(Incl. Project Implementation Progress for the Last Reporting Period: from 15.05.2015 До 30.09.2016)1

Total Page:16

File Type:pdf, Size:1020Kb

(Incl. Project Implementation Progress for the Last Reporting Period: from 15.05.2015 До 30.09.2016)1 PROGRAMME BG02 „INTEGRATED MANAGEMENT OF MARINE AND INLAND WATERS“ PROGRAMME BG03 „BIODIVERSITY AND ECOSYSTEMS“ Guidelines for project implementation under Programmes BG02 and BG03 page: 1/19 Annex № 5 Version Approved by the Head of the Programme Operator in MOEW Date: 15.04.2015 Final Report on progress № 1 Final Report (incl. Project implementation progress for the last reporting period: from 15.05.2015 до 30.09.2016)1 Programme: BG03 BIODIVERSITY AND ECOSYSTEMS Project title and acronym: Raising the awareness on environmental issues through education on sustainable development and volunteer bio- monitoring of Zlatna Panega River - Adopt The River Project registration number: 48-00-872/ 20.10.2014 Number of Project implementation D-33-53/1.07.2015 contract and date of signature: Name of the beneficiary: Regional Environmental Center for Central and Eastern Europe – branch Bulgaria Registration number of the beneficiary/ 121294200 BULSTAT: Project Partner/s name/s : 1. Zlatna Panega Cement PLC 2. Regional Museum of History - Pleven 3. Professional High school of Agriculture “Sergey Rumiancev” - Lukovit 4. Environment and Public Health Office Kjos District, Iceland Total value of the project (in Euro): 21 702 Total value of the project (in Leva): 42 445,42 Project implementation period (start 15.05.2015 – 30.09.2016. and completion date: Implementation period: 01.07.2016 - 30.09.2016 Contact person/position: Ventzislav Vassilev, REC - Bulgaria Address for correspondence: Sofia, bul. Yanko Sakazov 32, office 4 1 The final report shall cover the period either by the contract expiry date or by the completion of project activities (if earlier). Apart from the technical report for the above period, it includes information on the entire project implementation period. Guidelines for project implementation under Programmes page: 2/19 Annex № 5 BG02 and BG03 Version Approved by the Head of the Programme Operator in № 1 Date: 15.04.2015 Final Report on progress MOEW Phone: +359 2 9835217 Fax: +359 2 9834817 e-mail: [email protected] 2 Guidelines for project implementation under Programmes page: 3/19 Annex № 5 BG02 and BG03 Version Approved by the Head of the Programme Operator in № 1 Date: 15.04.2015 Final Report on progress MOEW Part І. Financial information under the Grant Contract for the last reporting period Project title and acronym: Raising the awareness on environmental issues through education on sustainable development and volunteer bio-monitoring of Zlatna Panega River - Adopt The River Project budget in Euro, of which: 21 702 Grant amount (amount in Euro and in (%)): 20 804 Co-financing (amount in Euro and in (%)): 3120,60 Own financing (amount in Euro and in (%)): 898 Advance payment (amount in Euro and in (%)): N/A Amount requested for verification with the present 18 217,85 report in Euro: Amount requested for verification with the present 35 631,02 BGN report in Leva, equivalent to Euro at the central rate of the BNB Beneficiary: …………….. Chief Accountant:…………………….. /Ventzislav Vassilev, Director REC - Bulgaria/ /Miroslava Todorova/ (№ and date of the authorization document, if applicable) (or functionary responsible for business operations) Signature and stamp:………………… Date: 14/06/2017 3 Guidelines for project implementation under Programmes BG02 and BG03 page: 4/19 Annex № 5 Version № 1 Approved by the Head of the Programme Operator in MOEW Date: 15.04.2015 Final Report on progress Part ІI. Summary of physical progress for the last reporting period and for the entire project implementation period Implementation of project activities 1. Implementation of project activities for the last reporting period (from 01.07.2016 to 30.09.2016) Implementation of the Justification of indicators at programme Planned activities Planned delays, Planned output level according to the (according to the implementation for the Actual implementation for the last problems or Target № (according to the approved project Enclosed evidence approved project) last reporting period, reporting period failure of value approved project) following the Timeline implementatio n Indicator name Text Text Text Text/Number Text Text Number Text,link 1. Monitoring visits Activity 4 Adopt a Monitoring visits The monitoring equipment N/A 1.2.1. Number of 6 - Protocols; implemented; River - monitoring implemented; and materials, purchased publications, Environmental data activities for Environmental data during the project have been expositions or other gathered and biodiversity and gathered and possessed to the local awareness tools published. water quality of published. schools, covered by the created in the the Zlatna Panega project. The field monitoring campaigns River; activities on biodiversity and water quality in Zlatna Panega River have been implemented in July 2016. The next monitoring visits are planned for the school year 2016-2017 in compliance with the school curricula (continuation of the project activities beyond the project duration, covered by the partners). Value: 6 2. 3 awareness Activity 5 3 awareness The students from Bawsic N/A 1.2.1. Number of 3 - Pictures; campaigns on Awareness campaigns on school in Rumyantzevo, publications, - Award environmental campaigns on environmental awarded from the art expositions or other certificates; 4 Guidelines for project implementation under Programmes BG02 and BG03 page: 5/19 Annex № 5 Version № 1 Approved by the Head of the Programme Operator in MOEW Date: 15.04.2015 Final Report on progress protection and environmental protection and competition visited RHM – awareness tools - Media coverage rivers condition are protection rivers condition are Pleven as a form of created in the and publications; carried out carried out competition prize. The visit campaigns - Developed happened on 29 Sep 2016. website of the project with Value: 3 voluntary monitoring module; 3. Successful Project Activity 6 Project Approval of the The activity is ongoing N/A 1.1.1. Number of 1 - Technical management management; products from the throughout the project persons trained in reports; subcontractors; implementation period. the use of the - Financial reports; Coordination with Co-ordination with partners national biodiversity - Communication the partners; was carried out in relation to information with the Financial and the trainings, exchange visits system's public part institutions; technical reporting of the Icelandic partner and the monitoring activities; Financial and technical reporting of the previous period. Стойност 1 1.2. Implementation of project activities (for the entire project implementation period) Planned Planned activities Partially /fully/ Partially /fully/ non- Planned result implementation, (according to the Partially /fully/ non-implemented non-implemented implemented indicators № (according to the according to the approved project) activities, reasons indicators at project at programme level (if approved project) Implementation level (if applicable) applicable) schedule Sufficient number of Activity 1: Analysis of Analysis of good The activity is successfully accomplished. Number of 1.2.1. Number of 1. good practices and good practices and practices from documents publications, successful awareness awareness campaigns successful awareness Two reports have been produced: elaborated expositions or other campaigns examples for adoption of rivers campaigns for adoption - Best practices in EC and Bulgaria Value: 2 - achieved awareness tools created 5 Guidelines for project implementation under Programmes BG02 and BG03 page: 6/19 Annex № 5 Version № 1 Approved by the Head of the Programme Operator in MOEW Date: 15.04.2015 Final Report on progress for adoption of rivers in in Iceland, EU and of rivers in Iceland, EU - Best practices in Iceland in the campaigns Iceland, EU and Bulgaria and Bulgaria Bulgaria; Educational program Activity 2 Elaboration Educational program The activity is successfully accomplished. Number of 1.2.1. Number of 2. and monitoring and adaptation of an and monitoring The producs are: programs and publications, methodology on educational program methodology on - Educational program.curriculum; methodologies expositions or other collecting for environmental collecting - Methodology on biodiversity Value: 3 - achieved awareness tools created environmental data are protection and environmental data are monitoring; in the campaigns elaborated. The methodology for elaborated. The - methodology on water quality program and biodiversity and water program and monitoring monitoring monitoring monitoring The educational program and methodology are methodology are methodology for voluntary monitoring of elaborated in elaborated in biodiversity and water are provided as a compliance with NBIS compliance with NBIS final result as attached to the previous requirements. requirements. report. The educational program has been aligned with the EEA and no critical remarks have been received. The educational program is also translated into English for co-ordination with the Icelandic partner. Activity 3 Training of Trainings of volunteers The activity has been successfully Number of trained 1.1.1. Number of teachers and students (students and teachers) completed. volunteers persons trained in the 3. to monitor on monitoring of Three trainings with teachers and Value: 3 - achieved use of the national biodiversity and water biodiversity and water students were held: biodiversity information Trainings of volunteers quality quality by collecting Training 1 "Field work. Observations on system's public
Recommended publications
  • EU COMPLAINT.Pdf
    Contents: Page I. IDENTITY AND CONTACT DETAILS 003 II. DESCRIPTION OF THE SUSPECTED INFRINGEMENT OF UNION LAW 004 A. River stretches dry between the barrage and the turbine house of HPP 005 B. Fish passes design and construction 010 C. Legislation gaps 012 D. Control on operational HPP by MOEW, RIEW or RBD 015 E. RBD practice on Water Permits 017 F. MOEW or RIEW practice on Environmental Impact Assessment 018 G. Practice on new HPP approval for operation 020 H. Fundamental problem 023 I. Union laws (e.g. Treaties, regulations, directives, decisions) or principles underpinning Union law that we believe to have been breached by the authorities of the country 024 J. Does the EU country concerned receive EU funding relating to the issue that prompted this complaint, or may it receive such funding in future? 027 III. LIST OF DOCUMENTS / EVIDENCE 028 IV. APPEALS/LEGAL ACTIONS/ OTHER ACTIONS 029 A. Actions taken by “Balkanka” Association 029 B. Actions taken by other NGO 029 C. Action taken by the Bulgarian Chamber of Engineers 030 D. Action taken by the Department of "General and Applied Hydrobiology” at the FACULTY OF BIOLOGY of the UNIVERSITY OF SOFIA “ST. KLIMENT OHRIDSKI” 030 E. Other actions 031 V. CONFIDENTIALITY – DATA PROTECTION 031 VI. AIM OF THE COMPLAINT 032 VII. SUPPORT 034 _____________________________________________________________________ ABBREVIATIONS MOEW - Ministry Of Environment and Waters of Bulgaria RIEW - Regional Inspectorate/s of Environment and Waters RBD - River Basin Directorate/s BDDR - Basin Directorate Danube Region EARBD - East Aegean River Basin Directorate WARBD - West Aegean River Basin Directorate WA - Water Act FA Act - Fishing and Aquaculture Act EIA - Environmental Impact Assessment AA - Appropriate Assessment RBMP - River Basin Management Plan HPP - Hydropower Plant 2 I.
    [Show full text]
  • Biodiversity Management Plan at Zlatna Panega Quarry, Titan Cement Bulgaria
    Biodiversity Management Plan at Zlatna Panega Quarry, Titan Cement Bulgaria Kostis Dragasakis Titan Group Quarries & Raw Materials Technology Manager Quarries Alive 2-4 May 2018, University of Évora, Portugal Background TITAN Group is an independent, vertically integrated cement and building materials producer with over 110 years of industry experience. Rehabilitation and biodiversity management at quarry sites are important components of TITAN’s environmental policy for sustainable development. More than 40 years experience in quarries rehabilitation have proved successful for the mitigation of adverse impacts from extractive activities. Target is set to develop and implement Biodiversity Management Plans (BMPs) for all sites recognized as areas of high biodiversity value. Quarries Alive 2 2-4 May 2018, University of Évora, Portugal Background The Zlatna Panega Cement Plant and nearby quarry for the supply of main raw materials (limestone, marl) are located in Lovech region in Bulgaria. Part of the Zlatna Panega Quarry has been included in the country’s Natura 2000 network (Karlukovo SAC/SPA). Initiatives and actions taken from Zlatna Panega Cement Plant for the biodiversity baseline assessment and the development of an Integrated Biodiversity Management Plan, in line with the Biodiversity Management Plan (BMP) Guidance of the WBCSD/CSI. http://wbcsdcement.org/index.php/key-issues/biodiversity/biodiversity-management Quarries Alive 3 2-4 May 2018, University of Évora, Portugal Background (cont.) Quarries Alive 4 2-4 May 2018, University of Évora, Portugal Initial Ecological Scoping Study Targets of the Study: Biodiversity Inventory – Baseline Assessment at Zlatna Panega quarry and surrounding areas (200Ha study area). Evaluation of potential ecological impacts of, and constraints to, quarry development.
    [Show full text]
  • A Thesis Submitted to the Central European University, Department Of
    A thesis submitted to the Department of Environmental Sciences and Policy of Central European University in part fulfilment of the Degree of Doctor of Philosophy Local environmental governance and environmental rules on the ground in Bulgarian municipalities Supervisor: Prof. Alexios Antypas, CEU PhD Committee: Prof. Ruben Mnatsakanian, CEU Dr. Svetlozar Andreev, Committee of the Regions CEU eTD Collection Plamen PEEV April, 2011 Budapest Notes on copyright and the ownership of intellectual property rights: (1) Copyright in text of this thesis rests with the Author. Copies (by any process) either in full, or of extracts, may be made only in accordance with instructions given by the Author and lodged in the Central European University Library. Details may be obtained from the Librarian. This page must form part of any such copies made. Further copies (by any process) of copies made in accordance with such instructions may not be made without the permission (in writing) of the Author. (2) The ownership of any intellectual property rights which may be described in this thesis is vested in the Central European University, subject to any prior agreement to the contrary, and may not be made available for use by third parties without the written permission of the University, which will prescribe the terms and conditions of any such agreement. (3) For bibliographic and reference purposes this thesis should be referred to as: Peev, P.P. 2011. Local environmental governance and environmental rules on the ground in Bulgarian municipalities. Doctoral thesis, Department of Environmental Sciences and Policy, Central European University, Budapest. Further information on the conditions under which disclosures and exploitation may take place is available from the Head of the Department of Environmental Sciences and Policy, Central European University.
    [Show full text]
  • Of Bulgaria with Descriptions of Five New Species
    Ruthenica, 2013, vol. 23, No. 1: 59-67. © Ruthenica, 2013 Published online April 5, 2013. http: www.ruthenica.com Catalogue of the stygobiotic and troglophilous freshwater snails (Gastropoda: Rissooidea: Hydrobiidae) of Bulgaria with descriptions of five new species Dilian GEORGIEV Paisii Hilendarski University of Plovdiv, Faculty of Biology, Department of Ecology and Nature Conservation, 24 Tsar Assen Str., 4000 Plovdiv, Bulgaria, e-mail: [email protected] urn:lsid:zoobank.org:pub:03A66DFA-B197-47BA-AC0C-744844590BA9 ABSTRACT. New investigations of freshwater habi- erate flow. Stygobiont species make up almost all tats in caves revealed five new species of the Ris- the molluscs fauna associated with subterranean sooidea in Bulgaria. The new species: Belgrandiella continental waters [Bole, Velkovrh, 1986]. maarensis n. sp., Pontobelgrandiella tanevi n. sp. Shell morphology of the hydrobiids is often the (the second species from this genus ever known), main character for species and genera recognition, Bythiospeum simovi n. sp., Bythiospeum kolevi n. sp., and also occasionally even used to diagnose some Bythiospeum stoyanovi n. sp. are described and types illustrated. A synopsis of all published data on this higher taxa [Hershler, Ponder, 1984]. That is some- ecological gastropod group in the country was comp- times the only way to describe such stygobiotic liled and complemented by author’s unpublished data snail species, because there is no any possibility for to provide a catalogue of all known Bulgarian stygobi- the scientists to reach living populations in the otic and troglophilous freshwater snails with their lo- underground and study the soft body of the gastro- calities. pods. As an example, the Bulgarian species Paladil- hiopsis bureschi Wagner, 1927, Belgrandiella hessei Wagner, 1927, B.
    [Show full text]
  • Anual Report 2017 ENG.Cdr
    INTEGRATED ANNUAL REPORT 2017 B U I L D I N G O U R F U T U R E T O G E T H E R CONTENTS 03 04 CEO MESSAGE STRATEGIC REVIEW 15 26 ECONOMIC PERFORMANCE SOCIAL PERFORMANCE 53 64 ENVIRONMENTAL PERFORMANCE GOVERNANCE 71 APPENDIX This is TITAN Bulgaria's fourth Integrated Annual Report (IAR 2017). This report uses characteristics of the International Integrated Reporting Council's (IIRC) Guidelines to provide our stakeholders with comprehensive information by giving an overview of our business performance during 2017. The Reporting period is January 1st to December 31st, 2017. This Report presents the financial and non-financial disclosures of all operations of TITAN Group in Bulgaria, referred to as TITAN Bulgaria, including Zlatna Panega Cement AD (the legal entity for our cement and concrete operations) and all other TITAN Group subsidiaries in Bulgaria (GSPB EAD, Double W Co EOOD, GAEA EAD). Throughout the Report, TITAN Bulgaria is used wherever we refer to combined disclosures, except for specific cases where the exact name of the subsidiary is explicitly mentioned for pertinent figures and other disclosures. The main content of the Report includes an overall presentation of TITAN Bulgaria activities, goals and achievements, quantitative data and financial information for 2017. The IAR 2017 is independently verified for non-financial disclosures regarding the consistency to the UN Global Compact Communication on Progress principles and criteria. The audit expresses a limited assurance conclusion that the published disclosures and indicators for Health and Safety and Environmental performance have been established in accordance with the respective sectoral guidelines and protocols of the Cement Sustainability Initiative (CSI), which operates under the framework of the World Business Council for Sustainable Development (WBCSD).
    [Show full text]
  • BULGARIA: NONMETALLIC MINERAL PRODUCTS FACTSHEET Investbulgaria Agency – March 2010 Foreign Direct Investment Market Review
    BULGARIA: NONMETALLIC MINERAL PRODUCTS FACTSHEET InvestBulgaria Agency – March 2010 Foreign direct investment Market review Cumulative FDI in other nonmetalic mineral Company Net sales (EUR m), products' sector(Mio. USD) 2008 Devnya Cement JSC - Devnia 133,94 Zlatna Panega Cement JSC - 1003 124,58 Zlatna Panega Holcim Bulgaria JSC - Beli izvor 121,90 719 Trakia Glass Bulgaria SPJSC - 116,82 556 Targovishte 392 Drujba Glass Works JSC - Sofia 110,70 311 Ideal Standard Bulgaria SPJSC - 45,08 Sevlievo Vulkan Ciment JSC - Dimitrovgrad 42,05 Xella Bulgaria SPLTD - Sofia 32,25 Building Materials and Systems 23,88 2004 2005 2006 2007 2008 ABO Ltd - Plovdiv Baumit Bulgaria – Elin Pelin 23,68 Source: NSI Source:BEIS Production Manufacture of products from other Production of Production of ceramic products, non-metallic mineral materials, 2005- cement and lime, 2005-2008 (EUR m) 2008 (EUR m) 2005-2008 (EUR m) 65 65 59 61 58 1765 57 52 55 1501 43 43 48 1190 428 347 29 863 280 223 9 14 18 17 2005 2006 2007 2008 Sanitary ceramic 2005 2006 2007 2008 2005 2006 2007 2008 Ceramic construction bricks and fixtures Cement Lime Ceramic tiles Source: NSI Labour cost Production of glass and glass Annual average earnings in the products, 2005-2008 (EUR m) sector(Euro) 3596 310 283 2753 2310 212 1945 2049 125 2005 2006 2007 2008 2004 2005 2006 2007 2008 Source: NSI Success story Roca Bulgaria AD Wienerberger Bulgaria Part of Roca Corporacion Empresarial, S.A , Spain Entering the Bulgarian market in 1999 Part of Wienerberger AG, Austria – the biggest brick manufacturer in 2 factories for sanitary ware in Kaspichan (Shumen Municipality) the world and No.1 on the clay roof tiles market in Europe Total annual output is about 1 Mio.
    [Show full text]
  • Integrated Annual Report 2019
    INTEGRATED ANNUAL REPORT This is TITAN Bulgaria’s sixth Integrated Annual Report (IAR 2019), referred as ‘the Report’ throughout this About document (in printed or electronic format). The Report follows the principles of the International Integrated Reporting Council’s (IIRC) Framework to provide our stakeholders with comprehensive information by giving an the overview of our business performance during 2019. The reporting period is January 1st to December 31st, 2019. The Report presents the financial and non-financial disclosures of all operations of the TITAN Group in Report Bulgaria, referred to as TITAN Bulgaria, including Zlatna Panega Cement AD (the legal entity for our cement and concrete operations) and all other TITAN Group subsidiaries in Bulgaria (GAEA EAD, GSPB EAD and Double W Co EOOD). Throughout the Report, TITAN Bulgaria is used wherever we refer to consolidated disclosures, except for specific cases when the exact name of the subsidiary is explicitly mentioned for pertinent figures and other disclosures. The main content of the Report includes an overall presentation of TITAN Bulgaria activities, goals and achievements, quantitative data and financial information for 2019. The Report is independently verified for non-financial disclosures regarding the consistency to the UN Global Compact Communication on Progress principles and criteria. The audit expresses a limited assurance conclusion that the published disclosures and indicators for our Health and Safety and Environmental performance have been established in accordance with the respective sectoral guidelines and protocols of the Global Cement and Concrete Association, which – since January 1st, 2019 – continued all work and activities of the previous Cement Sustainability Initiative (CSI), which operated under the framework of the World Business Council for Sustainable Development (WBCSD).
    [Show full text]
  • Industry Report Real Estate Activities 2016 BULGARIA
    Industry Report Real estate activities 2016 BULGARIA seenews.com/reports This industry report is part of your subcription access to SeeNews | seenews.com/subscription CONTENTS I. KEY INDICATORS II. INTRODUCTION III. REVENUES IV. EXPENSES V. PROFITABILITY VI. EMPLOYMENT 1 SeeNews Industry Report NUMBER OF COMPANIES IN REAL ESTATE ACTIVITIES INDUSTRY I. KEY INDICATORS BY SECTORS SECTOR 2016 2015 2014 The Real estate activities industry in Bulgaria was RENTING AND OPERATING OF OWN OR 13,171 12,321 11,498 represented by 23,612 companies at the end of 2016, LEASED REAL ESTATE compared to 23,204 in the previous year and 22,533 in BUYING AND SELLING OF OWN REAL ESTATE 5,107 5,687 6,046 2014. MANAGEMENT OF REAL ESTATE ON A FEE OR 2,706 2,611 2,427 CONTRACT BASIS The industry's net loss amounted to BGN 75,706,000 in REAL ESTATE AGENCIES 2,628 2,585 2,562 2016. The industry's total revenue was BGN 4,990,645,000 in 2016, up by 13.62% compared to the previous year. III. REVENUES The combined costs of the companies in the Real estate The total revenue in the industry was BGN 4,990,645,000 in activities industry reached BGN 5,011,917,000 in 2016, up 2016, BGN 4,392,480,000 in 2015 and 4,504,857,000 in 2014. by 4.21% year-on-year. The industry's total revenue makes up 5.38% to the Total revenue country's Gross domestic product (GDP) in 2016, compared Net sales revenue to 4.92% for 2015 and 5.24% in 2014.
    [Show full text]
  • People Are the Key Teach for Bulgaria Foundation Annual Report 2017/2018
    PEOPLE ARE THE KEY TEACH FOR BULGARIA FOUNDATION ANNUAL REPORT 2017/2018 INITIATED AND GENEROUSLY SUPPORTED BY PEOPLE ARE THE KEY TEACH FOR BULGARIA FOUNDATION ANNUAL REPORT 2017/2018 INITIATED AND GENEROUSLY SUPPORTED BY PEOPLE ARE THE KEY TEACH FOR BULGARIA FOUNDATION ANNUAL REPORT 2017/2018 Authors: Pavlina Radoslavova Lyuba Yordanova Martin Dimitrov Editor: Pavlina Radoslavova Translation: Maya Stoyanova-Warner Correction (in Bulgarian): Penka Vatova, Milena Evtimova Design Ivan Panov | еpiquestudio.com Photos: Elena Nenkova, Mihail Novakov, Jordan Georgiev, Pavlina Radoslavova, Teach For All Contacts [email protected] +359 2 988 06 88 /zaednovchas.bg /TeachForBulgaria /zaednovchas Teach For Bulgaria was awarded as “Best training program” and “Best professional development program” in the Employer of the Year awards for 2018. The organization has a quality certificate ISO 9001:2015. 2 TEACH FOR BULGARIA FOUNDATION ANNUAL REPORT 2017/2018 TABLE OF CONTENTS TEACH FOR BULGARIA AND BULGARIAN EDUCATION 4 People Are the Key / An Address by Trayan Trayanov 6 For the Success of Every Child / Mission, Vision, Goals 8 What We Believe in / Our Values 10 Why Teach For Bulgaria / The Problem We Are Addressing 12 Our Work / Our Program for Leadership and Professional Development TEACH FOR BULGARIA’S YEAR 24 Our Year in Retrospect 26 Reach 28 Story: “Sometimes teachers have to be kind, but at other times they have to be strict.” 32 Story: Changing Students’ Lives Is One “Event” Away 36 Change Goes On/ Teach For Bulgaria Alumni 40 Story: The First
    [Show full text]
  • European Destinations of Excellence
    European Destinations of ExcelleNce ONLINE BULLETIN ON BULGARIAN EDEN DESTINATIONS, CREATED UNDER THE PROJECT ENTITLED “COMMUNICATION CAMPAIGN TO PROMOTE BULGAR- IAN EDEN DESTINATIONS – SECOND EDITION”, AS IMPLEMENTED BY THE MINISTRY OF TOURISM UNDER A GRANT FINANCIAL AID AGREEMENT WITH THE EUROPEAN COMMISSION NO 699265 OF JAN 18, 2016 (issue 9, November 2016) NEWS RELATING TO PROJECT IMPLEMENTATION The Ministry of Tourism presented the project entitled Communication Cam- paign to Promote Bulgarian EDEN Destinations – Second Edition during the TTR II (autumn) tourism exchange in Bucharest, Romania. The Ministry of Tourism’s project for promotion of Bulgarian EDEN Destinations was presented in the framework of the Ministry’s participation in the TTR II tourism exchange in Bucharest, Romania during the period 17.11.2016-20.11.2016. Presentation of those destinations was another opportunity to in- troduce them to both the general public and the professionals engaging in tourism (tour operators, sustainable tourism organizations, etc.). The project’s participation during the exhibition is part of the overall campaign for promotion of EDEN destinations and is a prerequisite for efficient ad- vertising of those destinations on the domestic market and for redirecting/generating extra tourist interest in those destinations. TTR /autumn/ is among the most significant tourism forums in Romania. The exchange is open to both professionals and the general public, gathering 226 exhibitors from Romania and other countries in 2015 and attracting over 15 000 visitors. The exhibition also has a spring edition, which is even livelier, with Bulgaria being a traditionally strong participant there as well. Romania is a major target market for Bulgaria, last year it topped the chart in terms of number of international tourists in our country, with over 986 000 visits and a 4% growth.
    [Show full text]
  • Arachnida, Pseudoscorpionida)
    Proc. 16th Europ. ColI. Arachnol. 261-269 Sied1ce,10.03.1997 A review of Bulgarian pseudoscorpions (Arachnida, Pseudoscorpionida) Boyan P. PETROV Stefan Milenkov str. 60, Sofia 1619, Bulgaria. Key words: Bulgaria, distribution, pseudoscorpions. ABSTRACT The paper is an outline survey on Bulgarian pseudoscorpions. Until now 43 species belonging to 8 families and 18 genera are reported from Bulgaria. The most diverse are the genera Chthonius C. L. Koch, 1843 (Chthoniidae) with 7 species and Neobisium Chamberlin, 1930 (Neobisiidae) with 12 species. Other genera are represented by 1-4 species each. Twelve species are endemic to the country. The taxonomic status and distribution Of some chernetid and cheliferid pseudoscorpions are not clear yet. Also the data on the distribution of all species are insufficient. Considering that the pseudoscorpion fauna of neighbouring countries (Romania, Yugoslavia, Macedonia, Greece) is rich - especially in endemics and relicts, it may be expected that the fauna of false scorpions in Bulgaria is much more diverse than is presently known. INTRODUCTION The Bulgarian pseudo scorpion fauna is not well researched, both in biogeographical and taxonomical aspects. Only some cavernicolous species of genera Chthonius, Neobisium and Roncus are comparatively better known. Speleologically studied caves in Bulgaria are over 4500. At the moment the biospeleological data are available from only 650 caves (Beron 1994) and most of them are incompletely studied. For about 25 of them is known to be inhabited by pseudoscorpions. A big amount of data on the distribution of false scorpions in the country (Beron in litt.) is still unpublished. Poorly known are litter, bark and soil dwelling species.
    [Show full text]
  • Integrated Annual Report 2019
    TITAN CEMENT GROUP Integrated Annual Report 2019 SUMMARY About the Report This is the Summary of the 2019 TITAN Cement Group Integrated Annual Report (IAR 2019), which has been prepared in accordance with the Belgian Law, the 2020 Belgian Code on Corporate Governance, the International Financial Reporting Standards (IFRS) and the International Integrated Reporting Council (IIRC) principles for integrated reporting. You may find the IAR 2019 at www.titan-cement.com/integratedannualreport2019. Other reporting frameworks followed by TITAN Group in the development and presentation of the IAR 2019 are the UN Global Compact Communication on Progress Guidelines, the Charter and the Global Cement and Concrete Association Guidelines and the UN SDGs 2030 as presented in the Non-Financial Review. The separate and consolidated financial statements of the IAR 2019 were audited by PWC. The Non-Financial Performance Overview and statements were independently verified at a reasonable level by ERM Certification and Verification Services (ERM CVS), in accordance with the guidelines and protocols of the Global Cement and Concrete Association (GCCA), as well as the “advanced” level criteria for Communication on Progress of the United Nations’ Global Compact (UNGC). The independent auditor’s report by PWC and the independent assurance statement by ERM CVS are included in the IAR 2019 and are available online at www.titan-cement.com/integratedannualreport2019. You may enter the IAR 2019 link by scanning the QR code with your mobile device. We welcome your feedback,
    [Show full text]