~'!:"i(Cfll( Government of ~'«~ +i'il11~4 Ministry of Power ~if~ PJf~'Q '51TnTcp~'Uf Central Electricity Authority PJf~'Q ~urr~ 41"\il"o:rr ~ct ~::~~rt;;po:r ~ mlf-II Power System Planning & Appraisal Division-11

No. 66/5/2017/PSPA-2/ 513,21 Dated: 13 .07.201 T: ~ J< /f ~~';.;~. --';;_1 To As per List Enclosed

Subject: 19th Meeting of Standing Committee on Power System Planning in Eastern Region -Agenda.

Sir/Madam, Agenda of 19th Meeting of Standing Committee on Power System Planning in Eastern Region is available on the CEA, website: (Path to access- www.cea.nic.in/Wings/Power Systems/PAP&A-II/Standing Committee on Power System Planning/Eastern Region). Exact date and Venue of the meeting will be intimated shortly.

The meeting will be chaired by Member(Power System), CEA. You are requested to kindly make it convenient to attend the meeting to resolve various issues relating to transmission system of Eastern Region.

Copy for kind information to:

1) PPS to MemberPS, CEA

ircrr'+fCI"ii, am:.~- ~-1, ~~-110066 ~Jlil"'': 011-26198092 ~: [email protected] ~iil'tii~C:: www.cea.nic.in Sewa Bhawan, R.K Puram-1, New Delhi-11 0066 Telephone: 011-26198092 Email: [email protected] Website: www.cea.nic.in

1 List of addressee:

1. Managing Director, 2. Director (System), State Power Transmission Company, Damodar Valley Corporation Vidyut Bhavan, Baily Road, DVC Towers, VIP Road,Kolkata-700054. Patna-800021. Tel. 033-23557934 Tel. 0612-2504442 Fax No. 23554841 Fax No. 0612-2504557 3. Member Secretary, 4. Director (Commercial), Eastern Regional Power Committee, Grid Corporation of Orissa Ltd, 14, Golf Club Road, Tollygange, Jan path, Bhubaneshwar-751022. Kolkata-700033. Tel. No. 0674-2541127 Tel. No. 033-24235199 Fax No. 0674-2541904 1-~ Fax No.033-24171358 -~; if ... 5. Director (Transmission), 6. Director (Operation), Orissa Power Transmission Corporation West Bengal State Electricity Transmission Ltd, jan path, Bhubaneshwar-751022. Company Ltd, Vidyut Bhavan, 5th Floor, Tel. No. 0674-2540098 Block-D, Bidhannagar, Sector-11, Kolkata- Fax No.0674-2541904 700091. Tel. No. 033-23370206 Fax No.033-23342243 7. Principal Chief Engineer cum Secretary, 8. Managing Director, Power Department Urja Sancharan Nigam Limited Government of Sikkim, Sikkim. Engineering Building, Tel. No. 03592-2022440 H.E.C., Dhurwa,- Fax No.03592-202927 -834004. Fax-0651-2400799

9. CEO,POSOCO 10. Director (Projects), B-9, Qutub Institutional Area, Power Grid Corporation of India Katwaria Sarai, New Delhi-110016 "Saudamini" Plot No.2, Sector-29, Tel. No. 26852843 Gurgaon-122001 FaxNo.2626524525,26536901 Tel. No. 0124-2571816 . Fax No.0124-2571932 11. Director (Teclinical); 12. Executive Director (T &RE), NTPC Limited, NHPC Ltd, NHPC Office complex, Engineering Office Complex, Sector 33, Faridabad-121003. A-8, Sector 24, Noida. . Tel. No. 0129-2255805 Tel. No. 24362050 Fax No. 0129-2277523 Fax No. 24362421 ) Copy to:

1. Chairman-cum-Managing Director(CMD), Orissa Power Transmission Corporation Ltd(OPTCL), With request to nominate concerned officer Jan path, Bhubaneshwar-751022. Tel. No. 0674-2540098

2. General Manager,Eastern Regional Load Dispatch Center, 14, Golf<;lub Road, Tollygange, Kolkata-700033. Fax No. Q33-24235809

2 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

Agenda for 19th Standing Committee Meeting on Power System Planning of Eastern Region

1.0 Confirmation of the minutes of 18th Standing Committee Meeting on Power System planning of Eastern Region. 1.1 The minutes of the 18th meeting of the Standing Committee on Power System Planning held on 13th June, 2016 at Kolkata were circulated vide CEA letter no. 66/5/SP7PA-2016/139-150 dated 19th August, 2016. ERPC vide their letter no. ERPC/MS/2016/767 dated 06.09.2016 and POWERGRID vide their letter no. C/CTU-Plg/E/SCM dated 23-09-2016 had submitted their comments and a corrigendum was issued by CEA vide letter No. CEA/PSPA-2/66/5/2016/265-275 dated 26.09.2016. Also, 2nd Corrigendum to the minutes issued to bring clarity were circulated vide CEA letter No. 66/5/PSPA-II/2016/344-355 dated 20.10.2016. WBSETCL has also requested some modifications to the minutes vide their letter no. No. CE/CPD/CEA/1136 dated 05.10.2016 and 3rd corrigendum was circulated vide CEA letter no. 66/5/PSPA-2/2016/413-423 dated 15.11.2016. 1.2 Members may confirm the minutes of 18th Standing Committee Meeting and the three corrigenda of the minutes. 2.0 Termination of 400kV lines at Jeerat (WBSETCL) S/s under the ERSS-XV and ERSS-XVIII schemes

2.1 Ministry of Power had appointed PFC Consulting Ltd (PFCCL) as BPC for ERSS-XVIII scheme. PFCCL vide its letter No. 03/16-17/ITP-23/MJTL/RfQ dated 19.08.2016 intimated CEA that there was a RoW constraint for termination/interconnection of Jeerat(New) - Jeerat(WBSETCL) 400kV D/c (Quad) to be developed under TBCB at the proposed GIS location at existing Jeeart(WBSETCL) substation. 2.2 In order to address the RoW constraint, a joint team of officials of WBSETCL, CEA, CTU, PFCCL, POWERGRID (ER-II) visited the Jeerat substation of WBSETCL on 09th September, 2016. This was followed by a joint meeting of the above officials on 10th September, 2016 at WBSETCL office, Kolkata. Copy of minutes of meeting dated 10.09.2016 at Annexure-2.1. 2.3 Following 400kV lines are existing / under construction / planned at 400/220kV substation of Jeerat (WBSETCL) : Existing:

(i) Jeerat (WBSETCL) – Baharampur/Farakka 400kV S/c line of POWERGRID

(ii) Jeerat (WBSETCL) – Rajarhat/Subhashgram 400kV S/c line of POWERGRID

(iii) Jeerat (WBSETCL) – Barkeshwar (WBSETCL) 400kV S/c line of WBSETCL

(iv) Jeerat (WBSETCL) – Kolaghat (WBSETCL) 400kV S/c line of WBSETCL

3 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

Under Construction:

(v) LILO of Sagardighi – Subhashgram 400kV S/c line at Jeerat (WBSETCL) as a part of ERSS-XV – by POWERGRID

Planned:

(vi) Jeerat (New) – Jeerat (WBSETCL) 400kV D/c line (quad) as a part of ERSS-XVIII – to be implemented as ISTS under tariff based competitive bidding route.

2.4 In the meeting, WBSETCL was requested to submit the detailed survey report regarding feasibility of overhead crossing of existing lines mentioned at 2.3(i) to 2.3(iv) by two D/c lines mentioned at 2.3(v) & 2.3(vi) for termination at GIS extension of Jeerat S/s of WBSETCL. WBSETCL vide its letter dated 05.10.2016 has submitted the detailed survey report, wherein WBSETCL mentioned that overhead crossing of the existing lines are not feasible as it requires huge height of crossing towers as well as considerable space for maintaining required tower falling height. 2.5 Further, a meeting was held on 14.12.2016 at CEA regarding the above issue. Copy of minutes of meeting issued vide letter dated 27.01.2017 is at Annexure-2.2. In the meeting, it was agreed that dismantling the crossing portion of the existing lines (ISTS and State lines) and termination of the existing lines through GIS bus duct might be the appropriate option, as the new lines mentioned at 2.3(v) and 2.3(vi) can be directly terminated on separate double ckt towers at normal height (around 45 meters) to new GIS extension area. The following points were agreed in that meeting and these needs to be ratified in this Standing Committee meeting: 2.6 Following scope may be implemented at Jeerat S/s by POWERGRID as an additional scope under already approved ERSS-XV scheme: (i) Dismantling of dead end towers and termination of existing lines mentioned at 2.3 (i) to 2.3 (iv) through GIS duct to the existing 400kV Jeerat AIS S/s (WBSETCL). (ii) It was also agreed that the termination of the WBSETCL lines mentioned at 2.3 (iii) & 2.3 (iv) through GIS duct to the existing 400kV Jeerat AIS S/s (WBSETCL) shall be implemented as ISTS and included in the approved scope of ERSS-XV being implemented by POWERGRID and cost recovered by POWERGRID as ISTS transmission tariff . (iii) Further, it was also acknowledged that implementation of LILO of Sagardighi-Subhasgram 400kV at Jeerat along with associated line bays shall get delayed by about one year due to addition of above mentioned GIS duct arrangement.

4 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

(iv) The new lines mentioned at 2.3 (v) and 2.3 (vi) can be directly terminated on separate double ckt towers at normal height (around 45 meters) to new GIS extension area. 2.7 WBSETCL vide letter dated 04.04.2017 (Enclosed at Annexure-2.3) informed that WBSETCL has considered and accepted the above mentioned scope (Dismantling of dead end towers and termination through GIS Bus duct by POWERGRID under ISTS) of the minutes of meeting held on 14.12.2016 at CEA. 2.8 Members may discuss. 3.0 Creation of 220kV level at the under construction 400/132kV Motihari (TBCB) – Proposal of BSPTCL

3.1 400/132kV (2x200MVA) Motihari GIS substation is under construction through TBCB by M/s Essel Infra. BSPTCL had requested to create 220kV level in the 400/132kV Motihari GIS substation to avoid additional expenditure and time on creating a new 220/132kV Motihari (New) substation planned under intra-state strengthening scheme in 13th Plan. In this regard, a meeting was held at CEA on 18.01.2017 with the representatives of CTU and BSPTCL. Copy of minutes of meeting is at Annexure-3.1. In the meeting it was decided that shifting of the new 220/132kV S/s from Motihari (New) to Raxaul (New) with the following scope of works would be better option. Raxaul (New) S/s: 220/132kV, 2x200MVA (to be implemented by BSPTCL) (a) Sitamarhi (New) – Raxaul (New) 220kV D/c (Twin Moose) (b) Raxaul (New) – Gopalganj 220kV D/c (Twin Moose/ Single Zebra) (c) LILO of Bettiah – Raxaul 132kV D/c line at Raxaul (New) 3.2 In the meeting, following was agreed: (i) The available space in the Motihari substation is not adequate to accommodate the proposed 220kV extension of BSPTCL. Creation of 220kV level would restrict any future expansion plans at Motihari S/s. Load flow results also shows that Motihari (TBCB) – Raxaul and Motihari (TBCB) – Bettiah 132kV D/c lines are critically loaded, when 220kV level is created at Motihari (TBCB) S/s. (ii) The new 220/132kV substation at Motihari is planned primarily to feed the loads of Gopalganj, Bettiah and Raxaul, it was decided to shift the planned substation towards Bettiah/Raxaul keeping the same connectivity. Based on the above observations and load flow studies, the new 2x200MVA, 220/132kV S/s may be created near Raxaul with Sitamarhi(New) – Raxaul(New) 220kV D/c (twin Moose) line and LILO of Bettiah – Raxaul 132kV D/c line.

5 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

(iii) Considering the lower projected load growth of Bihar in 19th EPS, it was suggested that the implementation of Raxaul (New) – Gopalganj 220kV D/c may be taken up at a later date. (iv) BSPTCL may send their proposal on the basis of above discussion to CEA for taking up with forthcoming meeting of the Standing Committee (SCMPSPER) for finalization. 3.3 BSPTCL has sent agenda through their letter dated 28.03.2017 and the same is enclosed at Annexure-3.2. In its agenda BSPTCL proposed to construct a new GSS 220/132 kV, 2x200 MVA near Raxaul with the following scope of works to be implemented by BSPTCL. i) Raxaul (New) S/s: 220/132kV, 2x200MVA

ii) Sitamarhi (New) – Raxaul (New) 220kV D/c (Twin Moose)

iii) * Raxaul (New) – Gopalganj 220kV D/c (Twin Moose/ Single Zebra)

iv) LILO of Bettiah – Raxaul 132kV D/c line at Raxaul (New)

Note: * this line may be implemented at later date. The above is in place of Motihari new 220/132 kV, as proposed under 13th plan with the following scope of works. i) Sitamarhi (New) – Motihari (New) 220kV D/c (Twin Moose)

ii) Motihari (New) – Gopalganj 220kV D/c (Twin Moose)

iii) Motihari (New) – Raxaul 132kV D/c

iv) Motihari (New) – Betiah 132kV D/c ( Single Moose)

3.4 BSPTCL may present. Members may discuss.

4.0 Modifications/ additions in bay equipment of 400/220 kV sub- station of POWERGRID and generation switchyard of Maithon-RB

4.1 Reconductoring of Maithon RB - Maithon 400kV D/c with HTLS conductor was approved in 18th Standing Committee Meeting held on 13.06.2016. Along with line reconductoring, necessary modifications/ additions in bay equipment at Maithon 400/220kV sub-station of POWERGRID and at generation switchyard of Maithon-RB needs to be carried out by POWERGRID. It is intimated that approval under section-68 of Electricity Act-2003 has already been issued to POWERGRID on 07.02.2017 along with scope of requisite modifications/ additions in bay equipment at Maithon 400/220kV sub-station of POWERGRID and at generation switchyard of Maithon-RB. Copy of the approval is at Annexure-4.1. 4.2 Members may approve.

6 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

5.0 Revised dedicated transmission system for Lanco Babandh Power Pvt. Ltd. (2x660 MW)

5.1 Lanco Babandh generation project (4x660MW) was granted LTOA of 1600MW (NR-650MW & WR-950MW) by CTU vide its letter C/ENG/E/00/SEF/OA dated 14.05.2009 with the following dedicated transmission system. a) 400kV Lanco Babandh TPS - 765/400 kV Angul Pooling station (PGCIL) 2xD/c lines with associated bays to be developed as a dedicated lines by the generation developer. b) 3X1500 MVA, 765/400 kV ICTs at Angul with associated bays to be developed by the generation developer. 5.2 MoP vide its letter no. 11/2/2011-PG(LBPL) dated 09.06.2011 has granted prior approval of the Government under section 68 of the Electricity Act 2003 based on minutes of 11th meeting of Standing Committee Meeting on Power System Planning in Eastern Region held on 20.09.2010 with the above scope of work. This approval expired on 08.06.2014 because the implementing agency did not start the construction works within 3 years from date of grant of Sec-68 approval. 5.3 Subsequently, Lanco Babandh Power Pvt. Ltd. (LBPPL) has relinquished its long term access to the tune of 800MW in line with CERC order dated 08.06.2013 in petition No: 118/MP/2012 due to non-implementation of Phase-II (2x660MW). Revision of LTOA from 1600MW to 800MW was issued to LBPL with allocation of NR-650MW & WR-150MW based on the minutes of 11th Connectivity and LTA meeting of ER held on 13.06.2016. The following revised dedicated transmission system was proposed by CTU vide its letter No. C/CTU-Plg/E/LTA/Lanco Babandh dated 19.10.2016 (Copy is at Annexure-5.1) based on the revised LTOA quantum of 800MW. (a) Lanco Babandh Gen Switchyard - Angul 400kV D/c line (Equivalent to triple snow bird or higher) (b) 2X1500 MVA, 765/400 kV ICT (7x500MVA single phase units) at Angul along with associated bays 5.4 Subsequently, Lanco vide letter dated 15-11-2016 requested for review of requirement of above mentioned revised dedicated system on mutually agreed terms in view of non-commissioning/non-implementation of certain generation projects at Angul. The revision of Lanco’s dedicated system is being considered at its own request as also on its own risk and cost. Further, as Lanco had relinquished LTA for 800 MW under Petition No. 118/MP/2012 and is also presently contesting a petition (38/MP/2016) before CERC inter alia seeking abeyance of LTA, the revision discussed hereunder shall be without prejudice to the proceedings before CERC and to Lanco’s liability(ies) towards payment of relinquishment/transmission charges as the case may be.

7 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

5.5 Considering the following existing/under-construction generation projects at Angul it is observed that margin is available in the existing 765/400kV, 4x1500MVA ICTs for power evacuation from Lanco. Generation projects at Angul S/s Original Original Revised Revised Sl. Project Capacity LTOA Capacity LTOA/LTA Schedule No. (MW) (MW) (MW) (MW) GMR Kamalanga 1 Energy Ltd. 1050 800 700 647 Commissioned (*3X350MW) Monnet Power Ltd. 2 1050 900 1050 900 Uncertain (2x525MW) Jindal India Thermal 3 1200 1044 1200 95 Commissioned Ltd. (2x600MW) Navbharat Power 4 1050 720 0 0 Uncertain Pvt. Ltd. (2x525MW) Lanco Babandh U-1: Sept’18 5 Power Pvt. Ltd. 2640 1600 1320 800 U-2: Jan’19 (4x660MW) Total 6990 5064 4270 2442

Note: * one unit has been connected to Odisha intra-state system.

5.6 In view to the above, it is proposed to revise the dedicated transmission system of Lanco Babandh project as mentioned below:  Lanco Babandh Gen Switchyard - Angul 400kV D/c line (triple snow bird) 5.7 In the 11th Joint Coordination Committee (JCC) meeting of CTU held on 27-12-2016 LBPPL has indicated its commissioning schedule as Mar 2018. LBPPL has neither awarded construction of its dedicated line nor the line bays at Angul. 5.8 Members may discuss. 6.0 Evacuation of power from Patratu (3x800MW) TPS 6.1 Patratu Vidyut Utpadan Nigam Limited (PVUNL) (3X800+2X800MW) is a joint venture of NTPC Ltd. and the Jharkhand state government owned Patratu Thermal Power Station (PTPS). 6.2 A meeting regarding evacuation of power from Patratu (3x800MW) TPS was held on 20.01.2017 at CEA with NTPC, CTU and JUSNL. Copy of minutes of meeting is at Annexure-6.1. In the meeting, CTU representative informed that Patratu Vidyut Utpadan Nigam Ltd. (PVUNL) has applied for connectivity of 2400MW (Phase-I), to the ISTS system, from Dec, 2020 for their planned Patratu (3x800MW) TPS situated in Ramgarh District of Jharkhand. 6.3 PVUNL informed that 85% of power is allocated to Jharkhand state and 15% is kept as unallocated power. This matter was discussed and it was agreed that as majority of power of Patratu TPS is allocated to Jharkhand, it would be prudent that Patratu TPS is directly connected with JUSNL (Jharkhand

8 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

STU) system. If remaining share (15%) of power of Patratu TPS is to be transferred outside Jharkhand, for which PVUNL may apply for ISTS Long Term Access to CTU (POWERGRID), as per CERC regulations. 6.4 Joint studies were carried out to evolve immediate evacuation system for Patratu (3x800MW) TPS. Studies are available at Annexure-6.1. and accordingly following power evacuation system from Patratu (3x800MW) TPS was evolved: (a) Patratu gen. switchyard – Patratu (JUSNL) S/s 400kV (Quad Moose) D/c line (b) Patratu gen. switchyard – Koderma (JUSNL) S/s 400kV (Quad Moose) D/c line (c) Patratu gen. switchyard – New Chandil (JUSNL) S/s 400kV (Quad Moose) D/c line (d) 420kV, 2x125MVAR bus reactors at Patratu gen. switchyard and 420kV, 1x125MVAR bus reactor at Patratu 400kV bus (e) From Patratu 400/220/132kV substation: (i) Patratu (JUSNL) S/s to 400kV D/c line (already under construction) (ii) Patratu (JUSNL) to Ranchi (POWERGRID) 765/400kV S/s 400kV D/c line (already under construction) along with LILO of both circuits at Mandar 400/220kV S/s 6.5 In this way, Patratu generation would also get connected to strong ISTS pooling stations viz. (i) Ranchi (POWERGRID) 765/400kV through Patratu (JUSNL) and (ii) Chandwa Pool (POWERGRID) through Patratu (JUSNL) & Latehar (JUSNL) substations of JUSNL. 6.6 Further, the connectivity of Patratu (3x800MW) TPS to Koderma (northern part of Jharkhand) and New Chandil (south-eastern part of Jharkhand) through 400kV high capacity (Quad Moose) double circuit lines would facilitate the transfer the power from Patratu TPS to different load centers in Jharkhand. 6.7 These interconnections would complete the 400kV high-capacity ring viz. Patratu TPS – Koderma – (ISTS) – New Chandil – Patratu TPS in Jharkhand, which shall improve reliability of power transfer within the state. 6.8 From the joint studies, it was also observed that three-phase fault level at both Patratu (3x800MW) TPS and Patratu (400/220kV) substation is about 50kA. Accordingly, it was decided that 400kV bus at Patratu generation switchyard as well as Patratu (400/220kV) substation (JUSNL) would be designed with 63kA fault level for 1sec.

9 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

6.9 JUSNL informed that construction is yet to start at Patratu (400/220kV) substation. Therefore, it was suggested that JUSNL would explore possibility of construction of 400kV and 220kV level at Patratu (400/220kV) substation with fault level of 63kA and 50kA respectively. 6.10 In view of the above, after the approval of the above system in this Standing Committee Meeting, ISTS Connectivity application of PVUNL for Patratu TPS shall be closed and PVUNL may apply for connectivity of its Patratu (3x800MW) TPS to JUSNL (STU of Jharkhand). 6.11 Members may discuss. 7.0 Perspective transmission plan of JUSNL up to 2021-22

7.1 JUSNL informed that at present power demand of Jharkhand is about 1855.5MW (JUSNL area has 1068MW load and DVC area has 787.5MW load). The total load projected for Jharkhand for the year 2021-22 is around 5613MW (4193MW for JUSNL area + 1420MW for DVC area). 7.2 Load flow studies were carried out for projected peak load of Jharkhand as 4193MW for the year 2021-22. 7.3 JUSNL had submitted draft report on perspective transmission plan of JUSNL up to 2021-22. In the meetings held on 26.10.2017 and 20.01.2017, some modifications were proposed by CEA and CTU to incorporate in the study. The copy of Minutes of meeting held on 20.01.2017 is at Annexure- 6.1. JUSNL incorporated these changes and submitted the compliance report vide their email dated 01.02.2017. The compliance report is available in the minutes. 7.4 The following 400/220kV intra-state substations along with downstream connectivity mentioned at Annexure-7.2 were agreed under perspective transmission plan of JUSNL up to 2021-22: (i) Jasidih 400/220kV, 2x500MVA (ii) New Chandil 400/220kV, 2x500MVA (iii) Koderma 400/220kV, 2x500MVA (iv) Mandar 400/220kV, 2x500MVA (v) 400/220 kV , 2x500 MVA ( with commissioning of Tenughat Ph-2 (1320 MW)) Note: 420kV, 2x125MVAR bus reactors may be installed at all of the above new 400kV substations of JUSNL for voltage control.

7.5 The transmission system planned for JUSNL network along with evacuation system of PVUNL would create a high capacity 400kV ring Patratu TPS – Koderma – Jasidih – Dhanbad (ISTS) – New Chandil – Patratu TPS in Jharkhand, which would improve reliability of power transfer within the state.

10 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

The intra-state system of Jharkhand would also get well interconnected at various ISTS points for smooth power exchange. 7.6 In the meeting, it was pointed out that 220kV D/C line considered from Chaibasa (JUSNL) to Ramchandrapur 220/132kV substation was earlier envisaged as Chaibasa (POWERGRID) to Ramchandrapur 220/132kV substation. In the 18th SCM of ER, JUSNL had informed following outlets for utilization of 4 no. 220kV line bays at Chaibasa (POWERGRID) substation: (i) Chaibasa (POWERGRID) – Chaibasa (JUSNL) 220kV D/c (ii) Chaibasa (POWERGRID) – Ramchandrapur (JUSNL) 220kV D/c line 7.7 However, as per detailed scope of work submitted by JUSNL, the line at (ii) above is proposed to be terminated at Chaibasa (JUSNL) substation and hence connectivity considered in revised draft report studies i.e. Chaibasa (JUSNL) – Ramchandrapur 220kV D/c line is retained. 7.8 Accordingly, it is imperative that JUSNL may plan a new outlet from Chaibasa (POWERGRID) to utilize the remaining 2 no. 220kV line bays already constructed. 7.9 Jharkhand may update on utilisation of remaining 2 no. 220kV line bays constructed at Chaibasa (POWERGRID). 7.10 Members may discuss. 8.0 Transmission system for evacuation of power from Buxar Thermal Power Project (1320 MW) – Agenda of BSPTCL 8.1 BSPTCL vide their letter dated 25.10.2016 (copy at Annexure 8.1) requested CEA to examine their proposal for evacuation of power from Buxar Thermal Power Project. BSPTCL has proposed following evacuation system: 400 kV  Buxar TPS - Naubatpur 400kV D/C 220 kV  Buxar TPS - Dumraon new 220kV D/C (Twin Moose)  Buxar TPS - Pusauli (BSPTCL) 220kV D/C (Twin Moose)  Buxar TPS - Dehri 220kV D/C  2X500MVA 400/220kV ICT at Buxar generation switchyard-under the scope of respective generation project. 8.2 Members may discuss. 9.0 Connectivity of Railway TSS with ISTS network for Mughal Sarai – Howrah route 9.1 Railway Board vide its letter dated 09.09.2016 has requested for connectivity to Railways from various ISTS points to feed their TSS (Traction Sub Station) for Mughal Sarai(NR) – Howrah(ER) route (Copy enclosed at Annexure-9.1).

11 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

9.2 A meeting was held on 07.10.2016 in CEA to discuss the connectivity of Railways’ TSS with ISTS network for two routes of Railways i.e. (i) Delhi (NR) – Bharuch (WR) route (ii) MughalSarai (NR) – Howrah (ER) route (MoM enclosed at Annexure-9.2). In the meeting, following ISTS substations were preliminarily identified for giving connectivity to the Railways TSS for its MughalSarai (NR) – Howrah (ER) route: (i) Arah or Patna (ii) Gaya or Chandoti (iii) Maithon (iv) Durgapur (v) Lakhi Sarai (vi) Subhashgram 9.3 M/s PGCIL was requested to furnish the information regarding the availability of space for 2 nos. 220 kV bays and margins in transformation capacity at each of the above substation. Railways were requested to provide information about its present connectivity (connectivity of TSS along this route) with STUs. 9.4 Railway board vide its letter dated 19.10.2016 has furnished the information about its TSS points and their present connectivity with state utilities. 9.5 A meeting was held on 20.04.2017 at CEA with STUs regarding connectivity of Railways with ISTS network for the Mughalsarai – Howrah. Minutes of the meeting enclosed at Annexure-9.3. 9.6 Members may discuss. 10.0 Modification in - Common Transmission System for Phase-II generation project in Odisha- agenda by POWERGRID 10.1 In the 18th ER SCM, it was suggested to review the installation of 765/400kV, 2x1500MVA ICTs at Angul S/s in view of non-materialisation of some of the IPPs envisaged to be connected at Angul substation. 10.2 Accordingly, the matter has been reviewed by CTU (POWERGRID) and the following has been observed: i) In view of uncertain commissioning of NSL (connectivity cancelled) and Talcher-III (connectivity and LTA applications closed) generation projects and non-materialisation of Navbharat (applicant has filed for relinquishment in CERC) generation project, the installation of 765/400kV, 2x1500MVA ICTS at Angul is not required. ii) Accordingly, the spare 765/400kV, 500MVA ICT (single phase unit) at Angul S/s is also not required. iii) The bus splitting at Angul at both 400kV and 765kV levels is not required at present as the fault level at Angul is found to be within rated limits.

12 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

iv) The split bus arrangement may be implemented in future under a different scheme upon firming of generation projects near Angul. v) The spare 765/400kV, 500MVA ICT (single phase unit) at Sundargarh (Jharsuguda) S/s is not required. 10.3 In view of the above, following elements are proposed to be deleted from POWERGRID’s scope under the scheme – “Common Transmission System for Phase-2 Generation Projects in Odisha”: (i) 2x1500MVA, 765/400kV ICTs at Angul S/s along with associated bays (ii) Split Bus Arrangement at Angul S/s at 765kV & 400kV buses (iii) 500MVA, 765/400kV single phase spare ICT unit each at Angul and Sundargarh (Jharsuguda) substations

10.4 Members may approve. 11.0 Termination of 220kV side of 400/220kV, 500MVA ICT-4 at Biharsharif (POWERGRID) substation under ERSS-XX- Agenda by POWERGRID 11.1 In the 18th ER SCM, installation of 400/220kV, 500MVA ICT-4 at Biharsharif (POWERGRID) substation by POWERGRID under ERSS-XX scheme was approved. 11.2 In this regard, it is to mention that there is no 220kV bus at Biharsharif (POWERGRID) S/s. Accordingly, 220kV side of the existing three ICTs is terminated at Biharsharif (BSPTCL) S/s which is adjacent to Biharsharif (POWERGRID) S/s. Similarly, for installation of 4th 400/220kV ICT, 220kV ICT bay needs to be constructed at Biharsharif (BSPTCL) S/s along with small 220kV interconnecting line section from 220kV ICT bushing to 220kV ICT bay. 11.3 Accordingly, termination of 220kV side of the 400/220kV, 500MVA ICT-4 at 220kV bus of Biharsharif (BSPTCL) S/s and laying of small 220kV interconnecting line section from 220kV ICT bushing to 220kV ICT bay under ERSS-XX is proposed by POWERGRID. This proposal has already been granted in principle approval by CEA vide our letter no. 77/7/PSPA- II/2017/12 dated 05-01-2017 (Copy at Annexure-11.1). 11.4 Members may approve. 12.0 Baharampur (India) – Bheramara (Bangladesh) 2nd 400kV D/c line Agenda by POWERGRID 12.1 Cross border interconnection between India and Bangladesh through Baharampur (India) - Bheramara (Bangladesh) 400kV D/c line along with 500MW HVDC Back-to-Back terminal at Bheramara, was commissioned in Sept 2013. About 500MW of power is being transferred from India to Bangladesh through this link. 12.2 The capacity of Bheramara (Bangladesh) HVDC station is being upgraded from 500MW to 1000MW by Bangladesh. The system strengthening required

13 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

in the Indian and Bangladesh side for transfer of about 1000MW from India to Bangladesh is already under implementation. In regard to N-1 reliability criteria for 1000MW export to Bangladesh, it was decided that during single circuit outage of Baharampur – Bheramara 400kV D/c line, Bangladesh would restrict/reduce the loading on the operating circuit to the permissible extent with the help of runback control /ramping down facility on the HVDC system. 12.3 Therefore, in order to ensure reliable supply of 1000MW power to Bangladesh from Baharampur, it was decided in the 12th India-Bangladesh Joint Steering Committee (JSC) meeting (on 11th Dec 2016) to construct a 2nd 400kV D/c transmission line from Baharampur (POWERGRID) to Bheramara (Bangladesh) in matching time frame of 2nd 500MW HVDC terminal at Bheramara. Further, in the 12th JSC meeting it has also been decided that, the Indian portion of the line may be implemented by POWERGRID and the mechanism of sharing of transmission charges by Bangladesh for Indian portion of this link would be on same principles as for the first Baharampur – Bheramara link. Accordingly, MoP vide letter no. 9/5/2016-Trans-Vol-2 dated 01-03-2017 has granted approval for implementation of Indian portion of Baharampur (India) – Bheramara (Bangladesh) 2nd 400kV D/c line along with 2 no. 400kV line bays for termination of this line at Baharampur S/s through regulated tariff mechanism route. 12.4 Members may approve.

13.0 High Capacity India-Bangladesh AC Corridor and Formation of second 400kV node in NER-ER Corridor- Agenda by POWERGRID 13.1 In the 5th SCM of NER, it was informed that at present the ER-NER corridor is connected mainly through 400/220kV Bongaigaon S/s in NER. In case of any eventuality at Bongaigaon S/s, there is no second in feed to NER from NEW grid. Therefore, it was agreed that there is a need for 2nd 400kV AC node for interconnection with national grid. The same has been taken into account while planning new interconnection between India and Bangladesh. 13.2 The new interconnection between India and Bangladesh has been planned with high capacity AC link (765kV line to be initially operated at 400kV) to interconnect Bangladesh with Eastern Region (ER) and North Eastern Region (NER) of Indian grid. The scheme has been discussed in the 11th India-Bangladesh JSC/JWG meeting held on 13th July 2016. The scheme consists of establishment and interconnection of following substations in NER, ER and Bangladesh. . In NER: In view of space constraint at Bongaigaon S/s and to provide a reliable take off point in NER, it was proposed to establish new 400kV substation (to be upgraded to 765kV level in future) at Bornagar in Assam, about 50km away from Bongaigaon, through LILO of Bongaigaon

14 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

– Balipara 400kV D/c (quad) line and extension of Alipurduar-Bongaigaon 400kV D/c line to Bornagar substation. Bornagar substation would also act as alternative in-feed to NER in addition to Bongaigaon. . In ER: A new 400kV substation (to be upgraded to 765kV level in future) was proposed as a probable take-off point at Katihar (near Purnea) in ER through LILO of both ckts of Rajarhat-Purnea D/c line (one ckt via Gokarna and other ckt via Farakka). . In Bangladesh: A new 400/230kV substation at Parbotipur (to be upgraded to 765kV level in future) was proposed for the drawl of power by Bangladesh. The proposed interconnection has been planned to connect Parbotipur in Bangladesh to Katihar in Eastern Region and Bornagar in North Eastern Region through 765kV D/c line to be initially operated at 400kV for supply of 500MW power to Bangladesh in Phase-I.

. Bangladesh will draw the power at Parbotipur through HVDC back-to- back. . In Phase-II, this interconnection would be upgraded to 765kV for transfer of about 1000MW power to Bangladesh along with upgradation of associated AC substations and augmentation of HVDC terminal at Parbotipur with another block of 500MW. 13.3 Accordingly, the following scope of work is proposed: Phase-I Indian Side:  New 400kV substation (upgradable to 765kV at a later date) at Bornagar (Assam) with LILO of Balipara - Bongaigaon 400kV D/c (quad) line.

15 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

 Disconnection of Alipurduar-Bongaigaon 400kV D/c (quad) line from Bongaigaon and extension of the same to Bornagar with 400kV D/C (quad) line so as to form Alipurduar-Bornagar 400kV D/c (quad) line.  New 400kV substation (upgradable to 765kV at a later date) at Katihar (Bihar) with LILO of both ckts of Purnea - Rajarhat 400kV D/c (triple snowbird) line (one ckt via Gokarna and other ckt via Farakka). Common:  Katihar (ER) - Parbotipur (Bangladesh) - Bornagar (NER) 765kV D/c line to be initially operated at 400KV Bangladesh Side:  1x500MW, HVDC Back-to-back converter station at Parbotipur Phase-II Indian Side:  Upgradation of Katihar and Bornagar substations from 400kV to 765kV  Operation of Katihar - Parbotipur - Bornagar 765kV D/c line at its rated voltage  Other system strengthening in ER and NER (to be identified at alter date) Bangladesh Side:  Augmentation of HVDC back-to-back substation at Parbotipur (Bangladesh) by another 1x500MW (total 2x500 MW) block  Upgradation of Parbotipur substation from 400kV to 765kV

13.4 Detailed scope of works is at Annexure-13.1. This scheme has already been discussed and agreed in the 6th NER SCM held on 03rd Oct 2016 at Imphal. The project report of the above scheme was discussed in the 12th India- Bangladesh JWG/JSC meetings held on 10th-11th Dec 2016, wherein it has been agreed that the modalities of implementation and commercial arrangement etc. need to be worked out jointly by India and Bangladesh. 13.5 Member may discuss. 14.0 Additional power supply to Nepal through Muzaffarpur-Dhalkebar transmission line 14.1 Presently, the Muzaffarpur-Dhalkebar 400kV line is being operated at 132kV in view of non-readiness of 220kV level at Dhalkebar by Nepal. For 132kV operation of the line and supply of about 80MW power to Nepal, one 100MVA, 220/132kV ICT was installed at Muzaffarpur by POWERGRID as an interim arrangement. 14.2 In view of low hydro scenario in Nepal in winters, Govt. of Nepal requested for installation of 2nd 220/132kV, 100MVA ICT at Muzaffarpur for additional power supply. 14.3 Accordingly, a meeting was held at CEA on 02-12-2016, wherein installation of 2nd 220/132kV, 100MVA ICT at Muzaffarpur (spare ICT obtained after replacement of ICT at Purnea) by POWERGRID as a goodwill gesture for

16 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

supply of about 145MW power to Nepal was agreed with following SPS settings at Muzaffarpur S/s: . The power supply to Nepal would be disconnected by opening Muzaffarpur – Dhalkebar 132kV line in case, (a) The power flow through any of the 400/220kV transformers (2x315 + 1x500MVA) at Muzaffarpur exceeds more than 310MW (for 315MVA) and 490MW (for 500MVA). Or (b) If power flow through Muzaffarpur – Dhalkebar 132kV line is more than 140MW. . There is no disruption of power supply to Bihar through the Muzaffarpur S/s.

14.4 The said ICT has already been installed by POWERGRID and upto 145MW (170MVA) power is being supplied to Nepal though the cross-border link. 14.5 Accordingly, members may post facto approve utilisation of 220/132kV, 100MVA ICT released from Purnea for installation at Muzaffarpur (for supply of additional power to Nepal), till operation of Muzaffarpur – Dhalkebar line at 220kV, which is expected by September 2017. 15.0 Modification in - Transmission System for Transfer of power from generation projects in Sikkim to NR/WR (Part-B1)- Agenda by POWERGRID 15.1 In the 18th ER SCM, it was decided to delink the LILO of 2nd circuit of Teesta-III – Kishanganj 400kV D/c (Quad) line at Rangpo from Part-B of the scheme “Transmission System for Transfer of power from generation projects in Sikkim to NR/WR (Part-B)” and take it up as a separate part (Part- B1) of the same scheme as “Transmission System for Transfer of power from generation projects in Sikkim to NR/WR (Part-B1)”. 15.2 LILO of first circuit of Teesta-III – Kishanganj 400kV D/c (Quad) line at Rangpo has been made using HTLS conductor. Accordingly, keeping in view the anticipated problems in construction due to hilly terrain as well as requirement of land for foundation, construction of 2nd LILO line with HTLS would be a better techno commercial solution. 15.3 The two 400kV LILO lines are being constructed on two separate D/c towers, however, in view of RoW constraints near Rangpo the two LILO lines are proposed to be terminated on a Multi Circuit tower at Rangpo end. Multi circuit has been considered along with LILO of first circuit. 15.4 In view of the above, members may approve the following: (i) LILO of 2nd circuit of Teesta III – Kishanganj 400kV D/c (Quad) line at Rangpo with Twin HTLS conductor (ii) 400kV multi circuit tower/line at Rangpo end for termination of LILO of both circuits of Teesta III – Kishanganj 400kV D/c (Quad) line at Rangpo.

17 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

16.0 Interim connectivity to generation projects through LILO arrangement - Agenda by POWERGRID 16.1 POWERGRID has informed that numbers of generation projects in different regions were granted Connectivity / Long Term Access (LTA) with strengthening of transmission system. In few cases generation projects were to be commissioned ahead of the anticipated commissioning of the associated transmission system. In such cases, generation projects were given temporary connectivity through loop-in & loop-out (LILO) of nearby transmission lines so as to enable them connect with the grid and commission their generation projects. The temporary connectivity through LILO was to be withdrawn after commissioning of the associated transmission system. Associated transmission system of some of such generation projects have been commissioned and their temporary connectivity through LILO has been disconnected; however, some are still connected through LILO arrangement. 16.2 After hearing the tariff petition for one such case viz. transmission system associated phase-1 IPPs in Odisha (Petition No.112/TT/13), where two generation projects are still connected through temporary LILO arrangement, the Hon’ble CERC has passed the order dated 07.10.15 wherein the following direction has been given in para 65 of the order: "The associated transmission lines were to be constructed by the generation developer matching with the transmission system to be developed by the petitioner and the LILOs constructed by generation developers which were temporary arrangement were to be replaced by the associated transmission system. It is noticed that some of the generation developers have not commissioned the dedicated lines and are continuing to evacuate power through the temporary LILO arrangements. We direct the petitioner to discuss the issue in the Standing Committee Meeting on Transmission and finalize the timeline for replacement of the LILOs of generation developer by dedicated transmission lines within a period of six months from the date of connection of LILO of the petitioner."

16.3 Further, CERC in its order dated 28-09-2016 in Petition no. 30/MP/2014 has directed that: “CTU shall take up all the existing cases of connectivity on interim LILO with the RPC of respective regions within a period of one month from the date of issue of this order for review and decision on disconnection of the interim arrangements through LILO. All such interim arrangements through LILO shall be disconnected within a period of three months of the issue of this order unless the RPC grants extension for continuation of LILO keeping in view of all relevant factors.”

16.4 The progress of dedicated transmission lines of IPPs in Eastern Region, which were connected through interim arrangement, was reviewed in the 18th

18 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

SCM of ER on 13-06-2016 and subsequently in the 34th TCC/ERPC meeting held on 19-11-2016. Dikchu HEP of Sneha Kinetic Power Projects Pvt. Ltd. is expected to be shortly commissioned on interim arrangement. Therefore, it is proposed that status of dedicated transmission system of Dickhu HEP may also be monitored. 16.5 The latest status of the dedicated transmission lines as reported by IPPs in recent meetings and that of Dikchu HEP is summarized below:

Generation Project in ER connected through temporary LILO arrangement

Installed Present Final Connectivity Sl. Anticipated Completion Generation Project Capacity Connectivity Arrangement No. Schedule (in MW) through LILO (not commissioned) LILO of one circuit of Vedanta Ltd. (Sterlite Rourkela - Raigarh Sterlite - Jharsuguda 15-04-2017 (as per 35th 1 4x600 Energy Ltd.) 400kV D/c line 400kV 2xD/c TCC/ERPC) (granted in Sept’09) LILO opened on 11-03-2017. LILO of one circuit of The project is currently not Jharsuguda - Ind Barath - connected to the Grid and Ind Barath Energy 2 2x350 Raigarh 400kV D/c Jharsuguda 400kV IBEUL has placed order to (Utkal) Ltd. line (granted in D/c increase the tower heights at 4 Sept’09) locations which shall be completed by Jun’17. Line completed. Commissioned LILO of Rangpo - Chuzachen - Rangpo on interim arrangement. Line bays Gati Infrastructure 3 2X49.5 Melli 132kV S/c line 132kV D/c (with Zebra by Govt. of Sikkim at Rangpo end Ltd. (Chuzachen) (granted in Nov’07) conductor) are expected by Dec 2017 (as per 35th TCC/ERPC) LILO of one circuit of Sneha Kinetic Power Teesta-III – Rangpo Dikchu – Dikchu Pool ($)To be informed by Sikkim 4 Projects Pvt. Ltd. 2x48 400kV D/c line at 132kV D/c and project developer (Dikchu) Dikchu (granted in Dec’14 by CERC)

($) Dikchu Pool S/s is being implemented under Sikkim Comprehensive Scheme of Govt. of Sikkim (being implemented by POWERGRID on consultancy). The expected commissioning schedule of Dikchu Pool S/s and Dikchu – Dikchu Pool 132kV D/c line needs to be informed by Govt. of Sikkim and project developer respectively.

16.6 In view of the above, generation project developers may indicate the latest status regarding commissioning of their respective dedicated line. 16.7 Member may discuss and finalise the date for disconnection of interim arrangement.

17.0 Status of downstream 220kV or 132kV network by STUs from the various commissioned and under-construction ISTS substations 17.1 POWERGRID has informed that various ISTS sub-stations have been commissioned / expected to be commissioned shortly (under construction) for which the down linking system is being implemented by STUs. Following downlinking network along with expected commissioning schedule was informed by STUs in the previous meeting(s): A. Existing substations

19 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

(a) Chaibasa 400/220kV S/s (i) Chaibasa (POWERGRID) – Chaibasa (JUSNL) 220kV D/c [1st line] – Commissioned (ii) Chaibasa (POWERGRID) – Ramchandrapur 220kV D/c – JUSNL to update on the proposal

(b) Bolangir 400/220kV S/s (i) LILO of one ckt of Sadeipalli – Kesinga 220kV D/c at Bolangir – Oct’17 (ii) LILO of one ckt of Katapalli – Sadeipalli 220kV D/c at Bolangir – Commissioned

(c) Keonjhar 400/220kV S/s (i) Keonjhar (POWERGRID) – Keonjhar (OPTCL) 220kV D/c – Dec’17 (ii) Keonjhar (POWERGRID) – Turumunga (OPTCL) 220kV D/c – Mar’19

(d) Pandiabil 400/220kV S/s (i) Pratapsasan (OPTCL) – Pandiabil (POWERGRID) 220kV D/c – Oct’17 (ii) LILO of one circuit of Atri – Puri (Samangara) 220kV D/c line at Pandiabil (POWERGRID) – Commissioned

(e) Alipurduar 400/220kV S/s (i) Alipurduar (POWERGRID) – Alipurduar (State) 220kV D/c – Matching

(f) Subashgram 400/220kV S/s (i) Subashgram – Baraipur 220kV D/c line – Dec’17

(g) Darbhanga 400/220kV S/s (i) Darbhanga (ISTS) – Darbhanga (BSPTCL) 220kV D/c – 2 months after finalisation of gantry at Darbhanga (BSPTCL) (ii) Darbhanga (ISTS) – Motipur 220kV D/c – Commissioned (iii) Darbhanga (ISTS) – Samastipur New 220kV D/c (S/c strung) – Commissioned (iv) Darbhanga (ISTS) – Laukhi (earlier Supaul New) 220kV D/c – 30-07-2017

B. Under Construction substations (h) Daltonganj 400/220/132kV S/s: Expected by Dec’17 (i) Daltonganj (POWERGRID) – Latehar 220kV D/c – Matching (ii) Daltonganj (POWERGRID) – 220kV D/c – Matching (iii) Daltonganj (POWERGRID) – Daltonganj (JUSNL) 132kV D/c – Matching (iv) Daltonganj (POWERGRID) – Chatarpur/Lesliganj 132kV D/c – Matching

(i) Rajarhat 400/220kV S/s: Expected by Sept’17 (i) Rajarhat – New Town AA3 220kV D/c – Oct’16 (ii) Rajarhat – New Town AA2 220kV D/c – Oct’18

20 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

(iii) Rajarhat – Barasat 220kV D/c – Jun’18

(j) Motihari 400/132kV S/s: Expected by 15th July 2017 (i) Motihari (ISTS) – Motihari (BSPTCL) 132kV D/c – Completed. (ii) Motihari (ISTS) – Betiah 132kV D/c – Completed. (iii) Motihari (ISTS) – Raxaul 132kV D/c – 15-07-2017

(k) Dhanbad 400/220kV S/s: May’19 (i) Dhanbad – Jainamore 220 kV D/c – Matching (ii) Dhanbad – Govindpur 220 kV D/c – Matching

17.2 STUs of Bihar, Jharkhand, Odisha and West Bengal may update the status of the under-construction downstream network. 18.0 Connectivity and LTA application of Odisha Integrated Power Ltd. (Odisha UMPP) and transmission system for power evacuation- Agenda by POWERGRID 18.1 The 4000MW Connectivity and LTA applications for Odisha UMPP submitted by Odisha Integrated Power Ltd.( OIPL), wholly owned subsidiary of PFCCL, are pending since long (June’14) on account of non-firming of generation project implementation. In this regard, it is to mention that CERC vide Amendment dated 17-02-2016 has directed CTU not to hold any application in abeyance and process them within the timeline prescribed in Regulation 7 of the Connectivity Regulations. 18.2 Transmission system for Odisha UMPP was discussed in the 17th ER-SCM held on 25-05-2015, wherein it was decided to discuss the transmission system when the implementation of the generation project is firmed up. The said applications were also discussed in the 11th Connectivity and LTA meeting of ER held on 13.06.2016 wherein OIPL informed the commissioning schedule of Odisha UMPP as 2021-22 and it was decided that CEA shall convene a meeting to finalise the transmission system for Odisha UMPP. Subsequently, in association with CEA, various transmission system alternatives have been studied by CTU and a study report in this regard is enclosed at Annexure-18.1. As per the study report, following transmission system is proposed for Odisha UMPP:  Split bus arrangement at Odisha UMPP (3x660MW in Section-A and 3x660MW in Section-B)  LILO of Sundargarh-A – Dharamjaygarh 765kV D/c line at Odisha UMPP-A Or LILO of Sundargarh-A – Raipur Pool 765kV D/c line at Odisha UMPP-A  Odisha UMPP-B to Sundargarh-B 765kV D/c line  Ranchi (New) – Gaya 765kV D/c line

21 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

18.3 Further, OIPL is required to submit MoP letter regarding allocation of power to various beneficiaries from Odisha UMPP. In absence of the same, Application Bank Guarantee @ Rs. 5 lakh/MW shall be required to be submitted for further processing. OIPL is also requested to confirm the generation project unit size and commissioning schedule. 18.4 It is proposed to grant Connectivity and LTA to OIPL for Odisha UMPP project (4000MW) with following transmission system:

Transmission System for Connectivity:

 Split bus arrangement at Odisha UMPP with 3x660MW in Section-A and 3x660MW in Section-B. For connectivity of 6X660 MW, bus sectionaliser should be kept closed.  Odisha UMPP-B – Sundargarh-B 765kV D/c line

Transmisson System for LTA

 Split bus arrangement at Odisha UMPP with 3x660MW in Section-A and 3x660MW in Section-B. The bus sectionaliser should be kept normally open.  LILO of Sundargarh-A – Dharamjaygarh 765kV D/c line at Odisha UMPP-A  Ranchi (New) – Gaya 765kV D/c line

18.5 Upon grant of Connectivity and LTA, OIPL/beneficiaries need to sign requisite agreements for taking up the evacuation system for implementation, failing which the Connectivity and LTA intimations shall be liable for closure/cancellation. 18.6 Members may discuss. 19.0 Additional feed to southern Odisha to improve power supply reliability and enable maximum utilisation of Guzuwaka Back-to-Back HVDC- Agenda by POWERGRID 19.1 POWERGRID has informed that, in the 18th SCM of ER it was noted that in absence of Talcher – Behrampur –Gazuwaka 400kV D/c line by M/s Reliance under TBCB, power flow though Gazuwaka 2x500MW HVDC is restricted under Low Hydro scenario in southern Odisha. Accordingly, it was decided that an additional scheme independent of Talcher – Behrampur – Gazuwaka may be planned and if in future Talcher – Behrampur – Gajuwaka 400kV D/c line is implemented, it would give additional strength to the southern Odisha transmission system and would also improve the low voltage problem in the area. 19.2 Accordingly, a meeting was held at CEA on 30-06-2016 among officials of CEA, CTU (POWERGRID) and OPTCL wherein following ISTS scheme was identified as an additional transmission system to improve reliability of power

22 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

supply to southern Odisha and also to enable maximum utilisation of Guzuwaka Back-to-Back HVDC: (a) Angul – Narendrapur (New) 400kV D/c (Triple Snowbird) line (b) Narendrapur (New) – Gazuwaka 400kV D/c (Triple Snowbird) line

Note: OTPCL would implement new 400/220kV, 2x500MVA Narendrapur (New) substation along with following transmission lines as an intra-state scheme: (i) Pandiabil – Narendrapur (New) 400kV D/c line (ii) Narendrapur (New) – Aska 220kV D/c line (iii) LILO of both the circuits of existing Therubali – Narendrapur 220kV D/c line at Narendrapur (New)

19.3 Load flow study results for the above system was included in the minutes of 18th ER SCM. The above Angul – Narendrapur (New) – Gazuwaka corridor is proposed to be implemented independent of Talcher – Behrampur – Gazuwaka corridor. As mentioned above, if in future 400kV D/c Talcher – Behrampur – Gajuwaka line comes, it would give additional strength to the Odisha transmission system and would also improve the low voltage problem in the area. 19.4 Members may discuss. 20.0 Proposal for stepwise completion of Rajarhat – New Purnea 400kV D/c line under ERSS-V scheme- Agenda by POWERGRID 20.1 POWERGRID has informed that major transmission system under ERSS-V scheme is Rajarhat – New Purnea 400kV D/c (Triple Snowbird) line with LILO of one circuit at Gokarna (WBSETCL) and other circuit at Farakka (NTPC). 20.2 The construction work of 400/220kV GIS substation and 400kV transmission lines at Rajarhat end has been completely brought to a standstill condition due to agitation by local villagers. The West Bengal state administration has advised POWERGRID to stop construction activities at and near Rajarhat substation till further instructions. 20.3 It is likely that Rajarhat – Farakka transmission line at Rajarhat end may not be completed within FY 2016-17 due to volatile political situation. However, Farakka – Gokarna portion of the said line along with associated bays at Farakka may be completed within the FY 2016-17. Further, substation works at Gokarna viz. ICT (under scope of WBSETCL) and 400kV line bays including 80MVAR bus reactor (under scope of POWERGRID) are ready for commissioning. Accordingly, it is proposed to commission Farakka – Gokarna portion of Rajarhat – New Purnea line. Commissioning of Farakka – Gokarna portion would establish connection of Gokarna substation at 400kV level with ISTS enabling improvement of power situation in and around Gokarna and Baharampur area.

23 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

20.4 In view of the above facts, the Rajarhat – New Purnea line is proposed to be commissioned in steps as detailed below:

Sl. No. Charging of elements Farakka – Gokarna 400kV D/c portion of the Rajarhat – New Purnea line (including sections of LILO of one circuit of Rajarhat – New Purnea 1 line at Farakka & other circuit at Gokarna) along with 80MVAr bus reactor at Gokarna and 80MVAr switchable line reactor at Farakka end Rajarhat – Gokarna 400kV D/c portion of the Rajarhat – New Purnea 2 line (resulting in formation of Farakka – Rajarhat and Farakka – Gokarna – Rajarhat 400kV S/c lines) Farakka – New Purnea 400kV D/c portion of the Rajarhat – New Purnea 3 line (resulting in formation of planned lines viz. New Purnea – Farakka – Rajarhat and New Purnea – Gokarna – Rajarhat 400kV S/c lines)

The schematic of Rajarhat – New Purnea line is shown below:

20.5 Farakka – Gokarna 400kV D/c section of the line has already been charged. 20.6 Members may discuss.

24 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

21.0 Programme for 11th/12th Plan augmentation of DVC System- Submission of revised plan for approval 21.1 DVC vide its letter dated 05.01.2017 (copy enclosed at Annexure-21.1) informed that approved 11th/ 12th Plan for network augmentation of DVC system, a 220kV new substation was proposed at Gola in Jharkhand with 220kV D/c lines connecting the new Gola S/s to Ramgarh(DVC), MTPS(DVC) and Ranchi(PGCIL) substations. Due to financial crunch and restriction imposed by MoP on investment in respect of DVC transmission System, the construction of new 220kV substation at Gola has been dropped by DVC. The above mentioned 220kV lines (proposed connecting Gola S/s with Ramgarh & MTPS substations of DVC and Ranchi-PG S/S) are complete/nearing completion. To utilize the upcoming 220kV lines to the best extent possible, a revised plan is proposed bypassing the Gola S/s (enclosed with the Annexure-22.1). 21.2 DVC also informed vide its e-mail dated 10.04.2017 (copy enclosed at Annexure-21.2) that load growth at Gola would be met by installation of third 31.5 MVA, 132/33kV power transformer. 21.3 DVC requested to approve the revised plan. 21.4 Members may discuss. 22.0 Installation of bus reactors at 400kV level at substations of STU 22.1 POWERGRID has informed that following 400kV intra-state substations were approved for implementation by respective STUs of Bihar and Odisha in the 18th ER Standing Committee Meeting: (a) Bihar (to be implemented by BSPTCL) (i) 2x500MVA+2x160MVA+2x80MVA, 400/220/132/33kV GIS S/s at Naubatpur (ii) 2x500MVA+2x160 MVA, 400/220/132kV GIS S/S at Bakhtiyarpur (iii) 2x500MVA+3x160MVA+4x80MVA, 400/220/132/33kV GIS S/s at Jakkanpur (b) Odisha (to be implemented by OPTCL) (i) 2x500MVA, 400/220kV sub-station at Meramundali-B (ii) 2x500MVA, 400/220kV sub-station at Narendrapur (New) (iii) 2x500MVA, 400/220kV sub-station at Khuntuni 22.2 With the above mentioned 400kV intra-state substations no bus reactors have been planned by BSPTCL and OPTCL. In order to keep operational flexibility/control over voltages, it is suggested to install suitable bus reactors at 400kV levels in STU system also like in ISTS system. Accordingly, it is proposed that OPTCL and BSPTCL may install 420kV, 2x125MVAr bus reactors at above planned substations except Narendrapur (New) where 420kV, 2x80MVAr may be installed. 22.3 Members may discuss.

25 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

23.0 Constraint in transportation of ICT to Farakka (NTPC) under ERSS-XII- Agenda by POWERGRID 23.1 POWERGRID has informed that replacement of 400/220kV, 2x315MVA ICTs with 400/220kV, 2x500MVA ICTs was approved at Patna, New Purnea and Sasaram (Pusauli) substations in the 15th ER Standing Committee Meeting held on 27-08-2013. Therein, it was also decided to install one of the 315MVA ICT released from Patna, New Purnea and Sasaram after replacement at Farakka generation switchyard as 2nd ICT by POWERGRID. The said scopes are being implemented by POWERGRID as part of ERSS- XII scheme. One 400/220kV, 315MVA ICT released from Sasaram (Pusauli) was identified for installation at Farakka. 23.2 The 400kV & 220kV switchyard equipment and Control & Relay equipment associated with installation of 400/220kV ICT are in place at Farakka. While in transit the main ICT tank was stopped by CISF at Farakka Barrage Project (under Ministry of Water Resources). POWERGRID vide letter dated 19-08- 2016 requested permission from Farakka Barrage Project for transportation of the ICT. However, the Barrage Authority vide letter dated 05-09-2016 denied permission for the same. Subsequently, POWERGRID approached The Secretary, Ministry of Water Resources (apex body for Farakka Barrage Project) on 08-09-2016. However, the Ministry of Water Resources declined permission vide their letter dated 23-09-2016 and requested POWERGRID to explore for alternate routes. Previously, all other consignments were transported to Farakka generation project through this route only.

23.3 Accordingly, POWERGRID explored following routes for transportation of the ICT:

(a) Via NEW FARAKKA where a railway underpass (14 ft.) physically prevented the consignment of 17.5 ft. height.

(b) Via DHULIAN-SHANKARPUR, but one intermediate bridge on feeder canal of nearly 500 mtr length is unfit for movement of even LMV: very risky as the condition of the bridge is dilapidated.

(c) Via – NTPC FARAKKA: explored and physically surveyed by POWERGRID & transporter but found not feasible as Major civil work are required for construction of road/bypass over bridges/culverts; en-route, for Trailer with such dimension and weight.

23.4 From above it emerges that the ICT can be transported to Farakka only through the road of Farakka Barrage Project, which has been denied by the apex body (Ministry of Water Resources).

23.5 Thus with no possible transportation options, the ICT has been diverted and stationed at Durgapur S/s of POWERGRID.

26 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

23.6 In the 18th ER Standing Committee Meeting held on 13-06-2016, installation of 3rd 400/220kV, 315MVA ICT at Durgapur (ICT-2 released after replacement at New Purnea S/s) was approved. This is being implemented by POWERGRID under ERSS-XVII (Part-B) scheme.

23.7 In view of the above mentioned transportation constraints it is proposed that ICT diverted from Sasaram S/s (identified for installation at Farakka under ERSS-XII) may be installed at Durgapur S/s as 3rd ICT (under ERSS-XVII Part-B).

23.8 Accordingly, the following modifications in the scope of ERSS-XII and ERSS-XVII (Part-B) schemes are proposed:

(a) Deletion of scope of installation of Sasaram (Pusauli) 400/220kV, 315MVA ICT-2 as 2nd 400/220kV, 315MVA ICT at Farakka generation switchyard from ERSS-XII scheme.

(b) Modification in ERSS-XVII (Part-B) scheme: Installation of above mentioned Pusauli 400/220kV, 315MVA ICT-2 as 3rd 400/220kV, 315MVA ICT at Durgapur instead of earlier approved New Purnea 400/220kV, 315MVA ICT-2.

(c) Shifting of New Purnea (ICT-2) to Durgapur under ERSS-XVII (Part-B) scheme is not required; hence the same may be kept as spare ICT at New Purnea itself. 23.9 Members may discuss. 24.0 Conversion of 50MVAR (3x16.67) bus reactor at Farakka to switchable line reactor under the ERSS-XV due to space constraints in termination of Farakka – Baharampur 400kV D/c (Twin HTLS) line- Agenda by POWERGRID 24.1 POWERGRID has informed that ERSS-XV scheme inter alia includes construction of Farakka – Baharampur 400kV D/c (Twin HTLS) line. One spare future bay has been selected for termination of one circuit of Farakka – Baharampur D/c line at 400kV bus at Farakka generation switchyard, however, due to non-availability of adjacent bay for termination of the other circuit it is proposed to terminate the second circuit in the exiting 50MVAR bus reactor bay along with conversion of this reactor to switchable line reactor. This arrangement would result in connection of 50MVAR switchable line reactor in one circuit of Farakka – Baharampur 400kV D/c line at Farakka end. 24.2 Members may approve. 25.0 Modification in transmission system required for power evacuation from Sikkim IPPs and Operationalization of LTOA/LTA- Agenda by POWERGRID

27 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

25.1 Sikkim Phase-1 IPPs 25.1.1 POWERGRID has informed that following seven IPPs envisaged under Phase-1 in Sikkim, the High Capacity Power Transmission Corridor-III was planned:

Commissioning Installed LTOA Sl. Name of the Developer/ Schedule Capacity Quantum No. Open Access Applicant (as per 12th JCC) (MW) (MW) 1200 1 Teesta Urja Ltd. / PTC (Teesta-III) Commissioned 1200 (6x200) U-1: Feb’20, 2 Lanco Energy Pvt. Ltd. (Teesta-VI) 500 (4x125) 500 U-2, 3 & 4: Mar’20 3 DANS Energy Pvt. Ltd. (Jorethang) Commissioned 96 (2x48) 96 U-1: Sep’19 4 JAL Power Corporation (Rangit-IV) 120 (3x40) 120 U-2 & 3: Oct’19

Madhya Bharat Power Corporation U-1: Nov’18 5 96 (2x48) 96 Ltd. (Rongnichu) U-2: Dec’18 6 Gati Infrastructure Ltd (Chuzachen) Commissioned 99 (2x49.5) 99

Gati Infrastructure Bhasmey Power U-1: Apr’18 7 51 (2x25.5) 51 Pvt. Ltd. (Bhasmey) U-2: May’18 Total 2162 2162

Based on the decisions of various Standing Committee Meetings of ER and Connectivity & LTA meetings of ER, following common transmission system is being implemented under the High Capacity Power Transmission Corridor-III:  Substation (A) Establishment of new 400/220kV, 2x500MVA GIS S/s at Kishanganj (B) Establishment of 400/220/132kV (400/220kV, 16x105 MVA, Single Phase transformers and 220/132kV, 3x100MVA) GIS S/s at Rangpo (C) Establishment of 220kV GIS switching station at New Melli

 Transmission Line (D) LILO of Gangtok – Melli 132kV S/c line at Rangpo (E) LILO of Gangtok – Rangit 132kV S/c line at Rangpo (F) Rangpo – New Melli 220kV D/c line (with single HTLS conductor) (G) LILO of Siliguri – Dalkhola 220kV D/c line at Kishanganj (H) LILO of New Siliguri – New Purnea 400kV D/c line (quad) at Kishanganj (I) LILO of Teesta V – Siliguri 400kV D/c line at Rangpo (J) Kishanganj – Patna 400kV D/c (quad) line (K) Teesta III – Kishanganj 400kV D/c line (quad) (L) LILO of both circuits of Teesta III – Kishanganj 400kV D/c line at Rangpo with Twin HTLS conductor Note: (i) Elements at (A) to (J): Commissioned by POWERGRID. (ii) Element at (K): Being implemented by TPTL (JV of POWERGRID and Teesta Urja Ltd.). Teesta-III to Rangpo section has been commissioned and Rangpo to

28 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

Kishanganj section is expected by Mar 2018 (as informed in 12th JCC of Eastern Region held on 27-03-2017). (iii) Element (L): LILO of one circuit has been commissioned by POWERGRID.

25.1.2 The dedicated and above mentioned common transmission system associated with Phase-I generation projects in Sikkim (except Chuzchen which was granted LTA separately) were intimated by CTU vide letter dated 07-10-2015. Therein, the dedicated transmission system of Bhasmey HEP was modified from “LILO of one ckt of Chuzachen – Rangpo 132kV D/c line with Zebra conductor at Bhasmey along with associated line bays” to “Bhasmey – Rangpo 132kV D/c line along with associated line bays”. 25.1.3 In the 18th Standing Committee Meeting of ER held on 13-06-2016, it was decided to delink the LILO of 2nd circuit of Teesta-III – Kishanganj 400kV D/c line at Rangpo from the scheme “Transmission System for Transfer of power from generation projects in Sikkim to NR/WR (Part-B)” for Phase-1 IPPs in Sikkim and take it up as a separate part (Part-B1) as “Transmission System for Transfer of power from generation projects in Sikkim to NR/WR (Part- B1)”. From system studies it has been observed that power from the above mentioned Phase-I IPPs can be evacuated with LILO of one circuit of Teesta-III – Kishanganj line at Rangpo with N-1 security criteria (the original transmission system was planned keeping in view N-1 criteria). The 2nd LILO at Rangpo, which is required for meeting the N-1-1 reliability criteria is under DPR stage. 25.1.4 In view of the above, it is found that the following Transmission System for Transfer of power from generation projects in Sikkim to NR/WR from Phase-I Sikkim IPPs (without LILO of 2nd circuit of Teesta-III – Kishanganj 400kV D/c line at Rangpo ) is capable of power evacuation from Phase-I Sikkim IPPs: Common Transmission System (under scope of ISTS) (a) Establishment of 2x500MVA, 400/220kV GIS sub-station at Kishanganj (b) Establishment of 16x105MVA (single phase), 400/220kV and 3x100MVA, 220/132kV GIS substation at Rangpo (c) Establishment of 220kV GIS switching station at New Melli (d) Teesta-III – Kishanganj 400kV D/c line (quad) (e) Kishanganj – Patna 400kV D/c (quad) line (f) LILO of New Siliguri – New Purnea 400kV D/c line (quad) at Kishanganj (g) LILO of Siliguri – Dalkhola 220kV D/c line at Kishanganj (h) LILO of Teesta-V – New Siliguri 400kV D/c line at Rangpo (i) LILO of one circuit of Teesta-III – Kishanganj 400kV D/c line (quad) at Rangpo (with Twin HTLS) (j) Rangpo – New Melli 220kV D/c line (with Single HTLS) (k) LILO of Rangit – Gangtok 132kV S/c line at Rangpo (l) LILO of Gangtok – Melli 132kV S/c line at Rangpo

Dedicated Transmission System

29 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

under scope of generation developer Teesta-VI – Rangpo 220kV D/c line with Twin Moose conductor (a) Teesta-VI along with associated line bays. Jorethang – New Melli 220kV D/c line with Zebra Conductor along (b) Jorethang with associated line bays. Rangit-IV – New Melli 220kV D/c line with Zebra Conductor along (c) Rangit-IV with associated line bays Rongnichu – Rangpo 220kV D/c line with Zebra conductor along (d) Rongnichu with associated line bays under scope of generation developer / Govt. of Sikkim Chuzachen – Rangpo 132kV D/c with Zebra conductor along with (e) Chuzachen associated line bays (f) Bhasmey Bhasmey – Rangpo 132kV D/c line along with associated line bays

25.1.5 Govt. of Sikkim and the project developers of Chuzachen and Bhasmey HEPs need to clarify regarding ownership of dedicated transmission lines (viz. Chuzachen – Rangpo and Bhasmey – Rangpo 132kV D/c lines) of the Chuzachen and Bhasmey HEPs. 25.1.6 All the elements of the above mentioned Common Transmission System( mentioned at Para 25.1.4) for Phase-I IPPs except Teesta-III – Kishanganj 400kV D/c (Quad) line has been commissioned. This line (under construction by TPTL) is expected by March 2018. With the completion of this line, the LTOA/LTA of Sikkim Phase-I IPPs shall be operationalised and the generation developers shall be liable for payment of applicable transmission charges. The 2nd LILO at Rangpo, which is under DPR stage would be commissioned at later stage. 25.2 From system studies it has also been observed that common transmission system identified for Phase-1 IPPs is also capable of evacuating power from Tashiding HEP (of Shiga Energy Pvt. Ltd.). Accordingly, it is proposed to modify the LTOA system of Tashiding HEP incorporating the common transmission system for Sikkim Phase-1 IPPs mentioned at Para 25.1.4 above. 25.3 Members may discuss and approve. 26.0 Connectivity granted to Vedanta Ltd. (erstwhile Sterlite Energy Ltd.)- Agenda by POWERGRID 26.1 POWERGRID has informed that Vedanta Ltd. (4x600MW) was granted LTOA of 400MW along with other Phase-1 IPPs in Odisha and LTA of 1000MW along with Phase-2 IPPs in Odisha. For connectivity, Vedanta was to construct two 400kV D/c lines (one for 400MW LTOA and another for 1000MW LTA) from the generation switchyard to Sundargarh (Jharsuguda) S/s of POWERGRID. Subsequently, Vedanta Ltd. has relinquished its entire LT(O)A quantum of 1400MW (Phase-I: 400MW & Phase-II: 1000MW). The first dedicated line is still under construction, whereas the second dedicated

30 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

line has not been taken up for implementation. Connection agreements have been signed between CTU (POWERGRID) and Vedanta Ltd. for both the dedicated transmission lines. 26.2 Vedanta has connected Unit-1, 3 & 4 of the generation project to ISTS system and Unit-2 to Odisha grid. In the 125th OCC meeting of ERPC held on 20-09-2016 under the agenda item no. B.7 – “Persistent under generation and inappropriate operational methodologies vis-à-vis grid requirements in operation of Vedanta, Jharsuguda”, it has emerged that Vedanta has got converted the status of ISTS connected units from IPP to CPP. Accordingly, following was decided in the meeting: (a) Vedanta has to get a fresh connectivity from CTU for their CPP units #1, 3 & 4 (as these units were converted from IPPs to CPPs) as per the decision of 11th Connectivity and LTA meeting of ER held on 13.06.2016. (b) Vedanta has to get NOC from SLDC Odisha for scheduling of their units through ERLDC. (c) Vedanta will be allowed to connect to CTU system only after submission of the above two documents. (d) ERLDC will start scheduling Vedanta CPP Units #1, 3 & 4 only after getting a fresh NOC from SLDC Odissa and with grant of fresh connectivity by CTU. (e) Till then Vedanta would be treated as an embedded customer under the jurisdiction of SLDC Odisha and may remain connected to grid through STU system only (as presently its units are connected to OPTCL system) and do their STOA transaction through SLDC Odisha. (f) In view of all of above, the NOC granted to Vedanta would stand revoked and fresh NOC could be issued subject to fulfillment of the stated conditions (g) Vedanta has to complete the dedicated line within the schedule (i.e. November, 2016) otherwise the LILO may be removed as per the decision of 33rd ERPC and the meeting convened by CEA held on 16.09.2016. 26.3 The matter related to Vedanta was subsequently discussed in a meeting at ERPC on 14-10-2016, wherein following was decided: (a) Control area jurisdiction of Vedanta will be shifted from ERLDC to SLDC, Odisha. (b) CPP units (unit #1, 3 &4) and IPP unit (#2) of Vedanta Ltd along with SEZ (smelter) load shall be kept at 400 kV bus of Vedanta Ltd Switchyard without bus splitting and shall be connected to STU network through 400 kV Vedanta Ltd- Meramundali D/C line. There will be no need to operate the 400kV buses of Vedanta in split bus mode and they should be coupled by completing all the dias. (c) One unit shall be kept as standby till the completion of 400 kV Sterlite- Jharsuguda D/C line. (d) Vedanta Ltd shall be a State embedded entity for all purposes and requisite STU connection would be obtained by Vedanta Ltd i.r.o above.

31 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

(e) The CTU connectivity of Vedanta may be kept in abeyance. The same may be closed/withdrawn from the date of getting the STU connectivity. (f) On change of control area jurisdiction the NOC granted by ERLDC to Vedanta Ltd shall stand revoked. (g) After changeover of control area jurisdiction, the LILO point of 400 kV Rourkela- Raigarh at Vedanta will be interface point of Odisha STU till 30th November, 2016. (h) Subsequently, after the completion of 400kV Sterlite-Jharsuguda D/C line the interface point of Odisha STU will be shifted to Jharsugada. (i) With the change of control area jurisdiction the status of 400kV Sterlite- Jharsuguda D/C line will no more be a dedicated line. So, Vedanta agreed to hand over the line to OPTCL which can be treated as an ISTS tie of OPTCL. (j) Vedanta has to strictly adhere to the schedule for completion of 400kV Sterlite- Jharsuguda D/C line (i.e. 30th November, 2016) as per the decision of 33rd TCC/ERPC and decided in the meetings held in CEA on 16.9.16. In case 400kV Vedanta-Jharsuguda D/C line is not commissioned by that date, the LILO connection to Vedanta shall be withdrawn. (k) Due to change of control area jurisdiction from ERLDC to SLDC Odisha. Vedanta Ltd has to settle the following: (i) ERLDC fees and charges shall be paid by Vedanta Limited as applicable up to the cutoff date. (ii) Previous dues up to cut off date of the pool accounts such as DSM charges along with interest, RTDA, any others has to be settled by Vedanta. (iii) Henceforth, any deviation of Vedanta Limited will be treated as deviation of OPTCL. (iv) After changeover of jurisdiction if in future it is found that any amount in pool account had remained unaccounted by mistake against Vedanta Limited, Vedanta Limited will have to pay the amount into the pool account. (v) For calculation of POC charges and losses Vedanta Limited generation will be considered as generation of Odisha. (vi) Vedanta Limited has to get registered afresh at each RLDC for Short Term Open Access as embedded entity in OPTCL. (vii) Reconciliation of accounts is also required to be done up to the cutoff date by Vedanta. (viii) OPTCL in coordination with Vedanta has to send weekly SEM data to ERLDC by Tuesday Noon.

26.4 For above mentioned deliberations of OCC and ERPC meetings, it emerges that ISTS connected units (Unit-1, 3 & 4) of Vedanta has been converted from IPP to CPP and the same shall now be kept connected with STU connected unit (Unit-2). This would result in connection of all four generation units, Vedanta – Meramundali 400kV D/c line (STU connection) and Vedanta – Sundargarh (Jharsuguda) 400kV D/c line (ISTS connection) to common

32 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

400kV bus. Further, it has been decided that Vedanta shall be embedded entity of Odisha upon completion of Vedanta – Sundargarh (Jharsuguda) line as Vedanta Ltd. has agreed to hand over the line to OPTCL. In such case, the status of the line would change from dedicated transmission line to STU line. 26.5 In regard to connectivity of Vedanta Ltd. with ISTS, interim connectivity arrangement through LILO of one circuit of Rourkela - Raigarh 400kV D/c line at generation switchyard was discussed in the 35th meeting of ERPC held on 25-02-2017 wherein Vedanta Ltd. was provided time extension till 15-04-2017 for completion of the dedicated line and it was decided to open the interim connectivity on 16-04-2017. Accordingly, CTU (POWERGRID) vide letter dated 11-04-2017 requested ERLDC to initiate necessary actions regarding disconnection of the interim arrangement of M/s Vedanta Ltd as per decision of 35th EPRC meeting. 26.6 Member Secretary, ERPC vide email dated 25-04-2017 has informed that the above issue was discussed in 132nd OCC meeting held on 21.04.2017 at ERPC, Kolkata, wherein OCC agreed to extend the interim LILO connectivity till 30th June, 2017 in view of requirement of above mentioned LILO for OPTCL to meet peak summer demand. 26.7 It is understood that interim arrangement of Vedanta Ltd. is yet to be opened. Accordingly, CTU (POWERGRID) vide letter dated 11-05-2017 has requested Member Secretary, ERPC to take suitable necessary action. 26.8 In view of the above, the connection agreement of the first dedicated transmission line shall become null and void upon transfer of the line by Vedanta Ltd. to OPTCL. Accordingly, OPTCL or Vedanta Ltd. need to confirm regarding transfer of above mentioned asset from Vedanta Ltd. to OPTCL. 26.9 Further, with relinquishment of LTA of 1000MW (Phase-II) by Vedanta Ltd. the 2nd dedicated line viz. Vedanta generation switchyard – Sundargarh (Jharsuguda) 400kV D/c 2nd line may not be required. 26.10 Members may discuss. 27.0 Dropping of Banka (PG) – 132kV D/c line, which had proposed in 16th SCM-ER meeting 27.1 In the 16th SCM-ER meeting, ERPC had informed that the 132kV Deoghar S/S (JSEB) is being fed through 132kV line(s) from DVC source (132kV Maithon--Deoghar S/C) or from NTPC source (Lalmatia). There is also a feed from BSPTCL source through 132kV Sultanganj- Deoghar S/C line, which is normally kept open due to overloading in Kahalgaon-Sabour- Sultanganj section of BSPTCL system. The Deoghar & Jamtara sub-stations feed important railway loads of 10MW each to Shankarpur TSS & Jamtara TSS and loading on Maithon – Jamtara – Deoghar 132kV S/C line sometimes exceeds 75MW. The reliability of supply to railway loads is being

33 Agenda for 19th Standing Committee Meeting on Power System Planning of ER

affected. In view of above, it was agreed to provide an additional supply to Deoghar S/S (JSEB) from 400/132kV Banka S/S (PG) by creating a 132kV Banka- Deoghar D/C lines (about 40 Kms). 27.2 JUSNL vide their letter dated 30.07.2015 addressed to POWERGRID informed that termination of above line at Deoghar is not possible due to space constraint. Further, JUSNL informed that after commissioning of 132kV Jasidih – Deoghar line (about 5km), Deoghar S/s will be able to receive 250MVA of power through Jasidih S/s and Dumka S/s, whereas the transformation capacity at Deoghar is only 150MVA. The matter was discussed in 18th SCMPSP(ER) meeting and it was decided to review the possible interconnections at Deoghar in a separate meeting at CEA with Railways & other stakeholders. 27.3 In regard to above, a meeting was held on 13.06.2017 (MoM is at Annexure-27.1), in which representative of CTU informed that POWERGRID has closed the ERSS-XVI project involving construction of Banka (PG) - Deoghar 132kV D/C line and the same was informed to CEA vide letter dated 27-10-2016. 27.4 Representative of BSPTCL stated that BSPTCL can supply power with exiting system to Deoghar (Jharkhand) through 132kV Sultanganj- Deoghar S/C line during off-peak hours only, as the bus bars capacity at Sultanganj is inadequate. However, supply during peak hours would be possible only after strengthening of bus bar at Sultanganj, which is likely to be completed in next 6 months. 27.5 Chief Engineer (PSPA-II), CEA expressed that in absence of representatives from JUSNL (Jharkhand) and Railways, it is difficult to assess the loading of the network in present situation. 27.6 The proposed Deoghar-Jasidih 132kV D/C line (by JUSNL) and strengthening of 132kV bus at Sultanganj (by BSPTCL) are likely to enhance the reliability of power supply to the Railways TSS at Deoghar. In view of above, it was decided to drop the proposal of construction of Banka (PG) - Deoghar 132kV D/C line. 27.7 Members may discuss.

34 Annexure-2.1

Minutes of the meeting on lOth September, 2016 after the site visit on 09th September regarding ROW problem for termination of 400kV lines at Jeerat(WBSETCL) S/s for the ERSS-18 scheme

List of the participants is enclosed at Annexure-!. In order to address the RoW constraint for termination of Jeerat(New)-Jeerat(WBSETCL) 400kV D/c line at Jeerat(WBSETCL) as informed by PFCCL, the Bid Process Coordinator for ERSS-18 scheme being implemented through TBCB route, a joint team of officials of WBSETCL, CEA, CTU, PFCCL; POWERGRID(ER-11) visited the Jeerat substation ofWBSETCL on ogth September, 2016. This was followed by a joint meeting of the above officials on lOth September, 2016 at WBSETCL office, Kolkata.

The Director (Projects), WBSETCL welcomed the participants to the meeting. It was stated that WBSETCL participated in the site visit and meeting being the beneficiary of ERSS-15 & ERSS-18 and will extend all help and support required for expeditious execution of the schemes.

Based on the outcome of the site visit, following was discussed in the meeting:

It was noted that the following 400kV lines are existing I under construction I planned at 400/220kV substation of Jeerat(WBSETCL):

Existing: (i) Jeerat(WBSETCL)- Baharampur/Farakka 400kV S/c line ofPOWERGRID (ii) Jeerat((WBSETCL) -Subhashgram/Rajarhaat 400kV S/c line ofPOWERGRID (iii) Jeerat(WBSETCL)- Barkeshwar(WBSETCL) 400kV S/c line ofWBSETCL (iv) Jeerat(WBSETCL)- Kolaghat(WBSETCL) 400kV S/c line ofWBSETCL

Under Construction: (v) LILO of Sagardighi- Subhashgram 400kV line at Jeerat (WBSETCL) as a part of ERSS-15 -by POWERGRID

Planned: (vi) Jeerat(New) - Jeerat(WBSETCL) 400kV D/c line .(quad) as a part of ERSS-18 - to be implemented under tariff based competitive bidding route.

Note : In view of space constraint, the 4 number of bays for termination of 2 no of 400kV Die lines under (v) and (vi) above at Jeerat(WBSETCL) has already been decided to be constructed as GIS bays.

During the site visit and the meeting, the following options were deliberated :

Option 1 : Construction of Multi-circuit Towers for termination of new lines

There is a ROW problem for termination of both the 400kV D/c lines at item (v) & (vi) above to the proposed GIS as extension of existing s/s in the Northern part of the Jeerat(WBSETCL) substation. This would involve crossing of existing 2 nos 400kV D/c lines, which can be addressed by constructing the new: ~OO:;:s on 1[cuit towe~ fr

35 This may however involve construction of 4-5 nos. multi-circuit towers including 2 nos. of multi­ circuit towers of about 90-100 meter height for crossing the existing 400kV lines. Further, there is a space constraint in termination of the new lines at the proposed GIS, which may involve dismantling of same existing buildings in the substation.

Option 2 : Shifting of existing 400kV lines to the proposed GIS

The termination of existing 2 nos. of 4QOkV D/c lines at Jeerat(WBSETCL) S/s may be shifted from the existing 400kV AIS to the new 400kV GIS proposed in the Northern part of existing substation and the new 400kV lines may be terminated at the existing 400kV AIS.

This would avoid the crossing of existing 400kV lines through multi-circuit towers. This would involve dismantling of some existing D/c towers and construction of new D/c towers and upgradation of 2 no of AIS bay equipment for "termination of 400kV D/c line with quad conductor. This would however involve establishment of 2 number of new GIS bays by WBSETCL for termination of their Jeerat- Bakreshwar and Jeerat- Kolaghat 400kV lines.

Option 3 : GIS substation in the Eastern part of the Jeerat(WBSETCL) S/s

The new GIS may be planned in the Eastern part of Jeerat(WBSETCL) substation in place of proposed GIS in the Northern part. In this option, new 400kV lines would be terminated at the GIS in the Eastern part ofthe S/s.

With this there would no ROW constraints in the termination of new 400kV lines and no requirement of crossing of 400kV existing lines with multi-circuit towers. This would however involve procurement of additional land (about 5 acres) in the Eastern part of the substation.

Option 4 : GIS substation in the Northern part and termination of new lines in the Eastern part of the Jeerat(WBSETCL) S/s

The GIS extension may be planned in the ex1stmg space available in the Northern part of the Jeerat(WBSETCL) substation however the termination of new 400kV lines may be planned in the Eastern part of the substation. The interconnection between the termination gantry of the new lines and GIS may be made through GIS bus duct.

In this option there would be no ROW constraint in termination ofthe new lines and there would be no crossing of 400kV lines with multicircuit towers. This would however involve procurement of small land (about 1 acres) in the eastern part of the substation by WBSETCL for establishment of termination gantry for the new lines.

Option 5 : Shifting of the existing 400kV AIS bay of 4th 400/220kV 315MVA ICT to GIS, and termination of new lines utilizing the space in the Eastern part of the Jeerat(WBSETCL) S/s

The 400kV AIS bay ofthe 4~400/220kV ICT at Jeerat(WBSETCL) may be dismantled and the space available may be utilized for termination of 400kV new lines in the Eastern part of the substation. This

36 /- . . option would require establishment of 5 nos. of GIS bays (4 for lines and 1 for transformer). The interconnection of termination gantry to GIS may be carried out through GIS bus duct.

This option would avoid the crossing of 400kV existing lines through multi-circuit tower. This would however involve establishment of 1 no. of GIS bays by WBSETCL for their 4001220kV, 315MVA ICT(4th).

Recommendation :

After detailed deliberations, option:.__ 1 was considered in view of following: i) Difficulty in acquisition of land (option 3 & 4 ). ii) Availability of space for construction of 400 kV GIS bus duct (four I five circuits) from proposed GIS to terminal gentry of new lines & ICT in the Eastern part of the Jeerat Sis (option 4& 5). iii) Additional cost to be borne by WBSETCL towards construction of new GIS bays due to shifting from existing AIS bays (option-2 & 5)

While deliberating option-1, it was also decided to explore the feasibility of crossing the existing 400 kV lines with 2 no. 400 kV DIC lines mentioned at (v) and (vi) above (one DIC line with twin moose and other with quad moose conductor). In this regard, it was decided that WBSETCL will conduct detailed survey for feasibility .of availability of corridors for the above crossing and termination at the proposed GIS at Jeerat 400 kV sub-station end only. If required location of proposed GIS building may be shifted I reoriented. WBSETCL will complete the survey work by end September, 2016 and share the survey report along with profiles with CEA, CTU and PFCCL.

It was also decided that if required, for accommodating the corridor for two DIC lines, shifting of existing quarters may be considered in ERSS-XV/ ERSS-18.

Based on the detailed survey by WBSETCL, if it is found that corridor for the crossings with 2 no. 400 kV D/c lines is not available, then the crossing with multi circuit towers as given in option-1 would be considered. Shi"fting of existing quarters, if required may be considered in ERSS-XV/ ERSS-18.

~lr..lc... ?..J. I 9t!-6 (Arundhati~ Ghosh) (Ashok·~~ l Pal)'"' (A.K.~:;!;' Mait) CE: CPD Director: CEA GM: CTU-Plg AVP: PFCCL GM: Projects . WBSETCL POWERGRID POWERGRID ER-11

37 Annexure-2.2 'l-fffif ,a �cf>R Government of India Fcl�gaJ..i::41aq Ministry of Power �Fcl�qa� Central Electricity Authority fcl�qaQOlldl � l{�icf>"1� 1f41Tf-2 [ISO: 9001:2008] Power System Planning & Appraisal lJivision-II � ircR, xl. cp. 1Fll,� � -110066 Sewa Bhawan, R. K. Puram, New Delhi-110066 No. 77/3/PSPA-Il/2016-t;- �, l"l- Dated �l-01-2017

To COO(CTU-Plg), Chief Engineer, CEO, Power Grid Corp. of India Ltd. Central Planning Department, PFC Consulting Ltd, "Saudamini", Plot No.2, West Bengal State Electricity First Floor, Urjanidhi, Sector-29, Trans. C. Ltd ( WBSETCL), 1, Barakhamba Lane, Gurgaon 122 001, Vidyut Bhavan ( 9th Floor), Connaught Place, Haryana. Block-DJ, Sector-II, Bidannagar, New Delhi -110001 FAX: 95124-2571932 Kolkata-700091 (Fax- 011-23456170)

Subject: Minutes of the meeting regarding termination of 400kV lines at Jeerat(WBSETCL) S/s under the ERSS-XV and ERSS-XVIII scheme.

Sir, The minutes of the meeting held on 14-12-2016 at CEA, Sewa Bhawan, R K Puram, New Delhi regarding above subject is enclosed.

Yours faithful , y � tt:��/) \" '\'"°' ishik�Sharan) Director (PSPA-11) Copy to: 1 Managing Director, With request to consider and convey WBSETCL, Vidyut Bhawan, approval on the option No# 3, as agreed 5th Floor, Block-D, Bidhannagar in above meeting Sector-II, Kolkata - 700091 , 2 PPS to Member(PS), CEA \

38 Minutes of the meeting regarding termination of 400kV lines at Jeerat (WBSETCL) Sis under the ERSS-XV and ERSS-XVIll scheme held on 14.12.2016 at CEA.

List of participant is enclosed at Annexure-}.

1. Chief Engineer (PSPA-II), CEA welcomed the participants. He informed that a joint team of officials of WBSETCL, CEA, CTU, PFCCL, POWERGRID(ER-II) visited the Jeerat 1 1 substation of WBSETCL on 09 h September, 2016 and had meeling on 10 h September, 2016 to address the RoW constraint for termination of Jeerat(New)-Jeerat(WBSETCL) 400kV Die line at Jeerat(WBSETCL). This line is to be implemented through TBCB as part of ERSS-XVIII scheme with PFCCL as BPC. He informed that WBSETCL was requested to submit the detailed survey report regarding feasibility of overhead crossing of existing lines mentioned at 2(i) to 2(iv) by two Die lines mentioned at 2(v) & 2(vi) for termination at GIS extension of Jeerat Sis of WBSETCL.

2. Following 400kV lines are existing I under construction I planned at 4001220kV substation of Jeerat (WBSETCL) :

Existing:

(i) Jeerat(WBSETCL)- Bahararnpur/Farakka 400kV Sic line ofPOWERGRJD

(ii) Jeerat(WBSETCL)- Rajarhat/Subhashgram 400kV Sic line of POWERGRJD (iii) Jeerat(WBSETCL)- Barkeshwar(WBSETCL) 400kV Sic line of WBSETCL

(iv) Jeerat(WBSETCL)- Kolaghat(WBSETCL) 400kV Sic line ofWBSETCL

Under Construction: (v) LILO of Sagardighi- Subhashgrarn 400kV Sic line at Jeerat (WBSETCL) as a part of ERSS-XV- by POWERGRID

Planned:

(vi) Jeerat (New) - Jeerat (WBSETCL) 400kV Die line (quad) as a part of ERSS-XVIli -to be implemented as lSTS under tariff based competitive bidding route.

The map of the above is at Annexure II & Ill. The poinmrise discussions held in the meeting are as follows: 3. Detailed survey report submitted by WBSETCL after site visit of Jeerat Sis on 09.09.2016.

3.1 ChiefEngineer(PSPA-ll) informed that WBSETCL vide its letter dated 05 .1 0.2016 has submitted the detailed survey report for examining the possibility of overhead crossing of existing lines mentioned at 2(i) to 2(iv) by two Die towers or Multi circuit towers mentioned at 2(v) & 2(vi) for termination at GIS extension of Jeerat Sis of WBSETCL.

3.2 Representative of WBSETCL informed that the overhead crossing of the lines either on Double circuit or Multi circuit towers is not feasible. In both the cases, the height of Double Ckt!Multi ckt towers will be in the range of 75-100 m and conductors after overhead crossing of the lines, need to be brought down at normal gantry height (20-25 rn)

39 within the limited space of 90 meters. This configuration will violate the minimum electrical clearance required and to accommodate the lines, many structures including staff quarters would have to be dismantled at existing Jeerat S/s. He added that in the multi ckt tower, the lower ckt will be used for twin moose conductors and upper ckt will be for quad moose. This configuration will have different tensions on tower at different heights.

3.3 Alternatively, WBSETCL proposed that crossing portion of existing lines may be dismantled and the lines may be terminated to the existing AIS bays qf Jeerat S/s through GIS bus duct. This arrangement may cost around Rs. 20-30 crores. WBSETCL further recommended that the expenditure for this might be booked in ERSS-XV or ERSS-XVIII i.e. as part of ISTS. This will remove the RoW constraints for the new lines and the two new separate 400kV D/c corridor can be constructed for ERSS-XV and ERSS-XVIII schemes.

3.4 On a query regarding demolishing of existing staff quarters to construct the additional towers for terminating the new lines at extended Jeerat S/s (GIS), WBSETCL stated that this option is not agreeable to their management.

4. After detailed discussions, Chief Engineer (PSPA-II), CEA expressed that the suggestion of WBSETCL i.e. dismantling the crossing portion of the existing lines (ISTS and State lines) and termination of the existing lines through GIS bus duct might be the appropriate option, as the new lines mentioned at 2(v) and 2(vi) can be directly terminated on separate double ckt towers at normal height (around 45 meters) to new GIS extension area.

Members agreed for the above.

5. Regarding booking of expenditure for above work, mentioned at 4, following was deliberated: (i) Option-1 (Sharing of cost between POWERGRID and WBSETCL): It was suggested that the cost of the above arrangement may be shared equally between POWERGRID and WBSETCL as both are having 2 lines each. WBSETCL did not agree to this option. CE (WBSETCL) stated that their DISCOMS may not agree for this, because this rearrangement work is entirely on account of strengthening in the ISTS. As such, this option was dropped.

(ii) Option-2 (Dropping of 400kV Jeerat (New) - Jeerat(WBSETCL) line under TBCB): POWERGRID stated that the construction of LILO of Sagardighi - Subhashgram 400kV line at Jeerat (WBSETCL) under ERSS-XV does not require any tower crossing as this line could be built along null point between the existing towers. POWERGRID emphasised that the above arrangement is necessary for Jeerat(New)­ Jeerat(WBSETCL) 400kV D/c line (quad) being implemented through TBCB.

Upon suggestion of dropping the Jeerat(New) - Jeerat(WBSETCL) 400kV D/c line, CE(WBSETCL) stated that this line is very much necessary for meeting the future load growth at Jeerat and should not be dropped. As such this option was also not considered further.

40 (iii) Option-3 (Dismantling of dead end towers and termination through GIS Bus duct by POWERGRID under ISTS) :Under this option, the additional work as suggested by WBSETCL and mentioned at point 4 above, would be implemented as ISTS and to be included in the scope of ERSS-XV being implemented by POWERGRID. Ownership of these works shall be of POWERGRID as ISTS scope and cost of these reconfiguration (including those for the State lines) to he recovered as tariff by POWERGRID. WBSETCL agreed to this proposal subject to approval of their management.

Thus, out of above options, the Option-3 was agreed. WBSETCL was requested to give their official communication/acceptance from their management on the proposal i.e. dismantling the crossing portion of existing line from (ISTS and State lines) and termination of the existing lines through GIS bus duct by POWERGRID and ownership of same to POWERGRJD. (This is similar to LILO of a State transmission line at an ISTS S/s by POWERGRID).

6. POWERGRID clarified that ERSS-XV scheme compnsmg of U LO of Sagardighi­ Subhasgram 400kV S/c line at Jeerat is already under implementation and the above proposed scope of works of dismantling of part of existing lines mentioned at 2 (i) to 2 (iv) and terminating the same through GIS duct to existing Jeerat S/s could be implemented by POWERGRID under ERSS-XV scheme itself.

7. After further discussions, following was agreed: (i) Following scope may be implemented at Jeerat S/s by POWERGRID as an additional scope under already approved ERSS-XV scheme:

Dismantling of dead end towers and termination of existing lines mentioned at 2 (i) to 2(iv) through GIS duct to the existing 400kV Jeerat AIS S/s (WBSETCL).

(ii) It was also agreed that the termination of the WBSETCL lines mentioned at 2 (iii) & 2(iv) through GIS duct to the existing 400kV Jeerat AIS S/s (WBSETCL) shall be implemented as ISTS and included in the approved scope of ERSS-XV being implemented by POWERGRID and cost recovered by POWERGRID as ISTS transmission tariff. (iii) Further, it was also acknowledged that implementation of LILO of Sagardighi­ Subhasgram 400kV at Jeerat along with associated line bays shall get delayed by about one year due to addition of above mentioned GIS duct arrangement. (iv) The new lines mentioned at 2(v) and 2(vi) can be directly terminated on separate double ckt towers at normal height (around 45 meters) to new GIS extension area.

41 Annexure-1 List of the participants of the meeting held on 14.12.2016 at CEA

Sl. Name of the Participant Designation Organization No. 1 Pardeep Jindal Chief Engineer, (PSPA-11) CEA 2 Ravinder Gupta Chief Engineer CEA 3 Rishika Sharan Director, (PSPA-11) CEA 4 U.M.Rao Deputy Director, (PSPA-11) CEA 5 R.Nagpal GM (CMG) POWERGRID 6 A.P.Gangadharan AGM (Engg.-S/s) POWERGRID 7 Ramchandra DGM (CTU-Pig.) POWERGRIO 8 S.J.Lahiri OGM (Engg.) POWERGRIO 9 A. Ghosh CE (CPO) WBSETCL 10 G.Banerje ACE '(Engg.) WBSETCL 11 A.Kamasaur ACE (CPO) WBSETCL 12 Koushik Bhanmik SE (Engg.) WBSETCL

42 Farakka - Jeerat 400kV D/c

Farakka

Sagardighi Baharampur

LEGEND

--- Existing --- ERSS-V --- ERSS-X --- ERSS-XV Jeerat --- ERSS-XVIII

Subha~gram Rajarhat

43 Site: Plan of Proposed 2nos 400KV Tr. IJne at Jeemt S/S

..,.., ~ac:IIOI...... '" ...... -'.. ..,.. "'"'• ...... _'!d .... """"" ....-.. -iJ ... , ...... ,. &' 411 ,...__~ C'n' Q ~...:-.a. --c• ~~~~ ·~';ell ~ ...... ICP""'.. • ·-~,.,.., ~. ..., "'"' .... ,...... ~---- · -­

Client: WBSE1'CL Scll/6.' 1:1,000 Surveyed By: North Line

44 Annexure-2.3

West Bengol State Electricity Transmission Company Ltd. (A West Bengal Gove rnme nt Enterprise) CIN : U40101WB2007SGC113474 Office of the Chief Engineer Central Planning Department FAX : 033 2359-1955 Vidyut Bhavan (9th Floor) Telephones: 033 2359-2652, 033 2319-7359 Block - DJ, Sector- II E-Mail : [email protected]; [email protected] Bidhannagar, Kolkata- 700 091

Ref No.: CEjCPD/CEA/t ~ (h

To The Chief Engineer (PSPA-11), Power System Planning & Appraisal Division - II , Central Electricity Authority, Sewa Bhawan, RK Puram, New Delhi - 110066.

Sub.: Termination of 400 kV lines at Jeerat (WBSETCL) 400 kV sub-station under ERSS-XV and ERSS­ XVIII scheme - reg.

Ref.: Your Jetter no. 77 /3/PSPA-11/2016, Dated -01-2017, received through e-mail dated 21/ 02/2017.

Dear Sir,

In response to above, this is to inform you that WBSETCL has considered and accepted the option no. 3 of the minutes of meeting held on 14/ 12/2016 at CEA regarding termination of 400 kV lines at existing Jeerat (WBSETCL) 400 kV sub-station.

This is for your information and further action please.

Yours faithfully, Q\.J>~ ~~'1 t ~ l 1 1 (Arundhati Ghosh) Chief Engineer : CPD

Registered Office : "Vidyut Bhavan", Bidhannagar, Block- OJ, Sector- II, Kolkata - 700 091. Web : www.wbsetcl.in 45 WR~I=T("I Annexure-3.1 . ' . ·. • . • • . • , •• �lx.e1 � •• . .• • • .. ·• . • • • ,. • •• . • • • '• "' It If • e + t It o 9 . + • • • • • • + e t • •• + •1 It It + e t t • • + •' I I . . • ,... + f e it 0 . 't � ct La . ·-'. , • .: • .. ... , • . :· ,•, ·.•; •. ·.1r,,.;�,..rer;n�11.G�'i·'OlLn • . I + It .� •• • + .. .. t t + ,. . . .. • • ,LJ:.:::. •,, . � ; ,•I • t• · • .. ••, . "· ;::j ··� ' �··�·=• ... . . 111 •• •, • ·. ·,,. .. •• . ;_.�:;,,..-, ..-,l(.rll..{ � • • •• • ••• ,' (�·••+ . �'"'-,.. • ..\.•.• •, • • : ' .. ·· .' • · • . -· • ·. 1 _ .· : • · .. � ..• ·... : -;-1�·[r1i�tr;1 of·P·ovter . · • · . : · :.,· ·. · · ��· . ��� . � = -�-r/ . y Central Electricity Authority 2 [r' � � � 'QcfJi1 U'l-ffTf-2 [ISO: 9001 :2008] Power System Planning & Appraisal Division-II �cfP.f

No. 69/l/PSPA-II/2017-ff-f?'? Dated 15-02-2017

To 1. Managing Director, 2. COO(CTU-Plg), Bihar State Power Transmission Power Grid Corp. of India Ltd. Co. Ltd (BSPTCL), "Saudamini", Plot No.2, Vidyut Bhawan, Bailey Road, Sector-29, Patna- 800021, Bihar Gurgaon 122 001, Haryana. FAX: 95124-2571932

I l Subject: Minutes of meeting regarding creation of 220kV level at the under construction 400/132kV Motihari (TBCB) Substation on 18th Jan 2017 at CEA

Sir, The minutes of the meeting held on 18-01-2017 at CEA, Sewa Bhawan, R K Puram, New Delhi regarding above subject is enclosed.

Yours faithfully, 4,��1f' (Rishika S�aran) Director (PSPA-11)

Copy to: PPS to Member(PS), CEA

46 ..

1. Chief Engineer (PSPA-11), CEA welcomed the participants. He informed that BSPTCL has requested to create 220kV level in the 400i 132kV (2x200MVA) Motihari GIS substation, which is under construction through TBCB by M/s Esse! Infra. BSPTCL proposed for installation of 400/220kV, 2x500MVA ICTs to avoid additional expenditure and time on creating a new 220/1 32k\/ ~~o·i: ih a ri (New) substation. 2. Representative of CTU stated that Motihari 400/132kV (TBCB) GIS substation is being established through LILO of Barh - Gorakhpur 400kV 0/c (Quad Moose) line under ERSS-VI where space for 5 no. 400kV bays, 5 no. 132kV bays and 400/132kV, 1x200MVA ICT had be~n kept for future expansion. Out of these, 3 no. 400kV bays, 1 no. 132kV bay and ICT space would be utilized for substation extension under ERSS-XXI. The layout of substations plan of 400/132 kV- Motihari S/s is enclo'sed at An nex-11. · 3. The layout of Motihari S/s was examined and the available space shown in the layout was examined in view of proposal for creation of 220 kV leve ~ at same location. 4. Representative of BSPTCL stated that they were taking up with l\1/s Esse! Infra for creation of 22QkV Voltage at 400/132kV Motihari (TBCB). However 1~/s Esse! infra had intimated that 220kV level. could not be created due to space constrarnt. It was decid~d t ha~ CTU may consult Substation expert of POVV~RGR_ID to know the feasibility of creation of 220kV Voltage at 400/132kV Motihari (TBCB). CTU vide their email dated 02.02.2017 have informed that the request of BSPTCL to accommodate 220kV level at Motihari along with 400/220kV, 2x500MVA ICT and 2 no. 220kV line ~ays in the available ~pace of Motihari 400/132kV substation was studied. It was observed that the available space in the fv1otihari substation is not .adequate to accommodate the proposed 220kV extension of BS~TCL. It ... was also pointed out that creation of 220kV level with only one no. 220kV 0/c outlet from 2x500MVA ICTs may not be prudent. Further, creation of 220kV level would restrict any future expansion plans at Motihari S/s. 5. Chief Engineer (PSPA-11), CEA stated that since new 220/132kV substation at Motihari was planned primarily to feed the loads of Gopalganj, Bsniah anci Raxaul, it might be prudent to shift the planned 220/132kV substation towards Bettiah/Raxaul keeping the same connectivity. This would also improve the voltage profile in that area. Representative of CTU said that they would ~a rry out system studi~s under various scenarios of the system. 6. CTU has provided following information vide their e-mail dated 02.02.2017 on the above subject. 1. The new 220/132kV substation at Motihari (New) was planned in consultation with BSPTCL under intra-state strengthening scheme in Bihar to meet its expected 131h plan demand by providing feed to the following: (a) 2nd 220kV feed to Gopalganj 220/132kV S/s (b) Additional 132kV feed to Bettiah/Ramnagar and Raxaul

47 .. -. fl . .. ~ ... • • :-- .:-= rc .~- ~s .i" :: • : t; : l : .... c ; _...... ~ ::: · - •:-~..a£ ;::. ~cr~u •- ..· ..· ...... : ... :· ·... ·...... \ ...... · ...... ::·.:.· ·· . .··. ·.·.. . ··.· ...· .~ · · •· . ,.. ·. •.. . • .. • . •. F. ~ r(-1· c. n ' ~ur 1 32!\-"' l ~= ~ •• .-· • ·...... •••• • • . •• • • •• • • •• •• • •• • •• • • ~ • • • • • • . • • ' ' • • 0: •• • • • • .,. • ·• . ~ . ... , . ,~s · 1~c ~ --~ "' -- --· ~·· ~ · .. <~~~ ···'1 • .... . •• ·• •·. ·•• :. • • ••.• •• • • ' "-... :...- lt~ l ' . c; ...... l'-' ,;::, ;::,.~ · "'""• '' i •.:: ;._ -:-; .. , • • -·: · . • • • • • • • • • • • • . 11 .' • Load flow results considering P'r6po sat ·orB S ?IC ~ of creation of 220kV le\~t l ·.. at Motihari (TBCB) S/s (along with 220kV D/c line to Gopalganj) and deletion of Motihari (New) 220/132kV S/s (along with deletion of associated lines) is shown at Exhibit-2. It may be observed in Exhibit-2 that Motihari (TBCB) - Raxaul and Motihari (TBCB)- Bettiah 132kV D/c lines are critically loaded in the base case itself. iii. Thus, in view of the above mentioned issues and load flow studies it is suggested that 220kV level may not be created at Motihari (TBCB) S/s. iv. BSPTCL also informed that space for new 132kV bays are not available at the existing Raxaui/Bettiah substations. Therefore it was proposed that the new '220/132kV substation can be created near Bettiah/Raxaul by LILO of existing Bettiah- Raxaul 132kV D/c line. v. In view of the above, two alternatives were considered for shifting the proposed new 220/132kV substation, one close to Bettiah and another close to Raxaul. The load flow results with new substation at Bettiah and Raxaul is shown at Exhibit-3 and Exhibit-4 respectively. It may be seen that from the load flow studies (Exhibit-3) that the load distribution on 132kV lines from Bettiah (New) is highly uneven and the flow on Motihari(TBCB) - Raxual 132kV D/c is around its thermal limit in base case itself. However, the issues are resolved when the substation is shifted to Raxual (Exhibit-4). It was observed from the above study results that the Raxaul (New) - Gopalganj 2'20kV D/c is mainly acting as a tie line. Considering the lower projected load growth of Bihar in 19th EPS, it was suggested that the implementation of Raxaul (New) - Gopalganj 220kV D/c may be taken up at a later date. vi. Thus, it is was decided that shifting ofthe new 220/132kV S/s from Motihari (New) to Raxaul (New) with the following scope of works would be better option. Raxaul (New) S/s: 220/132kV, 2x200MVA (to be implemented by BSPTCL) (a) Sitamarhi (New)- Raxaul (New) 220kV D/c (Twin Moose) (b) Raxaul (New) - Gopalganj 220kV D/c (Twin Moose/ Single Zebra) (c) LILO of Bettiah- Raxaul 132kV D/c line at Raxaul (New) 7. Based on the above decision following was agreed: (i) The available space in the Motihari substation is not adequate to accommodate the proposed 220kV extension of BSPTCL. Creation of 220kV level would restrict any future expansion plans at Motihari S/s. Load flow results also shows that Motihari (TBCB)- Raxaul and Motihari (TBCB) - Bettiah 132kV 0/c lines are critically loaded, when 220kV level is created at Motihari (TBCB) S/s. (ii) The new 220/132kV substation at Motihari is planned primarily to feed the loads of Gopalganj, Bettiah and Raxaul, it was decided to shift the planned substation towards Bettiah/Raxaul keeping the same connectivity. Based on above observations and load flow studies, it was proposed that the new

48 ·. . .. •' ' ' ', ' ~...... ,,..,~ :..· . ., ·, _: __ . ' - '_., • r• ,• ': • -: ~ ' ··- ·.·,,.- ~.- ·~ ·:..{.: ' 0> ~ .... •••• • • • • L.t.~· t ..).:..•~ •• ~~._s,c.. ~ .J"1mo.)' /)e. ccec:,ear.e, r -R.c.··, a.- b) •• •.::··...!••- · j ·~).• .., .,rg •.. :· ·. · ::·. ,.'8ett·i'~t1·~:Ra.x~nr. ~·~2k'V.' Drc Hn~. · · · ·. • ::"". ::· · ·. : •• ·.'·.. . : ·. ~ ·. ::: ·:: · · . • t. . \ ' • ...... • . t. • ·. • • ... . . • . . . /-1f[)'- ~O'}?~~~i-ing . t ~. e ·i O\',re.r vojected loaC'§i0\'/f,h pf 5iG3 t_ it.J~~ :-. · ·(:-:· s ·. i ~. ''V o.S · · • suggested.that the implementation of ~axaul (t\Jew)- Gopalganj 220kV D/c may be taken up at a later date. (iv) BSPTCL may send their proposal on the basis of above discussion to CEA for taking up with forthcoming meeting of the Standing Committee ( SCMPSPER) for finalization.

Annexure-1

List of the participants of the meeting held on 18.01.2017 at CEA 51. Name of the Participant Designation Organization No. 1 Pardeep Jindal Chief Engineer(PSPA-11) CEA 2 Rishika Sharan Director(PSPA-11) CEA 3 U.M.Rao Deputy Director(PSPA-11) CEA 4 Suyash A. Verma Asst. Director . CEA 5 Ashok Pal General Manager( CTU-Pig) POWERGRID 6 Anupam Kumar Engineer( CTU-Pig} POvVERGRID 7 H.R.Panday ESE/DGM .BSPTCL 8 Pankaj Kumar ESE/(P&E) BSPTCL 9 Ravi. S. Prasad ESE/(P&E) BSPTCL

49 . . .· ...... - .. . .: ...... • • • __:~ • • • • ....!- - - .- •· . .. . ·...... ' .... .·. ·: · 'I ill' I t 'I •• 'I .. ·. ·...... ,...... :' ...... • • .•· • • •. I ~ • : ...... : ...... • • • •• • •• i · • ...... •-. I...... I .,' • ...... , .. ... •.. -:

50 ;··~--

I I I ...

.. I

,....tb CD =,.:::s :::r CD =3' =::s-· m I! I I I m X ,· ;;; ...... • I • -.:;:""' .. . . . 'I' ... ..• " ... ~. ·~ . .. .··· .. .. . · : · •• i ...... • I ..

51 \ ('f l•n4a To ..... Gorakh•"''" Mah~'* ~ Bal~la:::::;;:::::::~ "•liQt .. ""' .. Hathvite- . ._ ~kh """ lp I "'.::.. ,,..., ; s ~l v ~.:= .. -~ ;' '~ ~- · _ - ~·!:"" ~ ~ • -f .1: I ~ '" ' ' tRlla'"t*" '-! w --- ...... NKSTPP "''\ • y -;f ..... Jl . -~- ~ Dh-l· ...!!- ~ ...... ' J.tt..k._ \ ~ ~"ohJ \ \\ ...... '""if.­ viD reo~ Transmission ...... Tollt,.Usft • l System Bettiah (With Tim e-f M•i!ito'f@ Strengthening) r New amo: ~ Strengthening 220kV 2021-22 P twt)tar ·tt.- ~ .. a~ / option ' t / • Hk"'' ~ ~ ~~~J t7 ~ ,,~ "\ D•oth• Ku•aha IH-1 'f \ '~ ~tafJJ " * \.. in Bihar a th!hlthenlng Stt..,.tPt•nlnl ~~ l'tt!M• Pb f · • -41 .... 5h-llntJttHnm' {PM1 f'1tas•4 f'art 2 fllf 2 o . 2) {l'art f . 2) .... I · l 8SttTCL Jlhft-rft-.3 .,.. : E fiOCL 1 of xhi ~ l'l - · bit-3 . - . · ·. --. 4 • . --; . 'Q;. ... - ...... ~ • · ...... · . : ~ . . · : . . . ; .. ... - . 4 . ' ] J 1· j . • ' ~ .. r I · ...... ·.· •• • : :. :. . .. :; . ·.· . : . t . : . .

52 ..

~ I . ' I ·.

c 0 ·-en ·een cen l! 1-

53 • . • • • I t / . u""• • "''"'"' . v. <"'III:Jitrl · >91t~l ~!<\t.~ .jj(• :.- '"' . . t,o \ • t"' , i\.) . l ~fJ "'''"""'"' . --"" -·· ~ · --~ \ ~ " - ] J / .~ . I . - . ., -- - "'-'j ~ ~F [ r . _· :1 ~~-ft.l ' , · 'l .. ~ · • .· 7 ·.~ ~: t:xhibit-4 ...... , : ~ . ~ --~ r-... : . • ..___ .r . . " .... / ' .. ~t •. • . s·; ~ ~ t~>..__ -~ . . ~ o;-!' ._ •o .. · _ ·~ · • · : · :. • . ·. · ' .... . • ' \ :·~ l ~ • . . ,f .. ~ . "'e / ~ "- . , ' ; .,. .., - t • i'f- ~· • ~ .' .. ~ . - ~~!" . .. · ~ • : • " ...... :~ "' - ~ ·• • : .. . Jw -~ .· t . · \ ,,:rf ~., . . , • • . . . .- . l at e ._____,__ .. . -- > • ' .. -·- ~ - -J' '.·:- A~ .1 bV !.- - ,>.~-.:_ ~l\t •~ ' . ... · d • . · J "- . 1 ~ ,i; ;;~~~ t( -1. • ~,~· • - . « - ' ' z -~~- ' ' ' !•-• l"- "':~; . • ~ . . · " ,., . o ~ '' tr r~· " - _ -· t 4 ;. :::.. . tr.~,~ · +\t' l ,Cj( -·-., : e K~tlh ~~!>'' - p~ ...... -,. · ,. - _ ~ i!!'l'll ~~ {,<~,. .ailhl).n ... .. 11s~ Pha!l - ,__,. \/~ _ Ph ,.! ·-·· · - --- St"""""'t .,. , - ~ - - - 5trtm9f;henl~ts ~ mrnutta.nfng " s "" Bihar "' ...... "" in _-;;:..-- :::::::;::c::~= --- ;.;bl - "' Trivonlt•nle.:: -=- ______(N!!p:t.IJ Duh --..., -- ha \ ;,!. I' s~ - ~tgh~tr ' Nepal) \ e ( Ku ) O " ___ % 7. - -> Laul'ltll .. ~ ~ 4:h:;;::::::: ·-I •"P'"i.f "'""\" ' ~ [ ~ ~- option . 2021·22 ~hening) 220kV : e Strengthening eng 1Qh® New Str fram l'.t;1ilJ - Time (With Raxaul System lfh1 · . . ______· {New) . 8tt.)N. "------H------Transmission _____ HKS'N"f) ' •. _,-;/ lb ~ ______.,. ..,:;-..-:; 1 , o// •:o.:·; ~ - ~ - -.!!. ~, '-""' .... .L - • - ~ Nagu R•m N:n1latlyag1;] BaUa ~- ______(NftP;,I) Ga,.d9k _____ L___

54 Bihar State Powet· Transmission Company Ltd., Patna Annexure-3.2 A ' ub si diar~ compan~ of Bihar State Po\\c.'t' (Holding) Co mpan~ Ltd., Patna Cl~ - lf"'0102BR2012SGC0188X9 Hc:td Office, Vidyut Bh:m an, Hail e~ Road, Patna - 800021,

Letter No. f~·ans , mist72 .' 2016 t _,.2=-d.:.-_ BSP ITL Put~Dnted 2E /~ - From. ,- Dr. A.K Shrivasla\'a Chief l ngi neer (Planning & Engineering) To. Sri Pradcep Jindal Chief Engineer (SP & PA-ll). Central Electricity Authority (CEA). St:\\a Bhawan. R.K Puram. 1\e\\ Delhi- 110066 Sub:- BSPT C L .\genda to he !:>Ubmitt~.:d in the forthcoming meeting (COp) Fnclosed) Ref:- 'sour onict: L. 1\o.-69!], 1PSP \-II '20 17t88-89. dated-15.02.17 Jr. \\ tth reli.!r~:n ce to the abo\ c. BSPl C l is suhmitting tht:ir propos.tl to put up in the lonhcoming meeting of 'tanding Committee. 1 hanJ..ing \ ou.

Encl- 1\s abo\~.:. Yours faithfully.

55 Agenda

Sub :- To construct a new GSS 220/ 132 K V, 2X200 MVA near Raxaul in place of Motihari new 220/ 132 KV, as proposed w1der 13 111 plan by BSPTCL.

1. BSPTCL proposed for installation of 4001220kV, 2x500MVA lCTs at the under construction 4001132k V Motihari GIS Substation(TBCB) to avoid additional expenditme and time on creating a new 2201132kV Motihari (New) substation. 2. Motihari (New) substation has been approved in the 18 111 Standing Committee Meeting under intra-state strengthening scheme to meet its expected 13 111 plan demand by providing feed to the follov.ing:- (a) 220kV feed to existing Gopalganj 220/132kV Sis. (b) 132kY 'teed to existing Bettiah and Raxaul GSS. (c) Improve reliability of power supply to Nepal through Raxaul - Parwanipur 132kV line. 3. To know the feasibility of creation of 220kV Voltage at 4001l32kV 1 Motihari, CEA called the meeting on 18 h Jan-17 with the BSPTCL officers and the Substation experts of POWERGRlD. After studying the layout of Motihari Sis and load flow studies by CEA following observation has been made by the experts:- Minutes ofthe meeting is attached. a) Motihari (TBCB) - Raxaul and Motihari (TBCB) - Bettiah 132kV D/c lines are critically loaded in the base case itself. b) It is suggested H1at 220kY level may not be created at Motihari (TBCB) Sis. c) It was proposed that the new 2201132k V substation can be created near Bettiahl Raxaul by LILO of existing Bettiah - Raxaul I 32k V Die line in place ofMotihari (New) 2201132 as earlier proposed in 13th plan. d) fn view of the above. two alternatives were considered for shifting the proposed new 220/l32kV substation. either close to Bettiab GSS or close to RaJ The available space in the Motihari substation is not adequate to accommodate the proposed 220kV extension of BSPTCL. Creation of 220kV level would restrict any future expansion plans at Motihari Sis. Load flow results also shows that Motihari (TBCB) - Raxaul and Motihari (TBCB) - Bettiah 132kV Die lines are critically loaded. when 220kV level is created at Motihari (TBCB) Sis. ~ TI1e new 2201132kV substation at Motihari is planned primarily to feed the loads of Gopalganj, Bettiah and Raxaul, it was decided to shift the planned

56 substation towards Bettiah/Raxaul keeping the sam~? connectivity. Based on above obst:rvations and load now studies. it \\US proposed that the new 220/132kV substation may be created near Raxaul b) the ULO of existing -- Bettiah - Raxaul 132kV 0 /c line \vith the follo'' ing scope of works. Raxaul (New) S/s: 220t 132k V. 2x200MV A (to be implemented by BSPTCL)

(a) Sitamarhi (Nev.. )- Raxaul {Ne,.,) 220kV D c (fv,in toosl!) (b) Raxaul (Ne~)- Gopalganj 220k V Q,c (I ~in Moose Single Zebra) (c) LILO ofBettiah- Raxaull32kV Ole line at Raxaul (Nev.) )... Considering the lower projected load gro'' th of Bihar in 19th EPS. it was suggested that the implementation of Ra"aul (New) - Gopalganj 220k V D/c may be taken up at a later date.

in the light of above. it is requested to put up BSP'I CL agenda in the lorthcoming meeting of the Standing Committee ( SCMPSPLR) Cor finalization to construct a new GSS 220/132 K V. 2X200 MVA near Raxaul with the ioUowing scope of works to be implemented by BSPTCL.

1. Raxaul (~ew) S/s: 220/132kV. 2x200MVA 2. Sitamarhi (1\ew)- Raxaul (~e\\) 220k. V 0 /c (Tv. in Moose) 3. Ra'\auJ (Nt:\\} - Gopalganj 220{V D c (T\\ in Moose! Single Zebra) 4. LILO of Bettiah - Raxaul 132kV D1c line at Ra\.aul (1'\1!\\) 11 in place of Motihari ne\\ 220/ 132 KV. as proposed under 13 ' plan with the follov. ing scope of works. (a) Sitamarhi( ew) - Motihari (1\ew) 220kV D/c (T\\ in Moose) (b) Motihari (t ew) - Gopalganj 220kV 0 /c(T\\ in Vloose)

(c) Motihari (New)- Raxaul I 32k V 0 /c (d) Motihari (Ne\\)- Betiah 132kV 0 /c (Singk Moose)

57 Annexure-4.1

Government of India ~ J"i:ili<'i~ Ministry of Power ~~~ Central Electricity Authority ~ ~ ~ Vii qfi:q);;jCJ11 JO(<"~iCflcrt -cnwr-11 [ISO: 9001 :2008] Power System Planning & Appraisal Division-ll ~ 31cfcrt", "U. Cf· ~ , crt

No. 68/ER/PSPA-2/ 78 Dated:01 '02/2017

To

Chairman cum Managing Director, Po\\er Grid Corp. of India Ltd., "Saudamini", Plot No.2, Sector-29, Gurgaon -122 001 , Haryana.

Subject: Prior approval of the Government of India under Section 68 of Electricity Act. 2003 for "Eastern Region Strengthening Scheme-XVII (ERSS-XVII)"- Revision regarding.

Reference: POWERGRID letter no C/CP/ERSS-XVIJ dated 06.01.2017

Sir.

1. This bas reference to POWERGRID letter no- C/CP/ERSS-XVll dated 06.01.2017 seeking prior approval of Government under section 68ofthe Electricity Act, 2003 for "Eastern Region Strengthening Scheme-XVII (ERSS-XVTT)". The scope under the subject scheme was discussed and modified in the 18111 meeting of the Standing Committee on Power System Planning of ER held on June 13, 2016. The modified scope of works is as given below:

I. ERSS-XVII (Part-A):

i. 2x 160 MVA. 220/132 kV ICT along with associated bays at Daltonganj S/s ii. 4 nos. of 132 kV line bays at Daltonganj S/s.

I I. ERSS-XVII (Part-B):

i. Augmentation of transformation capacity at POWERGRJD substations: a) Installation of 400/220 kV, 1 xSOO MVA TCT at Gaya Substation (400 kV bay in AIS and 220 kV bay in GIS). b) Rt!placement of400 '220 kV. 2x315 MVA ICTs at Maida Substation by 400/220 kV. 2x500 MVA ICTs.

58 c) Installation of3rd 400/220 kV, 1x 315 MVA ICT (to be sourced from pool of spare JCTs) at New Siliguri S/s (400 kV bay in GIS and 220 kV bay in AIS). d) Installation of 3rd 400/220kV. 1 x315 MVA ICT (to be sourced from pool of spare ICTs) at Durgapur Substation with associated bays. e) Installation of 400/220 kV, 2 x315 MVA ICTs (to be sourced from pool of spare fCTs) at Jeypore S/s (one each in parallel to the existing ICTs). f) Installation of400/220 kV, 2x315 MVA ICTs (to be sourced from pool of spare ICTs) at Rourkela Substation (one each in parallel to the existing lCTs).

For elements from (c) to (f) above, sourcing of old ICTs from pool of spare ICTs s h a II b c as g1ven . be Iow. New location for installation of old ICTs Source Location of Old ICT

New Siliguri (lCT-3) Maida (ICT-3)

Durgapur (ICT-3) Pumea (ICT-2)

Jeypore (lCT-3 & ICT-4) Patna (ICT-2) & Sasaram (ICT-2)

Rourkela (ICT-3 & ICT 4) Ballabgarh (ICT-1) & Mandola (ICT-4)

ii. Re-conductoring of Maithon RB- Maithon 400 kV D/C line with twin HTLS (equivalent to quad moose) along with modifications/ additions in bay equipment at both ends of the line viz. Maithon 400/220 kV sub-station of POWERGRID and generation switch yard of Maithon-RB.

iii. Bypassing arrangement of LILO of 400 kV lines at Angul: LILO ofMerarnundali­ Bolangir/Jeypore 400 kV S/c line and LILO of one circuit of Talcher- Meramundali 400 kV D/C line has been done at Angul 765/400 kV substation. Now, it is proposed to establish a switching arrangement at Angul substation such that. the above 400kV LILOs may be operated either by-passing Angul substation or terminating at Angul sub-station as and when required depending upon the power flow condition.

2. In view of above, CEA conveys the prior approval of Government under Section 68 of Electricity Act, 2003 for the schemes: a) ERSS-XVII(Part-A). and b) ERSS-XVII (Part-B) with scopes as given above. With this approval, the earlier a pproval given by CEA vide letter no. 68/ER/2015/1506 dated 07.07.2015 is revoked.

3. This approval is subject to compliance of

(a) The requirement of the relevant provisions of the Electricity Act, 2003, as amended from time to time and the rules and regulations framed thereunder and (b) CEA's (Measures relating to Safety and Electricity Supply) Regulations, 2010 fran1ed under the Electricity Act, 2003.

59 4. The approval is also subject to the following conditions:

(i) The implementing agency will commence construction of the project within three years, unless this term is extended by the Central Electricity Authority. (ii) Central Electricity Authority may withdraw the approval before the expiry of the period of three years after giving a one-month notice. (iii) "The implementing agencies shall abide by the provisions of Works of Licensee Rules. 2006 notified by the Government oflndia, Ministry of Power in the Gazette oflndia, extra­ ordinary Part-11, Section 3(i) dated 18-04-2006 (vide GSR 217 (E) dated 18-04-2006)". Provided that "nothing contained in this rule shall effect the powers conferred upon the Licensee under section 164 ofthe Electricity Act, 2003"

Yours faithfully, ~"'ll (P. D. Siwal) Secretary (CEA)

Copy to: I. Joint Secretary (Trans), MOP, Shram Shakti Bhawan, New Delhi.

60 ------"~-~-- ~------~-- Annexure-5.1

Qta~ ~ a:u::zcil~~rar 3ift5 ¥$Th:ua f&llllas ('ilml' -~ 'ifiT CVII') POWER GRID CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

~ ~: ·~· t(iffc ~. 2, ~-29, ~-122 001, ~) ~: 0124-2571700-719, ¢

Sub: Transmission system for Lanco Babandh JPS in Odistia Phase-1 (2x660MW) & Phase-11 (2x660MW) - Reg. Sir, This is with reference to your letter no. 68/ER/2016/PSPA-2/279 dated 27-09-2016 regarding requirement for revision in dedicated transmission system of Lance Babandh Power Ltd.(LBPL) in view of reduction in L TOA quantum. In this regard, following is submitted:

• LTOA of 1600MW (NR-650MW & WR-950MW). was granted to Lance· Babandh (4x660MW) generation project vide intimation no. C/ENG/E/00/SEF/OA dated 14-05-2009 with the following dedicated transmission system: · (i) Lance Babandh Gen Switchyard - Angul 400kV 2xD/c line

(ii). 3x1500MVA1 ?§_5/40Q~Y I.Qis ati\OQI,d.withassociatedJlays....

• Subsequently, LBPL has relinquished its long term access to the tune of 800MW in line with CERC order dated 08-06-2013 in Petition No: 118/MP/2012. Based on the decisions of 11th Connectivity and L TA Meeting of ER held on 13-06-2016, revision to LTOA intimation was issued, revising the LTOA quantum from-e1600MW to 800MW with allocation of NR-650fv.'!~MW. Keeping in view the revised LTOA quantum of 800MW, following revised dedicated transmission system is proposed: (i) Lance Babandh Gen Switchyard - Angul 400kV D/c line (Equivalent to triple snowbird or higher) (ii) 2x1500MVA, 765/400kV ICT (7x500MVA sir'!gle phase units) at Angul along with associated bays It is requested that CEA may take up the proposed revised dedicated system of LBPL in the forthcomin th i · __of ER. Simultaneously, we would also take up the . revised sche.me:Jocdeliberation in the fortQs?ming Connectivity and LT A meetin9. of ER.

Yours faithfully, I

(Subir sen) COO (.CTU-Planning)

~ ~= if ~'<-eit;'i_'il'i&J ~, CficCJI~lll mm. '1{ . 011-26560112,26560121,26564812,26564892, ~: 011-26601081 Regd. Office: B-9, Qutab I tiona! Area, Katwaria sarai, New Delhi-110016 Tel.: 011-26560112, 26560121, 26564812, 26564892, Fax: 011-26601081, Web.: www.powergridindia.com

61 Annexure-6.1

'J-lffifIx '(H.ct, J Government of India � J-i?flcill Ministry of Power ��� Central Electricity Authority � WJT@Tltcf � J{�ict,.:i "Q"irrT-2 [ISO: 90Q1 :2008] Power System Planning & Appraisal Division-II mrr'l-lcR, �- W-� , �� -110066 Sewa Bhawan, R. K. Pu ram, New Delhi-110066

No. 75/1/PSPA-II/2017,/lf>4- 1Sr Dated� -02-2017

To 1. Managing Director, 2. COO(CTU-Plg), 3. Shri Subhash Thakur, < �­ Jharkhand Urja Power Grid Corp. of Asst. General Manager, · Sancharan Nigam India Ltd.( PGCIL), Project Engineer(Electrical), Limited (JUSNL), "Saudamini", Plot No.2, NTPC.ltd, Engineering Building, Sector-29, Engineering Office Complex, H.E.C., Dhurwa, Gurgaon-122001, A-8A; Sector-24, Ranchi-834004. Haryana. Noida-201301 ( UP) Fax-0651-2400799 FAX: 95124-2571932

Subject: Minutes of meeting regarding draft report of JUSNL perspective transmission plan (2021-22) and Evacuation of power from Patratu TPS (3x800MW) held on 20.01.2017 at CEA Sir, The minutes of the meeting held on 20.01.2017 at CEA, Sewa Bhawan, R K Puram, New Delhi regarding above subject is enclosed.

Yours faithfully, �\� ,,�\Cf}}�t Y \ (Rishika Sharan) Director (PSPA-11)

Copy to: PPS to Member(PS), CEA

62 Minutes of meeting regarding draft report of JUSNL perspective transmission (2021-22) and Evacuation of power from Patratu TPS (3x800MW) held on 20.01.2017 at CEA

List of participants is enclosed at Annexure-I.

1. Chief Engineer (PSPA-II), CEA welcomed the participants. He informed that draft report submitted by JUSNL for their perspective transmission plan up to year 2021-22 and evacuation of power from Patratu TPS (3x800MW), PVUNL would be discussed in this meeting. A meeting on 26.10.2016 was earlier held in CEA with CTU and JUSNL representatives to discuss the above, after which JUSNL has revised the studies.

2. Evacuation of power from Patratu TPS (3x800MW) Patratu Vidyut Utpadan Nigam Limited (PVUNL) (3X800+2X800MW) is a joint venture of NTPC Ltd. and the Jharkhand state government owned Patratu Thermal Power Station (PTPS).

CTU representative informed that Patratu Vidyut Utpadan Nigam Ltd. (PVUNL) has applied for connectivity of 2400MW (Phase-I), to the ISTS system, from Dec, 2020 for their planned Patratu (3x800MW) TPS situated in Ramgarh District of Jharkhand.

PVUNL informed that 85% of power is allocated to Jharkhand state and 15% is kept as unallocated power. This matter was discussed and it was agreed that as majority of power of Patratu TPS is allocated to Jharkhand, it would be prudent that Patratu TPS is directly connected with JUSNL (Jharkhand STU) system. If remaining share (15%) of power of Patratu TPS is to be transferred outside Jharkhand, PVUNL may apply for ISTS Long Term Access to CTU (POWERGRID), as per CERC regulations.

2.1 Immediate Evacuation System and Evacuation voltage level

2.1.1 Joint studies were carried out to evolve immediate evacuation system for Patratu (3x800MW) TPS and accordingly following power evacuation system from Patratu (3x800MW) TPS was evolved: (a) Patratu gen. switchyard – Patratu (JUSNL) S/s 400kV (Quad Moose) D/c line (b) Patratu gen. switchyard – Koderma (JUSNL) S/s 400kV (Quad Moose) D/c line

63 (c) Patratu gen. switchyard – New Chandil (JUSNL) S/s 400kV (Quad Moose) D/c line (d) 420kV, 2x125MVAR bus reactors at Patratu gen. switchyard and 420kV, 1x125MVAR bus reactor at Patratu 400kV bus (e) From Patratu 400/220/132kV substation: (i) Patratu (JUSNL) S/s to Latehar 400kV D/c line (already under construction) (ii) Patratu (JUSNL) to Ranchi (POWERGRID) 765/400kV S/s 400kV D/c line (already under construction) along with LILO of both circuits at Mandar 400/220kV S/s

2.2 In this way, Patratu generation would also get connected to strong ISTS pooling stations viz. (i) Ranchi (POWERGRID) 765/400kV through Patratu (JUSNL) and (ii) Chandwa Pool (POWERGRID) through Patratu (JUSNL) & Latehar (JUSNL) substations of JUSNL.

2.3 Further, the connectivity of Patratu (3x800MW) TPS to Koderma (northern part of Jharkhand) and New Chandil (south-eastern part of Jharkhand) through 400kV high capacity (Quad Moose) double circuit lines would facilitate the transfer the power from Patratu TPS to different load centers in Jharkhand.

2.4 These interconnections would complete the 400kV high-capacity ring viz. Patratu TPS – Koderma – Jasidih – Dhanbad (ISTS) – New Chandil – Patratu TPS in Jharkhand, which shall improve reliability of power transfer within the state.

2.5 From the joint studies, it was also observed that three-phase fault level at both Patratu (3x800MW) TPS and Patratu (400/220kV) substation is about 50kA. Accordingly, it was decided that 400kV bus at Patratu generation switchyard as well as Patratu (400/220kV) substation (JUSNL) would be designed with 63kA fault level for 1sec.

2.6 JUSNL informed that construction is yet to start at Patratu (400/220kV) substation. Therefore, it was suggested that JUSNL would explore possibility of construction of 400kV and 220kV level at Patratu (400/220kV) substation with fault level of 63kA and 50kA respectively.

64

2.7 In view of the above, it was suggested that JUSNL may take up the proposed transmission system for Patratu (3x800MW) TPS for approval in the forthcoming meeting of Standing Committee on Power System Planning of Eastern Region. Upon approval, ISTS Connectivity application of PVUNL for Patratu TPS shall be closed and PVUNL may apply for connectivity of its Patratu (3x800MW) TPS to JUSNL (STU of Jharkhand).

3. Perspective transmission plan of JUSNL up to 2021-22

3.1 JUSNL informed that at present power demand of Jharkhand is about 1855.5MW (JUSNL area has 1068MW load and DVC area has 787.5MW load). The total load projected for Jharkhand for the year 2021-22 is around 5613MW (4193MW for JUSNL area + 1420MW for DVC area).

3.2 Load flow studies were carried out for projected peak load of Jharkhand as 4193MW for the year 2021-22.

3.3 JUSNL had submitted draft report on perspective transmission plan of JUSNL up to 2021-22. In the meetings held on 26.10.2017 and 20.01.2017, some modifications were proposed by CEA and CTU to incorporate in the study. JUSNL incorporated these changes and submitted the compliance report vide their email dated 01.02.2017. The compliance report is attached at Annexure-II. The transmission system indicated by JUSNL in the perspective transmission plan is enclosed at Annexure-III.

3.4 In the meeting, it was pointed out that 220kV D/C line considered from Chaibasa (JUSNL) to Ramchandrapur 220/132kV substation was earlier envisaged as Chaibasa (POWERGRID) to Ramchandrapur 220/132 kV substation. In the 18th SCM of ER, JUSNL had informed following outlets for utilization of 4 no. 220kV line bays at Chaibasa (POWERGRID) substation:

(i) Chaibasa (POWERGRID) – Chaibasa (JUSNL) 220kV D/c (ii) Chaibasa (POWERGRID) – Ramchandrapur (JUSNL) 220kV D/c line

3.5 However, as per detailed scope of work submitted by JUSNL, the line at (ii) above is proposed to be terminated at Chaibasa (JUSNL) substation and

65 hence connectivity considered in revised draft report studies i.e. Chaibasa (JUSNL) – Ramchandrapur 220kV D/c line is retained.

3.6 Accordingly, it is imperative that JUSNL may plan a new outlet from Chaibasa (POWERGRID) to utilize the remaining 2 no. 220kV line bays already constructed and get the proposal approved in the forthcoming SCM of ER.

4. Based on the above deliberations, the following was agreed:

4.1 Immediate Evacuation System of PVUNL (3x800MW) (a) Patratu gen. switchyard – Patratu (JUSNL) S/s 400kV (Quad Moose) D/c line (b) Patratu gen. switchyard – Koderma (JUSNL) S/s 400kV (Quad Moose) D/c line (c) Patratu gen. switchyard – New Chandil (JUSNL) S/s 400kV (Quad Moose) D/c line (d) 420kV, 2x125MVAR bus reactors at Patratu gen. switchyard and 420kV, 1x125MVAR bus reactor at Patratu 400kV bus

4.1.1 The following transmission system from Patratu (JUSNL) S/s is already under construction:

(a) Patratu (JUSNL) S/s – Latehar 400kV D/c line (b) Patratu (JUSNL) – Ranchi (POWERGRID) 765/400kV S/s 400 kV D/c line

Note: Patratu (JUSNL) – Ranchi (POWERGRID) 400kV D/c line would be LILOed at Mander 400/220kV S/s by Jharkhand as per perspective transmission plan of JUSNL up to 2021-22

4.1.2 400kV level at Patratu generation switchyard as well as Patratu (400/220kV) substation (JUSNL) would be designed with 63kA fault level for 1sec. 220kV level at Patratu S/s to be designed with 50kA fault level for 1sec

4.1.3 As 85% of power of Patratu (3x800MW) TPS project is allocated to Jharkhand, it was agreed that the generation would be connected to Jharkhand system. In such case, connectivity to ISTS shall not be required. Accordingly, it was decided that the ISTS Connectivity application of PUVNL would be discussed for withdrawal/closure in the next Connectivity and LTA meeting of ER. PVUNL may apply for connectivity of its Patratu (3x800MW) TPS to JUSNL (STU of Jharkhand).

66

4.2 Perspective transmission plan of JUSNL up to 2021-22

4.2.1 The following 400/220kV intra-state substations along with downstream connectivity mentioned at Annexure-III were agreed under perspective transmission plan of JUSNL up to 2021-22: (i) Jasidih 400/220kV, 2x500MVA (ii) New Chandil 400/220kV, 2x500MVA (iii) Koderma 400/220kV, 2x500MVA (iv) Mandar 400/220kV, 2x500MVA

4.2.2 The transmission system planned for JUSNL network along with evacuation system of PVUNL would create a high capacity 400kV ring Patratu TPS – Koderma – Jasidih – Dhanbad (ISTS) – New Chandil – Patratu TPS in Jharkhand, which would improve reliability of power transfer within the state. The intra-state system of Jharkhand would also get well interconnected at various ISTS points for smooth power exchange. 4.2.3 420kV, 2x125MVAR bus reactors may be installed at the new 400kV substations of JUSNL for voltage control. 400kV and 220kV levels at the new substations may be implemented with fault level of 63kA and 50kA respectively.

4.2.4 The SLD of 400kV & 220kV network and geographical map of JUSNL system for the JUSNL network for the year is attached at Annexure- IV (a), (b) & (c).

4.3 Utilisation of balance 2 no. 220kV line bays at Chaibasa

4.3.1 The utilization of 2 no. 220kV line bays at Chaibasa may be updated by JUSNL in 19th SCM of ER.

Meeting ended with vote of thanks to chair.

67

Annexure-I

List of the participants of the meeting held on 20.01.2017 at CEA

Sl. Name of the Participant Designation Organization No. 1 Pardeep Jindal Chief Engineer(PSPA-II) CEA 2 Rishika Sharan Director(PSPA-II) CEA 3 U.M.Rao Deputy Director(PSPA-II) CEA 4 Suyash A. Verma Asst. Director CEA 5 Ashok Pal General Manager(CTU-Plg) POWERGRID 6 Rohit Chandra Engineer(CTU-Plg) POWERGRID 7 A.K.Singh ESE JUSNL 8 Subhash Thakur AGM NTPC 9 Rakesha.H.S. Manager PRDC(JUSNL Consultant ) 10 Sharad Mishra Manager INFRA/IEDCL

68 Annexure-II

Compliance statement for revised draft report comments

Sl. Comments received on 20-01-2017 PRDC reply on 25-01-2017 No. CEA requested to submit the proposed substations Noted and it will be submitted 1 and connectivity by segregating them based on the as per the required format. 400 kV source. PVUNL power evacuation scheme is finalized as the connectivity given below:

From PVUNL generation plant 1. 400kV Quad moose D/C line from PVUNL to Patratu 400/220 kV substation. 2. 400kV D/C line from PVUNL to Koderma 400/220/132kV substation. 3. 400kV D/C line from PVUNL to Chandil 400/220/132kV substation. From Patratu 400/220/132kV substation – 4. 400kV D/C line from Patratu 400/220/132kV Noted and it will be 2 substation to Latehar 400/220/132kV substation. incorporated in the studies. 5. Charging of 400kV S/C (presently charged at 220kV) line from PTPS to TTPS at 400kV and shifting the line from PTPS to Patratu 400/220/132kV substation. 6. 400kV D/C line from Patratu 400/220/132kV substation to Ranchi PGCIL 765/400kV substation with LILO at Mandar 400/220kV substation. Also, 63 kA breakers has to be considered at both PVUNL and Patratu 400 kV buses and 2*125 MVAr bus reactor at PVUNL 400 kV bus and 1*125 MVAr bus reactor at Patratu 400 kV bus has to be considered.

400 kV D/C line from JUSNL Koderma Noted and it will be removed 3 400/220/132 kV substation to PGCIL Daltonganj from the studies. has to be removed from the studies.

Corporate Phase I (2*270 MW) IPP generation has Noted and it will be removed 4 to be removed from the studies. from the studies. 400/220 kV ICT unit capacity for all the proposed 400/220 kV substations has to be considered as 500 MVA except at Patratu and Latehar since Noted and it will be 5 already commissioning work is in progress. Also, incorporated in the studies. 63 kA breakers has to be considered in the 400 kV buses of all the proposed 400 kV substations. 220 kV D/C line from JUSNL Koderma Noted and it will be removed 6 400/220/132 kV substation to DVC Koderma from the studies. substation has to be removed from the studies.

69 Sl. Comments received on 20-01-2017 PRDC reply on 25-01-2017 No. Following changes has to be made in the 220 kV connectivity in Ranchi area,: 1. 220 kV D/C line from Ratu 220/132 kV substation to Bero 220/132 kV substation has to be Noted and it will be 7 changed to Mandar 400/220 kV to Bero 220/132/33 kV substation. incorporated in the studies. 2. 220 kV D/C line from Mandar 400/220 kV substation to Khunti 220/132 kV substation has to be removed.

220 kV D/C line from Govindpur 220/132 kV Noted and it will be removed 8 substation to CTPS DVC generation has to be from the studies. removed. As per the discussion with JUSNL it is understood that the 220 kV D/C line considered from Chaibasa JUSNL line will be terminated at to Ramachandrapur 220/132 kV substation has to 9 Chaibasa JUSNL substation be changed to Chaibasa PGCIL to and hence connectivity Ramachandrapur 220/132 kV substation. considered in revised draft report studies is retained. New 132 kV D/C line from Jasidih 400/220/132 kV substation to Hansdiha 132/33 kV substation has Noted and it will be 10 to be considered by removing 132 kV D/C line from incorporated in the studies. Hansdiha to Banka. New 220/132 kV substation at Adityapur has to be considered to relieve the loading on existing Adityapur 132 kV substation with the following connectivity. 1. LILO of both the circuits of Chaibasa PGCIL to Ramachandrapur 220/132 kV substation at New Adityapur 220/132 kV substation. Noted and it will be 11 2. LILO of 132 kV Chandil to old Adityapur line at New Adityapur 220/132 kV substation. incorporated in the studies. 3. LILO of 132 kV Rajkharaswan to old Adityapur line at New Adityapur 220/132 kV substation. New 220kV D/C line has to be considered from New Adityapur 220/132 kV to Jadugoda 220/132 kV substation instead of earlier consider 220 kV LILO line.

Instead of new 220 kV D/C line from new Chandil 400/220 kV substation to old Chandil 220/132 kV substation and Tamar 220/132 kV substations, LILO of both the circuits of existing 220 kV D/C line Noted and it will be 12 from Ranchi to old Chandil at new Chandil 400/220 incorporated in the studies. kV substation has to be considered. Also new Chandil to old Chandil portion of the 220 kV line can be re-conductored with higher size conductor. New 132 kV D/C line from Bero 220/132 kV Noted and it will be 13 substation to Kamdara 132/33 kV substation can incorporated in the studies. be considered.

70 Sl. Comments received on 20-01-2017 PRDC reply on 25-01-2017 No. Simdega 220/132kV substation will be considered for year 2021-22 (Earlier it was considered for year 2018-19 The 220 kV D/C line from Chaibasa to Simdega with 220kV connectivity to can be revised considering the length of 165 km. 14 Chaibasa) since Alternatively 220 kV D/C line from Bero 220/132 kV commissioning schedule of substation can be considered. Bero 220/132kV substation is year 2021-22 from which 220kV connectivity to Simdega will be considered.

71 Annexure-III

I. Latehar 400kV substation (Loads in this area are also supplied by Daltonganj PGCIL 400kV substation) Proposed substation details Sl. Voltage Capacity of Total Commissioning Name of substation District No of Connectivity No. level (kV) each unit capacity year units (MVA) (MVA) 400kV D/C line from Latehar 400/220/132kV substation to Patratu 400/220kV substation. 400kV D/C line from Latehar 400/220/132kV substation to 400/220 2 315 630 Jharkhand pooling station. (By year 2021-22, with commissioning of Essar generation this connectivity will become Essar to Latehar and Essar to Jharkhand pooling station 400kV D/C line) 220kV D/C line from Latehar 400/220/132kV substation to 1 Latehar Latehar 2017-18 Chatra 220/132kV substation. Charging of 220kV D/C line (presently charged at 132kV) from Daltonganj 132/33kV substation to Latehar 132/33kV substation 220/132 2 150 300 at 220kV, and termination of the line at PGCIL Daltonganj 400/220/132kV and Latehar 400/220/132kV substation. 132kV D/C line from Latehar 400/220/132kV substation to Latehar 132/33kV substation. 220kV D/C line from Latehar 400/220kV substation to Chatra 220/132kV substation. 220kV D/C line from Chatra 220/132kV substation to PBCMP 220/132 2 150 300 2017-18 (NTPC). 132kV D/C line from Chatra 220/132/33kV substation to Chatra 2 Chatra Chatra (Pratappur) 132/33kV substation. Charging of under construction 220kV D/C line from Latehar 132/33 2 50 100 400/220kV substation to Chatra 220/132kV substation at 132kV 2016-17 level and connecting it to existing Latehar 132/33kV substation. Charging of 220kV D/C line from Lohardagga 132/33kV substation to Latehar 132/33kV substation at 220kV (previously Lohardagg line was charged at 132kV). 3 Lohardagga 220/132 2 150 300 2018-19 a Charging of 220kV D/C line from Lohardagga 132/33kV substation to Hatia 220/132kV substation at 220kV (previously line was charged at 132kV). 220kV D/C line from Daltonganj 400/220kV substation to Garwha 220/132kV substation. 4 Garwha Garwha 220/132 2 150 300 2018-19 132kV D/C line from Garwha 220/132kV substation to Garwha road 132/33kV substation. 132kV D/C line from Chatra 220/132/33kV substation to Chatra 5 Chatra (Pratappur) Chatra 132/33 2 50 100 2017-18 (Pratappur) 132/33kV substation. 132kV D/C line from Latehar 400/220/132kV substation to 6 Mahuadanr Latehar 132/33 2 50 100 2018-19 Mahuadanr 132/33kV substation. 132kV D/C line from Latehar 400/220/132kV substation to 7 Chandwa Latehar 132/33 2 50 100 2018-19 Chandwa 132/33kV substation. 132kV D/C line from Chainpur 132/33kV substation to Mahuadanr 132/33kV substation. 8 Chainpur Gumla 132/33 2 50 100 2020-21 132kV D/C line from Gumla 132/33kV substation to Chainpur 132/33kV substation. 132kV D/C line from Chatra 220/132/33kV substation to Simaria 9 Simaria Chatra 132/33 2 50 100 2021-22 132/33kV substation. 132kV D/C line from Garwha 220/132kV substation to 10 Nagaruntari Garwha 132/33 2 50 100 2019-20 Nagaruntari 132/33kV substation. 132kV D/C line from Garwha 220/132kV substation to Meral 11 Meral Garwha 132/33 2 50 100 2019-20 132/33kV substation. 132kV D/C line from Garwha 220/132kV substation to 12 Ramkanda Garwha 132/33 2 50 100 2019-20 Ramakanda 132/33kV substation. 132kV D/C line from Chatarpur 132/33kV substation to Panki 13 Panki Palamu 132/33 2 50 100 2019-20 132/33kV substation. 132kV D/C line from Daltonganj 400/220/132kV substation to Chatarpur 132/33kV substation. 14 Chatarpur Palamu 132/33 2 50 100 2018-19 132kV D/C line from Chatarpur 132/33kV substation to Japla 132/33kV substation. Additional transmission lines for network strengthening 1 132kV D/C line from 132/33kV Garwha road substation to Japla 132/33kV substation. 2016-17 2 132kV D/C line from Daltonganj PGCIL 400/220/132kV substation to Daltonganj 132/33kV substation. 2017-18 3 132kV D/C line from Garhwa road 132/33kV substation to Daltonganj 132/33kV substation. 2017-18

II. Patratu 400kV substation Proposed substation details Sl. Voltage Capacity of Total Commissioning Name of substation District No of Connectivity No. level (kV) each unit capacity year units (MVA) (MVA) 400kV D/C line from Patratu 400/220/132kV substation to Latehar 400/220/132kV substation. 400/220 2 315 630 Charging of 400kV S/C (presently charged at 220kV) line from PTPS to TTPS at 400kV and shifting the line from PTPS to Patratu 400/220/132kV substation. Shifting of 220kV D/C line from PTPS to Hatia 220/132kV 220/132 substation to Patratu 400/220/132kV substation. (transform 220kV D/C line from Patratu 400/220/132kV substation to ers shifted 2 150 300 1 Patratu Hazaribagh PBCMP (NTPC). 2017-18 from PTPS to Patratu) 220kV D/C line from Patratu 400/220/132kV substation to PTPS.

72 Shifting of 132kV S/C line from PTPS to Patratu (DVC) to Patratu 400/220/132kV substation. Shifting of 132kV S/C line from PTPS to Kanke 132/33kV 132/33 2 50 100 substation to Patratu 400/220/132kV substation. Shifting of 132kV S/C line from PTPS to Hatia 132/33kV substation to Patratu 400/220/132kV substation. 132kV D/C line from Patratu 400/220/132kV substation to 2 Barkagaon Hazaribagh 132/33 2 50 100 2018-19 Barkagaon 132/33kV substation. 132kV D/C line from Ramgarh 132/33kV substation to existing Ramgarh (DVC) 132/33kV substation. 132kV D/C line from Chatra 220/132/33kV substation to Ramgarh 132/33kV substation. 3 Ramgarh Hazaribagh 132/33 2 50 100 2018-19 132kV D/C line from Patratu 400/220/132kV substation to Ramgarh 132/33kV substation. 132kV D/C line from Bokaro (Jainamore) 220/132kV substation to Ramgarh 132/33kV substation. Additional transmission lines for network strengthening 1 400kV D/C line from Patratu 400/220/132/33kV substation to Ranchi PGCIL 765/400kV substation. 2018-19

III. Jasidih 400kV substation Proposed substation details Sl. Voltage Capacity of Total Commissioning Name of substation District No of Connectivity No. level (kV) each unit capacity year units (MVA) (MVA) 400kV D/C line from Koderma 400/220/132kV substation to 400/220 2 500 1000 2018-19 Jasidih 400/220/132kV substation. 220kV D/C line from Dumka 220/132kV substation to Jasidih 220/132 2 150 300 220/132/33kV substation. 1 Jasidih Deoghar 132kV D/C line from Jasidih 220/132/33kV substation to 2017-18 Madhupur 132/33kV substation. 132/33 2 50 100 132kV D/C line from Deogarh 132/33kV substation to Jasidih 220/132/33kV substation. 220kV D/C line from Koderma 400/220/132kV substation to Giridih 220/132/33kV substation. 220/132 2 150 300 220kV D/C line from Govindpur 220/132/33kV substation to 2 Giridih Giridih 2018-19 Giridih 220/132/33kV substation. 132kV D/C line from Giridih 220/132/33kV substation to Jamua 132/33 2 50 100 132/33kV substation. 220kV D/C line from Dumka 220/132 kV substation to 220/132/33kV substation. 220/132 2 150 300 220kV D/C line from Godda 220/132/33kV substation to Lalmatia 220/132/33kV substation. 3 Godda Godda 132kV D/C line from Godda 220/132/33kV substation to 2018-19 Amarpara 132/33kV substation. 132/33 2 50 100 LILO of one circuit of 132kV D/C line from Dumka 132/33kV substation to Lalmatiya 220/132/33kV substation at Godda 220/132/33kV substation. 132kV D/C line from Giridih 220/132/33kV substation to Jamua 4 Jamua Giridih 132/33 2 50 100 2018-19 132/33kV substation. 132kV D/C line from Bishnugarh 132/33kV substation to Saria 5 Saria Giridih 132/33 2 50 100 2018-19 132/33kV substation. 150 LILO of 132kV S/C line from Deogarh 132/33kV substation to 6 Chitra Deoghar 132/33 70 2016-17 120 Jamtara 132/33kV substation at Chitra 132/33kV substation. LILO of 132 kV D/C line from Dumka 132/33kV substation to 7 Jarmundi Dumka 132/33 2 50 100 2018-19 Deoghar 132/33kV substation at Jarmundi 132/33kV substation. 132kV D/C line from Dumka 132/33kV substation to Sikaripara 8 Sikaripara Dumka 132/33 2 50 100 2018-19 132/33kV substation. LILO of one circuit of 132 kV D/C line from Lalmatiya 220/132/33kV substation to Dumka 132/33kV substation at 9 Hansdiha Dumka 132/33 2 50 100 Hansdiha 132/33kV substation. 2018-19 132kV D/C line from Hansdiha 132/33kV substation to Banka (PGCIL) substation. 132kV D/C line from Godda 220/132/33kV substation Amarpara 132/33kV substation. 132kV D/C line from Pakur 132/33kV substation to Amarpara 10 Amarpara Pakur 132/33 2 50 100 2018-19 132/33kV substation. 132kV D/C line from Dumka 132/33kV to Amarpara 132/33kV substation. 132kV D/C line from 132/33kV substation to 11 Sahebganj 132/33 2 50 100 2018-19 Rajmahal 132/33kV substation. 132kV D/C line from Sahebganj 132/33kV substation to 12 Udhwa Sahebganj 132/33 2 50 100 2018-19 132/33kV substation. Additional transmission lines for network strengthening 1 400kV D/C line from PGCIL Dhanbad 400/220kV substation to Jasidih 400/220/132/33kV substation. 2019-20 2 Conversion of 220kV S/C line from Lalmatia 220/132/33kV substation to Farakka NTPC generation into D/C line. 2020-21 3 220kV D/C line from Giridih 220/132/33kV substation to Jasidih 400/220kV substation. 2021-22 4 132kV D/C line from 220/132kV Dumka substation to Jamtara 132/33kV substation. 2018-19 5 132kV D/C line from Sahebganj 132/33kV substation to Pakur 132/33kV substation. 2018-19 6 132kV D/C line from Saria 132/33kV substation to Giridih 220/132/33kV substation. 2021-22

73 IV. Chandil 400kV substation (Loads in this are also supplied by Ramchandrapur and Chaibasa PGCIL 400kV Proposed substation details Sl. Voltage Capacity of Total Commissioning Name of substation District No of Connectivity No. level (kV) each unit capacity year units (MVA) (MVA) 400kV D/C line from PGCIL Chaibasa 400/220/132kV substation to Chandil 400/220/132kV substation. 1 Chandil Saraikela 400/220 2 500 1000 LILO of 220kV D/C line from Ranchi PGCIL 400/220kV 2018-19 substation to Chandil 220/132kV substation at Chandil 400/220kV substation. LILO of 220kV D/C line from Ranchi PGCIL 400/220kV 2 Tamar Ranchi 220/132 2 150 300 substation to Chandil 220/132kV substation at Tamar 220/132kV 2018-19 substation. 220kV D/C line from Bero 220/132/33kV substation to Simdega 220/132kV substation. 132kV D/C line from Simdega 220/132kV substation to Kolebira 220/132 2 150 300 132/33kV substation. 2021-22 LILO of 132kV D/C line from Simdega 132/33kV substation to 3 Simdega Simdega Kurdeg 132/33kV substation at Simdega 220/132kV substation. 132kV D/C line from Manoharpur 132/33kV substation to Simdega 132/33kV substation. 132/33 2 50 100 2016-17 132kV D/C line from Gumla 132/33kV substation to Simdega 132/33kV substation. LILO of proposed 220kV D/C line from Ramchandrapur 220/132/33kV substation to Chaibasa 220/132kV substation at East Jadugoda 220/132/33kV substation.(Interim arrangement) 4 Jadugoda 220/132 2 150 300 2018-19 Singhbhum 220kV D/C line from Adityapur 220/132kV substation to Jadugoda 220/132/33kV substation.(With commissioning of Adityapur 220/132/33kV substation) LILO of 220kV D/C line from Ramchandrapur PGCIL 400/220kV substation to Chaibasa 220/132kV substation at Adityapur 220/132kV substation. 220kV D/C line from Adityapur 220/132kV substation to Jadugoda 220/132/33kV substation.(With commissioning of East Adityapur 220/132/33kV substation) 5 Adityapur 220/132 2 150 300 2021-22 Singhbhum LILO of 132kV S/C line from Chandil 220/132kV substation to Adityapur 132/33kV substation at Adityapur 220/132kV substation. LILO of 132kV S/C line from Rajkharsawan 132/33kV substation to Adityapur 132/33kV substation at Adityapur 220/132kV substation. 132kV D/C line from Tamar 220/132/33kV substation to silli 6 Chouka Saraikela 132/33 2 50 100 2018-19 132/33kV substation via Chouka 132/33kV substation. 132kV D/C line from Chandil 220/132kV substation to Chakuliya 132/33kV substation. East 132kV D/C line from Bahragora 132/33kV substation to 7 Chakuliya 132/33 2 50 100 2018-19 Singbhum Chakuliya 132/33kV substation. 132kV D/C line from Dalbhumgarh 132/33kV substation to Chakuliya 132/33kV substation. 132kV D/C line from Dalbhumgarh 132/33kV substation to East Bahragora 132/33kV substation. 8 Bahragora 132/33 2 50 100 2018-19 Singbhum 132kV D/C line from Bahragora 132/33kV substation to Chakuliya 132/33kV substation. LILO of one circuit of 132kV D/C line from Chandil 220/132kV 9 Kandra Saraikela 132/33 2 50 100 substation to Rajkharsawan 132/33kV substation at Kandra 2018-19 132/33kV substation. 132kV D/C line form Ramchandrapur 220/132kV substation to Mango 132/33kV substation. East 10 Mango 132/33 2 50 100 LILO of one circuit of 132kV D/C line from Chandil 220/132kV 2018-19 Singbhum substation to Golmuri 132/33kV substation at Mango 132/33kV substation. East 132kV D/C line from Jadugoda 132/33kV substation to 11 Sundernagar 132/33 2 50 100 2018-19 Singbhum Sundernagar 132/33kV substation. LILO of 132kV S/C line form Goelkera 132/33kV substation to Tarkera 220/132kV substation at Manoharpur 132/33kV West 12Manoharpur 132/33 2 50 100 substation (commissioned). 2016-17 Singbhum 132 KV D/C line from Chaibasa 220/132/33kV substation to Manoharpur 132/33kV substation. East Addition of 132/33kV transformers at existing Ramchandrapur 13 Ramchandrapur 132/33 2 50 100 2016-17 Singbhum 220/132kV substation. 132kV D/C line from Kamdara 132/33kV substation to Kolebira 14 Kolebira Simdega 132/33 2 50 100 2018-19 132/33kV substation. 132kV D/C line from Simdega 132/33kV substation to Kurdeg 15 Kurdeg Simdega 132/33 2 50 100 2018-19 132/33kV substation. Additional transmission lines for network strengthening 1 400kV D/C line from PGCIL Dhanbad 400/220kV substation to Chandil 400/220kV substation. 2019-20 2 220kV D/C line from 220/132kV Ramchandrapura substation to Chaibasa 220/132/33kV substation. 2016-17 3 220kV D/C line from Chaibasa 220/132/33kV substation to Gua SAIL. 2018-19 4 132kV D/C line from 220/132 kV Ramchandrapur substation to Jadugoda 132/33kV substation. 2016-17 5 132kV D/C line from 132/33kV Jadugoda substation to Dalbhumgarh 132/33kV substation. 2016-17 6 132kV D/C line from 132/33kV Chakradharpur substation to Chaibasa 220/132/33kV substation. 2018-19 7 132kV D/C line from Noamundi 132/33kV substation to Chaibasa 220/132/33kV substation. 2018-19 8 LILO of one Ckt of 132 KV D/C line from Noamundi 132/33kV substation to Chaibasa 220/132/33kV substation at Kendposi 132/33kV substation. 2018-19 9 132kV D/C line from 220/132/33kV Chaibasa substation to Rajkharsawan 132/33kV substation. 2018-19 LILO of one circuit of 132kV D/C line from Chaibasa 220/132/33kV substation to Manoharpur 132/33kV substation at Goelkera 132/33kV 10 2018-19 substation 11 132kV D/C line from Noamundi 132/33kV substation to Manoharpur 132/33kV substation. 2020-21

V. Koderma 400kV substation Proposed substation details Sl. Voltage Capacity of Total Commissioning Name of substation District No of Connectivity No. level (kV) each unit capacity year units (MVA) (MVA) 400kV D/C line from Koderma 400/220/132kV substation to Koderma (DVC) 400/220kV substation. 400kV D/C line from Koderma 400/220/132kV substation to 400/220 2 500 1000 Jasidih 400/220/132kV substation.

74 1 Koderma Koderma LILO of 400kV S/C line from TTPS to Biharshariff at Koderma 2018-19 400/220/132kV substation. 220kV D/C line from Koderma 400/220/132kV substation to 220/132 2 150 300 Giridih 220/132/33kV substation. 132/33 2 50 100 - 220kV D/C line from Koderma 400/220/132kV substation to 220/132 2 150 300 2 Domchanch Giridih Domchanch 132/33kV substation. 2021-22 132/33 2 50 100 - 220kV D/C line from Hazaribagh 220/132/33kV substation to 220/132 2 150 300 3 Barkatha Koderma Barkatha 220/132/33kV substation. 2021-22 132/33 2 50 100 - 220kV D/C line from Tenughat TPS to Hazaribagh 220/132/33kV substation. 220/132 2 150 300 220kV D/C line from Hazaribagh 220/132/33kV substation to 4 Hazaribagh Hazaribagh 2018-19 Hazaribagh (DVC) 220/132kV substation. 132kV D/C line from Hazaribagh 220/132/33kV substation to 132/33 2 50 100 Bishnugarh 132/33kV substation. 132kV D/C line from Chatra 220/132/33kV substation to Barhi 5 Barhi Hazaribagh 132/33 2 50 100 2018-19 132/33kV substation. Additional transmission lines for network strengthening 1 132kV D/C line from Barhi 132/33kV substation to Hazaribagh (JSEB) 220/132/33kV substation. 2021-22

VI. Mandar 400kV substation (Loads in this area are also supplied by Ranchi PGCIL 400kV substation) Proposed substation details Sl. Voltage Capacity of Total Commissioning Name of substation District No of Connectivity No. level (kV) each unit capacity year units (MVA) (MVA) LILO of 400KV D/C line from Ranchi PGCIL 765/400kV substation to Patratu 400/220/132/33kV substation at Mandar 400/220kV substation. 220kV D/C line from Ratu 220/132/33kV substation to Mandar 400/220kV substation. 220kV D/C line from Tamar 220/132/33kV substation to Mandar 1 Mandar Ranchi 400/220 2 500 1000 2021-22 400/220kV substation via Khunti 220/132/33kV substation. LILO of 220KV D/C line from Hatia 220/132kV substation to Lohardagga 220/132kV substation at Mandar 400/220kV substation. 220kV D/C line from Mandar 400/220kV substation to Bero 220/132/33kV substation. 220kV D/C line from Patratu 400/220kV substation to Ratu 220/132 2 150 300 220/132kV substation. 2 Ratu Ranchi 2018-19 132kV D/C line from Hatia 220/132kV substation to Ratu 132/33 2 50 100 220/132kV substation. 220kV D/C line from Mandar 400/220kV substation to Bero 220/132/33kV substation. 220/132 2 150 300 220kV D/C line from Khunti 220/132/33kV substation to Bero 3 Bero Ranchi 2021-22 220/132/33kV substation. 132kV D/C line from Bero 220/132/33kv substation to Kamdara 132/33 2 50 100 132/33kV substation. 220kV D/C line from Tamar 220/132/33kV substation to Khunti 220/132kV substation. 220/132 2 150 300 2021-22 220kV D/C line from Khunti 220/132/33kV substation to Bero 220/132/33kV substation. 4 Khunti Khunti 132kV D/C line from Tamar 220/132/33kV substation to Khunti 132/33kV substation. 132/33 2 50 100 2017-18 LILO of 132kV S/C line form Hatia 132/33kV substation to Kamdara 132/33kV substation at Khunti 132/33kV substation. LILO of 220kV D/C line from Ranchi PGCIL 400/220kV 220/132 2 150 300 substation to Chandil 220/132kV substation at Sarwal 5 Sarwal Ranchi 2020-21 220/132/33kV substation. 132/33 2 50 100 - 132kV D/C line from Irba 132/33kV substation to Kanke 6 Irba Ranchi 132/33 2 50 100 2018-19 132/33kV substation. 132kV D/C line from Gola 132/33kV substation to Silli 132/33kV 7 Gola Hazaribagh 132/33 2 50 100 2018-19 substation. 132kV D/C line from Sikkidri 132/33kV substation to Angada 132/33kV substation. 8 Angada Ranchi 132/33 2 50 100 2018-19 132kV D/C line from Angada 132/33kV substation to Silli 132/33kV substation. 132kV D/C line from Silli 132/33kV substation to Angada 132/33kVsubstation. 132kV D/C line from Silli 132/33kV substation to Gola 132/33kVsubstation. 9 Silli Ranchi 132/33 2 50 100 2018-19 132kV D/C line from Chouka 132/33kVsubstation to silli 132/33kV substation. 132kV D/C line from Silli 132/33kV substation to Sikkidri 132/33kV substation. Additional transmission lines for network strengthening 1 220kV D/C line from 220/132kV Hatia substation to Ranchi (PGCIL) 400/220kV substation. 2016-17 2 132kV D/C line from 132/33kV Kanke substation to Hatia 220/132kV substation. 2016-17 3 LILO of 132kV S/C (3rd ckt) from Hatia 132/33kV substation to Sikidri 132/33kV substation at Namkum 132/33kV substation. 2016-17 4 Re-conductoring of Hatia-Namkum-Sikidri 132kV D/C line with HTLS conductor. 2016-17 5 Re-conductoring of Hatia-Kamdara 132kV S/C line with HTLS conductor. 2016-17 6 132kV D/C line from Irba 132/33kV substation to Ramgarh 132/33kV substation. 2019-20 7 132kV D/C line from Irba 132/33kV substation to Ratu 220/132/33kV substation. 2019-20

Govindpur 220kV substation (Dhanbad PGCIL 400kV substation is a power source in this area) 220 kV D/C line from TTPS to Govindpur 220/132/33kV substation. 220/132 2 150 300 1 Govindpur Dhanbad 220kV D/C line from Dumka 220/132kV substation to Govindpur 2016-17 220/132/33kV substation. 132/33 2 50 100 - LILO of 220kV D/C line from TTPS to Govindpur 220/132/33kV Bokaro 220/132 2 150 300 2 Bokaro substation at Bokaro 220/132/33kV substation 2017-18 (Jainamore) 132/33 2 50 100 -

75 220kV D/C line from Tenughat TPS to Gomia 220/132/33kV 220/132 2 150 300 substation. 3 Gomia Giridih 2018-19 132kV D/C line from Gomia 220/132/33kV substation to Dugda 132/33 2 50 100 132/33kV substation. 220kV D/C line from Tenughat TPS to Chandrapura 220/132 2 150 300 220/132/33kV substation. 4 Chandrapura Bokaro 2020-21 132kV D/C line from Chandrapura 220/132/33kV substation to 132/33 2 50 100 Dugda 132/33kV substation. 220kV D/C line from Govindpur 220/132/33kV substation to 220/132 2 150 300 Baliyapur 220/132/33kV substation. 5 Baliyapur Dhanbad LILO of 132kV D/C line from Putki 132/33kV substation to 2020-21 132/33 2 50 100 132/33kV substation at Baliyapur 220/132/33kV substation. 220kV D/C line from Govindpur 220/132/33kV substation to 220/132 2 150 300 220/132/33kV substation. 6 Topchanchi Giridih 2020-21 132kV D/C line from Topchanchi 220/132/33kV substation to 132/33 2 50 100 Dugda 132/33kV substation. LILO of 220kV D/C line from Dumka 220/132/33kV substation to 220/132 2 150 300 Govindpur 220/132/33kV substation at Palojori 220/132/33kV 7 Palojori Deoghar 2021-22 substation. 132/33 2 50 100 - 132kV D/C line from Bokaro (Jainamore) 220/132/33kV 8 Petarwar Bokaro 132/33 2 50 100 2018-19 substation to Petarwar 132/33kV substation. 132kV D/C line from Bokaro (Jainamore) 220/132/33kV substation to Dugda 132/33kV substation. 9 Dugda Bokaro 132/33 2 50 100 2018-19 132kV D/C line from Gomia 220/132/33kV substation to Dugda 132/33kV substation. 132kV D/C line from Govindpur 220/132/33kV substation to Putki132/33kVsubstation. 132kV D/C line from Putki 132/33kV substation to Pathardih 10 Putki Dhanbad 132/33 2 50 100 2018-19 132/33kVsubstation. 132kV D/C line from Putki 132/33kV substation to 132/33kV substation. 132kV D/C line from Putki 132/33kV substation to Pathardih 11 Pathardih Dhanbad 132/33 2 50 100 2018-19 132/33kV substation. 132kV D/C line from Govindpur 220/132/33kV substation to Chandankiyari 132/33kV substation. 12 Chandankiyari Bokaro 132/33 2 50 100 2018-19 132kV D/C line from Bokaro (Jainamore) 220/132/33kV substation to Chandankiyari 132/33kV substation. 132kV D/C line from Putki 132/33kV substation to Mahuda 13 Mahuda Dhanbad 132/33 2 50 100 2018-19 132/33kV substation. 132kV D/C line from Hazaribagh 220/132/33kV substation to Bishnugarh 132/33kV substation. Bishnugarh 132kV D/C line from Saria 132/33kV substation to Bishnugarh 14 Hazaribagh 132/33 2 50 100 2018-19 (Banaso) 132/33kV substation. 132kV D/C line from Gomia 220/132/33kV substation to Bishnugarh 132/33kV substation. 132kV D/C line from Baliyapur 220/132/33kV substation to 15 Nirsa Dhanbad 132/33 2 50 100 2021-22 132/33kV substation. Additional transmission lines for network strengthening 1 220kV D/C line from Dhanbad PGCIL to Govindpur 220/132/33kV substation. 2019-20 2 220kV D/C line from Dhanbad PGCIL to Bokaro (Jainamore) 220/132/33kV substation. 2019-20 3 132kV D/C line from Govindpur 220/132/33kV substation to Madhupur 132/33kV substation. 2021-22

76 Annexure-IV(a)

Koderma Sasaram { (DVC){

135km 15km 196km

Daltonganj_400kV Koderma_400kV Jasidih_400kV [4204019] [4204024] [4204025] 97.58 -97.70 -24.35 -24.35 179.91 179.91 97.58 (70.49) (29.34) (29.34) -97.70 (16.64) (16.64) (-84.72) (-84.72) 0.99 (2.25) 1.01 (9.53) (70.49) 1.02 (8.36) 0.00 0.00

(0.00) (0.00) 29.92 29.92

24.35 -89.63 -89.63 (24.48) 24.35 (24.48) 29.73 (4.25) -127.50 139.71 (54.09) 139.71 (54.09) -294.32 (-49.58) (-53.83) (-17.21) -127.50 (-53.83) (-17.21) (-16.64) (-16.64) { 2x315 MVA MVAr 80 2x500 MVA 2x500 MVA 133km MVAr 80 400/220kV 400/220kV Biharshariff 400/220kV

0.00 0.00 0.00 0.00 0.00 0.00 (0.00) (0.00) (0.00) (0.00) (0.00) (0.00) 1.00 1.00 1.00 1.00 89.54 127.28 89.54 -24.36 (15.34) -24.36 127.28 (16.30) (16.30) (49.57) (49.57) (15.34) Daltonganj_220kV Jasidih_220kV Koderma_220kV 90km [4202019] 111km [4202006] [4202026] 0.98 (2.82) 1.01 (8.39) 0.99 (5.33)

150km 172km 97km

Kahalgaon { {

50 MVAr 50 MPL Kahalgaon { 172km { Mejia 2x525 MW 70.7km Parulia Gaya 272km 84km { -0.00

(-46.49) { 50 MVAr 50 MVAr -0.00 86km 50 MVAr 50 MVAr -0.00 -0.00 -0.00

-0.00 -0.00 (-45.53) 50 MVAr 50 50 MVAr 50 MVAr 50

(-46.11) (-45.53) (-46.46) (-45.53) (-45.53) Latehar_400kV Dhanbad_400kV Maithon-I_400kV Maithon-II_400kV -0.00 [4204021] [4204008] [4204002] [4204003] (-46.49) 50 MVAr 50 80 MVAr 80 45.55 -79.61 (10.87) 187.35 (54.79) 0.00 1.01 271.31 (56.03) (0.00) 0.00 98.18 -79.61 (56.03) 160.70 185.57 271.31 (69.47) (27.56) -272.50 963.50 -0.00 (-21.51) -29.93 (10.84) (10.09) (24.02) (-32.26) 50 MVAr 50 185.57 (-33.58) (-23.52) (-32.39) -29.93 (27.04) 1.01 1.00 (-17.65) -272.50 (-32.39) (12.25) (8.67) (-33.58) 1.02 (27.04) (0.00) (-31.00) (-46.49) -229.12 -29.76 -229.12 Tenughat_400kV Maithon RB_gen [4204005] [4204004] 0.00 -0.00 (0.00) 42.87 0.00 (0.00) 42.87 (36.89) (36.89) (40.05) (35.95) (35.95) 3x500 MVA 157.86 157.86 -38.29 (9.94) -151.27 (11.41) -38.29 1.01 -151.27 1.01 -200.73 (-38.21) (40.05) (-70.39) -200.73 (-38.21) 196.93 (-45.53) -51.82 209.12 -116.29 (-26.32) (-26.32) (-26.32) (-70.39) (-6.21) (16.40) 209.12 -51.82 (2.26) (2.26) -209.25 (16.40) (-33.52) -139.39 -139.39 -139.39 (4.76) -78.79 -138.82 (62.96) -78.79 -209.25 (4.76) (-33.52) 2x315 MVA 2x500 MVA (29.49) 400/220kV

400/220kV 2x315 MVA 400/220kV

400/220kV 31km { 0.00 0.00 0.00 0.00 0.00 0.00 53km 0.00 0.00 0.00 Raghunathpur MVAr 50 (-0.00) (-0.00) (-0.00) (-0.00) (0.00) (0.00) (0.00) (0.00) (0.00) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MVAr 125

125km 139.16 139.16 139.16 150.96 150.96 (21.71) (21.71) (21.71) (64.21) (64.21) 199.96 (30.78) (30.78) 78.66 (22.73) 199.96 78.66 (22.73) Latehar_220kV Tenughat_220kV Dhanbad_220kV Maithon-II_220kV [4202030] [4202009] [4202021] [4292004] 1.00 (6.58) 0.99 (8.27) 1.00 (6.75) 0.99 (8.26) 200km 182km 80 MVAr 80

Aadhunik

-0.00 2x270 MW (-74.20)

Sipat { 45km 405km 161km DSTPS

{ 169km {

-245.73 -245.73

(-8.63) { 50 MVAr 50 MVAr (-8.63)

-0.00 Raghunathpur 153km 168km -0.00

{ -0.00 Mejia

Bisra (-74.20) 155km 90km Gaya 145km (-46.37) (Rourkela){ (-46.37) { 0.3km

125 MVAr 125 MVAr 125 MVAr 50 MVAr 50 177km Parulia North Karanpura_400kV Essar_400kV MVAr 80 Chandil_400kV [4244023] [4204017] [4204018] 80 MVAr 80 0.00 (0.00) -0.00 38.28 38.28 115.91 (57.28) (57.28) -23.44 (12.35) (29.79) (11.50) (8.25) (-50.52) 245.73 245.73 249.94 249.94 -526.89 -526.89 -157.96 (29.79) -230.41 (18.15) 1.01 1.01 (42.83) 1.01 (52.66) (42.98) (8.82) (44.53) (-26.12) (-26.12) -469.33 224.68 -0.00 -157.96 -230.41 (42.98) 51.72 (8.82) (-60.89) (21.34) (-50.52) -469.33 323.51 (29.99) 323.51 (29.99) 157.45 (29.52) -23.44 138.12 (44.53) (-60.89) (16.45) 51.72 (16.45) (18.15) 64km 90km

Ranchi_400kV Jamshedpur_400kV 2 2x705 MVA [4204010] [4204001]

400/21kV -0.00 (46.28) 261.84 (46.28) (32.75) (32.75) 261.84 -381.54 -381.54 (7.60)

1.01 87.84 87.84 -172.32 -127.79 (-30.73) (15.10) (-59.90) (-59.30) -172.32 (-59.30) -279.68 (-74.74) (15.10) -168.86 (-45.12) -7.88 -58.92

(8.78) (-24.25) -127.79 (-30.73) -160.97 (10.84) 1.01 (-74.20) 87.84 2x315 MVA -300.2 -392.60 (-10.49) (10.84) (10.84) (-30.43) 87.84 -300.22 1101.13 (-38.59) -392.60 (-10.49) (10.84) 1816.86 (-40.31) (-30.43) 3x776.5 MVA 400/220kV -58.92 2x500 MVA 400/24kV 400/220kV 1x500 MVA 1x315 MVA 2x600 MW 400/220kV 400/220kV

3x660 MW 1.00 0.00 0.00 0.00 1.00 (0.00) (0.00) 0.00 0.00 0.00 1.00 1.00 MVAr 125 MVAr 80 (-0.00) (-0.00) (-0.00) (-0.00) 1.00 1.00 1.00 Ranchi_220kV 1.00 [4292049] 1.00 (6.36) 278.73 (-78.81) (-153.53) 1826.55 (153.53) (51.90) (55.68) (33.62) 58.84 -1826.55 171.95 1107.00 168.28 -1107.00 (78.81) (28.80) 58.84 39km (28.80) (51.90) 171.95 46km 141km

North Karanpura_24kV Essar_21kV 78.6km 78.6km Chandil_220kV Jamshedpur_220kV [4290004] [4200007] [4202011] [4292001] (17.58) 1.02 (18.42) 1.02 1.00 (6.06) 0.99 (5.12) 10km 100km

35km { { Baripada TISCO

(DVC)

63 MVAr 63 135km MVAr 50 { -0.00 { (-46.23) Parulia Kharagpur 185km PSP 162km 80 MVAr 80 125 MVAr 125 125 MVAr 125 MVAr 125

125 MVAr 125 Mandar_400kV Ranchi new_400kV -0.00 -0.00 [4204026] [4204012] (-57.51) (-46.23) 0.00 0.00 63 MVAr 63 50 MVAr 50 299.45 (0.00) (0.00) 0.00 -42.90 MVAr 80 (9.25)1.01 381.08 392.47 0.00 (-27.99) 127.60 (102.04) -87.89 127.60 -87.89 (2.13) (15.62) 181.17 (-39.20) 181.17 (-39.20) -0.00 (-73.03) -187.78 -87.89 (46.92) (46.92) (8.22) (2.13) (0.00) (15.08) 381.08 (-27.99) (54.48) (15.08) (54.48) (-23.17) (46.92) -87.89 (46.92) 1.01 299.45 (0.00) -150.09 (-2.05) -150.09 (-2.05) 392.47 (15.62) (54.85) (54.85) -139.97 -42.90 -262.67 -262.67 (102.04) -139.97 PUVNL-gen_400kV Patratu_400kV Jharkhand pool Chaibasa_400kV [4204007] [4204011] [4204006]

[4204009] -0.00 (1.51) 232.86

479.62 (1.51) 479.62 413.87 (15.81) (15.81) (23.46) 413.87 -292.50 232.86 (8.54) (23.46) (11.31) 1.01 (11.16) -292.50 -481.05 (8.54) -717.87 (7.15) -481.05 -717.87 1.02 1.00 -164.34 (-25.36) -164.34 (-25.36) -233.23 -233.23 -112.63 -112.63 (18.44) -698.63 (-6.91) (-31.00) (-6.06) (-6.06) (-40.24) (-41.44) -146.58 -180.64 -180.64 -146.58 (-13.94) -415.21 (18.44) 698.59 (-40.24) (11.37) 698.59 -415.21 (-13.94) 1.02 (41.44) (-41.44) 2202.54 (-39.27) (41.44) (-115.57)

(-39.27) -698.63 (-6.91) (-135.78) (-31.00) 2x500 MVA MVAr 125 MVAr 125 2x1500 MVA 2x315 MVA Bus Voltage Colour code 2x315 MVA 400/220kV 765/400kV 400/220kV { 400/220kV Bisra 1km 43km 69km 131km 117km 1.00 1.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 (Rourkela) 765 kV (-0.00) (-0.00) (0.00) (0.00) (-0.00) (-0.00) 3x960 MVA 1.00 1.00 1.00 1.00 { 1.00 1.00 400/26kV Gaya MVAr 240 MVAr 240 400 kV 715.51 715.51 (-93.37) (-40.23) (-40.23) (31.58) -0.00 (-221.11) 112.36 146.17 180.25 (22.72) 220 kV (34.83) (31.58) (22.72) 146.17 180.25 -2214.00 PUVNL_26kV 112.36 (34.83) Ranchi new_765kV [4200008] Patratu_220kV Mandar_220kV Chaibasa_220kV [4207001] [4202014] 33 kV 1.02 (17.31) [4202010] [4202008] 1.00 (8.20) 1.00 (6.93) 1.01 (4.45) 0.99 (4.72) -660.64 (91.53) -660.64 (91.53) 10.63 (-100.78) 10.63 (-100.78) -65.50 (160.03) -65.50 (160.03) 2214.00 (93.37) 240 MVAr -0.00 -0.00 240 MVAr 26 kV (-221.11) (-221.11)

3x800 MW 38km 24 kV Dharamjaygarh { 303km 165km 260km { Medinipur 21 kV -0.00 -0.00 Display Notation

-0.00 (-221.11) (-221.11) -0.00 240 MVAr 240 MVAr 240 MVAr 240 MVAr Injection into the bus : +ve

(-221.11) (-221.11) Drawl away from the bus : -ve

{ Voltage Mag/(Ang) in PU /degree Gaya Flows in MW and (Mvar)

Rakesha H S Sagar singh P LFA R3 24.01.2017 Power Research & Development Consultants Pvt. Ltd., Jharkhand Urja Sancharan Nigam Limited #5, 11th Cross, 2nd Stage, Rakesha H S Sagar singh P R2 03.11.2016 Load Flow Study Results LFA West of Chord Road, Regd. office - engineering building, Bangalore- 560086, INDIA Rakesha H S Manjunath MG LFA R1 24.10.2016 H.E.C., Dhurwa, Ranchi - 834004 Ph : +91-080-2319 2209,2159 Fax: +91-080-2319 2210 E-mail : [email protected] Rakesha H S Sujay Ghosh LFA R0 26.08.2016 Single line diagram of 765kV and 400 kV JUSNL transmission network for the year 2021-22 TM APPROVED REVEIWED CHECKED DRAWN DESCRIPTION REV DATE: REMARKS PO details: W.O. No. 07 C.E. (T)/J.U.S.N.L dated 02 August 2016. DRAWN IN : MiPower DWG. NO : LFA\2021-22\765-400kV 77 Annexure-IV(b)

Garwah_132kV Daltonganj_400kV Daltonganj_132kV Koderma_400kV Koderma_132kV Domchanch_132kV Godda_132kV Lalmatiya_132kV [4201055] [4204019] [4201164] [4204024] [4201054] [4201063] [4201149] [4201020] 0.97 (0.38) 0.99 (2.25) 0.97 (0.79) 1.01 (9.53) 1.00 (7.41) 1.00 (7.79) 0.99 (4.04) (4.26)0.98 43.89 15.03 15.03 43.33 54.56 54.56 21.05 (5.41) (5.41) 43.33 21.05 38.22 (7.40) 43.89 24.35 38.22 (7.83) (7.83) (7.40) (9.40) (14.57) (9.40) (14.57) -89.63 -89.63 (11.45) (11.45) 24.35 (-17.21) (-17.21) (-16.64) 2x315 MVA (-16.64) 2x315 MVA 400/220kV 400/220kV 2x150 MVA 2x160 MVA 2x150 MVA 2x150 MVA 2x150 MVA 2x100 MVA 220/132kV 220/132kV 220/132kV 220/132kV 220/132kV 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 220/132kV 1.00 (0.00) (0.00) (0.00) (0.00) 1.00 1.00 1.00 1.00 Godda_220kV Lalmatiya_220kV [4202039] [4202012] -24.36 -24.36 (16.30) (16.30) (-5.58) (-5.58) -38.30 (-16.69) 89.54 -54.67 (-8.25) (-8.25) -38.30 (-11.00)

-43.97 (-12.92) (-16.69) -43.39 (-8.72) (6.47)0.99

-43.97 -54.67 -21.07 -21.07 0.99 (5.72) (-11.00) 89.54 (15.34) -15.03 -15.03 -43.39 (-8.72) (15.34) (-12.92) Garwah_220kV Daltonganj_220kV Koderma_220kV Domchanch_220kV [4202017] [4202019] [4202006] [4202033] 43.97 43.97 (8.07) 12.38 12.38 (8.07) 69.38 69.38

(5.90) (5.90) (5.58) (5.11) (5.11) -15.04 (5.58) 31.01 31.01 -15.04 15.03 123.10 (-4.73) -31.08 -31.08 (-4.73) -44.07 15.03

(2.13) -44.07 (8.35) (0.65) (0.65) (12.92) (12.92) 1.01 0.98 -53.43 (-2.36) -53.43 (-2.36)

(-9.04) (-9.04) 0.98 (2.82) 123.10 (9.44) 1.01 (8.39) (9.44) 33km 6km 50km 79km { Farakka

80km 80km { Hazaribag_220kV 21km (DVC) 70km

Hazaribag_220kV Barkath_220kV Giridih_220kV Jasidih_220kV [4202018] [4202042] [4202023] [4202026] -38.23 (-11.61) -38.23 (-11.61) 19.19 -19.24 19.19 (5.88)0.98 -19.24 53.10 (11.84) 53.10 (11.84) (2.97) (2.97) (-5.85) (15.44) (15.44) (5.75)0.98 (6.44)1.00 -12.40 -12.40 (-5.85) (6.75)1.00 Dumka_220kV 14.92 (-3.13) 15.04 (-3.13) -14.94 -14.94 15.04 127.28 -19.18 -15.04 127.28 -8.86 -8.86 (5.51) 14.92 70.29 (5.51) [4202015] (20.96) -34.74 (-6.22) -68.23 (14.18) -68.23 70.29 (20.96) -34.74 (-6.22) (6.09) -93.10 -93.10 -48.84 (6.09) -15.04 -15.04 (-5.51) -15.04 (-5.51) -19.18 (14.18) (-6.06) (49.57) -48.84 (-7.26) (-3.21) (-3.21) (-7.26) (-6.06) 88.01 88.01 (49.57) (-21.29) (-21.29) (-19.97) (-19.97) (-36.47) (-36.47) 2x315 MVA 1.00 (6.17) 2x150 MVA 400/220kV 220/132kV 18km 2x150 MVA 50km 1.00 1.00 2x150 MVA 220/132kV

1.00 1.00 1.00 220/132kV 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 2x150 MVA (0.00) (0.00) 2x150 MVA 220/132kV 220/132kV Jasidih_132kV [4201083] -127.50 92.77 92.77 (-53.83) 48.74 68.01 (17.00) -127.50 (-53.83) (29.86) 68.01 (17.00) 34.70 (5.36) 15.03 (5.33) 15.03 (5.33) (3.20) 48.74 (18.11) (18.11)

34.70 (5.36) 0.98 (29.86) Hazaribag_132kV Barkath_220kV Giridih_132kV Jasidih_400kV Dumka_400kV [4201057] [4201127] [4201134] 48km [4204025] [4201040] 0.97 (4.50) 0.97 (5.16) (4.58)0.98 1.02 (8.36) 0.98 (2.88) 81.7km

74km 58km Dhanbad Kalyanaswari DVC

DVC { {

43km 7.6km 52km 64km 64.3km 10km Chatra_220kV Maithon-II_220kV Tenughat_220kV Chandrapur_220kV Dhanbad_220kV Gomia_220kV Bokaro_220kV Govindpur_220kV Topchanchi_220kV [4202016] Palojori_220kV [4292004] [4202009] [4202041] [4202021] [4202036] [4202037] [4202045] [4202022]

(-17.01) [4202047] (-17.01) (-40.17) -88.71 -88.71 -74.10 -74.10 (8.65) 0.99 (12.68) (12.68) 0.99 (8.26) (6.15) 0.99 (8.27) (-40.17) 6.19 (12.95) -6.19 -12.23 -12.23 -125.99 19.15 -125.99 (-7.46) (-7.46) (0.28) (12.95) -52.98 -52.98 (6.04)0.99 (-5.35) -6.19 (8.65) 6.19 -70.52 8.85 (5.27) (6.71)0.99 8.85 (5.27) 19.15 (5.98)0.99 (0.28) -70.52 73.75 (-5.35) (12.59) (8.06) 1.00 (6.75) 52.94 52.94 (8.02)0.99 73.75 (12.59) (8.62) (-8.69) (-8.69) 0.99 (8.62) 0.99 (5.83) 4.77 4.77 22.55 11.18 11.18 -4.79 -4.79 (1.03) -11.18 56.00 22.55 -11.19 42.81 (1.03) -11.19 (9.00) (9.00) -86.32 -11.18 15.36 (9.28) 42.81 (9.06) (-9.00) -83.78 -83.78 (9.28) 15.36 (7.20) (7.20) 56.00 150.96 -55.93 -55.93 (-7.35) -58.16 -56.04 (64.21) (-7.35) (-9.00) -58.16 (-8.16) (9.06) 150.96 (-8.16) -56.00 (-9.06) -52.94 (-8.62) -52.94 (-8.62) -22.59 -22.59 145.78 145.78 (12.58) (30.78) 2x315 MVA 139.16 (64.21) -86.32 139.16 (12.58) -56.00 (-9.06) -146.17 -146.17 -15.03 -15.03 (21.71) (-21.86) 78.66 (-5.55) (-5.55) (21.71) (-21.86) -56.04 (-51.13) (-51.13) (-33.79) (-17.93) (-17.93) (50.49) 78.66 (-31.62) (-13.08) (19.42) (19.42) (50.49) (-31.62) 386.36 139.16 (30.78) (-21.65) (-13.08)

(21.71) 3x500 MVA 400/220kV 2x500 MVA (-33.79) 2x250 MVA 400/220kV 400/220kV 2x150 MVA 1.00 1.00 220/15.75kV 2x150 MVA 2x150 MVA 2x150 MVA 8km 220/132kV 1.00 1.00 61km 12km 220/132kV 220/132kV 1.00 1.00 1.00

220/132kV 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 (-0.00) (-0.00) 2x210 MW (0.00) (0.00) 2x150 MVA 2x150 MVA 2x150 MVA (0.00) (0.00) (0.00) 220/132kV 220/132kV 220/132kV 83.51 55.89 83.51 -151.27 52.85 52.85 55.89 (6.89) -151.27 (6.68) 11.18 15.03 (5.38) 15.03 (5.38) (-70.39) (-26.32) (-26.32) (-26.32) (-70.39) (6.68) 11.18 (8.86) (-33.52) 58.03 (19.25) (28.28) 58.03 (19.25) (6.89) (28.28) -139.39 -139.39 -139.39 -78.79 -78.79 (-33.52) (8.86) 388.50 (21.20) 55.81 (15.61) 55.81 (15.61) -388.50 (-21.20) Govindpur_132kV Chatra_132kV Tenughat_400kV Chandrapur_132kV Dhanbad_400kV Gomia_132kV Bokaro_132kV Topchanchi_132kV Palojori_132kV Maithon-II_400kV TTPS_15.75kV [4201151] [4201155] [4204005] [4200004] [4201122] [4204008] [4201113] [4201152] [4201062] [4201156] [4204003] (2.79)0.97 (3.90)0.98 1.01 (9.94) 1.00 (14.60) (5.89)0.99 1.02 (8.67) (5.97)0.99 0.98 (4.56) 0.99 (5.57) 0.99 (5.26) 1.00 (10.09)

46km

54km

11km 7km 65km

Latehar_400kV Latehar_132kV Lohardaga_132kV Khunti_132kV Hatia New_132kV Ranchi_400kV Sawal_132kV Tamar_132kV Chandil_132kV Baliyapur_132kV Jamshedpur_400kV [4204021] [4201052] [4201002] [4201143] [4201009] [4204010] [4201132] [4201078] [4201026] [4201059] [4204001] 1.01 (10.87) 0.98 (3.97) (4.83)0.99 0.98 (3.74) (3.52)0.97 1.01 (7.60) 0.99 (4.46) 0.98 (3.79) 0.97 (2.21) 0.97 (2.40) 1.01 (8.78) 41.65 41.65 (6.31) (6.31) 43.52 85.94 35.60 (7.37) 35.60 44.14 43.52 69.10 55.06 44.14 (7.37) 55.06 70.73 54.31 54.31 85.94 (26.36) (13.52) 66.55 (24.71) 66.84 (24.82) (17.74) (14.13) (11.76) (11.76) (14.13) (18.16) 65.17 (24.20) (13.52) -200.73 (-38.21) -200.73 (-38.21) (26.36) (13.32) (13.32) -279.68 (-74.74) -168.86 (-45.12) -58.92 2x315 MVA (-30.43) (-30.43) -58.92 2x150 MVA 2x315 MVA 3x150 MVA 400/220kV 2x150 MVA 220/132kV 4x100 MVA 1x500 MVA 1x315 MVA 400/220kV 2x150 MVA 220/132kV 220/132kV 2x150 MVA 2x150 MVA 2x150 MVA 220/132kV 400/220kV 400/220kV

1.00 220/132kV 220/132kV 220/132kV 1.00 16km 0.00 0.00 1.00 220/132kV 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 (0.00) (0.00) 0.00 0.00 (-0.00) (-0.00) 1.00 1.00 (-0.00) (-0.00) 1.00 1.00 1.00 1.00 Lohardaga_220kV Khunti_220kV Hatia New_220kV Sawal_220kV Tamar_220kV Chandil_220kV [4202029] [4202007] [4202003] [4202032] [4202034] [4202002] -35.65 -35.65 (-12.89) (-2.59) (-2.59) 7.58 7.58 (-12.89) (-8.90) 86.23 (-8.90) -35.00 -66.75 (-28.74) -67.04 (-28.87) -43.59 (-14.95) -42.95 -42.95 1.00 -7.59 -124.55 (6.44) (6.14) -69.30 -7.59 -55.22 -15.38 -15.38 (-3.67) (-32.10) (33.62) (-21.70) 278.73 58.84 -55.22 (-17.29) -70.93 (-3.67) 168.28 -124.55 -65.37 (-28.15) (-8.73) -44.20 199.96 (19.43) 1.00 (5.46)1.00 0.99 (-17.29) (-22.21) -86.23 199.96 -41.71 -41.71 58.84 -44.20 (-8.73) -43.59 (-14.95) (55.68) (22.73) -54.44 (-16.02) -54.44 (-16.02) (-7.51) (-7.51) (-11.50) (28.80) 0.99 (5.33) (5.20) 86.23 (-32.10) (22.73) (19.43) (28.80) (32.10) (-17.24) (-17.24) (32.10) 1.00 (6.42) -86.23 Latehar_220kV PBCMP_220kV Ranchi_220kV Baliyapur_220kV Jamshedpur_220kV [4202030] [4292001] -3.47

-3.47 [4292049]

[4202046] 21.53 3.47 3.47 21.53 5.57

69.84 (6.29) [4202020] 89.11 5.57 69.84 (6.29) 60.45 60.45 25.20 25.20 -7.18 (8.34) (8.34) (2.44) -29.17 (2.02) (6.99) (-5.93) 28.47 25.58 36.14 25.58 (9.08) (10.82) -5.58 -5.58 (5.52) 36.14 28.47 (5.26)

(5.90) (-5.93) -25.63 (5.26) (2.44) (2.00) (2.00) (5.52) (5.90) (6.99) (10.82) -69.89 -12.67 -7.18 7.18 7.18 -69.89 (-5.62) (-5.62) (5.12) -25.63 (-44.65) (9.08) (-1.16) -223.51 (-44.65) (10.85) (10.85) 0.99 -223.51 (47.45) (3.54) (-18.41) 146.25 146.25 89.11 (3.54)

1.00 (6.58) (5.85) (5.85) (6.36) 1.00 (47.45) 1.00 (7.23) (-1.16) 0.99 (5.77) Bero_220kV 105km { Santaldih TPS [4202031] 56km 35km 6.65km 57.2km 1.00 (5.89)

43km (-0.33) (2.65) (-0.33) -41.79 (7.72) (2.65) -35.77 -41.79 (7.72) -28.52 -35.77 106.08 -28.52 106.08 (-10.03) (-10.03)

35km 30km

2x150 MVA 42km 0.5km 1.00 1.00 220/132kV 13km

21km 53km 30km 102km 41.73 41.73 (8.80) (8.80) 42km

Bero_132kV 43km

[4201074] 0.99 (4.29) { 15km 50km 68km Gua SAIL

1km Ratu_220kV Chaibasa_220kV Jadugoda_132kV Chandil_220kV Ramchandrapur_220kV

PTPS Old_220kV Chaibasa_220kV Adityapur_132kV 8) [4202028] [4202004] [4202013] [4202014] [4201090] [4201018] [4202011] [4202001] 149.52

35.58 Bus Voltage Colour code 35.58 (10.21) 19.29 149.52 (-4.47) (10.40) (-6.73) (-6.73) 16.05 -17.53 (3.37) -17.53 (3.37) (10.21) -60.64 -60.64 (-4.47) -36.19 (-1.62) 12.65 (-10.25) (10.40) (4.66)0.99 (0.39)0.95 223.49 223.49 (44.55) (22.99) -16.07 (-20.97) 16.05 (22.99) -16.07 (-20.97) -21.57 (-2.26) -21.57 (-2.26) -25.25 -25.25 (-1.62) -19.32 (0.66) (-3.71) (-3.71) -36.19 (22.41) -106.42 (44.55) -149.56 (6.84) -89.60 0.99 (4.72) (2.10) (6.06) (5.07) (5.10) -149.56 (-10.25) -146.70 1.00 -106.42 1.00 0.99 (-48.18) (-0.38) -89.60 (-0.38) (8.27) 0.97 -146.70 1.00 (-48.1 Simdega_220kV Mandar_220kV Patratu_220kV [4202008] [4202010] 400 kV

[4202027] -9.24 -9.24 53.59 61.68 53.59 61.68 -35.58 60.90 -60.91 -60.91 -35.58 96.65 (17.59) -7.73 112.36 (-5.78) -70.22 -60.91 (11.71) (11.71) (-5.78) 180.25 (13.21) 171.95 (51.90) (17.59) (7.29) - 202.46 -60.90 -84.56 -84.56 -75.05 -81.42 (-0.01) (-0.01) 112.36 (34.83) 1.00 (8.20) (-34.83) (-24.00) (-18.11) 112.34 -112.36 -112.36 (-10.40) (-11.22) (31.58) (34.83) -76.69 (-28.31) 180.25 1.00 (6.93) 112.34 (34.85) -106.81 (-10.40) (-18.11) (-34.83) -76.69 (-28.31) (34.85) 171.95 (51.90) (-25.65) (-27.83) (-19.57) 60.64 -106.81 (-19.57) -146.58 (5.32) (4.18)0.99 60.64 (5.32) (-18.11) (-28.07) (-28.07) -146.58 (-31.00) (-31.00) (31.58) 2x315 MVA 2x315 MVA 220 kV 2x315 MVA 2x150 MVA 2x315 MVA 400/220kV 400/220kV 400/220kV 220/132kV 400/220kV 1.00 1.00 1.00 2x150 MVA 2x150 MVA 1.00 3x150 MVA 1.00 1x137 MVA 2x137 MVA 1.00 1.00 3x150 MVA 1km 220/132kV 44km 1.00 132 kV 1.00 1.00 1.00

1.00 220/132kV 1.00

1.00 220/132kV 1.00 1.00 1.00 0.00 0.00 0.00 0.00 220/132kV 0.00 0.00 0.00 0.00 1.00 1.00

220/11kV 1.00 1.00 220/11kV 1.00 1.00 2x150 MVA (0.00) 1.00 (-0.00) (-0.00) (-0.00) (-0.00) 1.00 (0.00) (-0.00) (-0.00) 2x150 MVA 1.00 33 kV 220/132kV 220/132kV Adityapur_220kV

105km [4202025] 15.75 kV 61.85 35.53 35.53 61.85 -172.32 (-59.30) -172.32 (-59.30) 69.99 -97.13 (4.52) -62.13 146.17 -53.72 -61.85 (9.46) 146.17 60.75 -61.85 (22.72) 0.98 -62.13 (21.03) (-21.03) -53.72 (-14.14) 60.75 74.80 81.14 (9.46) (-40.24) 84.23 (21.49) (21.03) (19.31) (-14.14) (-21.03) (-16.78) (-16.69) (14.94) 60.75 (14.94) (-40.24) 76.47 (23.83) 76.47 (22.72) (23.83) (-16.69) (14.94) -180.64 (-39.27) -180.64 (-39.27) -203.50 84.23 (21.49) -112.63 -112.63 (20.64) (22.39) (-34.01) Chaibasa_132kV Jadugoda_220kV Simdega_132kV Ratu_132kV Mandar_400kV PTPS_11kV PTPS_11kV Patratu_132kV Patratu_400kV Chaibasa_400kV Chandil_400kV Ramchandrapur_132kV 11 kV [4204007] [4201038] [4204006] [4202024] [4204018] [4201032] [4201153] [4201154] [4204026] [4200002] [4201008] 9.23

[4200003] 9.23 97.13 (10.86) 106.62 (19.97) (16.78) (3.25)0.97 (1.93)0.97 (7.15) (10.86) 1.00 106.62 (19.97) (8.25) 203.50 1.02 (11.31) 1.01 0.97 (1.63) 0.98 (2.79) 0.98 (3.89) (9.25)1.01 (34.01) 1.02 (13.77) 1.02 (14.03) 0.98 (4.16) Display Notation Injection into the bus : +ve { Joda 38.5km 11km Drawl away from the bus : -ve 1x105 MW 2x110 MW Voltage Mag/(Ang) in PU /degree 48km Flows in MW and (Mvar)

Power Research & Development Consultants Pvt. Ltd., Rakesha H S Sagar singh P LFA R3 24.01.2017 Load Flow Study Results Jharkhand Urja Sancharan Nigam Limited #5, 11th Cross, 2nd Stage, West of Chord Road, Rakesha H S Sagar singh P LFA R2 03.11.2016 Regd. office - engineering building, H.E.C., Dhurwa, Ranchi - 834004 Bangalore- 560086, INDIA Ph : +91-080-2319 2209,2159 Rakesha H S Manjunath MG LFA R1 24.10.2016 Fax: +91-080-2319 2210 Single line diagram of 220 kV JUSNL transmission network E-mail : [email protected] Rakesha H S Sujay Ghosh LFA R0 26.08.2016 for the year 2021-22 TM PO details: W.O. No. 07 C.E. (T)/J.U.S.N.L dated 02 August 2016. DRAWN IN : MiPower DWG. NO : LFA\2021-22\220kV APPROVED REVEIWED CHECKED DRAWN DESCRIPTION REV DATE: REMARKS 78 Annexure-IV(c) N

Towards KHSTPP (Bihar) -40 Sahibgunj Towards 4 7 (-13) - 0.96 k 2 Kahalgaon m 68 0 ( (Bihar) , P 0) 6 Geographical power map of JUSNL Network for 2021-22. 6 a (-1 ) 0 n 7 k t m m h k er 2 4 , e 9 h 5 P r 4 t - a ( n 3 k n -1 a 4 m th 1 P (0) ) (1 er P 3 0 a 1 ) n t -44 (-14) h

( 1 r

-8 -7 5 e ) e 2 0 r

2 ) h k 7 t ( m 2

Lalmatia n ( 0

- 2 a

6 1 P 2 P ) - a

0.99 /0.98 ) 39

2 n -20 1 m t ( 2 h

- ( k

3 1 e (-6) 0 0 1 ) 7 r - ) 9 k 9 Rajmahal GODDA ) 8 m a 3 ( , r ( Z 3 0.96 b e ( 4 e r b -6 Z e ra ) m h 0k t 5 n -34 a ) P (-11) (1 Godda Udhwa 62 m Towards Towards 0.99 0.99 k 0.95 -30 0 Sonenghar Biharsheriff_PG 2 (-6) 3 (-10) (Bihar) (Bihar) SAHIBGANJ -13 (1) 5 -4 2 6 5 (16) ( 6 1) Towards k Domchanch m Farakka , P 1.01 1.00 (WB) a n r -30 Towards a Towards e r th r - h e ( 2 e (-10) Sultangunj b t 6 8 Kahalgaon_PG h 0 ) 7 r 0 e n t k 3 m PAKAUR a ) (Bihar) Z n (Bihar) P a Pa 1 Pakur 1 m P n - ( m 2 m k th 1 Japla k k ( Towards 0 m e 0.97 -1 6 5 r 1 8 k ) 0.95 9 5 5 Sasaram 133km Twinmoose ) 1 -12 (-9) 7 (1 ) 12 (2) (Bihar) 0 - 4 4 0 (-4) 4 e 3 (-7) 3 Jasidih -32 9 ( 2 r -22 - 5 - s e ) 3 - - 1 1 2 1 h o r ) 1 -195(141) ( t 1 1 ) 3 - 3 (-10) - 135km Quadmoose e n ( 8 195 ) 1.02 1.00 0.98 o 2 (3) a 3 ( Koderma_JUSNL h P ( (4 8 t , M 1 n m r ) Hansdiha k r -18 (-2) a 4 0 he e 0 n P ( 5 8 t

4 1.01 1.01 (59) -)3 i ) 0.97 3 n h r 0 9 7 ) k 5 ( m a Towards t 1 w e m - k P Towards 7 0 ( 105 km, Panther n h p 52km Panther T 1 m t 2 m 6 7 4 a , k Rihand a n 30 0 3 n t Gaya_PG k 3 (4) GIRIDIH Towards 6 - 5 84 P h Chatarpur ) ) 1 4 1 ) m ) k a e 5 9 m m 1 8 k 0 -3 (UP) r - (0) 1 k 0 P 9 4 8 GARHWA 1 ( 1 7 14 a P 0 0 0 (Bihar) Gaya_PG - ( nth 0 7 Jamua 1 ) km ) e 6 4 Z m, 0.95 ( 2 4 r 1 -5) 3 eb ther ( m ( ( 1 0 (- ra ) n 7 a k - (Bihar) ( 2 P - 0 - - m 2 k 0.97 0 12 - 2 0k 1 5 5 ) ( ) - (1) 5 2 0 -32 1 ) -25 2 ( - 3 -42 0 4 5 Amarpara(- 45 5 3 8 (-3 3 (3 -8 ) ) ) 51 Koderma_DVC (-8) ( 1 km ) (-10) (-13) -70 (1) 8 6) (3 0.97 (5 , 5 6 Pratappur 8 4 4

Nagar Untari ) Pan - 5 ) V 0 1 e k t ) ( m 2 (-22) 3 -

h 2 k 2 (4) 8 er s 5 -7 1 - Z 7 -16 3km Panthe 0 r 0.96 Nagar Untari - 4 1 3 0.97 e 2 2 m (-8)

44 ( 3 ( 5 o b (1 1k ( 2 9

- 0 e ra 6 k 1 Deoghar 2 -27(3 6 2 o ) k 7km 1 2 ) 1 (-2) railway Garhwa Road ) -25 5 s m P -

(- 1 m 6 ) ant

r h 5 t 1 m 0.97 e o , -108 -18 ) - r Q ) 1 r )

e 2

5 a

1 0.96 d 1 (

e 3 KODERMA o 2

P -6 k (

8 0.98 0 (9 0 u ( ( -9 h

(-8) r ( -24 0 ABCIL h e ) a a ) d t k a t

6 k M 7 (-28) DUMKA

a - s m m u n d -35 (-6) ) n e a 2

1 r (-2) n Dumka 2X30MW t L

(-8) 2 (0) a o n M

b -53 Dumka g Q h P i

CPP -42 (-13) e Shankarpur o P CHATRA Meral P a r o

-18 e Z (-11) Jarmundi (-17)

a Pa 0.98 ( w o m 1 n a - m r

3 5 m n t m 12 1 8) m s 0.97 1.00/ 0.98 4 0.96 ) n T 0 2 k k

1 k h h ( 0.97

P k i t k 6 - 0 e

m m

0 (-6) ,

1 2 a h e 4 5 2

Barhi c 0 0 k ) ( 1 0 -

n w r 2

8 ( 3 k e 2 4

m ( 3 1 t 5 er ( - 2 5 6 h 1 T 9 nth m 2 1 4 r a y 6 r 2 P 4 1 0 - 1 0 1 0 - m e 40k l ) ) k P e ( 2 0 0.97 k 3 -9 m ) r t 4 2 5 ( ( 1) (15) ) 1 h m - 5 (- ) DEOGARH a 0 t -12 3 ) ) 1 (- P n a Sikaripara ( k 6 1 5 -12 1 n n 4 3 Chatra (13) 2 ) n k Giridih 25 t ) ) ( 1 h t a 2 6 5 r e e 81 ) h m ( er 9 ( e 1 Madhupur P 8 s Palojori -28 1 6 0.97 e (-4) 4 -13 s - 1 h -

- -30 2 r 1 m k 9 ) 0.99 0.98 t e er - 1.00 0.98 o ( 5 -6 HAZARIBAGH (-10) nth - Tolra r a 3 8 1 k m 4 ) n P 0.99 0.99 (-9) 0.97 ( 0 - -42 65km o -25 ( ( a 8 - 8 3 3 2) P 3 ( r - 4 1 (-7) 8 e (9 2 P - M Pa railway 3 ) ) ) ( 1 -30 4) th (-8) 7 ) (-13) 4 (

-42 2 n (9 n a m 21 0 Barkatha i k ) 5 (-13) r

- 9 -35 ( - 3 8 1 a ) n 0.96 - 3 1 ) r - k 6 0 - 8 0 8 00k (13) k (-1 P b ( 8 7 w 0 e

1 t 1 ) 6 ( m Saria m ) a -30 Z

- h 1 Pa 3 1 T m ( 3 0.98 0.97 L Garwah (-11) 3 0 9 nth 1) k 88 e km ) e Hazaribagh 1 r Z (1) 5 m

33km ) r ) ( e ) 0.97 1 (-9) k e Ze r a , bra 5 P 0 br e m 4 8 7

(-18) Panki a 3 30 Ze h 3 . s

0.970.98 -88 2 n 3 ( - t - b k 1

m m chitra

-30 o ( th 0.98 0.97 - k ( m 8

e 18 n r 0 (-10)

k o

( - r 3 a k - (26) 5 9

3 - 1 0.94 0 4 a

8 r 0 0.95 ( 6 Daltonganj_PGCIL k -42 P 4 M

- 0 52 m ) e

) - 6 3 6 ( (- 8 5 km s 1 Z h 1 n

) 5 i 1 e 3 m t i (2) )

1 r 0.99 0.98 0.97 ) b (-13) )

) i -30 k n w

0 r - 2 4

-36 (-2 a 7 50 0 a 2 (11) 0 12 T (

km 1

m 6 P 3 1 1

2 1 a P ) ( ) ,

i (-10) 7 nt - 6 4 6 ( he 7 1 1 r ( 5 ( (-11) 6 PALAMU s Simaria ( 4 ( m 6 se ( - 2 3) 1 ) m

( r - 2 1 ) -3 0 1 ) 5 - k k o 3 5 6 a

9 e ) k ( k Daltongunj 0.97 2 ) 0 r e 4 ) o m b -56 m b - 5

5 8 PBCMP(NTPC) e m -5 s 7 - 6 Z Bishnugarh Z k

M d 6 .5 ( 1 (-17) o

P 0.96 a e -42

a b 2 ) 4 m Jamtara 2 r r ( ) k (- Jamtara o

a a 0.97 (-2) u 1.00 b 5 ( 2 ad North karanpura TPP 7 1 3 . -5 8

n 5 (-13) 5 ( m e 0 ) 4 railway 5 )

t u Q 8 ) 6 0.96

n Z 1 k 6

h 3X660 MW e 3 - i - -35 m Topchanchi ( e Q s Hazaribagh 5 3 0.96 DHANBAD m m Z k w r k , o e m - 8 8 k 1.01 Barkagaon (-12) o b 3 0.99 0.99 - T 5 DVC r ( 0 2 ) 6 5 a P - 221 P 4 6 1827 1 m 1 2km 1 7 km 0.97 a 0 Z - 6 0 eb m r 2 d 6 n 3 ) ra (- 1 1 e k ) - ) 1 r k m 1 a 0 5-2 ( 4 3 s 7 1 7 th r 8 (1 ) 2 e e , (154) u Gomia -1 he 8) h 1 -1 ( 0 n 1 1 ( ( TVNL e ( t t 1 Z ( ) Q 7 Ramgarh -3 r - an Dhanbad_DVC 8 ) t 1 2 a 6 n JAMTARA e P 6 1 ly r 9 ) 4 ) b 3 4 ) 3 0.99 0.99 m a 2 ) c r 6 b 0 - k (-7) 8 ( a m 1 2X210 MW (-13) 0 P h 7 e 1 r 7 ( 2 1 - k 7 - -42 -9 , a Z ( e 0.97 5 -13 - ) ) 0 2 30km 5 86 0 Maithon_RB ) ( rg 1 se 3 6 th 6 ) -8 4 - -173 ( Govindpur m -30 3 ( 0 5 13 Putki -2 k 1 6 e o 9 m 8 n ) 86 20) 2X525 MW - ) o ( k 1 a 2 (9 a (- 8 3 d 3 r (-63) 4 m 2 3 ) (3) 0km ) 0.99 0.97 0 ( - 7 d 5 - P (7 8 0 b ) 0.96 2 3 ( a - a (9 ) 9 2 Dugda e (2 7km 1.01 1 (-9) 3 (0) -60 t ( u m ) ( 3 m Z m 5 1 1 Q 1 k 42 - 21 - 1 k 0.99 m -88 (20) k 2 LATEHAR 3 PTPS - 4 ) ( 0 0.99 0.98 k ra 1 2 8 Ramkanda m 2 0 5 k 2 k ) ( 1 b 1 - 969 3 m 9 4 ) - 4 e (64) 4 1 - ) k -2 5 1 172 5 PVUNL 9 3 1 2 Z (-28) 2 V ) 3 - 1 2 11 m (54) 8 IPP k 1 (19) ( -33 49 (-3) - 1X105MW - k ( 4 45 - m Z 8 ) 1 4 m 1 2 ( m (8) 1 5 0.95 2 k k k m ) , e 40km Panther40km 6 ) 8 -4 3 (70) T 5 6 1 9 1 7 3X800 MW - m ) 2 6 k Dhanbad 2 ) w b ( - - ( 8 0 - 1 Latehar 6 97 PTPS_O (1 ( 1 2 ( 5 in r - ( ) 7 -1 5 ) km 5 1 6 2 0 4) 42 -4 4 M a 8 -42 - 9 P k Chandrapura 4 4 ) 1.02 1.00 -45 42 5 3 1.02 1.00 - m -148 147 - 5 (- - o ) 16 -5 a P -1 18) o (5) ( 2 a (1 ( ) s 1.001.01 4 21 (17) ) n nt 5) - 46 e 0.98 5 4 204 3 t h 3km 4 (15) ( - km PTPS h e -42 (1 0 6. 2 35 ( Q ( ( r TTPS (25) 43km Zebra (-17) -1 2 2 (1 -1 uad Chandwa_JHK_POOL 93) e )-4 (- Nirsa 0) ( 0 m 1 r -5 1 1 - ) 3 o (34) 2X110 MW r (-13) ( 3 4 1 0 o 0 ) ) 0.96 1 1 2 k se 1.01 e 1.01 0.99 Mahuda 6 ) 8 3 1 8 m k 1km 7 50km - 6 P 7 PTPS_N h 18 2 ) a m 0 Ramgarh DVC (- 4 Baliyapur e n 1 t r 7 s Maithon_B1 t 1 (-4) P h 0.95 e 7 o e h (6)42 1.02 1.00 n (- 7 ( Maithon_B2 ) Latehar r IPP 0.98 ) 0) 32 t o 0 r ( 3 ( ) e (55 -23 n - 0.97 1.01 ( e 7 5 60) (79 - a Moos 9) Pa 0.99 m 2 - -86 3 1 in (3 13.5km n s ) 316 2 -18 P m, Tw V m r i 0.98 ( 2 . 8 k k e 1.00/ 0.99 -42 5 4 0 10 Maithon_DVC e 13 ESSAR TPP (-2 6 t 22 k w 346 (-13) k a ) m 3) ed 6 h 3 T 6 r n ( rg 4 t 9 7 4 - , m y cha Patherdih 54 -13 1 e t Chandwa 1 1 L ntl n m ) 9 l 0) - ) - a k rese -4 k 63 1 1 th y 5 - 2X660 MW (3 1 2 rk P 0 9 a ( - 5 3 9 4 ) -52 0 3 ( 6 6)

- 161 ( - 2 7 5 - - P 8 - ) ) n ( (1 2 3 0.96 ) ( c 6 1 3 6 - 1 BOKAROm ) -458 a 1 1.01 e 9 12 2 0) 5 Gola 5 2 4 7 - 0.97 s 2 k k ) 0 9 P h k ( 7 2 o 8 1 0 0) m 4 m -1 -6 (-0) - 3 ( k 1 -42 1 Patratu_DVC ( 2 a ) o 3 -1 P k m m 5 0 1 (52) m - - ( ( ( 3 (-13) - m r in 1 - k 0.95 Bokaro an ( 0 a m k g , w ) 2 Z t 5 T ) h (28) 5 e r e e Z Q -30 e -252 4 m 7 s ) b -42 r ) (-80) 0 (-65) d k r u ) 0.99 0.98 8 e b 4 8 e ) (

0 70.7 km, Twin Moose 9 (4 o a a 1 8 s b 9 d 1 1 o e (-10) ( a o 2 m 4 - o t r 8 ( (-13) a m Z o ( 2 (4 M 6 2 (1 o 6 ) 1 n 3)45 s ) in 3 9 8 i e ) Peterwar 7 w 2 w m 4 ( , T k T 25km -43 0 k 1 k Pan -30 m V m ther k RAMGARH 0.98 k 1 Mandar 8 Irba m 3 Kalyanaswari_DVC ) , m 5 ( k 4 m (-10) 4 4 Q 3 ) 3k (-14) P ( 1 2 1 0.97 1 ) 1.01 1.00 4 ) -1 32(13) a 7.6km Zebra u 2 ( -80 n 3 1 5 SHPS Chandankiyari a 1 t Lohardaga -38 1 -4 h d ( e 0.97 32 (46) 15km (8) 14 (-25) r 2X65 MW (-5) -20 1.00 0.99 (-12) M Ratu 42km Zebra Angada -15 4 Mahuadanr m Kanke 7 5 72 o (-42) -3 12 ) e

k s ) 2 1.00 0.98 2 0

4 o o

(-6) - ) 2 3 - 6 ) )71 o

1 ( 2 r0.97 0.95 -12- ( 115 1 s 8 (

( 0.98 1 1 7 Usha Martin m

1 3 6 9 e 3 ( ) - 3 4) n

0 e 2 ( (1 IPP Inland i k ( h 70

) m 4 t - w P - 44 km, Zebra -90 - (28) LOHARDAGA re Z 1 2X10 MW er 8 T ) n th s e 3 m Pan ( 3 m 4 en br 8 a 50k - 2X63MW k 3 e 2 tl a ( 4 CPP 2 7 2 y -90 P (-28) 1 1 - - k -4 8 Raghunathpur s (-29) c -213 3 ) h ( 2 (1 ) Sikkidiri 1

k ar 1 m 0 2) (-9 -2 3 o g m (4) m -8 2 m e ) (7 Usha Martin -2) k o Towards (-6) ( DVC -18 -14(-7) k

d k P ) m 0.97

a - 7 t 4 8 3) se M P 13 a 3 Namkum LS ( o Parulia_PG

2 3 3 n 0.96 T er ( o (-13) ) H - M n k 12 a V t 5 m, th 4 ( in i h - 4 k an LS ) 7 w n (- ( 0.96 0)3 P HT , T w 5 Hatia_N e (-38) m 40(1 , ) m 4 -121 k m k T e t ) r 7 4k km - 00 s h r ( -2 3 6 4 2 , o 1 -5 (-0) 4 43 2 Silli o e e 1.00 0.97/ 0 k 8 M m 4 2 m m n 7 178 (7) k Tatisiloi P 2 i r h 27 2 -5 a se se k w t ) ( ) nt 0.96 oo oo T 50 43 16) 7 3(3 15 km he M e M 3 , 0 1 n 21km 9 k S ( 2 r n d e m Z TL ) (-2) railway -21 wi s ua 5 km os ( 1 a 5 e H -43 , T o Q 1 97 o 1 br km m, M P 9 a ( m 9 o k n ) 18 -22(61 7k 0.96 16 5 i , ) ) 2 ) (-14) 15 Tw -6) (-1 RANCHI (-8) m m, m 0 ( d k

) ( . 8 4

k (3) 5 5 ( Ranchi_PG ) a 8 9 2 - 466 4

7 k 6) 3) 5 u

Chainpur 1 m -22 2 3 (4 1 Mejia DVC 0 )

GUMLA 2 2 10 8 2 6 2 1 1.01 13 1 Q

50 2 Hatia_O 5 -134 / 1.00 21) ( - 3 ( km Ranchi 2 5 km, ) 25

0.97 (6 P ( Zebra (33 2 m ) an (-42) k e t (15) 0.97 -20 he New_PG 1 ) 5 s (-6) r -352 1 3 78.6 km, Quad Moose(43)351 Towards o 1 647 (60) 2 1.01 /1.01 ( 4 1 o 303km Quadbersimiris -1321 212 6k Chauka PPSP M 8 57 m (2 k .2k Pa Lodhna ) m m nt 7 in (1) h 0.97 (188) 5 ) e (WB) Towards - 0 r 7 )

9 5 2 ) railway HEC 3 5 w (183) 4 4 -42 15km -11 5 55 -30 1 3 1 T 3 Gumla -408(-102) km DSTPS_DVC (- ( 1 ( Z , Z 1 STPS (WB) , Towards 1 0.97 -939 eb eb ( ra (-14) -2 0.97 (36) ra ra ) (-3) (- (18) (-10) eb m -24 -1 0.98 Bero r -5 7) 5 , Z k Parulia_PG e 7 - (-1) r -51 2 m e Towards h ( e 4 k s t -1 ( 1 05 8 (-8) (1 1.000.99 n ) 3 3 3 th (6 Chandil Chandil 1 6 o Dharmajaygarh ) a 2 1 62 n 6 1 o 6 P 0 ( a Twinmoose ) 9 M 2 , 4 -7 185km 1.01 1.00 0.99 0.97 -2 7 km 2k ) 8 P 5 in se , m -88 () -11 m ) o Pa 1 k m 1 w o

n Z (-29) ) (6) th 4 0 e k (95 (2 T M er ) 5 br Sarwal 4 )293 (30) , n 6 45k a 3 m i ( m, (1 14 (1 ) -51(-2) k Tw 1 49 Pan 2) 4) 1.000.99 1 13km 1 , LEGEND 1 2 km the 5 1 , Zebra 6 , r(-1 7 ( km Pan 1 -37( 1 7 t ) 1 5 - (2) (4) her -11 (-2) - -5 11 ADHUNIK IPP 17 se ( 42km 14 5 6) Maniqui - ) ) oo 0 -2 Z 1 - 6 5 2 3 in M Kamdara ) ebr (- (-61) -4 3 7 Tw r a 2 2X270 MW ) 05 km, e -21 m ) r k 5 9 4 r 35 km, Panther h 0 k 0.97 8 e (- m t 5 5 Towards n 32kV m (-1 th 13 P ( (8 GENERATION e a at 1 k - ) IPP 6 (0) (-12) d n 3 IPP P 2 -39 0.98 e 1 a 0 , ) 1 -4 y charg a 1 0k n 6 h - 3 l 0 km 3 Khunti ( (5) sent P ( m th Sipat t - 2 re 3 1 Bakaspur 1 ( - 45km Panther (-0) P m , 4- P e 5 6 6 1 -3 m -1 1 a r 1 7 n 2 k 4 -0 ) 3 3 k ) n -

(-0) 8 t (Chhattisgarh) 1 - 0.98 5 1 h 494 a railway 5 ) 0.99 ) . 3 e (70) ) - ( Tamar .8 -1 ) r ) HYDRO 4 3 0 -46 7 (( P ( 3 6 ( -29 (-9) 9 12 r (-14) Adhunik TPP (8 0.97 e 1.00 0.98 ) 0 Maniqui_DVC r 4 m h a 9 k 1.01 Bano t r he k t m Mango n b r n 0 a e KHUNTI e a ) railway P Kandra , Z 2 h 8 0.96 5 -12 t , (-4) P m 8 6 n Z 1 -42 5 THERMAL SARAIKELA a m ( k k m 0 k e m m P 0.97 1 (11) 37 0.00 k k , 0 3 ( P k 1 b 9 . 12 (-13) a 4 2 m m 4 0 n 0 k r )5 th 3 1 Rajkharswan .7 a 2 0 e 2 Q -12 1 9 4 r 1 u 2 2 -42 ( 1 Jamshedpur_PG railway ( ) (-13) ) a (-4) 4) (4 2 3 -8 (9 THERMAL-CGP ) d 2 (- 1.01 0.99 km 1 CGP

0 -45 (-14) 7 6 2 .5 e ) - 4 7

(- b 0.97 k ) 1 0) 2 k m s 3 6 m

-20 e (2 0 1( ) -92

m -2 -7 o

r 5 km k 4 (

s (-29) -0

Simdega 5 Ramchandrapur 11 1 ) 4 km, Panther

(-6) .

i o , 0 Kolibera P 0 0 m a 0 -4 1

(-1) n 6 3 0.97 0.98 i m t - 9 THERMAL-IPP

r Rajkharaswan h ) 9 k 6 Golmuri (0)0 (-0) IPP

8 3 m 2 1 m 0.98 i - d e 0 )- ( -20 s ) k r 3 (5 -7 , 5

1 4 9 T ) ) ( 2 a ( w 8 e 1 0.97 0.95

( s 2 4 6 in Saljagajari u r r ) 1 ( 1 - (- M (-6) e e 8 2 ) 5 6) o 1 ) - 6 o

th th - m m ) - 3 2 o 2 SUB

n ( ) Q 9 ( - 4 s Jamshed 0.00 Existing

) n o k k e 2 ) a k 4 3 m Proposed

4 5 a - ) m P -18 ( k k m ( - (-6) 2 1 ( P M , 0 -36 9 P

- m -4 2 4 a TISCO_DVC m STATION ( m 1 n m 2 k

k -65 (-21) m n - th

3 k k i 5 1 ( e k 4 5 0 0 r 5 2 ( e 5 3 Chakradharpur 5 ) k (-11)

- 8 - (-3) - as m 0 - 4 w -10 3 r m Sundarnagar 4( (8 5 o ( 3

-7 T ) -11 b o 1 k - 0 e (7 ) , Goelkera 0.97 ) Chaibasa M 7 )

5 ( Z ) 3 0.95 1 1 .

-10 7 (-3) -10 n 5 765 kV km ) - m i 42 9 2 8 m -16 2 36 (-5) Chakradharpur -5 2 22 k w ( 10 40km Panther (10) k railway ( 3 ( km 0.99 0.97 3 T 1 -42 -75 (-23) - -30 4 / 4 7 Jaduguda Kurdeg 5 3) ) m ) 5 -165 CGP AAPL (6) 4 -1 (2 railway 0.96 (-2) Chaibasa ) ) k 2 18k (1) 0.96 0 (1 12 46 ra (-13) m 0.98 1 (-10) 0.97 19 (- Zeb 1X30 MW 0.95 0.97 Simdega Goelkera -18 m m (-52) -7 (3) Rungta 5km k k 6 Adityapur 4 9 Dalbhumgarh 8 ) 6 ) .5 12 1 37 -124 2 1 1 53 (1 5 k ( 3 4 0.99 0.98 0.96 ) . 0.96 (- m 400 kV 4 - ) railway 1 2X20 MW ) 3 6 k ( -37 0 ) ( m 10 CPP (3 6 4

-17 - P (42) ) ( ( a 8 nthe er (-12) Adityapur (-33) 44km Zebra 7 0.95 r h ) -94 8 )

t (2) n (4) 6 4 km -5 -10 ( 1 4 a (-1) 1 0.98/ 0.97 (-30) 10.75 km P r 9 , ) anthe - 9 (-2) 220 kV

P 8 ) km 1

m 0 53km -9 ) - 3 9 10) Usha Martin ) -12

- - ) Mosabni_DVC (0

k ( ther (-2) ( 5 ) 5 -32 40 5 an 5 0 4 ( k P 1 e m 2 7km 3 ( 0 1 0 0.96 (6 4 -70 SIMDEGA -25 8 4 er ) - 2 ) 12 3 - th 2 9 3 s (-8) (1) an 7 r ( P ( ( -4 km e 8) (-22) 38 h 5 ( o - -42 Chakuliya r t 2 8 5 o (-3) n - (1 (4) e a 2 CGP 3 132 kV 0 9 ) (-13) ) h P CGP M - t -3 (7 ( 1 0.95 1 0 CGP EAST 1 n m 0 9 k 1 (- n Dalbhumgarh ) ) 9 32 a 0 4 i ) - 4 - ) Usha Martin 4 1 P ( - 2 0 2 1 (-5 , Manoharpur 7 (-6) r Chaibasa_PG w 0.95 k 2 a e k r h T m Existing Proposed b t m 3X300 MW m LINE ( , 0 e n k 1 0.97 ) Z a / 0.991.00 62 P P P 0 k 1X25 MW m ( m m SINGHBHUM a a k 3 8 m 4 k n n ) 6 k t

) (4) 12 0 1X15 MW t h ( 8 ( 1 1 h 35 1 6 e 765 kV ) 4 e r r 2 1 r - Towards 1 ( e 0 17 3 -35 th -18 0 9 an Kharagpur (-3 ) Gua SAIL P r ) 400 kV (-12) m (0) -1 e (-6) 0k th (WB) -42 4 0.98 ) 4 n e 0k 4 a 9

s -4(-1) oo m -1 ( km P - Kendposi in M Pan 7 ) 28 , ) (-13) 220 kV , Tw th 8 (1 er m km er th k 2 Towards Towards Bahragora 131 Panther 45km, 0 Pan (- 0.96 (0) (1) 4 0.95 Towards 1 -0 -9 Medinipur Baripada Noamundi (WB) (Orissa) 132 kV Rourkela 4 km, Panther (0) (-3) WEST (Orissa) 0.96 Kend FD STN a -26 (-8) r r LOAD e b SINGHBHUM 0.96 th e n Z a P m Load , k m 5 k 0 0 1 5 Display Notation Towards Injection into the bus :+ve Joda Drawl away from the bus:-ve Towards (Orissa) Tarkera Voltage Mag/(Ang) in pu/(deg) (Orissa) Flows in MW and (Mvar)

Rakesha H S Sujay Ghosh LFA R3 25/01/2017 Jharkhand Urja Sancharan Nigam Limited Power Research and Development Consultants Pvt. Ltd. Rakesha H S Sujay Ghosh LFA R2 02/11/2016 #5, 11th Cross, 2nd Stage,WOC Road, Regd. office - engineering building, Bangalore-560 086, INDIA. Rakesha H S Manjunath M G LFA R1 29/09/2016 Geographical power map of JUSNL transmission network for the year 2021-22 Tel : +91-080-23192159,23192168, H.E.C., Dhurwa, Ranchi - 834004 E-mail : [email protected] Rakesha H S Manjunath M G LFA R0 26/09/2016

APPROVED REVIEWED CHECKED DRAWN DESCRIPTION REVISION DATE REMARKS TM 79 PO details: W.O. No. 07 C.E. (T)/J.U.S.N.L dated 02 August 2016. DRAWN IN :MiPower DWG. NO. : Geographical Power Map\2021-22\JUSNL

Annexure-7.2

I. Latehar 400kV substation (Loads in this area are also supplied by Daltonganj PGCIL 400kV substation)

Commi Proposed Connectivity ssionin substation details g year Voltage Sl. Name of Capa Total District level No No. substation city of capa (kV) of each city uni unit (MV ts (MVA) A) 400kV D/C line from Latehar 400/220/132kV substation to Patratu 400/220kV substation. 400kV D/C line from Latehar 400/220/132kV substation to Jharkhand pooling station. (By 400/220 2 315 630 year 2021-22, with commissioning of Essar generation this connectivity will become Essar to Latehar and Essar to Jharkhand pooling station 400kV D/C line) 220kV D/C line from Latehar 1 Latehar Latehar 400/220/132kV substation to 2017-18 Chatra 220/132kV substation. Charging of 220kV D/C line (presently charged at 132kV) from Daltonganj 132/33kV substation to Latehar 220/132 2 150 300 132/33kV substation at 220kV, and termination of the line at PGCIL Daltonganj 400/220/132kV and Latehar 400/220/132kV substation. 132kV D/C line from Latehar 400/220/132kV substation to Latehar 132/33kV substation. 220kV D/C line from Latehar Chatra 400/220kV substation to Chatra 220/132kV substation.

220kV D/C line from Chatra 220/132kV substation to 220/132 2 150 300 2017-18 PBCMP (NTPC). 132kV D/C line from Chatra 2 Chatra 220/132/33kV substation to Chatra (Pratappur) 132/33kV substation. Charging of under construction 220kV D/C line from Latehar 132/33 2 50 100 400/220kV substation to 2016-17 Chatra 220/132kV substation at 132kV level and connecting

80

Commi Proposed Connectivity ssionin substation details g year Voltage Sl. Name of Capa Total District level No No. substation city of capa (kV) of each city uni unit (MV ts (MVA) A) it to existing Latehar 132/33kV substation.

Charging of 220kV D/C line from Lohardagga 132/33kV substation to Latehar 132/33kV substation at 220kV (previously line was charged at 132kV). 3 Lohardagga Lohardagga 220/132 2 150 300 2018-19 Charging of 220kV D/C line from Lohardagga 132/33kV substation to Hatia 220/132kV substation at 220kV (previously line was charged at 132kV). 220kV D/C line from Daltonganj 400/220kV substation to Garwha 220/132kV substation. 4 Garwha Garwha 220/132 2 150 300 2018-19 132kV D/C line from Garwha 220/132kV substation to Garwha road 132/33kV substation. 132kV D/C line from Chatra Chatra 220/132/33kV substation to 5 Chatra 132/33 2 50 100 2017-18 (Pratappur) Chatra (Pratappur) 132/33kV substation. 132kV D/C line from Latehar 400/220/132kV substation to 6 Mahuadanr Latehar 132/33 2 50 100 Mahuadanr 132/33kV 2018-19 substation. 132kV D/C line from Latehar 400/220/132kV substation to 7 Chandwa Latehar 132/33 2 50 100 Chandwa 132/33kV 2018-19 substation. 132kV D/C line from Chainpur 132/33kV substation to Mahuadanr 132/33kV substation. 8 Chainpur Gumla 132/33 2 50 100 2020-21 132kV D/C line from Gumla 132/33kV substation to Chainpur 132/33kV substation. 132kV D/C line from Chatra 9 Simaria Chatra 132/33 2 50 100 220/132/33kV substation to 2021-22 Simaria 132/33kV substation. 132kV D/C line from Garwha 10 Nagaruntari Garwha 132/33 2 50 100 2019-20 220/132kV substation to

81

Commi Proposed Connectivity ssionin substation details g year Voltage Sl. Name of Capa Total District level No No. substation city of capa (kV) of each city uni unit (MV ts (MVA) A) Nagaruntari 132/33kV substation. 132kV D/C line from Garwha 11 Meral Garwha 132/33 2 50 100 220/132kV substation to Meral 2019-20 132/33kV substation. 132kV D/C line from Garwha 220/132kV substation to 2019-20 12 Ramkanda Garwha 132/33 2 50 100 Ramakanda 132/33kV substation. 132kV D/C line from Chatarpur 13 Panki Palamu 132/33 2 50 100 132/33kV substation to Panki 2019-20 132/33kV substation. 132kV D/C line from Daltonganj 400/220/132kV substation to Chatarpur 132/33kV substation. 14 Chatarpur Palamu 132/33 2 50 100 2018-19 132kV D/C line from Chatarpur 132/33kV substation to Japla 132/33kV substation. Additional transmission lines for network strengthening

1 132kV D/C line from 132/33kV Garwha road substation to Japla 132/33kV substation. 2016-17 132kV D/C line from Daltonganj PGCIL 400/220/132kV substation to Daltonganj 132/33kV 2 substation. 2017-18

3 132kV D/C line from Garhwa road 132/33kV substation to Daltonganj 132/33kV substation. 2017-18

II. Patratu 400kV substation Proposed substation details Commiss Sl. Name of Voltage Capacity District No Total Connectivity ioning No. substation level (kV) of each of capacity year unit units (MVA) (MVA) 400kV D/C line from Patratu 400/220/132kV substation to Latehar 400/220/132kV 1 Patratu Hazaribagh 400/220 2 315 630 substation. 2017-18 Charging of 400kV S/C (presently charged at 220kV) line from PTPS to TTPS at 400kV and

82

shifting the line from PTPS to Patratu 400/220/132kV substation. Shifting of 220kV D/C line from PTPS to Hatia 220/132kV substation to Patratu 400/220/132kV 220/132 substation. (transformers 220kV D/C line from shifted from 2 150 300 Patratu PTPS to 400/220/132kV Patratu) substation to PBCMP (NTPC). 220kV D/C line from Patratu 400/220/132kV substation to PTPS. Shifting of 132kV S/C line from PTPS to Patratu (DVC) to Patratu 400/220/132kV substation. Shifting of 132kV S/C line from PTPS to Kanke 132/33kV substation to 132/33 2 50 100 Patratu 400/220/132kV substation. Shifting of 132kV S/C line from PTPS to Hatia 132/33kV substation to Patratu 400/220/132kV substation. 132kV D/C line from Patratu 400/220/132kV 2 Barkagaon Hazaribagh 132/33 2 50 100 substation to 2018-19 Barkagaon 132/33kV substation. 132kV D/C line from Ramgarh 132/33kV substation to existing Ramgarh (DVC) 132/33kV 3 Ramgarh Hazaribagh 132/33 2 50 100 substation. 2018-19 132kV D/C line from Chatra 220/132/33kV substation to

83

Ramgarh 132/33kV substation. 132kV D/C line from Patratu 400/220/132kV substation to Ramgarh 132/33kV substation. 132kV D/C line from Bokaro (Jainamore) 220/132kV substation to Ramgarh 132/33kV substation. Additional transmission lines for network strengthening 400kV D/C line from Patratu 400/220/132/33kV substation to Ranchi PGCIL 765/400kV 1 substation. 2018-19

III. Jasidih 400kV substation Commiss Proposed substation Connectivity ioning details year Voltage Sl. Name of Capac District level Total No. substation No ity of (kV) capaci of each ty units unit (MVA) (MVA) 400kV D/C line from Koderma 400/220 2 500 1000 400/220/132kV substation to 2018-19 Jasidih 400/220/132kV substation. 220kV D/C line from Dumka 220/132 2 150 300 220/132kV substation to Jasidih 220/132/33kV substation. 1 Jasidih Deoghar 132kV D/C line from Jasidih 220/132/33kV substation to 2017-18 Madhupur 132/33kV substation. 132/33 2 50 100 132kV D/C line from Deogarh 132/33kV substation to Jasidih 220/132/33kV substation. 220kV D/C line from Koderma 400/220/132kV substation to Giridih 220/132/33kV substation. 220/132 2 150 300 220kV D/C line from Govindpur 2 Giridih Giridih 220/132/33kV substation to Giridih 2018-19 220/132/33kV substation. 132kV D/C line from Giridih 132/33 2 50 100 220/132/33kV substation to Jamua 132/33kV substation. 220kV D/C line from Dumka 3 Godda Godda 220/132 2 150 300 220/132 kV substation to Godda 2018-19 220/132/33kV substation.

84

220kV D/C line from Godda 220/132/33kV substation to Lalmatia 220/132/33kV substation. 132kV D/C line from Godda 220/132/33kV substation to Amarpara 132/33kV substation. LILO of one circuit of 132kV D/C 132/33 2 50 100 line from Dumka 132/33kV substation to Lalmatiya 220/132/33kV substation at Godda 220/132/33kV substation. 132kV D/C line from Giridih 4 Jamua Giridih 132/33 2 50 100 220/132/33kV substation to 2018-19 Jamua 132/33kV substation. 132kV D/C line from Bishnugarh 5 Saria Giridih 132/33 2 50 100 132/33kV substation to Saria 2018-19 132/33kV substation.

1 50 LILO of 132kV S/C line from Deogarh 132/33kV substation to 6 Chitra Deoghar 132/33 70 Jamtara 132/33kV substation at 2016-17 1 20 Chitra 132/33kV substation. LILO of 132 kV D/C line from Dumka 132/33kV substation to 7 Jarmundi Dumka 132/33 2 50 100 Deoghar 132/33kV substation at 2018-19 Jarmundi 132/33kV substation. 132kV D/C line from Dumka 8 Sikaripara Dumka 132/33 2 50 100 132/33kV substation to Sikaripara 2018-19 132/33kV substation. LILO of one circuit of 132 kV D/C line from Lalmatiya 220/132/33kV substation to Dumka 132/33kV substation at Hansdiha 132/33kV 9 Hansdiha Dumka 132/33 2 50 100 substation. 2018-19 132kV D/C line from Hansdiha 132/33kV substation to Banka (PGCIL) substation. 132kV D/C line from Godda 220/132/33kV substation Amarpara 132/33kV substation. 132kV D/C line from Pakur 10 Amarpara Pakur 132/33 2 50 100 132/33kV substation to Amarpara 2018-19 132/33kV substation. 132kV D/C line from Dumka 132/33kV to Amarpara 132/33kV substation. 132kV D/C line from Sahebganj 11 Rajmahal Sahebganj 132/33 2 50 100 132/33kV substation to Rajmahal 2018-19 132/33kV substation. 132kV D/C line from Sahebganj 12 Udhwa Sahebganj 132/33 2 50 100 132/33kV substation to Udhwa 2018-19 132/33kV substation. Additional transmission lines for network strengthening

85

400kV D/C line from PGCIL Dhanbad 400/220kV substation to Jasidih 400/220/132/33kV 1 substation. 2019-20 Conversion of 220kV S/C line from Lalmatia 220/132/33kV substation to Farakka NTPC generation 2 into D/C line. 2020-21

3 220kV D/C line from Giridih 220/132/33kV substation to Jasidih 400/220kV substation. 2021-22 4 132kV D/C line from 220/132kV Dumka substation to Jamtara 132/33kV substation. 2018-19 5 132kV D/C line from Sahebganj 132/33kV substation to Pakur 132/33kV substation. 2018-19 6 132kV D/C line from Saria 132/33kV substation to Giridih 220/132/33kV substation. 2021-22

IV. Chandil 400kV substation (Loads in this are also supplied by Ramchandrapur and Chaibasa PGCIL 400kV substations) Proposed substation Name details Commis Voltage Sl. of No Capacity Total s District level Connectivity No. substati of of each capac ioning (kV) on unit unit ity year s (MVA) (MVA) 400kV D/C line from PGCIL Chaibasa 400/220/132kV substation to Chandil 400/220/132kV substation. 1 Chandil Saraikela 400/220 2 500 1000 LILO of 220kV D/C line from 2018-19 Ranchi PGCIL 400/220kV substation to Chandil 220/132kV substation at Chandil 400/220kV substation. LILO of 220kV D/C line from Ranchi PGCIL 400/220kV 2 Tamar Ranchi 220/132 2 150 300 substation to Chandil 2018-19 220/132kV substation at Tamar 220/132kV substation. 220kV D/C line from Bero 220/132/33kV substation to Simdega 220/132kV substation. 132kV D/C line from Simdega 220/132kV substation to 220/132 2 150 300 Kolebira 132/33kV substation. 2021-22 LILO of 132kV D/C line from Simdega 132/33kV substation Simdeg to Kurdeg 132/33kV substation 3 Simdega a at Simdega 220/132kV substation. 132kV D/C line from Manoharpur 132/33kV substation to Simdega 132/33kV substation. 132/33 2 50 100 2016-17 132kV D/C line from Gumla 132/33kV substation to Simdega 132/33kV substation.

86

Proposed substation Name details Commis Voltage Sl. of No Capacity Total s District level Connectivity No. substati of of each capac ioning (kV) on unit unit ity year s (MVA) (MVA) LILO of proposed 220kV D/C line from Ramchandrapur 220/132/33kV substation to Chaibasa 220/132kV substation at Jadugoda 220/132/33kV substation.(Interim East Jadugod arrangement) 4 Singhbhu 220/132 2 150 300 2018-19 a m 220kV D/C line from Adityapur 220/132kV substation to Jadugoda 220/132/33kV substation.(With commissioning of Adityapur 220/132/33kV substation) LILO of 220kV D/C line from Ramchandrapur PGCIL 400/220kV substation to Chaibasa 220/132kV substation at Adityapur 220/132kV substation. 220kV D/C line from Adityapur 220/132kV substation to Jadugoda 220/132/33kV substation.(With commissioning of Adityapur 220/132/33kV East Adityap substation) 5 Singhbhu 220/132 2 150 300 2021-22 ur m LILO of 132kV S/C line from Chandil 220/132kV substation to Adityapur 132/33kV substation at Adityapur 220/132kV substation. LILO of 132kV S/C line from Rajkharsawan 132/33kV substation to Adityapur 132/33kV substation at Adityapur 220/132kV substation. 132kV D/C line from Tamar 220/132/33kV substation to silli 6 Chouka Saraikela 132/33 2 50 100 132/33kV substation via 2018-19 Chouka 132/33kV substation. 132kV D/C line from Chandil 220/132kV substation to Chakuliya 132/33kV substation. 132kV D/C line from Bahragora East Chakuliy 132/33kV substation to 7 Singbhu 132/33 2 50 100 2018-19 a Chakuliya 132/33kV substation. m 132kV D/C line from Dalbhumgarh 132/33kV substation to Chakuliya 132/33kV substation.

87

Proposed substation Name details Commis Voltage Sl. of No Capacity Total s District level Connectivity No. substati of of each capac ioning (kV) on unit unit ity year s (MVA) (MVA) 132kV D/C line from Dalbhumgarh 132/33kV substation to Bahragora East Bahrago 132/33kV substation. 8 Singbhu 132/33 2 50 100 2018-19 ra m 132kV D/C line from Bahragora 132/33kV substation to Chakuliya 132/33kV substation. LILO of one circuit of 132kV D/C line from Chandil 220/132kV substation to 9 Kandra Saraikela 132/33 2 50 100 Rajkharsawan 132/33kV 2018-19 substation at Kandra 132/33kV substation. 132kV D/C line form Ramchandrapur 220/132kV substation to Mango 132/33kV substation. East 10 Mango Singbhu 132/33 2 50 100 LILO of one circuit of 132kV 2018-19 m D/C line from Chandil 220/132kV substation to Golmuri 132/33kV substation at Mango 132/33kV substation. 132kV D/C line from Jadugoda East Sundern 132/33kV substation to 11 Singbhu 132/33 2 50 100 2018-19 agar Sundernagar 132/33kV m substation. LILO of 132kV S/C line form Goelkera 132/33kV substation to Tarkera 220/132kV substation at Manoharpur West 132/33kV substation Manoha 12 Singbhu 132/33 2 50 100 (commissioned). 2016-17 rpur m 132 KV D/C line from Chaibasa 220/132/33kV substation to Manoharpur 132/33kV substation. Addition of 132/33kV East Ramcha transformers at existing 13 Singbhu 132/33 2 50 100 2016-17 ndrapur Ramchandrapur 220/132kV m substation. 132kV D/C line from Kamdara 14 Kolebira Simdega 132/33 2 50 100 132/33kV substation to Kolebira 2018-19 132/33kV substation. 132kV D/C line from Simdega 15 Kurdeg Simdega 132/33 2 50 100 132/33kV substation to Kurdeg 2018-19 132/33kV substation. Additional transmission lines for network strengthening

1 400kV D/C line from PGCIL Dhanbad 400/220kV substation to Chandil 400/220kV substation. 2019-20

88

Proposed substation Name details Commis Voltage Sl. of No Capacity Total s District level Connectivity No. substati of of each capac ioning (kV) on unit unit ity year s (MVA) (MVA) 220kV D/C line from 220/132kV Ramchandrapura substation to Chaibasa 220/132/33kV 2 substation. 2016-17

3 220kV D/C line from Chaibasa 220/132/33kV substation to Gua SAIL. 2018-19 4 132kV D/C line from 220/132 kV Ramchandrapur substation to Jadugoda 132/33kV substation. 2016-17 5 132kV D/C line from 132/33kV Jadugoda substation to Dalbhumgarh 132/33kV substation. 2016-17 132kV D/C line from 132/33kV Chakradharpur substation to Chaibasa 220/132/33kV 6 substation. 2018-19

7 132kV D/C line from Noamundi 132/33kV substation to Chaibasa 220/132/33kV substation. 2018-19 LILO of one Ckt of 132 KV D/C line from Noamundi 132/33kV substation to Chaibasa 8 220/132/33kV substation at Kendposi 132/33kV substation. 2018-19

9 132kV D/C line from 220/132/33kV Chaibasa substation to Rajkharsawan 132/33kV substation. 2018-19 LILO of one circuit of 132kV D/C line from Chaibasa 220/132/33kV substation to Manoharpur 10 132/33kV substation at Goelkera 132/33kV substation. 2018-19

11 132kV D/C line from Noamundi 132/33kV substation to Manoharpur 132/33kV substation. 2020-21

V. Koderma 400kV substation Proposed substation details Commis Name of Voltag Sl. Capacity s substati District e level No Total Connectivity No. of each ioning on (kV) of capacity unit year units (MVA) (MVA) 400kV D/C line from Koderma 400/220/132kV substation to Koderma (DVC) 400/220kV substation. 400kV D/C line from Koderma 400/22 400/220/132kV substation to 2 500 1000 0 Jasidih 400/220/132kV substation.

1 Koderma Koderma LILO of 400kV S/C line from 2018-19 TTPS to Biharshariff at Koderma 400/220/132kV substation. 220kV D/C line from Koderma 220/13 400/220/132kV substation to 2 150 300 2 Giridih 220/132/33kV substation.

132/33 2 50 100 - 220kV D/C line from Koderma 220/13 400/220/132kV substation to Domchan 2 150 300 Domchanch 132/33kV 2 Giridih 2 2021-22 ch substation.

132/33 2 50 100 -

89

Proposed substation details Commis Name of Voltag Sl. Capacity s substati District e level No Total Connectivity No. of each ioning on (kV) of capacity unit year units (MVA) (MVA) 220kV D/C line from 220/13 Hazaribagh 220/132/33kV 2 150 300 substation to Barkatha 3 Barkatha Koderma 2 2021-22 220/132/33kV substation.

132/33 2 50 100 - 220kV D/C line from Tenughat TPS to Hazaribagh 220/132/33kV substation. 220/13 2 150 300 220kV D/C line from 2 Hazaribagh 220/132/33kV Hazariba Hazariba 4 substation to Hazaribagh 2018-19 gh gh (DVC) 220/132kV substation. 132kV D/C line from Hazaribagh 220/132/33kV 132/33 2 50 100 substation to Bishnugarh 132/33kV substation. 132kV D/C line from Chatra Hazariba 5 Barhi 132/33 2 50 100 220/132/33kV substation to 2018-19 gh Barhi 132/33kV substation. Additional transmission lines for network strengthening

1 132kV D/C line from Barhi 132/33kV substation to Hazaribagh (JSEB) 220/132/33kV substation. 2021-22

VI. Mandar 400kV substation (Loads in this area are also supplied by Ranchi PGCIL 400kV substation) Proposed substation details Voltage Commiss Sl. Name of Capacity District level No Total Connectivity ioning No. substation of each (kV) of capacity year unit units (MVA) (MVA) LILO of 400KV D/C line from Ranchi PGCIL 765/400kV substation to Patratu 400/220/132/33kV substation at Mandar 400/220kV substation. 220kV D/C line from Ratu 220/132/33kV substation 1 Mandar Ranchi 400/220 2 500 1000 to Mandar 400/220kV 2021-22 substation. 220kV D/C line from Tamar 220/132/33kV substation to Mandar 400/220kV substation via Khunti 220/132/33kV substation.

90

Proposed substation details Voltage Commiss Sl. Name of Capacity District level No Total Connectivity ioning No. substation of each (kV) of capacity year unit units (MVA) (MVA) LILO of 220KV D/C line from Hatia 220/132kV substation to Lohardagga 220/132kV substation at Mandar 400/220kV substation. 220kV D/C line from Mandar 400/220kV substation to Bero 220/132/33kV substation. 220kV D/C line from Patratu 400/220kV 220/132 2 150 300 substation to Ratu 220/132kV substation. 2 Ratu Ranchi 2018-19 132kV D/C line from Hatia 220/132kV substation to 132/33 2 50 100 Ratu 220/132kV substation. 220kV D/C line from Mandar 400/220kV substation to Bero 220/132/33kV substation. 220/132 2 150 300 220kV D/C line from Khunti 220/132/33kV 3 Bero Ranchi substation to Bero 2021-22 220/132/33kV substation. 132kV D/C line from Bero 220/132/33kv substation 132/33 2 50 100 to Kamdara 132/33kV substation. 220kV D/C line from Tamar 220/132/33kV substation to Khunti 220/132kV substation. 220/132 2 150 300 2021-22 220kV D/C line from Khunti 220/132/33kV substation to Bero 220/132/33kV substation. 132kV D/C line from 4 Khunti Khunti Tamar 220/132/33kV substation to Khunti 132/33kV substation. LILO of 132kV S/C line 132/33 2 50 100 2017-18 form Hatia 132/33kV substation to Kamdara 132/33kV substation at Khunti 132/33kV substation.

91

Proposed substation details Voltage Commiss Sl. Name of Capacity District level No Total Connectivity ioning No. substation of each (kV) of capacity year unit units (MVA) (MVA) LILO of 220kV D/C line from Ranchi PGCIL 400/220kV substation to 220/132 2 150 300 Chandil 220/132kV 5 Sarwal Ranchi 2020-21 substation at Sarwal 220/132/33kV substation.

132/33 2 50 100 - 132kV D/C line from Irba 132/33kV substation to 6 Irba Ranchi 132/33 2 50 100 Kanke 132/33kV 2018-19 substation. 132kV D/C line from Gola 7 Gola Hazaribagh 132/33 2 50 100 132/33kV substation to 2018-19 Silli 132/33kV substation. 132kV D/C line from Sikkidri 132/33kV substation to Angada 132/33kV substation. 8 Angada Ranchi 132/33 2 50 100 2018-19 132kV D/C line from Angada 132/33kV substation to Silli 132/33kV substation. 132kV D/C line from Silli 132/33kV substation to Angada 132/33kVsubstation. 132kV D/C line from Silli 132/33kV substation to Gola 132/33kVsubstation. 9 Silli Ranchi 132/33 2 50 100 132kV D/C line from 2018-19 Chouka 132/33kVsubstation to silli 132/33kV substation. 132kV D/C line from Silli 132/33kV substation to Sikkidri 132/33kV substation. Additional transmission lines for network strengthening 220kV D/C line from 220/132kV Hatia substation to Ranchi (PGCIL) 400/220kV 1 substation. 2016-17

2 132kV D/C line from 132/33kV Kanke substation to Hatia 220/132kV substation. 2016-17 LILO of 132kV S/C (3rd ckt) from Hatia 132/33kV substation to Sikidri 132/33kV 3 substation at Namkum 132/33kV substation. 2016-17

4 Re-conductoring of Hatia-Namkum-Sikidri 132kV D/C line with HTLS conductor. 2016-17 5 Re-conductoring of Hatia-Kamdara 132kV S/C line with HTLS conductor. 2016-17 6 132kV D/C line from Irba 132/33kV substation to Ramgarh 132/33kV substation. 2019-20

92

Proposed substation details Voltage Commiss Sl. Name of Capacity District level No Total Connectivity ioning No. substation of each (kV) of capacity year unit units (MVA) (MVA) 7 132kV D/C line from Irba 132/33kV substation to Ratu 220/132/33kV substation. 2019-20

Govindpur 220kV substation (Dhanbad PGCIL 400kV substation is a power source in this area) Proposed substation details Voltage Commiss Sl. Name of No Capacity Total District level Connectivity ioning No. substation of of each capac (kV) year unit unit ity s (MVA) (MVA)

220 kV D/C line from TTPS 1 Govindpur Dhanbad 220/132 2 150 300 to Govindpur 220/132/33kV 2016-17 substation. 220kV D/C line from Dumka 220/132kV substation to Govindpur 220/132/33kV substation.

132/33 2 50 100 -

LILO of 220kV D/C line from TTPS to Govindpur Bokaro 220/132 2 150 300 220/132/33kV substation at 2 (Jainamore Bokaro Bokaro 220/132/33kV 2017-18 ) substation

132/33 2 50 100 - 220kV D/C line from 220/132 2 150 300 Tenughat TPS to Gomia 220/132/33kV substation. 3 Gomia Giridih 132kV D/C line from Gomia 2018-19 220/132/33kV substation to 132/33 2 50 100 Dugda 132/33kV substation. 220kV D/C line from Tenughat TPS to 220/132 2 150 300 Chandrapura 220/132/33kV substation. Chandrapu 4 Bokaro 2020-21 ra 132kV D/C line from Chandrapura 220/132/33kV 132/33 2 50 100 substation to Dugda 132/33kV substation. 220kV D/C line from Govindpur 220/132/33kV 5 Baliyapur Dhanbad 220/132 2 150 300 substation to Baliyapur 2020-21 220/132/33kV substation.

93

Proposed substation details Voltage Commiss Sl. Name of No Capacity Total District level Connectivity ioning No. substation of of each capac (kV) year unit unit ity s (MVA) (MVA) LILO of 132kV D/C line from Putki 132/33kV substation to Pathardih 132/33 2 50 100 132/33kV substation at Baliyapur 220/132/33kV substation. 220kV D/C line from Govindpur 220/132/33kV 220/132 2 150 300 substation to Topchanchi 220/132/33kV substation. 6 Topchanchi Giridih 2020-21 132kV D/C line from Topchanchi 220/132/33kV 132/33 2 50 100 substation to Dugda 132/33kV substation. LILO of 220kV D/C line from Dumka 220/132/33kV substation to Govindpur 220/132 2 150 300 220/132/33kV substation at 7 Palojori Deoghar 2021-22 Palojori 220/132/33kV substation.

132/33 2 50 100 - 132kV D/C line from Bokaro (Jainamore) 220/132/33kV 8 Petarwar Bokaro 132/33 2 50 100 substation to Petarwar 2018-19 132/33kV substation. 132kV D/C line from Bokaro (Jainamore) 220/132/33kV substation to Dugda 132/33kV substation. 9 Dugda Bokaro 132/33 2 50 100 2018-19 132kV D/C line from Gomia 220/132/33kV substation to Dugda 132/33kV substation. 132kV D/C line from Govindpur 220/132/33kV substation to Putki132/33kVsubstation. 132kV D/C line from Putki 132/33kV substation to 10 Putki Dhanbad 132/33 2 50 100 Pathardih 2018-19 132/33kVsubstation. 132kV D/C line from Putki 132/33kV substation to Mahuda 132/33kV substation. 132kV D/C line from Putki 132/33kV substation to 11 Pathardih Dhanbad 132/33 2 50 100 Pathardih 132/33kV 2018-19 substation.

94

Proposed substation details Voltage Commiss Sl. Name of No Capacity Total District level Connectivity ioning No. substation of of each capac (kV) year unit unit ity s (MVA) (MVA) 132kV D/C line from Govindpur 220/132/33kV substation to Chandankiyari 132/33kV substation. Chandanki 12 Bokaro 132/33 2 50 100 2018-19 yari 132kV D/C line from Bokaro (Jainamore) 220/132/33kV substation to Chandankiyari 132/33kV substation. 132kV D/C line from Putki 132/33kV substation to 13 Mahuda Dhanbad 132/33 2 50 100 Mahuda 132/33kV 2018-19 substation. 132kV D/C line from Hazaribagh 220/132/33kV substation to Bishnugarh 132/33kV substation. 132kV D/C line from Saria Bishnugarh Hazariba 132/33kV substation to 14 132/33 2 50 100 2018-19 (Banaso) gh Bishnugarh 132/33kV substation. 132kV D/C line from Gomia 220/132/33kV substation to Bishnugarh 132/33kV substation. 132kV D/C line from Baliyapur 220/132/33kV 15 Nirsa Dhanbad 132/33 2 50 100 substation to Nirsa 2021-22 132/33kV substation. Additional transmission lines for network strengthening

1 220kV D/C line from Dhanbad PGCIL to Govindpur 220/132/33kV substation. 2019-20 2 220kV D/C line from Dhanbad PGCIL to Bokaro (Jainamore) 220/132/33kV substation. 2019-20 3 132kV D/C line from Govindpur 220/132/33kV substation to Madhupur 132/33kV substation. 2021-22

95 Annexure-8.1

96 •· e development ci Buxs:r TPS &tld nave il}t~ndeatil lttiOW the poW~t ~\I:&Cijati:qn ~~ v\~.pfth~ above, bJs requ~ted that Ci!A may abQ'l:~,nioui'ft~d pfau nssociated with. ttansmisskm.iln~.4;l ons:. taer-ang li!>.nlll''I'Af!r•n ~jnt Qf v.iew tmd ;tnay &ve their sugg~stiotl so tha,t nut~ uet:es~;ary nlay he taken ftam out end. Encl ·-A~ abov~

~skat Dire(@r (ProJt~tt)

()

97 Annexure-9.1

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD)

No. 2012/Elect(G)/150/1 Pt.II NewDelhi, Dated 09.09.16

vC'hairperson . Central Electricity Authority Sewa Bhawan, R. K. Puram: Sector-1, New Delhi -110 066

Sub: Connectivity of Railway TSSs with ISTS network - Appro,val · for Connectivity.

Central Electricity Authority (CEA) in their report on "Energy Plan·,fo'r Indian Railways" of Feb 2015 has advised that for connecting its existing or future TSSs, Railways as Deemed Transmission Licence are required to communicate their connectivity requirement to CEA & CTU for consideration of integrated planning for ISTS in a coordinated manner.

Pursuant to above, Indian Railways. is initially planning to connect its .. existing TSSs between Mughal. Sarai - Howrah and Delhi Bharuch routes of Railways by way of construction of associated infrastructure including transmission lines and bay extension. work at ISTS points preferably at 220kV. Power requirement of Railways from the nearby proposed ISTS points as well· as the indicative route diagrams for these sections are enclosed.

· It is requested that the connectivity to Railways from these ISTS points for the given load may kindly be communicated at the . earliest for planning and execution oftransmission line works of Railways. ~·~u (Sudhir Garg) Executive Director(EEM) Railway Board

. Copy to: CMD, PGCIL: - For kind inform:atir.m & n/a please. CEO, REMCL:- For kind information & n/a please.

! 1

I I

98 Connectivity scheme of TSS along Delhi - Bharuch route

Connectivi ....Gr.Jd ··· ·· . J"e.fl!@1iYQ ...... ,. · RatlwayTSs-to· road Sr. ·PGctLGSS ty required .Voltage be supplied requiremen at(kV) atTSS t 1 . Ballabhgarh 66 ----- Ballabhgarh 220 50 2 Hod aI 66 3 Mathura 132 r-- 4 Bharatpur 132 ~ Agra/Bassi. 220 60 5 Hindun city 132 - 6 Gang~pur city 132 .. 7 · ·· Sawaimadhopur 132 - 8 Lakheri 132 - 132 - 9 Kota 220 Gudla 75 10 Ramganj Mandi 132 - 11 Suwasra 132 12 Nagda 132. - 13 Ratlam . 1.32 r-- Rajgarh 220 75 14 Bainania 132 f--- 15 Dahod 132 16 Limkheda 220. r- 17 . Godhra 132 - 18 Dehgam 220 .Samlaya 132 100 - 19 Makarpura 132 - 20. · .Hh.C~tl1~~f ·.·. ~~2'' "

99 ---

Connectivity scheme of TSS in Mugalsarai-Howrah route I

I '

!" Sr. Propo-sed. Connect! Railway TSS Grid Contarct Tentative load . ------"- -- TSTSpoTnf ·vrw -.· tobe supplied Voltage:ar o-r.:~mand requ1rerrrent· ,_.~. required TSS (MVA) (MW) ' .. ~ llr\1\ 1 Z,:amania 13.5 1- 2 Oumraon 10.8 I 1- .. 3 Arah/ Ara ...... 10.8 i 220/ 13.2 60 Patna ~ Dana pur 10.8 t> s- Jahanabad 10.8 r I 6 Son nagar 14 1- ' ., 7-".-- •. · . Raf.iqganj· -lOiS ! ' i Gaya 9 . i ~ Pusauli/Gaya r 220 75 ! i' '9 -' Paharpur 9 I Tc) Koderma 24 ! _,. I 11 Hazaribag 14 l~n.:.i-1 .. .. i~· I 12 Nim.laghat 19.5 ;

·- Pradhankunta 18 13 Maithon/ 220 75 I 14 ,.: Parulia Kumardhubl 132kV 20.5 -$64--- ,Kalipahari .NewTSS I J~ Waria 25 ! ; 16 .. I 19 Burddhwan 22 ' : f:j? Bandel· 18 .. l ~ Shubhas- ·220. Belmuri 16. 75 I gram ~ bankuni 11.5 ~ Belur 20 I 22 JShusroopur · '10.8 I 1---- 23 . Mokama -10.8 I F--- ! ' 24• L-uckeesarai. 10;8. Luckisarai/Bih ·- 220/132 50 I 25 . · arsarif Jhajha 10.8 -· ' 26 Shankarpur 12.5 I I ~ 27 Jamtara 12 ':~ ·"' I .. . , : ':··

I r ' '

i

-~ ! I [i

100 Delhi · Bharuch Section

Details ol TSS and PGCIL subslalions

ll-Vniil'i h;\/1 0

. ~ i .•i' ,l v ·If j i I I i ! j i

INDEX..

0 '~W llli(li;n$lb:;ld't-' i e) I @ I . ' I i - I l I !

101 SINGLE liNE DIAGRAM OF TSS/FP IN MGS-GAYA-HWH ROUTE (SONNAGAR ONWARDS)

3 \

1 . ' I 7 8 /I '1ir(~l MGS 9 Gay a s

'

·, .. ~ EJ 10 19 14 15 12

11

.lr91 18 u

Indicative list of~nllwny TSS/FP No. Location No. Location of No. Location No. Location I Zamania T$S 8 Rafiganj · TSS 15 Kalipahari TSS 22 Klmsroopw TSS 2 Dumraon TSS 9 Paharpur :rss 16 Waria FP 23 Mokama TSS 3 Ara TSS 10 Koderma FP 17 Barddhman FP 24 Lucheesara TSS 4 Danapur TSS . 11 Hazaribagh TSS 18 Bandel FP 25 Jhajha TSS Road ~-- 5 1 Jalianabad TSS 12 Nimiaghat FP 19 Belmuri FP 26 £l_lan~ft~·pter. TSS ·' ' 6 Gay a FP ·IJ·rradhankunta TSS 20 Dankuni TSS 27 Jamtarn TSS 1 Sonnagar FP 14 Kurnardhubi FP 21 Belur FP Indfcntive list of Nearest ISTSpoint No. Location No. Location No. Location No. Location Tl Sasaram (Pusauli) T4 Gaya. T1 Maithon T9 Subhashgram T2 Arah TS niharsarif T8 ParuliaJNear Durgapur) T3 Patna T6 luckeesarai ......

102 Annexure-9.2

m«r i~Hcpl~l Government of India ~ 431184 /Ministry of Power ~ fiRrn:a'~l Central Electricity,Authority ~ 1l1Jileft~ Q.Ct l!~ic:p"'i II~ l Power System Planning & Appraisal- II Division ~~.aiR.~.~-~~ -110066/ Sewa Bhawan, R.K. Puram, New Delhi 110 066

No. CEA/PS/PSPA-II/200/16/2016 3t'.!l-"'b 3 Dt. 25-0ct-2016

To

1. Sh. J.C.S. Bora 2. Dr. Subir Sen, General Manager ChiefOperating Officer (CTU); REMCL, RITES Bhawan No.1 Power Grid Corporation of India Ltd.,. Sector-29 ''Saudan:llni" Plot No.2, Sector-29, Gurgaon Gurgaon-12200 1. Haryana

Subject: Minutes ofthe meeting held in CEA for connectivity ofRaih~ay TSS with ISTS Network, held on 7-10-2016.

Sir,

A meeting was held in CEA on Jili October, 2016 to discuss con~ectivity of Railway's Traction Sub Stations (TSS) with Inter-State Transmission System (ISTS) network for two routes ofindian railways:~ (i)Delhi-Bharuch route, and (ii) Mughal Sarai­ Hovvrah route. Minutes of the meeting are enclosed. ·

Yours faithfully, ~))_ ~- . (Pardeep Jindal) ChiefEngineer(PSPA-II)" Tel: 26198092

I

103 Minutes of the meeting held in CEA for connectivity of Railway TSS with ISTS Network, held on 7-10-2016

L A meeting was held in the office of CE (PSP A-ll) to discuss connectivity of Railway TSS with ISTS for two routes of Railways i.e. (i) Delhi-~ Bharuch route, and (ii) Mughal Sarai- Howrah route. The meeting was attended by officials from REMCL, CTU i.e. Power Grid and CEA List of participants is given at Annexure-I

2. Follo.wing _I~TS .Sub-st~ti_ons were p~elinrin~~ly i~entified for the_ Delhi-Bharuch ]-· route for g1vmg connect1v1ty to the Railways T~S w1th ISTS sub-stations: · , (i) Ballabhgarh or Tughlakabad (under constftl,ction). /' (ii) Agra or Bassi (Rajasthan) ! (iii) Kota (iv) Rajgarh (v) Dehgam I Pirana or Vadodara.

~r, . . . ~ 3. Following Sub-Stations were preliminarily identified for.the Mughal Sarai-Howrah route for giving connectivity to the Railways TSS with ISTS sub-stations: ~J··. fa* . . 1 i ¢- (i) Arah or Patna (ii) Gaya or Chandoti (iii) Maithon (iv) Durgapur (v) Lakhisarai (vi) S ubhashg_ram

4. It was agreed that POWERGRID will examine the feasibility of taking out connectivity lines from these Sub-Stations to proposed TSS ofRailways at 220 kV level along the two routes. For this, they will assess the availability of space for two -(2) numbers o£220 kV ba:Ysforterril1natf(;~ of"Z~;;~cti:;ity:"ii~~-·~£R:;ii;~;~·.···They ~·=~ ..... ~...... ""'"""--""""'·"'~=~ .. --~-"';"''""~~-»···-~--~--""-•-- .. ..-~"-'-''· •.•.....--.,.~~--. .. -..,, . <: ··- --~,- -~·'" • .,._ ,,o •. ""' ,. Will also study the avallability of margins in the transfotiiiation capacity at these ISTS sub-stations 'io"meet 'tl1e' tracilon loacf 'The 'Rai1wa)?s'' traction load that would be incident on an ISTS substation would be ofthe or-·~- ' 5. ~~:E:~;~:e!f::~r~~f:;( 1·· and tpodalities of disconnecting from existing STU nodes or paralleling with STU l ·.1 network would be decidbd based on system studies.

104 ·· ·· )\s ·Ministty ofPower, Governmentofindia has issued c1arifrcations·that·Railways is a deemed licensee under third proviso of section 14 of the Electricity Act, 2003. Therefore, it would be appropriate, if issues relating to connectivity ofTSS with ISTS ~---···------··-·-·---···· _, -- .. . . .,..--....., are dealt by Railways instead of REMCL. It was also agreed that Indian Railways ~ '- . will appoint one nodal officer from Railway Board/Indian Railways for further discussion and correspondence on these matter with CEA/CTU. Railways may take assistance from their associates like REMCL etc., if required. 7. Railways/REMCL representative requested for convening of meeting of Standing Committee on Power System Planning for approval of connectivity at feasible points at the earliest. It was informed that these proposals would be taken up in the Standing Committee for discussion after finalization oftechnical analysis~ including discussion

with the· respective STU whose system is currently being used for the TSS along ., > above two railway routes.

Annexure-I List ofParticipants of the meeting held in CEA for connectivity ofRailway TSS with ISTS Network, held on 7-10-2016:

1. Pardeep Jindal, ChiefEngineer(PSPA-II), CEA 2. Ravinder Gupta, Director(PSPA-11), CEA 3. Manjari Chaturvedi, Dy. Director(PSPA-I), CEA 4 .. J.C.S. Bose, GM, REMCL, Indian Railways 5. Mukesh Khanna, AGM(CTU-Plg), POWERGRID 6. Rajesh Kumar, Asstt.GM(CTU:·J>lg), POWERGRID 7. Bhaskar Wagh, Sr. Engineer(CTU.::Plg), POWERGRID

105 GOVERNMENT OF INDIA MINISTRY OF RAILWAY RAILWAY BOARD

Dt. 19.10.16 ,o. 2012/El~ct(G)/150/lPt.~II

To,

Chief Engineer · Central Electricity Authority Sewa Bhawan, R. K. Puram Secto:r;..l; new Delhi-110066

(Kind attn: Mr. Pf:trdeep Jindal)

Sub:: Connectivity of Railways TSSs :with ISTS network approval for cOiinectivity~ Ref: This office's letter no. 2012/Elect(G)/150/1 Pt. .-II dt. 09,09.16.

~. As desired regarding subject matter, detailed infonna1:lon about the connectivity of Railways TSSs with State Utilities is attached.

Encl: AS above. ./

....> : ... ·,:c'·~. . . .,~-·t·n-c.~.r,.._ ... ,,'"' ...... ' ahd .. necessary actiou plea~e~

. - ~ •· .. ' ,,

106 z A~~f ?-/J 'I Details of TSS along Delhi - Bharuch route Coordinates Existing STU point Proposed ApproJ Location of Highest ISTS Dis tam ·tNo.//" TSS/FP Lattitude Longitude Location State State Utility Voltage .. .. ·--- Location .. .. i··· ·-fr-om-n -~--·- -- --~------·Levei{kvf (km) -·- - ··' ·' 1 Mathura 27.47948 77.673561 Mathura UP UPPCL 132 6.20 - Bassi 2 (PGCIL) Bharatpur 27.236305 77.488417 Bharatpur Raj. JWNL 220 1.40 1----- (Raj.)/ .3 Hindaun city 26.755726 77.03145 Hindaun· Raj. JWNL 220 1.50 1----- Agra i ! 4 Gangapurcity 26.468502 76.527469 Gangapur Raj. JWNL 132 2.20 ! Sawaimad 5 Sawaimadhopur 26.019077 76.357241 Raj. JWNL 220 1_.50 I hopur ! I 1-- ' 6 . Lakheri 25.640532 76.192401 Lakheri Raj. JWNL 132 1.10 I-- Kota 7 (PGCIL) Gurla 25.270958 75.885826 Sakatpura Raj. JWNL .?20 12.50 1-- (Raj.) .'· 8 Ramganj Mandi 24.643331 75.939128 Morak Raj. JWNL .c~20 8.50 1-- 9 Suwasra 24.070519 75.648657 Suwasra MP MPPTCL 132 1.90

10 Nagda 23.45578 75.412474 Nagda MP MPPTCL 220 1.80 I-- 11 Rat lam 23.340562 75.050409 Ratlam MP MPPTCL 220 3.00 1-- Rajgarh 12 (PGCIL) Bamania 23.095907 74.758689 Ratlam MP MPPTCL . 220 45.00 1-- (MP) 13 Oahod 22.844095 74.254539 Dahod Guj. MGVCL 132 1.54 ~ 14 Limkheda 22.835043 . 73.983611 Limkheda Guj. DGVCL 132 . 2.50

15 Godhra 22.77691 73.606149 Godhara Guj. MGVCL 220 ....I.UU "" I-- 16 Samlaya 22.884588 73.30251 Asoj Guj. MGVCL 400 14.30 I-- Dehgam/ Mehamada 17 Mehamadabad 22.81935 72.752112 Guj. MGVCL Pirana bad 132 3.00 1-- (PGCIL) 18 Anand (Guj.) 22.561686 72.966306 Ode. Guj. MGVCL 132 17.30 ;-- 19 Makarpura 22.233282 73.175857 Jambuva Guj. MGVCL 400 2.20 '----- 20 Bharuch 21.704389 72.99928 Bharuch Guj. DGVCL 400 1.50

. . ,•:J$> '. ~

'

. ' -

107 ' l Details of TSS along Mughal Sarai - Howrah route Coordinates Existing STU point Proposed Approx. Sr. Location of Highest ISTS Distance No. TSS/FP Lattitude Longitude Location State State Utility Voltage

-~--- JDMltion . ---~ .. .. frmn.IS£ ·- ----·· -··- ·--- ·-- . i··· £ever . '·'. {in KM) 1 2 4 11 12 13 14 15 1 Zamania 25.374231 83.544083 Gajipur U.P UPPCL 132 KV 57 f.-- Dumraon 25.571685 84.142882 Dumraon Bihar SBPDCL 132 KV 4 ~ Arah/ 3 Ara 25.550561 84.67292 Arah Bihar SBPDCL 132 KV 4 :--- Patna - 4 Dana pur 25.582015 85.04564 Khagoul Bihar SBPDCL 132 KV 1 / 5 Jahanabad 25.186422 84.984907 Jehanabad Bihar SBPDCL 132 KV 0 . :_._.6 Khushroopur 25.485244 85.387659 Fatuha Bihar SBPDCL 132 KV 15 - 7 Mokama 25.392106 85.91419 Hatidah Bihar SBPDCL 132 KV 0 8 Luckeesarai 25.173039 86.092171 Luckhisarai Bihar SBPDCL. 132KV 4 1-:-- 9 Lukhisarai Jhajha 24.767951 86.391983 Jamui Bihar SBPDCL 132 KV 38 1-- Baidyanath . 18 Shankarpur 86.6377979 24.4391859 jharkhand JUSNL 132KV 8.80 Dham 1-- 19 Jamtara 23.956994 86.812246 J~mtara jharkhand JUSNL 132 KV o,.so 10 Gaya 24~803242 84.999769 Bodhgaya ·Bihar BSPTCL 220kV ''·60' 1-- 11 Son Nagar 24.882665 84.230187' Son nagar Bihar BSPTCL 220kV 3•; 1-- Pusauli/ 12. Raftganj 24.820701 84.636464 Kaikaf Bihar BSPTCL 220 KV 10 1-- Gay a ~ Paharpur ' 24.627119 85.204086 Bodhgaya ·Bihar SBPDCL 132 KV 35 14 Koderma 24.439814 85.517085 Koderma · jharkhand DVC 132KV 0.5. ~ Hazaribagh Rd 24.181143 85.886921 Konar jharkhand DVC 132 KV 35 ~ Nimiaghat 23.933776 86.075386 Nimiaghat jharkhand DVC 132 KV 0.5 17 Pradhankhanta 23.772310 86.516885 · jharkhand DVC 132 KV 20 1-- Maithon/D' 20 urgapur Kumardhubi 23.747561 86.793549 Kumardhubi jharkhand. DVC 132KV 0.65 1-- 27 Kali Pahari 2.3.665212 87.016251 W.B 'Under construction b-- 21 Waria 23.538278 87.246715 DTPS W.B DVC 132 KV 0.87' 22 Bardhman 23.249832 87.869508 Bardhman W.B DVC 132 KV 1-- 1.9 23 Belmuri 22.936608 88.150029 Belmuri W.B DVC/WBSEB 132KV 0.6 1-- Subhashgr 24 Dankuni 22.678228 88.290773 Liluah 1-- am W.B WBSEB 132KV 10.5 25 Bandel 22.922770 88.377676 Adisapatgram w.B· WBSEB 132KV 1-- 0.3 26 Belur 22.635744' 88.3398 Liluah ·W.B WBSEB · 132 KV 2.5

108 ------~

I Annexure-9.3

~*i("'fil( Government of India ~~d 4-st 1

No: 200/16/PSPA-11/2017/ Dated:f/ To per address list Subject: Minutes the meeting related to Connectivity of Railway TSSs with network in Mughalsarai-Howrah Railway Route. ·

Sir, The minutes of the meeting held on 20.04.2017 at Bhawan, R K Puram, New Delhi regarding above subject is enclosed.

~. an-<:'.~- 10066 'l

1. Executive Director(EEM), 2. General Manager, Railway Board, Railway Energy Management Co. Ltd.( Room No. 102-A, Rail Bhawan, REMCL) New Delhi- 110001 Ground floor, Central wing, Plot No-1, Sector 29, Gurgaon-122001

3. COO (CTU), PGCIL, Saudamini, 4. CEO, POSOCO Plot No.2, Sectorn29, Gurgaon-122001. B-9, Qutub Institutional Area, Katwaria Sarai, Fax No. 0124-2571760/62) New Delhi-110016 •• :0,>

5. Executive Director (System), 6. Managing Director, Damodar Valley Corporation Bihar State Power Transmission DVC Towers, VIP Road, Company, Kolkata-700054. Vidyut Bhavan, Baily Road, Patna- Tel. 033-23557939 800021. Fax No. 033-23554841 Tel. 0612-2504442 Fax No. 0612-2504557

7. Managing Director, 8. Director (System Operation), Jharkhand Urja Sancharan Nigam Limited West Bengal State Electricity Engineering Building, Transmission Company Ltd, - -~ ~ H&E&Ce, Dhurwa, Vidyut Bhavan, 5th Floor, Block-D, Ranchi-834004. Fax-0651-2400799 Bidhannagar, Sector-11, Kolkata-700091. Fax No.033-23342243 . 9. Managing Director, Power Corporation Limited ( UPPCL), Shakti Bhavan, Ashok Marg, , Uttar Pradesh

110 Minutes of the meeting related to Connectivity of Railway TSSs with ISTS network in Mughalsarai-Howrah Railway Route, held on 20.04.2017 at CEA.

List ~f participants is enclosed at Annexure-1. ,)., \1~ Member (Power System), CEA welcomed the participants and stated that in an earlier meeting held in CEA on 07.10.2016, in regard to connectivity of Railways with ISTS network for the Mughalsarai - Howrah and the Delhi - Bharuch routes, it was decided that the issue of disconnection or paralleling of Railway TSS with STU network, would be further studied. To discuss the matter, the meeting was being held.

The following were discussed in the meeting:

1: CE (PSPA-11), CEA informed that Railways has proposed to connect their Trac.tiRn ·-:.! ;;o, Sub-stations (TSS) with ISTS points in Mughalsarai-Howrah route. The identified ISTS substations are Patna, Gaya, Maithon, Durgapur, Lakhisarai and Subhashgram. He expressed that simultaneously paralleling of Railway TSS with STU and ISTS network may increase the fault level and would result in stranded infrastructure. He stated that, at present, Railways are getting supply from STU network on this route. He asked Railways about the necessity of another infrastructure for Railways, when they are able to draw power from STU network in a reliable manner. 2. Director (Railways) informed that the decision of Railways to get connected to ISTS network and disconnection from STU network is purely based on economics of getting cheaper power from other sources through ISTS network. He, however, confirmed that they are getting reliable power from STU network. He further informed that the infrastructure for Railways connectivity to STU network was funded by Railways and built by respective STUs as a deposit work for Railways. As per the contract agreement with STUs, the assets are maintained by STUs. 3. Member (Power System), CEA requested Railways to share the economic analysis of shifting of Railway load from STUs/DVC to ISTS in this route. Director (Railways) said that he would send the report immediately. 4. D.C.E (DVC) stated that Railways connectivity to DVC network (from generator point upto 25 kV system) was created and funded by DVC and not by Railways. At present i._::._) total Railway load of DVC is about 320MW, which they supply to Railway, at an 'average cost of Rs.4.80/ unit: Which is quite competitive price considering the higher reliability of power supply from two sources specially for Railways. He also stated that DVC has already tied up for generation projects and made investment in transmission considering recent specific request from the Railways. Hence, proposal of Railways to disconnection from DVC would result these infrastructure, as redundant

111 \ \ \ \ \ and investment as non-performing asset for DVC. Before agreeing to Railways \ proposal based on their economic consideration, economic aspects of DVC/STUs \ should also be considered. 5. Director (Railw(J.ys) agreed with the DVC statement and stated that considering above facts, the case ofDVC would be resolved mutually. However, he further added that the scheme for disconnection in Mughalsarai-Howrah route have been planned in a holistic way and as per plan, Railway would be disconnected from DVC also on this route. He said that these disconnections would be carried out in accordance with the agreements between Railways and the STUs/DVC. He indicated that Railways can disconnect from STU/DVC, giving legal notice as per these agreements. 6. ChiefEngineer (PSPA-11), CEA stated that Railways may intimate the STUs and I)VC .!--t-""j,_ regarding the date from which Railways would likely to disconnect, so that they pl;m for utilization of those network for other purposes, if possible. Representative of Railways replied that the disconnection may takes place in around (3-5) years time. Railways said that they can send advance intimation to STUs for disconnectio:n, once the scheme of connection with ISTS gets agreed in the Standing Committee of CEA. 7. Director(BSPTCL) stated that Railways connectivity network with STU were built as deposit work by STU for Railways, however as per the legal agreement, the infrastructure belongs to the STU. He added that the load of Railways TSS would be around 80 to 100 MW at each 220 kV point and this would lead to under-utilisation of bays/lines/space at each ISTS points and thus is not an optimal planning as per the Electricity Act. He added that space for 2 No. 220kV Bays at ISTS S/s have been kept for future expansion of states and in this case the user would be only the Railways and · thus no space would be left for STUs to meet their future requirement.. He also informed that there is no space at Patna and Gaya ISTS S/s for Railways connectivity. 8. Chief Engineer (UPPTCL) stated that the infrastructure for Railways was created considering Railways as important customer in UP. Now after disconnections, bays etc . . would have to be utilised for other purposes. In future, if railways agam reqmres connectivity from STUs, this would not again be allotted to them. 9. AGM (POSOCO) expressed that for reliable supply to Railways, the STU and ISTS network may be kept in. parallel. This would be, as per CEA's Planning Criteria of Power System Planning for important loads. ChiefEngineer (PSPA-1), CEA stated that generally connectivity from two points i.e both STU and 'TSTS are not recommended. Two connectivity's for Railways, however can be considered either from STU or ISTS. GM(REMCL) Railways stated that they have planned their connectivity to TSS from two ISTS supply points and shared their scheme (a copy of which is given at Annex-11)

112 l l I 10. Director (BSPTCL) stated that Railways load at Bihar would be around 200MW. Recently, Bihar have allowed open access for 50MW to Railways and the remaining I may be granted gradually. He stated that state network would become stranded after building Railway network with ISTS. This would be national wastage of resources and Public money. He added that Railways may be advised to again look into the economics of connectivity to ISTS points, as many of the states have already granted/ are in the process of granting NOC for open access and as such there is no justification for getting connected with ISTS. 11. Regarding control area for scheduling, metering and deviation, AGM(POSOCO) infol111ed that as per CERC order, there would be two control areas, in each state i.e.one for RLDC and the other for SLDC( if they have connections from STU s also) for al:;lqye ~ ;.~~f,--"· purposes. 12. It is noted that no representative from West Bengal and Jharkhand was present in the meeting. 13. On the basis of above following was concluded.

1. Railways has to share the economic analysis of shifting of Railway load from STUs/DVC to ISTS in this route, which is basis of their proposal. Representative of Railways intimated that they would soon send the report.

11. As the transmission system is planned in an integrated manner, Railways were advised to again look into the economics of connectivity to ISTS points, as many of the states have already granted /are in the process of granting NOC for open access.

111. Transmission system for delivery of power to Railways need to be planned in , according with the Electricity Act 2003 and thus taken up for discussion with Standing Committee cop.stituted by CEA.

IV. No representative from West Bengal and Jharkhand was present in the meeting .. Meeting ended with vote of thanks to the Chair.

-

113 Annexure-I

List of the participants of the meeting held on 20.04.2017 at CEA

Sl. No.·~~~ N arne of the Participant Designation Organization 1 K.K.Arya ( In chair) Member( Power System) CEA 2 Pardeep Jindal Chief Engineer, (PSP A-II) CEA 3 Rishika Sharan Director, (PSPA-11) CEA 4 U.M.Rao Dy. Director, (PSPA-11) CEA 5 S.A.Verma Asst. Director-I CEA

6 Punit Agrawal Director(Power Supply) Ministry ofRailways

7 J.C.S.Bora G.M. REMCL ,:: ; ;?,,

,. 9 Bhaskar Sharma Director( Project) BSPTCL '• 10 SumanGuchh C.E.(Transmission) UPPTCL

11 SubirBhada D.C.E (E) DVC 12 Sangita Sil S.E.(E) DVC 13 S.S.Barpanda AGM,NLDC POSOCO 14 Ram Chandra DGM(CTU-Plg) POWERGRID

114 ·'4/

"

' I Annexure-U: 1 Pcage 1

Summary of proposed transmission scheme is as under: • Supply from the PGCIL substation shall be taken at 220 kV (or at , "~ r 132 kV if available) through 2 no. bays. . • Supply from PGCIL substation shall be taken to 220/132 kV substation (to be constructed) through D I C lines. Land of size about ~40X£)() m shall be required for the 220/132 kV substation. • From 220/132 kV substation, 13~ kV supply shall be extended to up as well as down directions~ailWay lili.e through D/9; lines. _ .~· :_;Jo. • On one direction 132 kV line shall feed about 3 TSS. Loop·in Loop~ "·. out arrangement shall be made at the existing TSS for e:xtending supply to next TSS. Alternatively (in case of ROW problem near existing TSS} 2-$, 1.32. kV Supply from the above 3-c:P. 132 kV line shall be extended to the TSS from a Tee-off point to be constructed at open space near the 'J;'SS. . · \ • One 220/132 kV substation and group ofTSSs supplied through it shall be controlled througli SCADA centre at the 220/132 kV subsW:tion. · • Group of two TSSs shall be protected by a common numerical distance protection relays to be provided at the 220/132 kV substation or at the selective TSS. • Two Hot line communication channels shall be made available between each of the 220/132 kV substation and the TSS in that element and nodal Traction power control (TPC} of the element. Two Hot line links shall also be made available between two adjacent 220/132 kV substations and respective ISTS point.

' \

. --.~

115 <)~~· ~ v. "' '"'\­ ~ )l .. ( '', 2 1'1.!;!' l ..• , Page ·i Annexure::{~ .I POINT availai:!!Ji~ ' ·~·' IJ.I kV ISTS RQY'J 220/132 ISTSPolnt substation ,:j .... ~IJ.d ~~ WtTH ----. l !. !· j I I ,, .. _,_ :I ·l ~.j ' I"~ Land TSS '"""' ..... , ...... _, ... , on OF ...... ,) ...... : ... : .. l•l••!'••·"~ i ! il. I I l ! l r based D/C .I line J kVI TSS 3-ph. Tie I of 2-oh.D/C 132 kVI ,,I .. CONNt;gTIVTY 132 out ' OF or P/C 1: ' . kV I TSS 220 ~,.. the SCHEME --·~ • 1 ]~ ") 'f'ithin ' kV ( be 220/132 t substation ISTSPoint eROP9§..ED , "" J. can I I ;;,;;;.~.r· LILO \ Npte: ,, .. .,. At) , ~-

116 Annexure-11.1 ~~'(cpj~ Government of In ia fu~ga- l=i51kl[f Ministry of Pow r ~~. '{ Central Electricity Au hority . ~"QOfldtiJl\JI'ff~ . ~'J.fTTf-2 Power System Planning & Appr isal Division-ll [ISO: 9001:2008] ."fu:rr'J.fCR, XT. cp.~ I~ -11006'6 :; Sewa Bhaw~n, R K. Puram, Ne Delhi':-1~0066 No: 77/7/PSPA-11/2017 /- ~ To. ' Dated:9zt.01.2017 0_1 Shi-i Ashok Pal, G"'J (CTU-PJanning) : Saudamini"Piot No.2, Sector-29, Gurgaon- 122 001 "(Haryana)

'II Subject Teimination of 220 kV side of 4001220 k 500 MVA ICT-4 at 220kV bus of Biharsharif(BSPTCL) underERSS-XX

Ref: (i) PGCIL letter no. C/CU-Pig/E/ERSS-XX da ed 21.11.2016 (ii) e-maiJ dated 29.12.2016 from PGCIL Sir, 0.

0. This has reference tO PGCIL letter datep 2t. 1.2016 in which PGC!Lrhas . requested CEA to grant principal approval for ter in

· The above documents tiave been examined and· accordingly, we Convey in­ principaLapproval to PGCIL for' termination of 220 k side of the 400/220 kV 4" transformer of 500 MVA at 220kV b.i.Js of Biharsharif( SPTCLt.~nd laying of small 220 Winter-connecting line seclion.. JrOm 220 kV ICT ushing .19 220kV ICT Bay in . the scope of ERSS-XX scheme ofPGCIL...... This is issued with the apprm7af :of Member(Power Sy tern}.· · ·.

". "'-\'$' fJ~J4·· . . .. ~I? (Pardeep Jindal) Chief Engineer (PSPA-11) ...... : \11: () ... ____ , ~... ~ .. 0 . . . •

117 Annexure-13.1 Scope of Works for the scheme “Interconnection of Northern part of Bangladesh with Indian Grid”

1.0 Indian Side

1.1 Transmission Lines

(a) Katihar (ER) – Parbotipur (Bangladesh) 765kV D/c line (to be initially operated at 400kV) – Indian Portion only

(b) LILO of both ckts of New Purnea - Rajarhat 400kV D/c (triple snowbird) line (one ckt via Gokarna and other ckt via Farakka) at Katihar

(c) Parbotipur (Bangladesh) - Bornagar (NER) 765kV D/c line (to be initially operated at 400kV) – Indian Portion only

(d) LILO of both circuits of Balipara – Bongaigaon 400kV D/c (quad) line at Bornagar substation

(e) Disconnection of Alipurduar – Bongaigaon 400kV D/c (quad) line from Bongaigaon and extension of the same to Bornagar with 400kV D/c (quad) line so as to form Alipurduar – Bornagar 400kV D/c (quad) line

1.2 Substation

(a) 400kV new substation at Katihar (Bihar) - upgradable to 765kV later - 400 kV Line bays: 6 nos.  2 nos. for Katihar (ER) – Parbotipur (Bangladesh) 765kV D/c line to be initially operated at 400kV

 4 nos. for LILO of both ckts of Purnea - Rajarhat 400kV D/c (Triple Snowbird) line at Katihar (one ckt via Gokarna and other ckt via Farakka)

- Reactive Compensation  420kV Bus Reactor alongwith associated bays: 2x125 MVAR

 Shifting of 2 nos. 420kV, 80MVAR switchable Line Reactors at Purnea end of Purnea – Rajarhat 400 kV D/c (Triple) line from Purnea to Katihar end of Katihar – Rajarhat 400 kV D/c (Triple) line [1.1(b)]

- Space for future 765kV switchyard  765/400kV 3x1500MVA ICTs (10x500MVA Single Phase Units) along with associated bays

 765kV Line bays (including space for sw. line reactor): 8 nos.

 765kV, 2x330MVAR (7x110 MVAR) Bus Reactors

- Space for future 400kV switchyard  400kV Line bays (including space for sw. line reactor): 6 nos.

118  765/400kV 3x1500MVA ICTs (10x500MVA Single Phase Units) along with associated bays

 400/220kV, 3x500MVA ICTs along with associated bays

- Space for future 220kV switchyard  400/220kV, 3x500MVA ICTs along with associated bays

 10 nos. 220 kV line bays

(b) 400kV new substation at Bornagar (Assam) - upgradable to 765kV later - 400 kV Line bays: 8 nos.  2 nos. for Parbotipur (Bangladesh) - Bornagar (NER) 765kV D/c line to be initially operated at 400 kV

 2 nos. for Siliguri/Alipurduar – Bornagar 400kV D/c (quad) line [Formed after shifting of Siliguri/Alipurduar – Bongaigaon 400kV D/c (quad) line from Bongaigaon to Bornagar at 1.1(e)]

 4 nos. for LILO of both circuits of Balipara - Bongaigaon 400kV D/c (quad) line

- Reactive Compensation  420kV Bus Reactor alongwith associated bays: 2x125 MVAR

 420kV, 63MVAR switchable line reactor at Bornagar end on each line of Parbotipur (Bangladesh) - Bornagar (NER) 765kV D/c line to be initially operated at 400 kV [1.1(c)]

 Shifting of 2 nos. 420kV, 80MVAR Line Reactors from Bongaigaon end of Siliguri/Alipurduar – Bongaigaon 400 kV D/c (Quad) line to Bornagar end of Alipurduar – Bornagar 400kV D/c (Quad) line [1.1(e)]

 Shifting of 2 nos. 420kV, 63MVAR Line Reactors from Bongaigaon end of Balipara – Bongaigaon 400kV D/c (Quad) line to Bornagar end of Bornagar – Balipara 400kV D/c (Quad) line [1.1(d)]

- Space for future 765kV switchyard  765/400kV 3x1500MVA ICTs (10x500MVA Single Phase Units) along with associated bays

 765kV Line bays (including space for sw. line reactor): 8 nos.

 765kV, 2x330MVAR (7x110 MVAR) Bus Reactors

- Space for 400kV switchyard  400kV Line bays (including space for sw. line reactor): 6 nos.

 765/400kV 3x1500MVA ICTs (10x500MVA Single Phase Units) along with associated bays

 400/220kV, 3x500MVA ICTs along with associated bays

119

- Space for 220kV switchyard  400/220kV, 3x500MVA ICTs along with associated bays

 10 nos. 220kV line bays

2.0 Bangladesh Side

2.1 Transmission Lines

(a) Katihar (ER) – Parbotipur (Bangladesh) 765kV D/c line (to be initially operated at 400kV) – Bangladesh Portion only

(b) Parbotipur (Bangladesh) – Bornagar (NER) 765kV D/c line (to be initially operated at 400kV) – Bangladesh Portion only

(c) LILO of Barapukuria – Bogra 230kV D/c line at Parbotipur

2.2 Substation (a) 400/230kV new substation at Parbotipur - upgradable to 765kV later - 500MW Back-to-Back HVDC Station

- 400kV Line bays: 4 nos.  2 nos. 400kV line bays for Parbotipur (Bangladesh) – Katihar (ER) 765kV D/c line to be initially operated at 400kV

 2 nos. 400kV line bays for Parbotipur (Bangladesh) – Bornagar (NER) 765kV D/c line to be initially operated at 400kV

- Reactive Compensation  420kV, 2x125 MVAR Bus Reactor alongwith associated bays

 420kV, 63 MVAR Switchable Line Reactor at Parbotipur end on each line of Parbotipur (Bangladesh) – Katihar (ER) 765kV D/c line to be initially operated at 400kV [2.1(a)]

 420kV, 63 MVAR Switchable line Reactor at Parbotipur end on each line of Parbotipur (Bangladesh) – Bornagar (NER) 765kV D/c line to be initially operated at 400kV [2.1(b)]

- 400/230kV, 2x600MVA (7x200 MVA single phase units) ICTs along with associated bays

- 230kV Line bays:  4 nos. 230kV line bays for LILO of Barapukuria – Bogra 230 kV D/c line at Parbotipur

- Space for future 765kV switchyard  765/400kV, 2x1500 MVA ICTs (7x500 MVA Single Phase Units) along with associated bays

 765kV Line bays: 8 nos.

 765kV, 2x330 MVAR (7x110 MVAR) Bus Reactors

120

- Space for future HVDC / 400kV / 230kV switchyard  500MW HVDC Back-to-Back 2nd block at Parbotipur

 765/400kV, 2x1500 MVA ICTs (7x500 MVA Single Phase Units) along with associated bays

 Capacity enhancement of 400/230kV Parbotipur substation by 600MVA (3x200MVA single phase ICTs) alongwith associated bays

 400kV Line Bays: 4 nos.

 230kV Line Bays: 8 nos. [including 2 nos. line bays for Parbotipur – Bogra – Kaliakoir 400kV (to be energized at 230kV) D/c line]

3.0 Schematic Diagram

121 Annexure-18.1

Transmission system for Odisha UMPP

Introduction:

Orissa Integrated Power Limited (SPV for Odisha UMPP) has applied for LTA of 4000MW from Odisha UMPP (Bhedabahal, Odisha) with the following allocation:

Beneficiary Quantum (MW) Odisha 1300 MW ER 1300 MW Madhya Pradesh 400 MW Chhattisgarh 200 MW WR 600 MW Tamil Nadu 300 MW SR 300 MW Rajasthan 400 MW Uttarakhand 200 MW Punjab 500 MW Haryana 400 MW Uttar Pradesh 300 MW NR 1800 MW Total 4000 MW

Odisha UMPP (4000MW) is expected to be commissioned by 2021-22 time-frame. Accordingly, studies have been carried out for 2021-22 time-frame to finalise transmission system for evacuation of power from Odisha UMPP.

Transmission System:

It has been assumed that Odisha UMPP shall consist of 6 generation units of 660MW each. As per coordinates provided, UMPP shall be established in proximity of the existing 765/400kV Sundargarh (Jharsuguda) substation of POWERGRID. On connecting the generation project to Sundargarh 765/400kV S/s, it was found that the fault levels were exceeding the rated limits. Thus, in order to control the fault level, split bus arrangement has been considered at UMPP switchyard with two bus sections having 3 generation units of 660MW each.

From the above mentioned power allocation it is observed that about 1800MW is to be transferred to beneficiaries in NR and about 600MW to WR. Accordingly, it is proposed that high capacity 765kV AC transmission lines be planned from Odisha UMPP in such a manner that power could be transferred to two routes viz. from ER to WR and from ER to NR.

Accordingly, the following alternatives have been considered:

Alternative-1 (transmission system approved in 17th ER-SCM) [Study Results at Exhibit-1]

Page 1 of 3

122  Establishment of new 765/400kV 3x1500MVA Pooling Station near Sundargarh  LILO of Sundargarh-A – Raipur Pool 765 kV D/c line at Sundargarh (New)  Odisha UMPP – Sundargarh New 765kV 2xD/c line  Establishment of new 400/220kV 4x500MVA Station at Badarpur (New)  Sundargarh (New) – Badarpur (New) ±800kV HVDC Bipole Line  ±800kV HVDC 3000MW (upgradable to 6000MW in future) Terminals at Sundargarh (New) and Badarpur (New)

Due to space constraint at 765kV bus section at Sundargarh-A, LILO of either Sundargarh-A – Dharamjaygarh 765kV D/c line or Sundargarh-A – Raipur Pool 765kV D/c line has been considered at one section of Odisha UMPP switchyard. The other section of Odisha UMPP switchyard is proposed to be connected to either Sundargarh-B section or alternatively to Gaya S/s via Ranchi (New) for transfer of power towards NR.

Alternative-2 [Study Results at Exhibit-2(a) & 2(b)]

 Split bus at Odisha UMPP (3x660MW in Section-A and 3x660MW in Section-B)  LILO of Sundargarh-A – Dharamjaygarh 765kV D/c line at Odisha UMPP-A Or LILO of Sundargarh-A – Raipur Pool 765kV D/c line at Odisha UMPP-A  Odisha UMPP-B to Sundargarh-B 765kV D/c line  Ranchi (New) – Gaya 765kV D/c line

Alternative-3 [Study Results at Exhibit-3]

 Split bus at Odisha UMPP (3x660MW in section-A and 3x660MW in Section-B)  LILO of Sundargarh-A – Dharamjaygarh 765kV D/c line at Odisha UMPP-A Or LILO of Sundargarh-A – Raipur Pool 765kV D/c line at Odisha UMPP-A  Odisha UMPP-B to Ranchi (New) 765kV D/c line  Ranchi (New) – Gaya 765kV D/c line

Observations:

From the above study results, it is observed that power flow in all the alternatives are within acceptable limits. However, following are the observations for the above mentioned alternatives:

Alternative-1: It is observed that existing/under-construction evacuation corridors from Sundargarh (Jharsuguda) are under-utilized. Further, as the expected cost of this alternative would be high, this alternative does not appear to be the optimised transmission system.

Alternative-2:

Page 2 of 3

123 It is observed that loading of transmission lines is similar whether LILO of Sundargarh-A – Dharamjaygarh 765 kV D/c line is considered at Odisha UMPP-A or LILO of Sundargarh-A – Raipur Pool 765 kV D/c line is considered at Odisha UMPP- A section. Therefore, it is proposed that LILO of one of the 765kV D/c lines be done at Odisha UMPP-A bus section depending on the proximity of transmission line route from the UMPP. Odisha UMPP-B is proposed to be connected to Sundargarh-B through 765kV D/c line

The power flows from Sundargarh-A and Sundargarh-B sections to Ranchi (New) via Dharamjaygarh substation in WR through Sundargarh – Dharamjaygarh – Ranchi (New) 765kV corridor. Further, there is a high capacity 765kV ER-NR corridor from Gaya in ER to Varanasi and Balia substations in NR. Thus, by completing the missing link i.e. Ranchi (New) – Gaya 765 kV D/c line, it shall be possible to connect southern and northern portion of ER through strong 765kV link and this shall enhance power flow on WR-ER-NR and ER-NR corridors and also increase utilisation of the existing transmission capacity in ER-NR corridor in a better way.

Further, in Alternative-2 by construction of Ranchi (New) – Gaya 765 kV D/c line, the Sundargarh-A – Odisha UMPP-A – Dharamjaygarh – Ranchi (New) – Gaya – Varanasi/Balia 765kV corridor gets completed.

Alternative-3: In this alternative, Odisha UMPP-A section is proposed to be connected same as mentioned in Alternative-2. However, in order to push more power through ER-NR corridor, Odisha UMPP-B bus section has been directly connected to Ranchi (New) through 765kV D/c line along with extension of 765kV D/c corridor to Gaya for further transfer of power to Varanasi and Balia substations in Northern Region.

Power flow on the existing Dharamjaygarh – Ranchi (New) 765kV 2xS/c lines is low in the base case itself. With construction of UMPP to Ranchi corridor it is observed that power flow on Dharamjaygarh – Ranchi (New) link is further reduced, as the two corridors become a parallel path (UMPP – Ranchi and UMPP – Dharamjaygarh – Ranchi).

Conclusion:

From above, Alternative-2 is found to be the most optimised/suitable one. In this alternative only by construction of Ranchi (New) – Gaya 765 kV D/c line, power flow in WR-ER-NR and ER-NR corridors is enhanced. This shall also result in better utilisation of existing and under construction inter-regional transmission lines.

Accordingly, following transmission system is proposed for Odisha UMPP:

 Split bus at Odisha UMPP (3x660MW in Section-A and 3x660MW in Section-B)  LILO of Sundargarh-A – Dharamjaygarh 765kV D/c line at Odisha UMPP-A Or LILO of Sundargarh-A – Raipur Pool 765kV D/c line at Odisha UMPP-A  Odisha UMPP-B to Sundargarh-B 765kV D/c line  Ranchi (New) – Gaya 765kV D/c line

Page 3 of 3

124 POWER MAP OF EASTERN REGION

Odisha UMPP Study

Alt-1: HVDC Bipole - Jharsuguda New - Badarpur TEESTA-III PUNATSANGCHU

TEESTA-V RANGPO TALA Bhutan Nepal DHALKEBAR JIGMELING SILIGURI MALBASE

AGRA SITAMARHI

GORAKHPUR 800kV HVDC BIPOLE MOTIHARI 2000MW ALIPURDUAR TO RANGIA MUZAFFARPUR TO BISHWANATH BALIA PURNEA CHARIYALI DARBHANGA ALLAHABAD SAHARSA KISHENGANJ KANPUR SARNATH BAKH'TYPR FATEHPUR NBT'PUR BARH JAK'NPR PATNA KAHALGAON A MALDA VARANASI A B TUGH'BAD BHRSHRF B Bangladesh SASARAM LKSRAI FARRAKA CHANDAUTI BADARPUR BANKA GAYA KODERMA BAHARAMPUR SG'DIGHI MAHARANIBAGH NABINGR TO BHERAMARA (BANGLADESH) MAITHON-RB DLTNGNJ ESSAR GOKARNA TO VINDHAYACHAL PL DHANBAD BOKARO B BKRSWAR M'THN LT'HAR TN'GHAT B JHRKND A B DURGAPUR 2500MW KATWA(New) POOL PATRATU A DTPS NKSTPP RAGHU- BDN'NGR NATPUR MEJIA-B RANCHI ER-I RANCHI-N PURULIA TURGA DPL PPSP-NEW JEERAT(New) ADHUNIK JEERAT

ARAMBAG RJ'HAT SUBHASGRAM TO WR POOLING TO SIPAT(WR) JMSD'PUR C'TALA STATION JMSD'PUR (DVC)

TO DJ'GARH(WR) MEDINIPUR HALDIA CHAIBASA KHRGPR ROURKELA A SUNDERGARH KOLAGHAT TO RAIGARH(WR) STERLITE BARIPADA B SUNDERGARH KEONJHAR TO RAIPUR POOL(WR) BHADRAK DJ'GARH(WR) OD UMPP ROURKELA RENGALI OPGC KVK A IND-BRTH LAPANGA (2x350) DRPLI DUBURI TALCHER RAIGARH(WR) B STPS STERLITE PARADEEP (3x600) A B K'TUNI RAIPUR POOL(WR) (600) ANGUL B PANDIABIL (660) OPGC GMR MM'DLIA SUNDERGARH-A (660) LAPANGA LANCO MENDHASAL DRPLI A JINDAL B BOLANGIR (2x800) ANGUL (2x600) TALCHER STPP THERUBALI MONNET NARENDRAPUR (2x525) INDRAVATI B SUNDERGARH ANGUL A M'MUNDLI-B KHUNTUNI

(3x350) (350) ER-II GMR (660) (660) LANCO BBND JEYPORE BOLANGIR NARENDRAPUR SRIKAKULUM (SR) TO KOLAR(SR) SRIKAKULUM (SR) LEGEND GAZUWAKA

EXISTING UNDER CONSTRUCTION/APPROVED

GAZUWAKA (SR) HVDC HVDC 400KV 220KV 132KV 765 KV 400 KV 220 KV BTB BIPOLE POWERGRID

TBCB TIME FRAME: 2021-22 Last Updated SEB R:\ER & NER\ER\PSSE\REGION\Odisha Strengthening and UMPP\Study files\umpp\Final 06 July 2016

125 POWER MAP OF EASTERN REGION Odisha UMPP Study -- Alt:2 LILO of .Jhar-A • Dharam. & .Jharsuguda - B ------Ranchi (New) • Gaya 765 kV D/c ----

Nepal DHALKEBAR .JIGMELING ~

TDRANGIA

VARANASI r Bangladesh I ~ =F hi I TO VINDHAYACHAL PL

ER-1

SUNDERGARH

ER-11

EXISTING UNDER CONSTRUCTION/APPROVED

GAZUWAKA (SR) HVDC HVDC 400KV 220KV 132KV 785 KV 400 KV 220 KV BTB BIPOLE POWI!RGRID ·-·-· ----- 1~1 ~ TBCB TIME FRAME: 2021-22 Last Updated SEB Ra\ER & NERIEIIIPUEIREGION\Od.... a Stnngthlllllh. aJid U.....,....,..,fl~l 06 .July2016

126 POWER MAP OF EASTERN REGION

Odisha UMPP Study

Alt 2a: LILO of Jhar-A - Raipur Pool & Jharsuguda - B TEESTA-III PUNATSANGCHU Ranchi (New) - Gaya 765 kV D/c TEESTA-V RANGPO TALA Bhutan Nepal DHALKEBAR JIGMELING SILIGURI MALBASE

AGRA SITAMARHI

GORAKHPUR 800kV HVDC BIPOLE MOTIHARI 2000MW ALIPURDUAR TO RANGIA MUZAFFARPUR TO BISHWANATH BALIA PURNEA CHARIYALI DARBHANGA ALLAHABAD SAHARSA KISHENGANJ KANPUR SARNATH BAKH'TYPR FATEHPUR NBT'PUR BARH JAK'NPR PATNA KAHALGAON A MALDA A B VARANASI BHRSHRF B Bangladesh SASARAM LKSRAI FARRAKA CHANDAUTI BANKA GAYA KODERMA BAHARAMPUR SG'DIGHI NABINGR TO BHERAMARA MAITHON-RB (BANGLADESH) DLTNGNJ ESSAR GOKARNA TO VINDHAYACHAL PL DHANBAD BOKARO B BKRSWAR M'THN LT'HAR TN'GHAT B JHRKND A B DURGAPUR KATWA(New) POOL PATRATU A DTPS NKSTPP RAGHU- BDN'NGR NATPUR MEJIA-B RANCHI ER-I RANCHI-N PURULIA TURGA DPL PPSP-NEW JEERAT(New) ADHUNIK JEERAT

ARAMBAG RJ'HAT SUBHASGRAM TO WR POOLING TO SIPAT(WR) JMSD'PUR C'TALA STATION JMSD'PUR (DVC)

TO DJ'GARH(WR) MEDINIPUR HALDIA CHAIBASA KHRGPR ROURKELA A SUNDERGARH KOLAGHAT TO RAIGARH(WR) STERLITE BARIPADA B SUNDERGARH KEONJHAR TO RAIPUR POOL(WR) BHADRAK DJ'GARH(WR) OD UMPP ROURKELA RENGALI OPGC KVK LAPANGA A IND-BRTH DUBURI (2x350) DRPLI RAIGARH(WR) TALCHER B STPS STERLITE PARADEEP (3x600) A B K'TUNI RAIPUR POOL(WR) (600) ANGUL B PANDIABIL (660) OPGC GMR MM'DLIA SUNDERGARH-A (660) LAPANGA LANCO MENDHASAL DRPLI A B BOLANGIR JINDAL (2x800) ANGUL (2x600) TALCHER STPP THERUBALI MONNET NARENDRAPUR (2x525) INDRAVATI B SUNDERGARH ANGUL A M'MUNDLI-B KHUNTUNI

(3x350) (350) ER-II GMR (660) (660) LANCO BBND JEYPORE BOLANGIR NARENDRAPUR SRIKAKULUM (SR) TO KOLAR(SR) SRIKAKULUM (SR) LEGEND GAZUWAKA

EXISTING UNDER CONSTRUCTION/APPROVED

GAZUWAKA (SR) HVDC HVDC 400KV 220KV 132KV 765 KV 400 KV 220 KV BTB BIPOLE POWERGRID

TBCB TIME FRAME: 2021-22 Last Updated SEB R:\ER & NER\ER\PSSE\REGION\Odisha Strengthening and UMPP\Study files\umpp\Final 06 July 2016

127 POWER MAP OF EASTERN REGION Odisha UMPP Study ------Alt-3: LILO of Jhar-A • Dharamjaygarh & Ranchi (New) ---- Ranchi (New) • Gaya 765 kV D/c

Nepal ~ DHALKEBAR .JIGMELING

TORANGIA

VARANASI r Bangladesh I ~ =F ~i I TO VINDHAYACHAL PL

TO WR POOLING STATION

ER-11

EXISTING UNDER CONSTRUCTION/APPROVED

GAZUWAKA (SR) HVDC HVDC 400KV 220KV 132KV 785 KV 400 KV 220 KV BTB BIPOLE POWI!RGRID ·-·-· ----- 1~1 ~ TIME FRAME: 2021-22 TBCB Last Updated SEB 06 .July2016

128 Annexure-21.1

···c:ro•~·ji:IU!Cl 1 ··•••• ··- dldi'di'( mtT fircrrd::r, Damodar Valley Corporation RidICfildl-54, DVC Towers, VIP Road, Kolkata-54

No. EDCON /SPEICEAI ()'f Dated: 05.01.2017

To The Directo1; (SP & PAL ~ System Planr1ing & Project Appraisal Division, . Central Electricity Authority, Sewa Bhawan, R. k. Puram, New Delhi-110066

Sub: Prograr.'lme for 11th I 12th Plan network augmentation of DVC System- Submission of revised pia~ for approval

Ref.: 1). DVC's letter no. EDCONISPMICEAI379 dated 12.03.2012 & even no./791 dated 25.05.2012 ·· 2). CEA letter no. 74lli2012-SP&PAI497 dated 03.05.2012 & even no./823-824 dated 31.07.12 (copy enclosed)

Dear Sir, Reft:rence above, this is to appraise you that as per the approved 11th I 12th Plan for network augmentation of DVC System (copy enclosed), a 220 KV new substation was proposed at Gola in Jharkhand with 220KV D/C lines connecting the new Gola SIS to Ramgarh(DVC), MTPS(DVC) and Ranchi(PGCIL) substations. ·

Due to financial crunch and a iestriction lmpused-byMoP on investment i;r:-u: BVC!r<:msmissi'on·--­ System, the construction of new 220KV substation at Gola has been dropped as of now. The above mentioned ::ZOKV lines (proposed connecting Gola SIS with·Ramgarh & MTPS substations of DVC and Ranchi-PG 5/5) are complete/nearing completion: To !:!Jilise the up-coming 220KV lines to the best extent possible, a revised plan (copy enclosed) iS'p_roposed bypassi(lg theiGgl<:rSIS,(now dropped).

The revised plan, as proposed, may please be approved.· ($; :.; ..

Yours faithfully, ~l.L. / (Suman Bose)Sil\ 11- Chief Engineer (SPE) Mobile no. 08145524994 Encl:l. Copy of letter dated 31.07.12 of CEA 2. Scope of work i.r.o. DVC System in the 12th Plan 3. Cop<;"ohhe Revised Plan submitted for ap[Jroval·of CEA·~

Copy to: 1. The Executive Director (System), DVC, DVC Towers, Kolkata-54 2. The Executive Director (ER-1), PGCIL, Patna ? \

129 /'} ~.~;',P. \_:l .~:::. .. ~ '\·

l ,, \ 'L (;0{/0Ji'fffillliiC~nil i~fhlldUi) . fi:)i?,!\'1 IJ\;HQ'NJ IVl!Ji:mir~~ry ~J>f Ul'tJ•W~i•· ~ "~ -''1 ,...... ~ !l)'''tll~ii i4iilrf llhf~l~f~ll~ "'"""'~ ' cd~iRI rnl K~li~itrkily Au.iini)di,y !,jBJI6ll ;lJf\ii"H l!!J qf~~~)iiFir ~1,\~'Llii{r<'( l!~IPl 1 Sy>;J~:m Y. !iHJ!lnluig }k fi'i'HJd~d Amu'!bitii~H mvisu!Hi j)SO: 9001::;W~}H[ \fl~lf ·~FFI 1 1111'{. rlt ·~\~{~19 '

r:;;r;vvn mH>nw~tHh~ lR, K, ]"vltirlWQ 1 Nt'!\V ]l)eRhi·- ~ .i!JHJ.6t~ if6NII!F~ I VVdlSU~Jt::: W\'(!'l/V,1t~~.GI,YQii>~.:Ji!

J.••

No.74/1/20J 2-SP&PA/ ~; . '/. l)ntr;:d: :J1.7.2012

•';f;•• l'' ...... ; " (nc•l'') .GJtli~~"r 1.::fl!.JI11E¥Ed r a l: , "Df·llllOdE:n~ \IGJIJf,;y Corporr:Jtion, Eh~cf.J icity Dept!.., · DVC Tower, VIP Hot:Ki, !

Du!:J: F1rogn:unrno for ·1 2111 Plun rlb'twork <:1l,lt;Jtrtentation of DVC system.

nr1t': i) CE.A Lr. No_ 7ll/'ll2Cti2--CfF\:?J\1\/4D'7 dli1lii:d 03.05. '12 ii) [1\IG'~s~. Jr. No. EDCON/SPI\jl/CEAIHYI dat(:td 25.5. 12 iii) !)VG':' lr 1\lo. I::DC:Ol\1/SPIVJ/CEA/::l?~) dtJled t2.2\..2(Jl2

Uir,

. LJVC vic!e llloir lettE)r FJJCON/SF'IVI/CEA/"1 CHT2 clysi:E.Hn stuclies consicleri.n~J .its ·~p[r:~rLJo

H is nob3r:l tht:ll OVC t·,as proposed to construct a 220kV Kodenna- North l-\uranpurct·· Pr:!lrtcJlU DIG lines for ostqbli:::;hrnent or 8 220 k\1 D!C rin[J in the upper VE!IIr::'l)/ are£1 (viz. l{%~rrrfr!l.;::North. f With C.JffJation ·of a new ·4001220kV S/S at Mosabsni ·Wtls proposed in of'r:lm· to ( i) supply 250MVA load of Trata Stet;~! (,Jarnshedoun U1rouah DVC's nt::~tworl\ frmn IVH..li.H'lbani and (ii)

130 ll ,,') Jl::viGcKI F;copc· c1f ·1 i 11 Plan' Trun,:Hllir:JI::iorJ :a1Jr,Jrn~3rrtotkln. work!'; pror)o~Jocl by DVC iu ni /\r1nmu.no.

TliG til:JOVC" pnlpo::;ttl or !.JVC i::; found to bt:~ h~chnically in orclnr. Hovvnver, it iE> tu ta ILJ!:JC1s;t thHJ ::1 prfJVi':siun l'or ;t 1 c~ 'I x3 '15 MV!\ iGT at ·400/2:2.DkV IVios£~bnnl SIS shoUld bt:J cidun~~d to moErt uuhJ~jG ot on !Gl.

\- -· ~~ - _ __ :,:{\._ , ··L·

131 '11TH PLAN SPILLOVER WORK -----v:;::--

SL 11TH PLAN SPILL ... Cf

10 132KV 0/C Patherdill- Govindpur line extn to Dl1anbad (14KM x 2) . 28 ----:rT ~-321\V DIC Ohanbad- Govindpur line (15KM x 2) to be charged at 33KV -30 12 132KV LILO line to Jamuria SIS (7KM x 2) 2nd cf

\ !\JEW SUBSTATION INFRASTRUCTURE

'Dl_,:) . New Worf

~--- 2 2201\VI132f(V Kharagpur 3 220f\VI331\V Raghunathpur 4 2201:

7 226Rv OSTPS -- -~ -- ~ 22d!Nf132KV Burdwan I 9 220f

! . 9

132 5/5{DVC) lines 5/5{DVC) Plan- now) 220KV of Ramgarh as 220KV 12th & 220KV Gala Proposal) Connecting {Dropped nth , & New in ------~ (DVC) 5/5 ,-• >' r- I ,, ~' \1< ): i\ II li !, F .II I,, } i I' r i ~~ ·~} ly ·I·' I [( T :\ J l 'f (R~vised 5/f Gol~l . :: MTP5 DVC plan Ranchi-PG propose~ 220KV 220KV 220KV ,------~~~------~ ~------~,---r----•------~ ~------n~, Revised System of DVC of lines 5/5{DVC) I 220KV Submission Plan) Ramgarh {DVC) /12th 5/5 augmentation Connecting 220KV 11th & in MTP5 5/5 Gala network 220KV 5/5) {Proposed 5/5{DVC) . DVC new ~ Ranchi-PG 220KV ~~ · ..,.._..,.._ \ 220KV • r (' u.,, I I ~--220KV. .I . {Prdposed 220kV Gala _ r--"'-·•'1• __ ;;n //

133!'""' I 18104/2017 Gmail- Fw: Programme for 11th/12th Plan Network Augmentation of OVC System- Submission of revised Plan for approval Annexure-21.2

Uma Mahesh

Fw: Progr~mme for 11th/12th Plan Network Augmentation of DVC System­ Submissio~ of revised Plan for approval 1 message

Pardeep Jindal Tue, Apr 11, 2017 at 6:26PM Reply-To: Pardeep Jindal To: Sharan Rishika , Uma Mahesh

- Forwarded Message --- From: Dinesh Singh To: jinda!_pa•[email protected] Cc: [email protected]; Suman Bose Sent: Monday, 10 April 2017 7:19PM .. ~ Subject: Programme for 11th/12th Plan Network Augmentation of DVC System- Submission of revised Plan for approval

Dear Sir, Further to our request for approval of revised plan submitted vide letter dated 05.01.2017 (copy attached) and discussion on the subject held in your office on 05.04.2017, this is to intimate your that DVC is planning to augment the capacity of 132/33KV Gola substation by installing a third Power· Transformer of 31.5MVA, 132/33KV rating to cater the load growth projection envisaged to be fed by earlier planned 220/33KV Gola Substation and which has been proposed to dropped as of now. The 31.5MVA Transformer will be spare on replacement of the same by higher capacity transformer at other DVC substation.

May please approve the revised plan as placed by DVC.

Regards

D. K. Singh Dy. Chief Englneer(E}, SPE, DVC, DVC Towers, VIP Road, Kolkata-54 Cell - 094345 35601 email: [email protected]

Goia bypass.pdf 947K

https:f/mail.google.com/mailtu/O/?ui=2&ik=32cdd56be9&view=pt&search=inbox&th=15b5d16126c6abec&siml=15b5d16126c6abec134 1/1 Annexure-27.1

~ '1:1"tetil< Government of India fel '#d)d +i 5I I ~ 4 Ministry of Power ~ft"lf -rt~~ 'SITnt'efi'('Uf Central Electricity Authority -rt~~ '51"1lfT~ m\if;rr ttci" l!~'efiif 'Sl"irr1f -II Power System Planning & Appraisal Division-11

No: 75/1/PSPA-11/2017/ 'Jt16-6o3 Dated: of;.07 .2017 Jo As per address list

Subject: Minutes of Meeting regarding 132kV Banka (PG) - Deoghar D/c . transmission line. Sir, Meeting regarding 132kV Banka (PG) - Deoghar D/c transmission line held on 13.06.2017 at CEA, New Delhi. Minutes of the meeting is enclosed herewith.

JUSNL is requested to send their comments/observations, if any, in regard to dropping of proposed Banka (PG)- Deoghar 132kV D/c line., Yours. fa. ithfully fl.- ~

(~~~ >' ~"'' (~sh~r n) Director (PSPA-11) List of addressee: 1 . Member Secretary 2. Mana.ging Director, Eastern Regional Power Committee Bihar State Power Transmission Co. Ltd., 14, Golf Club Road, Tollygunge Vidyut Bhawan, Bailey Road, Kolkata - 700033 Patna-800021 Fax No. 033-24171358 Telefax: 0612-2504968

3. Managing Director, 4. Chief Electrical Engineer, Jharkhand Urja Sancharan Nigam Limited East~rn Railway, Engineering Building, 17-NS Road, H.E.C., Dhurwa, Kolkata-700 001 Ranchi-834004. (fax no.: 033-22300446) F ax-0651-2400799 5. COO(CTU-Pig), 6. CEO, POSOCO Power Grid Corp. of India Ltd. B-9, Qutub Institutional Area, "Saudamini", Plot No.2, Sector-29, Katwaria Sarai, New Delhi-110016 Gurgaon 122 001, Haryana. FAX: 95124-'2571932 Copy to: PPS to Member (Power System)- for kind information please.

135 Minutes of Meeting regarding 132kV Banka (PG)- Deoghar D/c transmission line held on 13.06.2017 at CEA

List of participants is enclosed at Annexure-1

1. Chief Engineer (PSPA-11), CEA welcomed the participants and highlighted about the purpose of the meeting. He informed that Banka (PG) - Deoghar 132kV DIC line (about 40 km) was agreed in the 01st -2014 Standing Committee Meeting on Power System Planning in Eastern Region(ER) (16th SCMPSP(ER)) held on 02nd May 2014.

2. In the 16th SCM meeting, ERPC had informed that the 132kV Deoghar SIS (JSEB) is being fed through 132kV line(s) from DVC source (132kV Maithon­ Jamtara:Deoghar SIC) or from NTPC so;urce (Lalrn~tja). There is also a feed from BSPTCL source through 132kV Suftanganj- Deoghar SIC line, which is normally kept open due to overloading in Kahalgaon-Sabour- Sultanganj section of BSPTCL system. The Deoghar & Jamtara sub-stations feed important railway loads of 1OMW each to Shankarpur TSS & Jamtara TSS and loading on Maithon - Jamtara - Deoghar 132kV SIC line sometimes exceeds 75MW. The reliability of supply to railway loads is being affected. In view of above, it was agreed to provide an additional supply to Deoghar SIS (JSEB) from 4001132kV Banka SIS (PG) by creating a 132kV Banka- Deoghar DIC lines (about 40 Kms).

3. JUSNL vide their letter dated 30.07.2015 addressed to POWERGRID(copy enclosed at Annex-11) informed that termination of above line at Deoghar is not possible due to space constraint. Further, JUSNL informed that after comrnissi.oning of 132kV Jasidih - Deoghar line (about 5km); Deoghar Sis will be able-tg·re~eive 250MVA of power through Jasidih Sis and Dumka Sis, whereas the transformation capacity at Deoghar is only 150MVA. The matter was discussed in 18th SCMPSP(ER) meeting and it was decided to review the possible interconnections at Deoghar in a separate meeting at CEA with Railways & other stakeholders.

4. In the meeting, representative of BSPTCL stated that Banka (PG) substation is having 2x200 MVA 4001132 kV ICTs at present, which are sufficient to meet the loads of BSPTCL only. PGCIL informed that Banka substation is proposed to be augmented with addition of 1x315 MVA, 4001132kV ICT under ERSS-XX (approved in 18th SCMPSP(ER)). BSPTCL representative suggested that power supply to Deoghar (Jharkhand) from Banka (PG) may be commenced only after commissioning of additional 315 MVA ICT at Banka (PG), which is planned under 13th plan.

5. Chief Engineer (PSPA-11), ,CEA enquired about reason for keeping 132kV Sultanganj- Deoghar SIC line open under normal condition.

6. Representative of BSPTCL stated that BSPTCL can supply power with exiting system to Deoghar (Jharkhand) through the above line during off-peak hours only, as the bus bars capacity at Sultanganj is inadequate. However, supply

136 during peak hours would be possible only after strengthening of bus bar at I Sultanganj, which is likely to be completed in next 6 months. 7. Representative of CTU informed that POWERGRID has closed the ERSS-XVI project involving construction of Banka (PG) - Deoghar 132kV 0/C line and the I sawe was informed to CEA vide letter dated 27-10-2016. 8. Chief Engineer (PSPA-11), CEA expressed that in absence of representatives from JUSNL (Jharkhand) and Railways, it is difficult to assess the loading of the network in present situation.

9. Thus, the proposed Deoghar-Jasidih 132kV 0/C line (by JUSNL) arid strengthening of 132kV bus at Sultanganj (by BSPTCL) are likely to enhance the reliability of power supply to the Railways TSS at Deoghar. In view of above, it was decided to drop the proposal of construction of Banka (PG) - Deoghar 132kY DIC line in the next Standing Committee meeting. ."\

Annexure-1 List ofthe participants of the meeting held on 13.06.2017 at CEA 51. Name of the Participant Designation Organization No. 1 S.K.Ray Mohapatra Chief Engineer, (PSPA-11) CEA 2 Sanjay Srivastava · Chief Engineer, (PSE&TD) CEA 3 Uma Maheswara Rao Dy. Director, (PSPA-11) CEA

4 Ashok Pal General Manager(CTU-Pig) POWERGRID .. 5 Manish Ranjan Keshari Sr. Engineer(CTU-Pig) POWr=RGRID 6 N.Nallarasan Dy. General Manager POSOCO 7 Pankaj Kumar ESE BSPTCL 8 Premjeet Kumar ESE BSPTCL

137 Annexure-II

Jharkhand U1ja Sanchran Nigam Ltd. <)rfit:e of the Gem•ral Mnnngcr Cum Chier Engineer I niw:-mis�1�)11 I one - I I, Dumka I cncr t\u. �'l.U ... C, \1 ( I') Oumk<1. Datcu.. 3.C}.o.f. ..,'2015 i:rom Cr R ' \111gh (kneral I\lanag�r C'um Chief F. ngmeer l o. \G\1 (T•,n:,:g-S'�) (Sri •\.P. Gaogadh:1r:rn) Pu,,cr Grid �" h ·- Termination of L32 I,\' 0/(' Bu u�, tl'o1H·r Grid) - Deogbar Tra nsmissiun line.

R,•t ·- l'our '!!lin: h'fh•1 no c En'.! \'.\ER.,,_' I I doted 30 .J 201,

\\'i1h r�kr('nce to abo,e �ubjecl le1t�r of lield officrrc; and .::iug,k Jim.· diagram of 1J2oc1accJ Transnussiun lines in this rl�gnrd. Ko\,. with the commis!>ioning cit' 220 1--V Rupnar:iyanpur Oumka Tran�n11s,10n-- ·- line and ��Or 13� kV GS Durnl..u, PO\\t;r for I' 2 H I,. V l,�'-. i� a\ a1kJ from RupnJra) mpur lhrouch Duml,..i 112 I,.\' SC -ultanganj (Bihar)

1'2 1,..\ "i l \l.tith;1n - Jamrnra - lJ�t.,gha1 .1rc Jltcrnarl..' -.,ulJrcc:,. 1\1 present 132 kV�(' R,til\\tt) Dcoghar-Shankarpur b )uppli�J po\\t:r 11,1 n 0\ C. Although space 10 S\\lll..'.h)ard ,l!ld umtwl 1uom along \\ith :2 no. l�cdcrn in -I l5 \. 1nd: no. of 220 \' DC lt'eders ma) ..iho rn: U\,iilahle Rut m , 1e,, OJ rhe prt.'scm l)ystem It m.:iy be n:an.11) 1.ed n:gardrng the us�bility t'f ten 11na1ion ,!l GSS Ocugk1r or proposed aJ 1acem GSS Ja:-ict1h.

'\ our� ln11bfullv. -- �nJ�/� tb. R '°' "-in� (1..:nernl \fanager cum Chk•f Engineer

138 ----- Jharkhand Utja Sancharan Nigan1 Limited (Cli\ : l ··Ul1U8 .JH 2013 SGC' 001704) Regd. OOice- l .nginecring Bui ldio ~. HEC DhunHI. Ranchi- 83 ~0 04 Orticc ot the E lt•c tri c~tl Superintending Engineer r ransmission Circl~. D~oghar D.:ol!hardareJ- ... P..B.{.. Q .:J.:... 15 From.

l:.r. IJ I'. Hh.·~m. I lectncal Sup..: I imcn<.ling Enginc~r. T(.). l he Gt>ncral ~Lmag~r ~.:urn Chtt.:f [ngtnt:er. I r.m,mt'i'ton lone- II. Dumlul.

Sub :· Rcg;trding 1 crminution of 131 k\' lhnku - Dco~bar Tran~mi~l\ion Line ~1t Grid ~ub Station. Droghar. 'ir.

With n:tcr~n~l! l\1 ahove, pk.,...,c find ~m:lu-;~d herewith the femunntion nf 132

k V O.tnka lkogl.u· l rnnsmis:s1on lino! at Grid o;;ub • wtion, Dcoghar ~uhmitted b) A!>-..htant

I -..:ecutt' c I ngm..:cr. I ransmh~l m -.;un Dl\ J<~ton. Dcoghnr auJ Jul::- -.i)!ncd b) Elccl!H.:al

E'Cccuth t' Lngmct:r I nmsmission 01' i-,ion, Oeoghar- J for your 1-..ind infom1ntion and ncc\!Ss(l -J_ '$.. ~ •:. L:~ ... • ''{ • I. -.c:' • .,..l.._ r ;{ • £ncl • A\' uhpn.•. Yours faithful!). )1,, l~\ . eft:\~ ::­ l ,')1tt£J/r;;, cB.Pl Hha ga t~ f:lc.>-:tric.tl "upennt~nd i ng rngine..:r

139 Tcnr.ioation of 132 "\' Hanhtt - fh•oghar rr Line Ul GSS DCO!!h;lr

Pn:- ... cml~ Tran::>form~Hion l'ap:tcit~ of CiS~ Dt>ogha1 1\ I 00 \1\ . \ and it-.. t:~lpacit~ P~~ome. I ·o \ 1\·A alt~r tlhtall.ui

fht~ Gnd h..t~ been a\ailing pn\\1.:1 r"rom Q , ( 0 llln~3 -Dcogh:.~r l'r line. 4.) C ~ultanganj-Dl'og.h3r I r I inc & ~ ( .l.tmtara-OcPghar Tr lin~: G~.·rwrall}. '.; C "ult.. mganj -Denghar J r I ne n.:m.11n in tdlc ch.tn.!.lllg. I he;! 112 k. \ m.tin bu~ h.. 1::. been -.ectionali/Cd h~ I IJ..!.h I~\ l;!il'i1Jlltm duet~' mc~mting r~"'cr come~ tnm1 Du mka 1 r 11111.' &. Jnmtnr:1 I r I ine 1::. not synchronitl:!d.

1 •h 2:0 132 33 k. \ GS~ I >umk.~1 , c; Ltntkr con~ t ruc t ion :md it j, li~ch to he complett>d uptu cnJ 01 tlw .. ) car ..th1l Proro"al lc1r cun-.tntLtion of 220 112 i 1 k \

GSS Ja~iJih i~ und~ l pW!..!.fl'~'>. PropD;o,al for (.\ u nmi~:-,ioning or f\\() (.)<;, 13~ "' fee der at G S Dcnghar fnr rl.!cei\ ing p

\ o.:; such Ot>oghnr Gnd ''ill b..: capablt: to recci\cd rov.er ::lpr r ("~:-.nna t \?1~ to ~50 \IV,\ from G S Dumkn & (,S\ J.1stdih \\ htch ,.., ~nough l()r thts Grid bc~.:nu'e ma'\imum Tr

I l ~ n CI!. it 1:-i rcquc .... ted th:ll prnpn:-.nl nl' rcnnimnion of 11:::!. kV l3o.mk:.l- D\.'O!!har 1 r I ine ma~ be tcrminah:cl tn (lS~ J..t,idih instcau ol GSS Deoghar. In propo,ed .1.1:-idih CJSc; c;,uflicicnt -..p.t<:t' "',l\ .ulahk for I crmtnnti<'n l,f 112 1-. \' Bun"a­ DI!I.'IUhar I r line. Dt....t.lllCI.: h~m ccn fiS~ Ju"idih & CiS~ D~..·ol.!h.tr ,.., onh " .. ~ . l--mCappro"<.) So. that [)~n~h.Jr

/ ~;~,S

AEF I ~ I rr;.ln~ S D DcoJh~r l ran .... I)" l)c('ghJr-1

140 College \ ~ X\ \ Bay ~ \ I~ X\ \ 132 lt:\1 -..::...... Ouml<;;·l Bay < Macihup\lr -\ ~~ X\ \ - Bay ~- ? c: \ r, x \ \ r "" Transformer·2 \ 'h X\ · \ Bay

\ .J~ X\ \ ' tn x, ,

\ I~ X\ \ Coupler__ G:w _...

Tran~tormt:r·2 Bay Sdp L \ ~l X\ \ Bay

,.--- - \ I X\ \ \ i X\ \ ~av ' r x, _, \ J· X\\ 132 I-V J<•mtaru eay' 1"1a., ~ I "- t ~ LDv \.) Oeoghar·Z \ 1 X\ \ Bav 1<--+----

B2 kV RJolway R"'' 141