CV-Emer Stephen Ray

CURRIICULUM VIITAE: EMER STEPHEN RAY

Proposed Position : Quantity Surveyor Name of Staff : Emer Stephen Ray Name of the Bidder : I.C.M. Consultants Profession : Quantity Surveyor & Building Economist Date of Birth : 24-04-1986 Years with the Firm : Six (6) Years Nationality : Ugandan Email : [email protected] Membership in professional associations: Professional Associate Institution of Surveyors (Reg. No 308) Member Institute of Quantity Surveyors of Kenya (Reg. No 593) Registered Quantity surveyor with Board of Registration of Architects and Quantity Surveyors of Kenya (Reg. 811)

KEY QUALIIFIICATIIONS: Emer is a Quantity Surveyor of Infrastructure Cost & Management (I.C.M) Consultants, a consultancy firm of Project Managers, Quantity Surveyors and Engineers in , Uganda with a Six years working experience. Before he Joined I.C.M consultants, he had trained as an intern with Akright Projects Limited, a reputable Real estate and Construction Company in Uganda as Assistant Quantity Surveyor where he acquired experience in various aspects of quantity surveying and general construction works. This varied from tendering, preparation of estimates, construction and supervision of building projects. He joined I.C.M. Consultants in March 2008 as an intern and has continued to build his experience in all aspects of Quantity Surveying work for both Public and Private Sector projects EDUCATION: Year IInstiitutiion Certiifiicates//Degree 2005 – 2009 Kyambogo University Kampala BSC Building Economics 2003 - 2004 Uganda Martyrs S.S.S (U.A.C.E) Uganda Advanced Certificate 1999 - 2003 Uganda Martyrs S.S.S Namugongo (U.C.E) Uganda Certificate of Education EMPLOYMENT RECORD: Year Fiirm Posiitiion Jan 2015 – to date: I.C.M Consultants Managing Director Jan 2013 – Dec 2014: I.C.M Consultants Associate Partner Jan 2012 – Dec 2013: I.C.M Consultants Quantity Surveyor July 2009 – Dec 2011: I.C.M Consultants Assistant. Quantity Surveyor Mar 2008 –Oct 2008: I.C.M Consultants Student trainee June 2007 – Aug 2007; Akright Projects Limited Student trainee June 2006 – Aug 2006; Akright Projects Limited Student trainee HERE-BELOW IS A SHORT CATEGORIZED LIST OF PROJECTS, WHICH I HAVE HANDLED: DEC 2010 – TO-DATE: QUANTITY SURVEYOR, I.C.M. CONSULTANTS KAMPALA, UGANDA.

Status of Project Name of project Associated completion cost US$ consultants PROJECTS (2015) 1. Construction of a Commercial Complex on Plots 9A1, Kyagwe Road Post Contract 32,000,000 I.D Forum (Kisekka Market) 2. Completion of Hilton Hotel Post Contract 17,000,000 Abu Construction 3. Construction And Rehabilitation To Naro Stations (Ngetta, Nasarri, Buginyanya, Nabuin, Kachwekano, Bulindi, Mbazardi, Nafirri And Post Contract 5,500,000 I.D Forum Narosec Stations) 4. Construction Of Buildings( Laboratory Blocks, Lavatory, Administration Post Contract 3,600,000 I.D Forum Block, Solar Installation, Bio-Gas Installation) At Muni University 5. Proposed Rehabilitation And Expansion Of Regional Stadia of :Masaka, Pre- Pre-Contract I.D Forum Mbarara And Kabale Lot 1 - Kakyeka Stadium Contract 6. Proposed6 Commercial Development On Plot 2921 Block 111 Kyaggwe At Pre- Pre-Contract Fusione Architects . Industrial Park Contract

Page 1 of 4

CV-Emer Stephen Ray

Status of Project Name of project Associated completion cost US$ consultants 7. Proposed7 Commercial Apartments on Plot 8 Burton Street for Aponye(U) Ltd Post Contract 4,600,000 Imparqt Associates . 8. Quantity Surveyor on the DTRA contract no. HDTRA1-08-D-0008-0008, Phase I 157,000 Dream Architects, Solicitation No. 0008-1AE for the Design and Supervision of Renovations (Design) (consultancy Armstrong Engineers, and Upgrades for NADDEC and UVRI, complete services) IHK Engineers. PROJECTS (2014) 9. Proposed Fit-Outs For MTN Service Centre Outlets (Acacia Mall, 4,000,000 Completed N/A Victoria Mall, Village Mall, Mbale, Arua, Fort Portal, Gulu) 10. Proposed New Store For CTM (U) Ltd On Plot 26-28 Kibuli Road Pre-Contract 1,300,000 Sampar Associates 11. Proposed Central Library With Virtual Capabilities At Kyambogo 2,000,000 Ubuntu University Pre-Contract 12. Construction Of Pediatric Ward, Surgical Ward And Mortuary Block at 2,900,000 Icon Consultants Mubende Hospital Pre-Contract 13. Construct ion Cost Audit for Java House Kampala Post Contract 840,000 N/A 14. Completion to Naguru Skys Hotel (Protea) Post Contract N/A 15. Proposed New Warehouse and Showroom for Nina Interiors On Plot 26- Pre-Contract Dimensions Architects 28 Kibuli Road 16. Proposed Cherish Brook Housing Estate at Kungu, Wakiso Pre- Contract 5,000,000 Dream Architects PROJECTS (2013) 17. Proposed Residential Apartments on Plot 32 Naguru east road Pre-Contract 2,900,000 Symbion (U) Ltd 18. Proposed Factory for Graphics Phase 3 Complete 1,470,000 Proman Consult 19. Proposed Residential Apartments on Plot 26 & 27 Naguru Pre-Contract 2,000,000 Symbion (U) Ltd 20. Proposed Refurbishmennt to Airtel Head Office on Wampeyo Avenue Symbion (U) Ltd Pre-contract 4,600,000

21. Proposed Umoja International French School in Nsuti, Mukono District Post Contract 1,200,000 Symbion (U) Ltd PROJECTS (2012) 22. Proposed Fabrication Systems Warehouse and Head office at Banda Complete 1,255,000 Proman Consult 23. Refurbishment to East African Development Bank Head Office on Nile Post Contract 5,000,000 Symbion (U) Ltd Avenue 24. Proposed EPIC Hotel in Nyagatare , Kigali, Rwanda Post Contract 14,000,000 Fusione Architects 25. Construction Of MDR Tb Ward At Mulago Hospital Complete 200,000 Icon Consultants 26. Complet ion of CIID Head Office for Uganda Police Force at Katalima Complete 3,800,000 I.D Forum Road, Naguru 27. Proposed Residential House for Ms Lydia Apojok in Juba Pre-Contract 2,200,000 Symbion (U) Ltd PROJECTS (2011) 28. Proposed Residential House at Kololo for Meera Investments Limited Post Contract Symbion (U) Ltd 29. Refurbishment to Residential House on Ofwono close for EADB Complete 800,000 Symbion (U) Ltd 30. Proposed Emin Pasha Hotel in Juba Pre-Contract Symbion (U) Ltd 31. Construction New Taxi Park Retail and Whole sale lock up Shops Post Contract 25,000,000 I.D Forum PROJECTS (2010) 32. Proposed Monastery at Plot 875,876,877, Block 4, Rubaga Road, For Complete 884,000 Design International Happy Science Uganda Ltd 33. Construction of Vine International Academy Block Complete 730,000 Dream Architects 34. Construction Of Lira Main Market, in Lira Municipality, Contract No. Complete 12,000,000 I.D Forum MOLG/AFDB/Matip-1/Wks/Lot 01 35. Construction Of The Proposed Ministry of Water and Environment Post Contract 15,000,000 I.D Forum Headquarters on Plot 3-7, Kabalega Crescent, Luzira 36. Proposed Major Roof Repair Works Of Namirembe Cathedral K.K Consulting Complete 800,000 Architects MAR 2008 – TO-DATE: ASSISTANT QUANTITY SURVEYOR, I.C.M. CONSULTANTS, KAMPALA, UGANDA.

Page 2 of 4

CV-Emer Stephen Ray

Name of project Completion Project Client Associated consultant cost (US$) EDUCATIONAL INSTITUTIONS & CHURCHES 1. Proposed Development of St. Francis Counselor Pre- 6,000,000 St. Francis Family Helper I.D. Forum Training Institute, Mbarara Contract project 2. Proposed Children’s Hospital at Juba , Southern Complete 22,000,000 JCH/UNICEF/MOEST Astroid Building Sudan CES Consultancy 3. Proposed Vine International Christian Academy at Pre- 4,500,000 Vine Foundation Dream Architects Kungu, for Vine International Contract, Academy 4. Proposed Renovations and Modifications to Complete 50,000 Infectious Diseases Creations Consult Africa Infectious Diseases Institute Laboratories at Mulago Institute, Mulago Ltd 5. Proposed External works at the New LDC Complex Complete 600,000 Law Development Pinnarche’ & Envisions Center Architects Ltd 6. Proposed Extensions to Management and Complete 200,000 MAT College MM & Accountancy Training College at Plot 1, Second Associates Street, Kampala OFFICES & HOTELS DEVELOPMENTS 7. Shopping Mall at Plot 8, Burton Street Complete 17,000,000 Aponye Uganda Ltd I.D. Forum 8. Proposed Office Block at IBIS Close Complete 4,000,000 IBIS Investment Ltd Real Design Ltd 9. Proposed AAR Health Facility at Plot 11&13, Complete 2,650,000 Mackenzie Futures Architects Mackenzie Close, Off-Lugogo Bypass Development Co. Ltd BANKS 10. Banking Hall & Offices Fit-out at Hoima and Arua Complete 600,000 KCB Uganda Ltd Futures Architects Park 11. Banking Hall & Offices Fit-out at Mukono, Complete 900,000 United Bank for Africa Futures Architects Fortportal & Mbarara Ltd 12. Offices Fit-out at Katwe for Uganda Microfinance Complete 200,000 Uganda Microfinance Creations Consult Africa Ltd Ltd Ltd 13. Banking Hall Fit-Out at Holiday Express Hotel, Complete 350,000 KCB Uganda Ltd Futures Architects Luwum Street for KCB Uganda Ltd INDUSTRIAL & ALLIED BUILDINGS 14. Proposed Offices, Factory & Workshop at Plot 16 Complete 3,000,000 M/S Master Wood I.D. Forum Second Ring Road & Plot 65, Southern By-pass, Works Ltd Luzira Industrial Park for Master Wood Works Ltd 15. Proposed Extensions to Existing Factory at Plot 8, Complete 240,000 M/S Graphic Systems Proman Consult Ltd Buvuma Road, Luzira for Graphic Systems (U) Ltd (U) Ltd 16. Proposed Factory at Luzira Industrial Park for Complete 2,800,000 M/S Graphic Systems Proman Consult Ltd Graphic Systems (U) Ltd (U) Ltd HOUSING 17. Proposed Residential House at Plot No.215, Off Pre- 660,000 Mr. Paul Kavuma Dream Architects Fort-Portal Highway, 5km from Busega Contract Roundabout 18. Proposed Flatlets at Plot No.8, Bunyonyi Road, Pre- 230,000 Mr. Evelyn Nassuna Dream Architects Nakawa, Kampala Contract 19. Proposed Alterations and Extensions to Residential Complete 100,000 Mr. Al-Karim Hudda A+ Project Management House at Kololo 20. Proposed Alterations and Extensions to Residential Complete 100,000 Mr. Al-Karim Hudda A+ Project Management House at Kololo 21. Proposed Residential House at Plot 476, Block Complete 500,000 The Jabo Family IPD & Associates 221, , Kira, Wakiso District 22. Proposed Apartments on Plot No.2, Okurut Close, Pre- 5,500,000 Pearl Acres Ltd Real Design Ltd Kololo Contract 23. Proposed Residence at Luthuli Avenue, Bugolobi Complete 150,000 Mr. Nazir Hassan Futures Architects

Page 3 of 4

CV-Emer Stephen Ray

Name of project Completion Project Client Associated consultant cost (US$) LANDSCAPING

24. Proposed Beautification for Kampala – Entebbe Complete 1,000,000 Ministry of Local I.D.Forum Road Corridor Government 25. Proposed Beautification to Constitutional Square Complete 250,000 Ministry of Local I.D.Forum Government 26. Proposed Landscaping works at Plot 9A&9B, Kira Complete 180,000 City Oil Ltd Futures Architects Road 2006 – AUG 2007: ASSISTANT QUANTITY SURVEYOR, AKRIGHT PROJECTS LTD, KAMPALA, UGANDA. Project Client Associated Name of project Completion cost consultant US$) 27. Proposed Kakungulu Housing Estate & Satellite Under N/A Akright Projects Limited Akright Projects City Construction Limited 28. Proposed Kirinya Housing Estate Complete N/A Akright Projects Limited Akright Projects Limited 29. Proposed Namanve Housing Estate Complete N/A Akright Projects Limited Akright Projects Limited

LANGUAGES Speaking Reading Writing

English Fluent Excellent Excellent Luo Fluent Good Fair Luganda Good Good Fair Kiswahili Fair Fair Fair

Special skills. Computer skills in Computer Aided Design packages such as DimX, Auto Cad, Arch Cad. Microsoft office and internet management, Web design and Graphics design.

CERTIFICATION: I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications, and my experience.

………………………………...... Date :30th October 2015 [Signature of staff member] [Day/Month/Year] Full Name of staff member: EMER STEPHEN RAY

Page 4 of 4

Scanned by CamScanner Scanned by CamScanner