316,009 SQ. FT. CLASS A OFFICE AVAILABLE FOR LEASE JANUARY 2020 CENTRAL BELLEVUE LOCATION

THE IS MORE THAN BUILDINGS Its an emerging neighborhood in the heart of Bellevue. A mix of old and new, a lively, walkable neighborhood that is a community, densely packed with activity.

For more information or to schedule a tour, please contact:

Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] thespringdistrict.com BLOCK 16 STACKING PLAN & CURRENT AVAILABILITIES BLOCK 16

LEVEL 11 26,814 RSF Completion Date LEVEL 10 29,198 RSF LEVEL 9 29,023 RSF LEVEL 8 29,023 RSF JANUARY 2020 LEVEL 7 29,065 RSF LEVEL 6 29,124 RSF LEVEL 5 29,179 RSF LEVEL 4 29,168 RSF LEVEL 3 32,046 RSF LEVEL 2 53,369 RSF LEVEL 1 12,807 RSF

Parking 3.0/1,000 USF

For more information or to schedule a tour, please contact:

Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] thespringdistrict.com Views to the Cascade Mountains Views to Mt. Rainier

TYPICAL FLOORPLATE PROPERTY HIGHLIGHTS Spring District • 9’-10” finished ceiling heights optimize natural light throughout the space Urban • Spectacular views of Bellevue, , Cascade & Olympic Mountains View View • Future direct access to East Link light rail service, connecting The Spring District with top regional destinations including downtown Seattle, Bellevue, , University of , and Sea-Tac Airport • State-of-the-art mechanical, electrical and HVAC systems to meet the stringent demands of high-tech tenants Panoramic Vista Views to Lake Washington & Views to • Terrace and public park spaces create an inviting pedestrian experience Downtown Seattle

Floor Plan Block 16 Floor 7 11th Floor View & Deck / Informal Meeting & Office Space Rendering 29,182 RSF 124th Ave NE & NE 12th St. Bellevue, WA 98005

thespringdistrict.com Western view from top of Block 16

BLOCK 16 CONSTRUCTION TIMELINE 2018 2019 2020 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Construction Start

Excavation Complete

Garage Complete

Topping Out

Turnover for TI Work

Shell & Core Complete

Available for Move-In

FUTURE MASS TRANSIT HUB EastLink Light Rail Station (2023 Completion)

Block 16 Entry Hall

Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] For more information or to schedule a tour, please contact:

Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected]