Statement of Qualifications Statement of Qualifications Landfill / Digester Gas Introduction Services & Capabilities Summary of Projects Quality Management Program STATEMENT OF QUALIFICATIONS INTRODUCTION Venture Engineering & Construction (Venture) is a closely held, multi-disciplined engineering and construction management company. Pittsburgh based, Venture provides services to clients throughout North America and abroad ranging from front-end engineering to detailed design and construction management. Our core staff of engineering professionals is experienced in a variety of process industries including energy, refining, chemicals, petrochemicals, alloys, consumer products, and general manufacturing industries. We have registered professional engineers heading each discipline, and a design staff reflecting a balance of disciplines and a range of experience. Staffing is currently at 50+ employees, all disciplines, of which six are Chemical Engineers. Our core markets focuses are process industries, and energy. We are leaders in alternative energy solutions such as landfill gas plants, biodiesel plants, cogeneration facilities, and waste-to-energy plants. Venture works routinely with advanced design tools such as: Autodesk products ChemCAD Inventor STAAD AutoCAD PID Others AutoCAD Electrical “Vanilla” AutoCAD LANDFILL GAS Specific to the solid waste industry, we have worked for owner/operators, equipment suppliers, municipalities, and developers. Our clients include GSF Energy, DTE Biomass, QuestAir Technologies, Waste Management, DCO Energy, Wheelabrator Technologies Inc., Rumpke Landfill, Monmouth Landfill, etc. Our solid waste projects have included general consulting to landfill owners/ operators, landfill gas conversion to medium BTU and high BTU pipeline quality gas (both balance of plant and equipment design), landfill gas to electricity plant design, biodigester gas to electricity and high BTU gas plants, LFG and digester gas direct use projects via Combined Heat and Power Plant. Natural gas to LFG boiler conversion projects, landfill gas curve analysis, landfill gas collection system design. Further, we have related experience from work in waste-to-energy. STATEMENT OF QUALIFICATIONS SERVICES & CAPABILITIES Venture Engineering offers a wide array of engineering and environmental services in support of landfill gas and biodigester gas to energy projects, as well as municipal solid waste (MSW) to energy projects, and conventional cogen / combined heat and power projects. DESIGN AND FACILITY SITING AND CONSTRUCTION PERMITTING Landfill Gas (LFG) to High Comprehensive Planning BTU Gas Plants and Permitting Services LFG Direct Use Projects Site Investigations (medium BTU) Market Evaluation LFG to Electricity Waste Characterization (turbines, IC engines) Scope & Estimate Studies Biodigester gas to electricity Due Diligence Support Coal Bed Methane Services Siloxane removal system design H2S Removal System COMPLIANCE AND Design FIELD SERVICES Thermal Oxidizers Enclosed Ground Flares Groundwater Monitoring Leachate Collection Biogas Monitoring Systems Leachate Collection Landfill Gas Collection and Systems Control Systems (GCCS) Air Permitting Transfer Station and NSPS/NESHAP Compliance Material Services and Reporting Recovery Facilities MSW to Energy Plant NG to LFG Boiler Conversions Construction Management Full EPCM service provider STATEMENT OF QUALIFICATIONS SUMMARY OF PROJECTS Broadrock Renewables LLC—Olinda Landfill Gas to Energy Facility PROJECT SCOPE Venture Engineering & Construction was contracted to provide various engineering, design, procurement and equipment supply as part of an EPC contract with DCO Energy for a new combined cycle landfill gas to energy facility at the Olinda Landfill in Brea, California. The DCO Energy/Venture team provided EPC services for the project. The project includes four Solar Taurus Turbine Generators (T-60’s) with HRSG’s. The new combined cycle, merchant power plant produces 32.5MW of power for sale to the City of Anaheim Public Utilities under a long term power purchase agreement. The turbines are fueled with 11,500 scfm of landfill gas. Project scope included: Landfill gas blowers (75” wc vacuum, 12 psig discharge) Landfill gas compression (two stage, 12 psig suction, 260 psig discharge) Swing compressor (serves as backup first or second stage compressor) Landfill gas chiller (gas drying) Ammonia Refrigeration (for compression systems) Gas Conditioning System (remove unwanted landfill gas contaminants) Power Island: four Solar Taurus T-60 turbine gensets with HRSGs. Environmental systems: Oxidative and SCR catalysts (CO and NOx reduction, respectively) Inlet air chilling PG&E interconnect Services Provided Venture provided detailed engineering and design of the above, plus engineering, fabrication and supply of Venture Engineering’s patent- pending landfill gas conditioning system (pictured above). STATEMENT OF QUALIFICATIONS SUMMARY OF PROJECTS Broadrock Renewables LLC—Providence, RI—Landfill Gas to Energy Facility PROJECT SCOPE Venture Engineering & Construction was contracted to provide various engineering, design, procurement and equipment supply as part of an EPC contract with DCO Energy for a new combined cycle landfill gas to energy facility at the Providence Landfill in Providence, Rhode Island. This project is a sister plant to the Olinda LFGTE located in Brea, California. Both projects were designed and built concurrently. The DCO Energy/ Venture team is provided EPC services for the project. The project includes four Solar Taurus Turbine Generators (T-60’s) with HRSG’s. The new combined cycle, merchant power plant produces32.5MW of power for sale to the local grid. The turbines are fueled with 11,500 scfm of landfill gas. Project scope included: Landfill gas blowers (75” wc vacuum, 12 psig discharge) Landfill gas compression (two stage, 12 psig suction, 260 psig discharge) Swing compressor (serves as backup first or second stage compressor) Landfill gas chiller (gas drying) Ammonia Refrigeration (for compression systems) Cameron Hydrogen Sulfide Biological Removal System Gas Conditioning System (remove unwanted landfill gas contaminants) Power Island: four Solar Taurus T-60 turbine gensets with HRSGs. Environmental systems: Oxidative and SCR catalysts (CO and NOx reduction, respectively) Inlet air chilling PG&E interconnect Services Provided Venture provided detailed engineering and design of the above, plus engineering, fabrication and supply of Venture Engineering’s patent-pending landfill gas conditioning system (pictured above). STATEMENT OF QUALIFICATIONS SUMMARY OF PROJECTS DCO Energy—APEX Landfill Gas to Energy Facility PROJECT SCOPE Venture Engineering & Construction was contracted to provide engineering, design, procurement, and equipment supply to DCO Energy for a new combined cycle landfill gas to energy facility at the APEX Landfill in Las Vegas, Nevada. The project included two Solar Taurus Turbine Generators (T-60’s) with HRSG’s. The new combined cycle, merchant power plant produces 16MW of power for sale to Nevada Energy under a long term power purchase agreement. The turbines are fueled with 4,800 scfm of landfill gas. Project scope included: Landfill gas blowers (75” wc vacuum, 12 psig discharge) Landfill gas compression (two stage, 12 psig suction, 260 psig discharge) Landfill gas chiller (gas drying) Ammonia Refrigeration (for compression systems, LFG dryer and turbines) Gas Conditioning System (remove unwanted landfill gas contaminants) Power Island: two Solar Taurus T-60 turbine gensets with HRSGs Environmental systems: Oxidative and SCR catalysts (CO and NOx reduction, respective) Inlet air chilling Nevada Energy interconnect Services Provided Detailed engineering and design of the above, plus engineering, fabrication and supply of Venture Engineering’s patent pending landfill gas conditioning system (pictured below). STATEMENT OF QUALIFICATIONS SUMMARY OF PROJECTS WM Renewable Energy—LFGTE Complex Process Evaluation PROJECT SCOPE Venture Engineering & Construction was contracted to provide, under its Master Service Agreement, a process review of the existing Altamont Landfill Gas to Energy complex. The study was intended to identify potential process improvements to reduce or eliminate the need to burn supplemental fuel at the existing enclosed flare [which is used to control the off-gases (tail gas) from the new LFG to LNG plant), as well as to evaluate potential improvements to the overall functionality of the facility with respect to gas utilization as it impacts the existing engine gensets and LNG plant. A new LFG to LNG plant was built and became operational in September 2009 (Medal Membrane/Guild/Linde). This was the third LFG to Energy asset located at the Altamont Landfill. The facility also includes LFG to electricity production via a turbine plant and an IC engine plant, in addition to the new LFG to LNG facility. The LNG plant had performed fairly well, following minor process control changes made during commissioning. However, since it became operational, the facility had experienced various LFG “balancing” issues that resulted in non-steady state operation of the previously installed assets. Namely, electricity production was significantly curtailed because of the level of excessive raw LFG usage at the enclosed flare to combust the tail gas from the new LNG plant. This drastically reduced the total energy output at the facility, and revenues were down significantly from projections. Study Results
Recommended publications
  • Orange County Landfills: Talking Trash
    Orange County Landfills: Talking Trash GRAND JURY 2017-2018 Orange County Landfills: Talking Trash Table of Contents SUMMARY ................................................................................................................................... 3 REASON FOR THE STUDY ...................................................................................................... 4 METHOD OF STUDY ................................................................................................................. 4 BACKGROUND AND FACTS ................................................................................................... 5 Waste Disposal System ............................................................................................................................. 6 Olinda Alpha Landfill, Brea .................................................................................................................... 7 Frank R. Bowerman Landfill, Irvine ....................................................................................................... 8 Prima Deshecha Landfill, San Juan Capistrano ..................................................................................... 9 The Highly Regulated Life of a Landfill ...................................................................................................... 9 California Law on Recycling .................................................................................................................... 11 Recycled Materials as Commodities ......................................................................................................
    [Show full text]
  • Brea Power Ii, Llc's Olinda Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas, Brea, California
    DOE/EA-1744 FINAL ENVIRONMENTAL ASSESSMENT FOR BREA POWER II, LLC’S OLINDA COMBINED CYCLE ELECTRIC GENERATING PLANT FUELED BY WASTE LANDFILL GAS, BREA, CALIFORNIA U.S. Department of Energy National Energy Technology Laboratory October 2010 ACRONYMS AND ABBREVIATIONS CEQA California Environmental Quality Act CFR Code of Federal Regulations CHP combined heat and power CO carbon monoxide dBA A-weighted decibel DOE U.S. Department of Energy (also called the Department) EA environmental assessment EPA U.S. Environmental Protection Agency kWh kilowatt-hour mmscfd million standard cubic feet of landfill gas per day MW megawatt MWh megawatt-hour NAAQS National Ambient Air Quality Standards NEPA National Environmental Policy Act, as amended NO2 nitrogen dioxide NOx nitrogen oxides O3 ozone OC W&R Orange County Waste and Recycling Pb lead PM10 particulate matter with an aerodynamic size less than or equal to 10 microns PM2.5 particulate matter with an aerodynamic size less than or equal to 2.5 microns SCE Southern California Edison SO2 sulfur dioxide Stat. United States Statute at Large U.S.C. United States Code USFWS U.S. Fish and Wildlife Service VOC volatile organic compound Note: Numbers in this EA generally have been rounded to two or three significant figures. Therefore, some total values might not equal the actual sums of the values. COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for Brea Power II LLC’s Olinda Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas, Brea, California (DOE/EA-1744) Contact: For additional copies or more information about this environmental assessment (EA), please contact: Mark W.
    [Show full text]
  • Amendment to the Waste Disposal Agreement
    REQUEST FOR CITY COUNCIL ACTION MEETING DATE: APRIL 28 , 2015 TITLE: AMENDMENT OF WASTE DISPOSAL AGREEMENT RECOMMENDED ACTION 1. Adopt - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF IRVINE, CALIFORNIA, APPROVING AN AMENDMENT TO THE 2009 WASTE DISPOSAL AGREEMENT WITH THE COUNTY OF ORANGE 2. Authorize the Mayor to sign the Waste Disposal Agreement. 3. Direct staff to execute all provisions of the Waste Disposal Agreement with the County of Orange. EXECUTIVE SUMMARY The City, together with other public County agencies, has a Waste Disposal Agreement with the County of Orange that provides the County a consistent flow of waste and a predictable revenue stream to operate the landfill system , and allows for importation of solid waste into Orange County landfills from outside of Orange County through 2016. In return , participating cities and waste haulers pay reduced landfill fee rates for the full term of the Agreement through 2020. The Agreement maintains stable disposal rates and continuity of service for residents and businesses, ensuring continued cooperation between cities and the County. The proposed Amendment would allow for continued importation of out-of-County waste beyond 2016, allocate a share of future importation revenues to Orange County cities as long as waste importation continues, and extend the Waste Disposal Agreement through June 30 , 2025, presented as Attachments 1 and 2. COMMISSION/BOARD/COMMITTEE RECOMMENDATION Not applicable. City Council Meeting April 28, 2015 Page 2 of 4 ANALYSIS Background The disposal of solid waste at Orange County landfills is governed by a 2009 Waste Disposal Agreement whereby cities in the County have agreed to deposit their solid waste at the County's three landfill facilities in return for low, stable disposal rates.
    [Show full text]
  • Waste Management Commission Thursday, March 8, 2018 2 P.M
    Waste Management Commission Thursday, March 8, 2018 2 p.m. 300 N. Flower St., Suite 400 Santa Ana, CA 92703 Waste Management Commission AGENDA Local Task Force Chair (2nd District) City Selection If you wish to speak on an item contained in the agenda, please complete a Public Comment Form Rob Johnson identifying the item(s) and submit it to the Commission Clerk. If you wish to speak on a matter which does not appear on the agenda, you may do so during the Public Comment period at the rd Vice-Chair (3 District) close of the meeting. Speaker forms are available at the sign-in table at the back of the room. Donald R. Froelich The Orange County Waste Management Commission consists of 18 members. Nine members 1st District present constitute a quorum. In the absence of a quorum the meeting will be convened and Cheryl Brothers* adjourned, and no actions may be taken by the Commission. Deepak J. Krishan Vacant* Pledge of Allegiance 2nd District Roll Call The Clerk of the Commission will call roll. Tina M. Nieto Joe J. Carchio Chairman's Report Chairman Rob Johnson Director's Report Thomas D. Koutroulis, Director, OC Waste & Recycling 3rd District Mike Alvarez* Vacant Action Item Recap Commission Clerk Agenda Item 1: Minutes of Waste Management Commission/Local Task 4th District Force, December 14, 2017 Charles J. Kim Chad P. Wanke Summary: Review and approve minutes of December 14, Christine Marick* 2017 WMC/LTF meeting. 5th District Recommended Action: Review and approve minutes. Cynthia Conners* Joe Soto Mark Tettemer Agenda Item 2: OC Waste & Recycling Second Quarter 2017/18 Financial Report At Large Summary: Staff will provide the OC Waste & Recycling David J.
    [Show full text]
  • Biomethane from Dairy Waste
    Biomethane from Dairy Waste A Sourcebook for the Production and Use of Renewable Natural Gas in California Prepared for Western United Dairymen Michael Marsh, Chief Executive Officer Research Manager Ken Krich Authors: Ken Krich Don Augenstein JP Batmale John Benemann Brad Rutledge Dara Salour Funded in part through USDA Rural Development July 2005 Table of Contents Page Acknowledgements .........................................................................................................................................ix Glossary............................................................................................................................................................xi Executive Summary.........................................................................................................................................1 Chapter 1 Potential Biogas Supply from California Dairies ...............................................................19 California Dairy Industry...........................................................................................................19 On-Farm Manure Management and Biogas Supply ........................................................21 On-Farm Manure Management Systems...........................................................................21 Biogas Production Potential from California Dairies .......................................................22 Co-Digestion of Dairy and Other Wastes ................................................................................24 Crop
    [Show full text]
  • Waste Management Commission Thursday, March 9, 2017 2:00 P.M
    Waste Management Commission Thursday, March 9, 2017 2:00 P.M. 300 N. Flower St., Suite 400 Santa Ana, CA 92703 Waste Management Commission AGENDA Local Task Force Chair (2nd District) Joe J. Carchio If you wish to speak on an item contained in the agenda, please complete a Public Comment Form identifying the item(s) and submit it to the Commission Clerk. If you wish to speak on a matter Vice-Chair (2nd District) which does not appear on the agenda, you may do so during the Public Comment period at the Rob Johnson* close of the meeting. Speaker forms are available at the sign-in table at the back of the room. 1st District The Orange County Waste Management Commission consists of 18 members. Nine members Deepak J. Krishan present constitute a quorum. In the absence of a quorum the meeting will be convened and Vacant adjourned, and no actions may be taken by the Commission. Vacant* Pledge of Allegiance 2nd District Tina M. Nieto Roll Call The Clerk of the Commission will call roll. Chairman's Report Chairman Joe J. Carchio 3rd District Mike Alvarez* Director's Report Shaw Lin, Acting Director, OC Waste & Recycling Donald R. Froelich Steve Chavez Lodge Action Item Recap Commission Clerk 4th District Agenda Item 1: Minutes of Waste Management Commission/Local Task Charles J. Kim Force, December 8, 2016 Chad P. Wanke Christine Marick* Summary: Review and approve minutes of December 8, 2016 WMC/LTF meeting. 5th District Cynthia Conners* Recommended Action: Review and approve minutes. Joe Soto Mark Tettemer Agenda Item 2: OC Waste & Recycling Second Quarter FY 2016/17 At Large Financial Report David J.
    [Show full text]
  • Olinda Alpha Landfill
    North Region, Brea, California Commercial and Public Disposal OLINDA ALPHA LANDFILL About Olinda Alpha Landfill • Opened in 1960 • Owned and operated by the County of Orange • Accepts non-hazardous, municipal solid waste from commercial and self- haulers (Class III Sanitary Landfill • Maximum permitted daily refuse is 8,000 tons • Approximately 565 acres with about 453 acres to be used for waste disposal • Converts landll gas to energy, which powers about 36,000 average Orange County homes • The fourth largest landfill History gas-fueled plant in the US Olinda Alpha Landfill was originally permitted as two waste disposal facilities in adjacent canyons, Olinda and Olinda Alpha were divided by Location a central ridge. Disposal operations started in Olinda Canyon in 1960 and 1942 N. Valencia Ave. proceeded into Olinda Alpha Canyon in 1981. The central ridge was eventually Brea, California 92823 excavated, and the two canyons were joined into one large landfilling area in 1998. Given its expansive deck area, Olinda Alpha Landfill has been the site of emergency plane landings as well as a photo shoot for reality TV show “America’s Next Top Model.” Landfill Tours Do you want to learn how we operate landfills and what we do as stewards of the environment? We oer free tours. Please visit http://www.oclandfills.com/landfill/landfill_tours to schedule a tour. @ocwaste OCLandfills.com 714-993-0372 OLINDA ALPHA LANDFILL FACT SHEET North Region Brea, California OC Waste & Recycling works cooperatively with regulators to ensure that the landfill operates in full compliance with all Federal, Operating Hours State, and Local codes, ordinances, and regulations.
    [Show full text]
  • 5.6 Public Services and Utilities
    5.6 PUBLIC SERVICES AND UTILITIES Public services include services such as fire protection, police protection, schools, libraries and parks. Utilities include wastewater, water, solid waste, electricity, gas, telephone, and cable. The purpose of this section is to establish existing conditions for each provider, identify potentially significant impacts and recommend mitigation measures to reduce the significance of such impacts. The primary question regarding utilities and services, relative to the CEQA process, is whether or not the project has any direct effect on the physical environment through impacts to existing facilities or the requirement to construct new facilities, particularly where such impacts would have an adverse impact on the environment. Information in this section is based on the City of Huntington Beach General Plan, City of Huntington Beach General Plan EIR, and correspondence from public service and utilities agencies (refer to Appendix J, CORRESPONDENCE). EXISTING CONDITIONS Fire Service The City of Huntington Beach Fire Department operates a total of eight fire stations within the City, including: ˜ Station 1 (Gothard Station), located at 18311 Gothard Street; ˜ Station 2 (Murdy Station), located at 16221 Gothard Street; ˜ Station 3 (Bushard Station), located at 19711 Bushard Street; ˜ Station 4 (Magnolia Station), located at 21441 Magnolia Avenue; ˜ Station 5 (Lake Station), located at 530 Lake Street; ˜ Station 6 (Edwards Station), located at 18590 Edwards Street; ˜ Station 7 (Warner Station), located at 3831 Warner Avenue; and ˜ Station 8 (Heil Station), located at 5890 Heil Avenue. The fire stations serving the project vicinity are Stations 3, 4, and 5. The fire station nearest the project site is Station 4 (Paramedic Engine Company, staff of four), located at 21441 Magnolia Street approximately 0.5 miles from the subject site.
    [Show full text]
  • See Full Resume
    ROBERT B. GARDNER, PE, BCEE Education ME – Civil Engineering (Environmental), University of Virginia, 1980 BS – Civil Engineering, University of Virginia, 1979 Professional Licenses & Specialty Certifications Professional Engineer – Alabama, Arkansas, Florida, Georgia, Louisiana, Maine, Mississippi, New Jersey, New York, South Carolina, South Dakota, Virginia, Washington, Puerto Rico Board Certified Environmental Engineer (BCEE), Solid Waste Management Professional Affiliations American Academy of Environmental Engineers, American Society of Civil Engineers, Solid Waste Association of North America, National Society of Professional Engineers National Waste and Recycling Association, Environmental Education and Research Foundation Professional Experience As a Senior Vice President, Mr. Gardner is responsible for overseeing SCS’s nationwide solid waste management practice, which includes solid waste planning and studies, financial analysis, landfill services, operation and maintenance, and construction. Mr. Gardner works closely with SCS’s national and regional clients. Since joining SCS in 1980, he has completed solid waste, hazardous waste, environmental assessment, facility design, compliance audit, and other environmental study projects for municipal and private clients. Notable projects that Mr. Gardner has been involved in are summarized below: Landfill Engineering City of New York, Closure Design for the Fresh Kill Landfill, Section 2/8 and 3/4. Project Director responsible for the supervision of site investigations, wetlands assessments, permitting, closure plan development, landfill gas and stormwater management designs, and assistance during the $43 million construction project to close the 100-acre Section 2/8 and 137-acre Section 3/4 of the Fresh Kills Landfill. City of New York, Closure Design for Section 1/9, Fresh Kills Landfill. Reviewing Principal and Engineer of Record responsible for the design of the closure systems for Section 1/9 of the Fresh Kills Landfill (312 acres).
    [Show full text]
  • RESPONSES to COMMENTS I. Public Notice Orange County Waste & Recycling (OCWR) Submitted the Draft Addendum No
    APPENDIX J – RESPONSES TO COMMENTS I. Public Notice Orange County Waste & Recycling (OCWR) submitted the Draft Addendum No. 6 to Final EIR 588 (Addendum) for the revision to the Solid Waste Facility Permit to update the Olinda Alpha Landfill closure date to the State Clearinghouse (SCH) on November 10, 2020. Notice of Availability (NOA) of the Addendum and a public information meeting was mailed to an extensive list of recipients, including adjacent property owners and occupants of the properties located within 1.5 miles (mi) of the Project site. The NOA was also sent to state and local agencies. The public review period for the Draft Addendum was 30 days (November 10, 2020 through December 10, 2020). The Draft Addendum was made available for public review on OCWR’s website. II. Summary of Written Comments Received During the Public Review Period Formal responses to comments are not required for addendums to EIRs; however, to provide the public with additional information, this section contains comment letters and written responses to comments on the Addendum for the Update to the Olinda Alpha Landfill Closure Date. Section 15204(a) of the California Environmental Quality Act (CEQA) Guidelines indicates that in responding to comments on a draft EIR, “When responding to comments, lead agencies need only respond to significant environmental issues and do not need to provide all information requested by reviewers, as long as a good faith effort at full disclosure is made in the EIR.” Responses to comments are not required by the CEQA guidelines for an Addendum process. However, OCWR has provided responses to comments in this section per the Section 15204(a) of the CEQA guidelines as referenced above as a courtesy and in an effort for transparency with the residents of the community around the Olinda Alpha Landfill.
    [Show full text]
  • 5. Environmental Analysis
    5. Environmental Analysis 5.11 UTILITIES AND SERVICE SYSTEMS This section addresses utilities and service systems including: Water Supply and Distribution Systems, Wastewater Treatment and Collection, Solid Waste, and Dry Utilities. Storm Drainage Systems are addressed in Section 5.5, Hydrology and Water Quality. The analysis in this section is based in part on the following technical reports: • The Platinum Triangle Drainage Study, Merit Civil Engineering, Inc., September 2004 (Appendix F) • The Platinum Triangle Water Supply Assessment, PSOMAS, February 3, 2005 (Appendix K) • Hydraulic Network Analysis for the City of Anaheim Platinum Triangle, City of Anaheim Public Utilities Department Water Engineering Division, February 11, 2005 (Appendix K) • Platinum Triangle Sewer Study, Merit Civil Engineering, Inc., October 2004, First Revision January 2005 (Appendix L) A copy of these studies is included in the Technical Appendices to this DSEIR. In addition, the following documents were utilized in the preparation of this analysis and are available for review at the City of Anaheim Planning Department. • The Platinum Triangle Standardized Development Agreement • Updated and Modified Mitigation Monitoring Plan No. 106 for The Platinum Triangle • City of Anaheim General Plan Furthermore, public service questionnaires were sent out to relevant agencies and their responses were used in this analysis (Appendix I). 5.11.1 Water Supply and Distribution Systems 5.11.1.1 Environmental Setting With the exception of several small areas bordering the City Limits, the Anaheim Public Utilities Department provides water service throughout the City. The system includes approximately 749 miles of water mains, 61,500 active water meters and over 7,800 fire hydrants.
    [Show full text]
  • Waste Management Commission Thursday, September 14, 2017 2 P.M
    Waste Management Commission Thursday, September 14, 2017 2 p.m. 300 N. Flower St., Suite 400 Santa Ana, CA 92703 Waste Management Commission AGENDA Local Task Force Chair (2nd District) Joe J. Carchio If you wish to speak on an item contained in the agenda, please complete a Public Comment Form identifying the item(s) and submit it to the Commission Clerk. If you wish to speak on a matter Vice-Chair (2nd District) which does not appear on the agenda, you may do so during the Public Comment period at the Rob Johnson* close of the meeting. Speaker forms are available at the sign-in table at the back of the room. 1st District The Orange County Waste Management Commission consists of 18 members. Nine members Deepak J. Krishan present constitute a quorum. In the absence of a quorum the meeting will be convened and Vacant adjourned, and no actions may be taken by the Commission. Vacant* Pledge of Allegiance 2nd District Tina M. Nieto Roll Call The Clerk of the Commission will call roll. Chairman's Report Chairman Joe J. Carchio 3rd District Mike Alvarez* Director's Report Thomas D. Koutroulis, Director, OC Waste & Recycling Donald R. Froelich Steve Chavez Lodge Action Item Recap Commission Clerk 4th District Agenda Item 1: Minutes of Waste Management Commission/Local Task Charles J. Kim Force, June 8, 2017 Chad P. Wanke Christine Marick* Summary: Review and approve minutes of June 8, 2017 WMC/LTF meeting. 5th District Cynthia Conners* Recommended Action: Review and approve minutes. Joe Soto Mark Tettemer Agenda Item 2: OC Waste & Recycling FY 2016/17 Financial Report At Large Summary: Staff will provide the OC Waste & Recycling David J.
    [Show full text]