Haryana Vidyut Prasaran Nigam Limited
Total Page:16
File Type:pdf, Size:1020Kb
HARYANA POWER SYSTEM IMPROVEMENT PROJECT Draft Resettlement and Rehabilitation Action Plan – Package G 6 Transmission lines Haryana Power System Improvement Project RP769 v10 DRAFT RESETTLEMENT AND REHABILITATION ACTION PLAN PACKAGE G-6 TRANSMISSION LINES (FARIDABAD CIRCLE) Public Disclosure Authorized 220 kV D/C LINE FROM SECTOR -72 GURGAON (GURGAON DISTRICT) TO RANGALA RAJPUR (FIROZEPUR-ZIRKA) 220 kV D/C LINE FROM PROPOSED 400 kV SUBSTATION NAWADA (FARIDABAD DISTRICT) TO 220 kV SUB-STATION, A-5 FARIDABAD for HARYANA VIDYUT PRASARAN NIGAM LIMITED Public Disclosure Authorized Public Disclosure Authorized Prepared by Public Disclosure Authorized 5th Floor, Tower C, DLF Building No.8, Cyber city Phase II Gurgaon 122 022 (Haryana), India Tel.(91) 124 4380042, 4501100 Fax.no. (91) 124-4380043 Email: [email protected] Web: www.smec.com.au/india APRIL 2009 Page 1 Draft Resettlement and Rehabilitation Action Plan – Package G 6 Transmission lines Haryana Power System Improvement Project TTAABBLLEE OOFF CCOONNTTEENNTTSS LIST OF ABBREVIATIONS..................................................................................................... 4 EXECUTIVE SUMMARY......................................................................................................... 5 CHAPTER 1 – INTRODUCTION AND METHODOLOGY...................................................................... 8 1.1 Background ..................................................................................................................... 8 1.2 The Project- HPSIP.......................................................................................................... 8 1.3 Haryana Vidyut Prasaran Nigam Limited......................................................................... 8 1.4 Package G-6 (Transmission Lines)................................................................................... 9 1.5 Measures Taken to Minimize Impacts............................................................................ 10 1.6 Objectives of the Study.................................................................................................. 10 1.7 Approach and Methodology........................................................................................... 10 1.8 Structure of the Report................................................................................................... 11 CHAPTER 2 - PROFILE OF THE PROJECT AREA ............................................................................. 12 2.1 Introduction ................................................................................................................... 12 2.2 Profile of the Project Districts ........................................................................................ 12 2.3 Socio-economic Profile of Impacted Villages (Circle wise)............................................ 13 CHAPTER 3 – ANALYSIS OF ALTERNATIVES................................................................................ 16 3.1 Introduction ................................................................................................................... 16 CHAPTER 4 – IMPACT ON LAND AND PERSONS........................................................................... 21 4.1 Introduction ................................................................................................................... 21 4.2 Social Impact Assessment of the Proposed Sub-packages .............................................. 21 CHAPTER 5 – STAKEHOLDER CONSULTATIONS ........................................................................... 23 5.1 Introduction ................................................................................................................... 23 5.2 Consultations for Sub-package I..................................................................................... 23 5.3 Consultations for Sub-package II ................................................................................... 29 CHAPTER 6 – RESETTLEMENT POLICY AND LEGAL FRAMEWORK................................................. 32 6.1 Policy, Legal and Regulatory Framework ...................................................................... 32 6.2 Procedure for Land Acquisition ..................................................................................... 32 6.3 World Bank Operational Policy on Involuntary Resettlement (OP 4.12)......................... 34 6.4 HVPNL Environment and Social Policy and Procedures................................................ 34 6.5 Social Entitlement Framework....................................................................................... 34 CHAPTER 7 – INSTITUTIONAL ARRANGEMENTS AND GRIEVANCE REDRESSAL MECHANISMS........ 39 7.1 Introduction .................................................................................................................... 39 7.2 Institutional Framework.................................................................................................. 39 7.3 Social Procedures............................................................................................................ 39 7.4 Capacity Building .......................................................................................................... 40 7.5 Grievance Redress Mechanism ...................................................................................... 41 CHAPTER 8 – BUDGET ESTIMATES ............................................................................................. 43 8.1 Introduction ................................................................................................................... 43 8.2 Compensation................................................................................................................ 43 8.3 Budget and Costs........................................................................................................... 43 CHAPTER 9 – IMPLEMENTATION SCHEDULE ............................................................................... 45 9.1 Introduction....................................................................................................................... 45 9.2 Tasks and Schedule............................................................................................................ 45 Page 2 Draft Resettlement and Rehabilitation Action Plan – Package G 6 Transmission lines Haryana Power System Improvement Project LLIIISSTT OOFF AANNNNEEXXUURREESS Annexure A – Mewat and Gurgaon Annexure A1 – Photographs of area en-route in Mewat and Gurgaon.......................................................................... 47 Annexure A2 – Community consultations .................................................................................................................. 50 Annexure A3: Walkover Survey and route marked on Toposheets .............................................................................. 82 Annexure B - Faridabad Annexure B1 – Photographs of area en-route in Faridabad.......................................................................................... 84 Annexure B2 – Community consultations................................................................................................................... 85 Annexure C - Rates of Trees and Crops Annexure C1 – Rates of Trees and Crops ................................................................................................................... 89 Annexure D - Formats Annexure D1 – Consultation Checklist..................................................................................................................... 102 Annexure D2 – Census/Socio Economic Survey Questionnaire................................................................................. 104 Annexure D3 – Proforma for Compensation for Crops.............................................................................................. 111 Annexure E - List of Officials Annexure E1 – List of Officials................................................................................................................................ 115 Page 3 Draft Resettlement and Rehabilitation Action Plan – Package G 6 Transmission lines Haryana Power System Improvement Project LIST OF ABBREVIATIONS AF Affected Family BPL Below Poverty Line ESMC Environment and Social Management Committee ER&RC Environmental Rehabilitation and Resettlement Committee ESIU Environmental and Social Implementation Unit ESPP Environmental and Social Policy Procedures GOI Government of India GRC Grievance Redressal Committee HH Household HPGCL Haryana Power Generation Corporation Limited. HVPNL Haryana Vidyut Prasaran Nigam Limited kV Kilo volts IT Information Technology LAA Land Acquisition Act, 1894 (1984) LILO Loop In Loop Out OP Operational Policy PAF Project Affected Families NGO Non Government Organization NRRP National Resettlement and Rehabilitation Policy 2007 RRAP Resettlement and Rehabilitation Action Plan ROW Right of Way SAMP Social Assessment and Management Plan SC Scheduled Castes WB World Bank Page 4 Draft Resettlement and Rehabilitation Action Plan – Package G 6 Transmission lines Haryana Power System Improvement Project EXECUTIVE SUMMARY The proposed project – Haryana Power System Improvement Project, funded by the World Bank and implemented by Haryana Vidyut Prasaran Nigam Limited (HVPNL), aims to improve the accountability, efficiency and quality of electricity services in Haryana through investments in power supply infrastructure, training/capacity building and technology-transfer,