316,009 SQ. FT. CLASS A OFFICE AVAILABLE FOR LEASE JANUARY 2020 CENTRAL BELLEVUE LOCATION
THE SPRING DISTRICT IS MORE THAN BUILDINGS Its an emerging neighborhood in the heart of Bellevue. A mix of old and new, a lively, walkable neighborhood that is a community, densely packed with activity.
For more information or to schedule a tour, please contact:
Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] thespringdistrict.com BLOCK 16 STACKING PLAN & CURRENT AVAILABILITIES BLOCK 16
LEVEL 11 26,814 RSF Completion Date LEVEL 10 29,198 RSF LEVEL 9 29,023 RSF LEVEL 8 29,023 RSF JANUARY 2020 LEVEL 7 29,065 RSF LEVEL 6 29,124 RSF LEVEL 5 29,179 RSF LEVEL 4 29,168 RSF LEVEL 3 32,046 RSF LEVEL 2 53,369 RSF LEVEL 1 12,807 RSF
Parking 3.0/1,000 USF
For more information or to schedule a tour, please contact:
Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] thespringdistrict.com Views to the Cascade Mountains Views to Mt. Rainier
TYPICAL FLOORPLATE PROPERTY HIGHLIGHTS Spring District • 9’-10” finished ceiling heights optimize natural light throughout the space Urban • Spectacular views of Bellevue, Seattle, Cascade & Olympic Mountains View View • Future direct access to Sound Transit East Link light rail service, connecting The Spring District with top regional destinations including downtown Seattle, Bellevue, Microsoft, University of Washington, and Sea-Tac Airport • State-of-the-art mechanical, electrical and HVAC systems to meet the stringent demands of high-tech tenants Panoramic Vista Views to Lake Washington & Views to Downtown Bellevue • Terrace and public park spaces create an inviting pedestrian experience Downtown Seattle
Floor Plan Block 16 Floor 7 11th Floor View & Deck / Informal Meeting & Office Space Rendering 29,182 RSF 124th Ave NE & NE 12th St. Bellevue, WA 98005
thespringdistrict.com Western view from top of Block 16
BLOCK 16 CONSTRUCTION TIMELINE 2018 2019 2020 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Construction Start
Excavation Complete
Garage Complete
Topping Out
Turnover for TI Work
Shell & Core Complete
Available for Move-In
FUTURE MASS TRANSIT HUB EastLink Light Rail Station (2023 Completion)
Block 16 Entry Hall