316,009 Sq. Ft. Class a Office Available for Lease January 2020 Central Bellevue Location

316,009 Sq. Ft. Class a Office Available for Lease January 2020 Central Bellevue Location

316,009 SQ. FT. CLASS A OFFICE AVAILABLE FOR LEASE JANUARY 2020 CENTRAL BELLEVUE LOCATION THE SPRING DISTRICT IS MORE THAN BUILDINGS Its an emerging neighborhood in the heart of Bellevue. A mix of old and new, a lively, walkable neighborhood that is a community, densely packed with activity. For more information or to schedule a tour, please contact: Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] thespringdistrict.com BLOCK 16 STACKING PLAN & CURRENT AVAILABILITIES BLOCK 16 LEVEL 11 26,814 RSF Completion Date LEVEL 10 29,198 RSF LEVEL 9 29,023 RSF LEVEL 8 29,023 RSF JANUARY 2020 LEVEL 7 29,065 RSF LEVEL 6 29,124 RSF LEVEL 5 29,179 RSF LEVEL 4 29,168 RSF LEVEL 3 32,046 RSF LEVEL 2 53,369 RSF LEVEL 1 12,807 RSF Parking 3.0/1,000 USF For more information or to schedule a tour, please contact: Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] thespringdistrict.com Views to the Cascade Mountains Views to Mt. Rainier TYPICAL FLOORPLATE PROPERTY HIGHLIGHTS Spring District • 9’-10” finished ceiling heights optimize natural light throughout the space Urban • Spectacular views of Bellevue, Seattle, Cascade & Olympic Mountains View View • Future direct access to Sound Transit East Link light rail service, connecting The Spring District with top regional destinations including downtown Seattle, Bellevue, Microsoft, University of Washington, and Sea-Tac Airport • State-of-the-art mechanical, electrical and HVAC systems to meet the stringent demands of high-tech tenants Panoramic Vista Views to Lake Washington & Views to Downtown Bellevue • Terrace and public park spaces create an inviting pedestrian experience Downtown Seattle Floor Plan Block 16 Floor 7 11th Floor View & Deck / Informal Meeting & Office Space Rendering 29,182 RSF 124th Ave NE & NE 12th St. Bellevue, WA 98005 thespringdistrict.com Western view from top of Block 16 BLOCK 16 CONSTRUCTION TIMELINE 2018 2019 2020 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Construction Start Excavation Complete Garage Complete Topping Out Turnover for TI Work Shell & Core Complete Available for Move-In FUTURE MASS TRANSIT HUB EastLink Light Rail Station (2023 Completion) Block 16 Entry Hall Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected] For more information or to schedule a tour, please contact: Grant Yerke Matt Schreck 425.646.5264 425.646.5232 [email protected] [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us