (Motor Driver) on 04.09.2016 Easo Bhavan, Ernakulam 1. Roll No 280170123 Mylapalli Anil, D.No.16-13-7, Kotha Jalaripeta, Visakhaptnam-530001 2. Roll No 280170124 Lotla Venkata Ramana, D.No. 32-3-28, Mahalakshmi street, Bowdara Road, Visakhapatnam-530004 3. Roll No 280170125 Ganta Nagireddy, D.No. 31-23-3, Simhaladevudu street, Allipuram, Visakhaptnam-530004 4. Roll No 280170126 Lotla Padmavathi, W/o. G. Nagireddy, D.No. 31-23-3, Simhaladevudu street, Allipuram, Visakhaptnam-530004 5. Roll No 280170127 SERU GOPINADH Pallepalem Ramayapatnam Vulavapadu(m) Prakasham (d), AP-523291 6. Roll No280180001 Ram Naresh Meena Vill Post Samidhi Teh. Nainina, Dist - Bundi State Rajasthan – 323801 7. Roll No280180002 Harikeshmeena Vill Post-Samidhi Teh.Nainwa, Dist - Bundi Rajastan – 323801 8. Roll No280180003 Sabiq N.M Noor Mahal Kavaratti, Lakshadweep 682555 9. Roll No280180004 K Pau Biak Lun Zenhanglamka, Old Bazar Lt. Street, CCPur, P.O. P.S. Manipur State -795128 10. Roll No280180005 Athira T.G. Thevarkuzhiyil (H) Pazhayarikandom P.O. Idukki – 685606 11. Roll No280180006 P Sree Ram Naik S/o P. Govinda Naik Pedapally (V)Puttapathy Anantapur- 517325 12. Roll No280180007 Amulya Toppo Kokkar Tunki Toli P.O. Bariatu Dist - Ranchi Jharkhand – 834009 13. Roll No280180008 Prakash Kumar A-1/321 Madhu Vihar Uttam Nagar Newdelhi – 110059 14. Roll No280180009 Rajesh Kumar Meena VPO Barwa Tehsil Bassi Dist Jaipur Rajasthan – 303305 15. Roll No280180010 G Jayaraj Kumar Shivalayam Nivas Mannipady Top P.O. Ramdas Nagar Kasargod 671124 16. Roll No280180011 Naseefahsan B Beathudeen (H) Agatti Island Lakshasweep 17. -
GRMB Annual Report 2017-18
Government of India Ministry of Water Resources, RD & GR Godavari River Management Board ANNUAL REPORT 2017-18 GODAVARI BASIN – Dakshina Ganga Origin Brahmagiri near Trimbakeshwar, Nasik Dist., Maharashtra Geographical Area 9.50 % of Total GA of India Area & Location Latitude - 16°19’ to 22°34’ North Longitude – 73°24’ to 83° 4’ East Boundaries West: Western Ghats North: Satmala hills, the Ajanta range and the Mahadeo hills East: Eastern Ghats & the Bay of Bengal South: Balaghat & Mahadeo ranges stretching forth from eastern flank of the Western Ghats & the Anantgiri and other ranges of the hills and ridges separate the Gadavari basin from the Krishna basin. Catchment Area 3,12,812 Sq.km Length of the River 1465 km States Maharashtra (48.6%), Telangana (18.8%), Andhra Pradesh (4.5%), Chhattisgarh (10.9%), Madhya Pradesh (10.0%), Odisha (5.7%), Karnataka (1.4%) and Puducherry (Yanam) and emptying into Bay of Bengal Length in AP & TS 772 km Major Tributaries Pravara, Manjira, Manair – Right side of River Purna, Pranhita, Indravati, Sabari – Left side of River Sub- basins Twelve (G1- G12) Dams Gangapur Dam, Jayakwadi dam, Vishnupuri barrage, Ghatghar Dam, Upper Vaitarna reservoir, Sriram Sagar Dam, Dowleswaram Barrage. Hydro power stations Upper Indravati 600 MW Machkund 120 MW Balimela 510 MW Upper Sileru 240 MW Lower Sileru 460 MW Upper Kolab 320 MW Pench 160 MW Ghatghar pumped storage 250 MW Polavaram (under 960 MW construction) ANNUAL REPORT 2017-18 GODAVARI RIVER MANAGEMENT BOARD 5th Floor, Jalasoudha, Errum Manzil, Hyderabad- 500082 FROM CHAIRMAN’S DESK It gives me immense pleasure to present the Annual Report of Godavari River Management Board (GRMB) for the year 2017-18. -
Southern Power Distribution Company Limited of Andhra Pradesh (APSPDCL) & Eastern Power Distribution Company Limited of Andhra Pradesh (APEPDCL)
REVISED SOLAR RfS DOCUMENT Southern Power Distribution Company Limited of Andhra Pradesh (APSPDCL) & Eastern Power Distribution Company Limited of Andhra Pradesh (APEPDCL) Request For Selection (RfS) Document for 500 MW grid connected Solar Photo Voltaic Projects in Andhra Pradesh RfS (Bid) No. APSPDCL/02/LTSPP/2014 Issued by Southern Power Distribution Company Limited of Andhra Pradesh (APSPDCL) Tirupati, Chittoor District, Andhra Pradesh Telephone: 0877-2284109, extn:200 Email: [email protected] 6th September 2014 Bid Deadline 22nd September 2014, 1300 Hrs Southern Power Distribution Company Limited of Andhra Pradesh (APSPDCL) SOLAR RfS DOCUMENT DISCLAIMER 1. The RfS document is not transferable. 2. Though adequate care has been taken in preparation of this document, the Bidder shall satisfy himself that the document is complete in all respects. Any discrepancy noticed in the document shall be intimated to this office immediately. If no intimation is received from any Bidder within fifteen days from the date of issue of the RfS document, it would be construed that RfS document is complete in all respects and is upto the satisfaction of the Bidder. 3. Southern Power Distribution Company of Andhra Pradesh Limited (“APSPDCL”) reserves the right to modify, amend or supplement or cancel this RfS document, without any prior notice or without assigning any reason. 4. While the RfS has been prepared in good faith, APSPDCL shall not accept any responsibility or liability, whatsoever, in respect of any statements or omissions herein, or the accuracy, correctness, completeness or reliability of information in the RfS document, and shall incur no liability under any law, statute, rules or regulations as to the accuracy, reliability and completeness of this RfS document, even if any loss or damage is caused by any act or omission on their part. -
Committee for Consultations on the Situation in Andhra Pradesh
COMMITTEE FOR CONSULTATIONS ON THE SITUATION IN ANDHRA PRADESH REPORT December 2010 THE COMMITTEE CHAIRPERSON Shri Justice B N Srikrishna (Retd.) Former Judge, Supreme Court of India MEMBER SECRETARY Shri Vinod Kumar Duggal, IAS (Retd.) Former Home Secretary, Government of India MEMBERS Prof (Dr.) Ranbir Singh Vice Chancellor, National Law University, Delhi Dr. Abusaleh Shariff Chief Economist /Senior Fellow, National Council of Applied Economic Research, Delhi Prof (Dr.) Ravinder Kaur Department of Humanities and Social Sciences, IIT, Delhi The Inter State Council Secretariat (ISCS) provided full secretarial assistance including technical and budgetary support to the Committee C O N T E N T S VOLUME - I Prologue i Approach and Methodology iv Acknowledgements xii List of Tables, Figures, Appendices xvii Abbreviations xxix Chapter 1 Developments in Andhra Pradesh-A Historical Background 1 Chapter 2 Regional Economic and Equity Analysis 63 Chapter 3 Education and Health 125 Chapter 4 Water Resources, Irrigation and Power Development 177 Chapter 5 Public Employment Issues 245 Chapter 6 Issues Relating to Hyderabad Metropolis 295 Chapter 7 Sociological and Cultural Issues 341 Chapter 8 Law & Order and Internal Security Dimensions 423 Chapter 9 The Way Forward 425 VOLUME - II Appendices 1-173 Index 174 “In ages long past a great son of India, the Buddha, said that the only real victory was one in which all were equally victorious and there was defeat for no one. In the world today that is the only practical victory; any other way will lead to disaster”. Pt. Jawaharlal Nehru speaking on „Disputes and Discord‟ in the United Nations General Assembly on October 3, 1960 Prologue It has not been an easy task. -
MATHEMATICS S.No Name of the Surplus Teacher Working Place Mandal Name of the School Which He/She Allotted Mandal
WORK ADJUSTMENT - ANNEXURE SUBJECT : MATHEMATICS Name of the surplus Name of the school S.no Working place Mandal Mandal teacher which he/she allotted D G VENKATESWARA ZPHS KAKARLA ARDHAVEEDU 1 RAO ZPHS YACHAVARAM ARDHAVEEDU ZPHS B.GOPAL NAIK BALLIKURAVA 2 KOMMINENIVARIPALEM ZPHS KOPPERA PADU BALLIKURAVA DASARI ZPHS UPPUMAGULUR BALLIKURAVA 3 VENKATESWARLU MPUPS KUKATLA PALLI, BALLIKURAVA 4 S.Satyam ZPHS,KOTHAPETA BESTAVARIPETA ZPHS(G),B.PETA BESTAVARIPETA 5 S.Chandra Mohan ZPHS,PUSALAPADU BESTAVARIPETA ZPHS,GALIJERUGULLA BESTAVARIPETA 6 Ch.Sivakumar ZPHS,RAVIPADU CUMBUM ZPHS,BESTAVARIPETA BESTAVARIPETA 7 I.VENKATA RAO ZPHS,PEDARAJU PALEM C.S.PURAM ZPHS,C.S.PURAM C.S.PURAM 8 J. ANJANEYULU BABU ZPHS GONUGUNTA CHIMAKURTHI ZPHS BANDLAMUDI CHIMAKURTHI ZPHS RAJUPALEM K.GOPI KRISHNA 9 L.PURAM CHIMAKURTHI MPUPS PULIKONDA CHIMAKURTHI 10 A.STYA PRASAD ZPHS,KADAVAKUDURU CHINAGANGAM ZPHS,PEDAGANJAM CHINAGANGAM 11 N V SUBBA REDDY ZPHS MANGINAPUDI DONAKONDA ZPHS DONAKONDA (RS) DONAKONDA 12 G GOPINADH ZPHS POTHA VARAM DARSI ZPHS TELLA PADU DONAKONDA ZPHS,PODILI KONDA PALLE GIDDALURU 13 B.Srinivasa Reddy ZPHS(G),GIDDALUR (PT) GIDDALURU PALLEPOGU M MPUPS, Cheerladinne KANIGIRI MPUPS, Challagirigala KANIGIRI 14 PRIYADARSINI 15 T.Aruna ZPHS CHINNARIKATLA KONAKANAMITLA ZPHS GOTLAGATTU KONAKANAMETLA MPUPS WEST VEERAYA 16 G. NARASIMHAM ZPHS POTLAPADU KURICHEDU PALEM KURICHEDU 17 V.Subba Reddy ZPHS DARIMADUGU MARKAPUR ZPHS RAYAVARAM MARKAPUR MPUPS GUNDLA L.SRINIVASA REDDY ZPHS THANGELLA MARRIPUDI 18 SAMUDRAM MARRIPUDI 19 SK.KARIMULLA ZPHS KONANKI MARTURU ZPHS -
DSC-2003 MODIFIED LIST 03-06-2020 Xlsx
INFORMATION OF DSC-2003 SELECTED TEACHERS-MODIFIED ON 03-06-2020 CADRE OF FIRST DATE OF PRESENT NAME OF THE APPOINTMEN DATE OF FIRST WHICH S.No NAME OF THE TEACHER PLACE OF FIRST APPOINTMENT WORKING PRESENT WORKING SCHOOL CONTACT NO REMARKS IF ANY MANDAL T APPOINTMENT PRESENT CADRE (SGT-SA-LP- WORKING PET) MPUPS DEKANAKONDA,KURICHEDU MPUPS NAGULAPADU ,ADDANKI 1 ADDANKI KOMMALAPATI KOTESWARA RAO LP-TELUGU SA(TELUGU) MANDAL 12-12-2005 MANDAL 02-11-2019 9000109400 MPUPS WEST NAIDUPALEM , MPUPS VEMPARALA , ADDANKI 2 ADDANKI JATTAVATH KOTESWARANAYAK SGT SA(MATHS) KURICHEDU MANDAL 05-12-2005 MANDAL 10-07-2019 7382797497 MPPS BAYYAVARAM ,KURICHEDU MPPS PASUMARTHIPALEM ,ADDANKI 3 ADDANKI N.VARALAKSHMI SGT SGT MANDAL 04-12-2005 MANDAL 11-08-2017 8374074275 ZPHS KOTHAPATNAM ,KOTHAPATNAM MPUPS UPPALAPADU ,ADDANKI 4 ADDANKI PASUPULETI ANJANEYULU GR-II HINDI SA(HINDI) MANDAL 20-03-2006 MANDAL 03-11-2019 6302631012 MPPS VALLABHUNENIPALLI MPPS SINGARAKONDAPALEM (ST) 5 ADDANKI ALLADI PRASANNA VANI SGT SGT ,DONAKONDA MANDAL 03-12-2005 ,ADDANKI MANDAL 11-08-2017 8185011318 MPPS CHANDAVARAM (SC) MPPS VENKATAPURAM (SC) 6 ADDANKI JAVVALAMUDI ANJAMMA SGT SGT ,DONAKONDA MANDAL 05-12-2005 ,ADDANKI MANDAL 11-08-2017 8500916946 MPUPS LIMGAMGUNTLA,H.M.PADU MPUPS UPPALAPADU ,ADDANKI 7 ADDANKI CH.VEERANJANEYULU LP-TELUGU SA(TELUGU) MANDAL 28-11-2005 MANDAL 01-11-2019 8309576752 MPPS THURPUPALLI, KONAKANAMITLA MPPS NAGULAPADU (SC) ,ADDANKI 8 ADDANKI ALURI NIRMALAJYOTHI SGT SGT MANDAL 05-12-2005 MANDAL 11-08-2017 9491510653 9 ADDANKI J. Shakunthala SGT MPUPS, V.Appapuram, -
SC&ST JA Total After Verification
LIST OF APPLICATIONS RECEIVED FOR THE POST OF JUNIOR ASSISTANT UNDER ST-G CATEGORY - 2020 Sl. Appli- Name of the Father/Husband Name & Address Date of Birth Age as on Qualifi- Total Marks Percen- Particulars of Addl. Caste Local / Remarks No cation Applicant as per SSC 30.11.2020 cation Marks Obtained tage Computer Qualifi- Certificate Non- No. ( years) in Degree of Marks Course cations Local 1 1 Ponnars Pavan S/o Ponnas Bheema Raju, D.No.13-1-317/8, 02.10.1994 27 B.Pharma CGPA10 8.65 86.50% NIL NIL ST LOCAL Kalyan Vinukonda Road Over Bridge Circle, Narasaraopet cy YERUKALA Mandal, Guntur District 2 2 Kelavathu Yesu S/o Kelavathu Saida Nai, D.No.2-15, Bhatrupalem 16.07.1996 25 BA 10 L-6.78,G- B- Grade MS.Office,DC NIL ST LOCAL Caste certificate Naik Village, Dachepalli Mandal, Guntur District-522414 6.81 A. not enclosed 3 3, 40, Kumbha S/o Kumbha Narasimha Rao, Velpuru Village, 08.07.1991 30 B.Com 0 L-3rd 0 NIL NIL ST LOCAL 120 Venkateswarlu Atachampet Mandal, Guntur District. class,G- YERUKALA Triple 3rd class 4 4 Manupati S/o M. Subba Rao, D.No.13-65/5/1/1, 02.06.1986 35 B.Com 1900 930 49 NIL MBA ST LOCAL Sudheer Seethanagaram, Tadepalli, Guntur - 522501 YERUKALA 5 5 Kundanapu S/o Kundanapu Sivaiah, D.No.5-44, Chintalabeedu, 21.07.1995 26 B.Sc 2400 1476 61.5 PGDCA M.Sc ST LOCAL Niranjan Rao Mathukumalli Village, Savalyapuram Mandal, YERUKALA Guntur District-522646. -
Not Applicable for IOC/HPC
APPOINTMENT OF RETAIL OUTLET DEALERSHIPS IN AP BY IOC Location Sl. Name Of Location Revenue District Type of RO Estimated Category Type of Site Minimum Minimum Minimum Estimated Estimated Mode of Fixed Fee / Security No. (Not (Regular/Rur monthly (CC/DC/CFS) Frontage of Depth of Site Area of site working fund selection Min bid Deposit ( Rs applicable al) Sales Site (in M) (in M) (in Sq. M.). capital required for (Draw of amount ( Rs in Lakhs) for IOC/HPC) Potential requirement developmen Lots/Bidding in Lakhs) (MS+HSD) in for t of ) Kls operation of infrastructur RO (Rs in e at RO (Rs Lakhs) in Lakhs ) DRAW OF 1 BUKKAPATNAM VILLAGE & MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 2 GOTLUR VILLAGE, DHARMAVARAM MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 3 VAYALPADU (NOT ON NH - SH), VAYALAPADU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS THONDAVADA VILLAGE (NOT ON NH/SH), CHANDRAGIRI DRAW OF 4 CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 5 DODDIPALLE (NOT ON NH/SH), PILERU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS NARAYANA NELLORE VILLAGE (NOT ON SH/NH) NANDALUR DRAW OF 6 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 7 ARAKATAVEMULA NOT ON SH/NH , RAJUPALEM MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 8 GUTTURU VILLAGE, PENUKONDA MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 9 MADDALACHERUVU VILLAGE, KANAGANAPALLE MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 10 KALICHERLA (NOT ON NH/SH), PEDDAMANDYAM MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS CHINNACHEPALLE, NOT ON SH/ NH, KAMALAPURAM DRAW OF 11 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 12 GUDIPADU NOT ON SH/NH, DUVVUR MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS BUGGANIPALLE VILLAGE NOT ON NH/SH, BETHAMCHERLA DRAW OF 13 KURNOOL Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 14 GOVINDPALLE VILLAGE NOT ON NH/SH, SIRVEL MANDAL KURNOOL Rural 48 ST CFS 20 20 400 0 0 0 2 LOTS DRAW OF 15 POLAKAL VILLAGE NOT ON NH/SH, C . -
Gvk Jegurupadu Combined Cycle Power Plant 235 Mw (Phase-I) & 228 Mw (Phase-Ii) Jegurupadu Village East Godavari Dist
HALF-YEARLY ENVIRONMENTAL COMPLIANCE REPORT For the period of April - September 2013 GVK POWER PLANT JEGURUPADU Index Page No Introduction 3 Compliance Status of Environmental Clearance – Phase-I 4 Compliance Status of Environmental Clearance – Phase-II 6 CFO Compliances Status 9 Environmental Monitoring Reports Treated Effluent Analysis – Phase-I 17 Treated Effluent Analysis – Phase-II 18 Ambient Air Quality Location Wise 19 Stack Emissions – Phase-I 21 Stack Emissions – Phase-II 22 Weather Data 23 Noise Levels – Phase-I 24 Noise Levels – Phase-II 25 Raw Water Consumption & Waste Water Generation – Phase-I&II 26 Page 2 of 26 INTRODUCTION 235 MW (Phase-I) CCPP: The 235 MW (ISO) Combined Cycle Power Plant is situated in Jegurupadu Village, Kadiyam Mandalam, East Godavari District, Andhra Pradesh was constructed by GVK Industries Ltd., Secunderabad and is India’s First Independent Power Project (IPP) to commence commercial operations. The combined cycle mode of the project has commenced operation on 20/06/1997. The station has a configuration of 3 Gas Turbines + 3 Heat Recovery Steam Generators + 1 Steam Turbine. The plant is designed for operations on Natural Gas (or) Naphtha (or) any combination of both fuels. The plant is being operated at part load using Natural Gas Supplied by Gail (India) Ltd., and sometimes on Naphtha as per the instructions of APSLDC. The project was accorded clearance by Andhra Pradesh Pollution Control Board (APPCB) vide letter # 14027/PCB/NOC/AEE/9/92-6884 dt. 16/04/1992 and by Ministry of Environment and Forests (MoE&F) vide letter # J-13011/16/90-IA.II dt.