Summary of Environmental Impacts and Mitigating Measures All the Impacts That Are Likely to Be Generated by the Proposed Project Is Summarized in Table E
Total Page:16
File Type:pdf, Size:1020Kb
EIA for the Proposed Development at Leisure Farm, Mukim Pulai and Mukim Tanjung Kupang, Daerah Johor Bahru, Johor Darul Takzim for Leisure Farm Corporation Sdn. Bhd. Summary of Environmental Impacts and Mitigating Measures All the impacts that are likely to be generated by the proposed Project is summarized in Table E. Mitigating measures specifically proposed for each of the impacts are also presented in a systematic manner in accordance to pre-construction, construction and operational phase. Hence, such data enable convenient identification of impacts along with their respective temporal (i.e., acute or residual) and spatial (i.e., magnitude) considerations. Table E: Summary of Environmental Impacts and Mitigating Measures for the Proposed Project PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS A. Pre-Construction Phase Reconnaissance study of • Preparation of • The activity is rather None. Short-term. The pre-construction the Project Site. documentation and plans localized and not expected stage basically involves of the proposed to generate any the documentation, development. disturbances to the legal approval from the existing environment. relevant authorities, Detail study of the existing • Field survey and site • Some form of beneficial building construction condition. investigation by impacts such as job design and engineering and opportunities (i.e., development planning, environmental surveying works, field survey as well as consultants. associated labourers and site investigation. analytical laboratories) may be possible. d-i EIA for the Proposed Development at Leisure Farm, Mukim Pulai and Mukim Tanjung Kupang, Daerah Johor Bahru, Johor Darul Takzim for Leisure Farm Corporation Sdn. Bhd. Cont…. PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS B. Construction Phase Construction of the access • The provision of proper • Main impact is in terms of • Constant wetting of the road Short-term within The contractor should road transportational routes is noise and dust and covering the transported the duration of the ensure that the given foremost disturbances. raw or fill material with proposed Project. transportation of heavy consideration in any • Increment of traffic risks canvas sheets to control machineries, Main Access route to developmental project. especially by heavy fugitive dust during times of equipments and Project Site This is to ensure vehicles plying Jalan low precipitation. construction material convenience to the Tanjung Kupang. • Flagmen must be stationed adhere to specific workers as well as • Spillage of raw at the access road junctions guidelines from enabling smooth construction material to control and direct traffic. relevant authorities. transportation of onto public roads. • The vehicles will have to construction materials observe speed limits and any and heavy machinery. damage done to the • Transportation of transportation routes should machineries, equipment be repaired. and construction material • Proper warning signs, signals to the site is from Jalan or warning light and Tanjung Kupang. barricades are recommended to ensure safety and smooth flow of traffic. Access Route within • Existing tarred and • As the access route has • Twelve (12) wash troughs project site earthen and tarred routes been established within will be constructed to avoid within the site. the Project area, the dirtying the public road. magnitude of disturbance • Establishment of tarred road unto the physical or at least compacted environment may be crusher runs roads and considered as nominal. constant wetting of work tracks to minimize dust dispersion. d-ii EIA for the Proposed Development at Leisure Farm, Mukim Pulai and Mukim Tanjung Kupang, Daerah Johor Bahru, Johor Darul Takzim for Leisure Farm Corporation Sdn. Bhd. Cont…. PHASE OF ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS DEVELOPMENT Mobilization on site • Construction of workers • The benefits to the local • Adequate facilities to prevent an Short-term within camp. community would be unhealthy environment. the duration of the • The sewage to be source of employment • Providing safety devices which proposed Project. generated during the and small-scale business are recommended in the construction stage is at investment. Occupational Safety and Health 22,500 l/day 1 (~estimated • It is estimated that an Act 1994 (OSHA) for construction - 100 workers). approximate of 100 workers to ensure their safety. • Provision of maintenance workers shall be needed • All foreign workers shall be yard/ workshop. to complete the stage. screened against the presence of • In terms of adverse contagious diseases. impact, presence of • A total of 3 numbers of septic foreign labour might tanks with a capacity of 35 PE poses antisocial behaviour each are required to contain the and risk of introduction of sewage discharge of 100PE at the contagious diseases that site to the compliance limits. needs to be addressed. • No open-burning of rubbish • Organic pollution in terms should be carried out. of sewage waste. • Proper skid tank storage to curtail • Heavy machinery and the possibility of oil and grease equipment can generate contamination. oily waste. • The generated spent oil and • Oil/ grease and hydraulic grease from the maintenance spill onto soil causing the works have to be stored and soil and groundwater handled as per the Environmental contamination. Quality (Scheduled Wastes) Regulations 2005 1 Assumption during construction stage based on per worker with per capita discharge rate of 225l/day. Adapted from MS1228 Sewage Guidelines. d-iii EIA for the Proposed Development at Leisure Farm, Mukim Pulai and Mukim Tanjung Kupang, Daerah Johor Bahru, Johor Darul Takzim for Leisure Farm Corporation Sdn. Bhd. Cont…. PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS Site Clearing and Biomass • Site clearing will involve the • The loss of current • Biomass stockpile area should Short term Close compliance to the Disposal. removal of mainly of oil vegetation and the related be earmarked within the proposals in the ESCP palm trees and shrubs and habitats. Project area prior being plan, biomass disposal small woody plants. • May lead to soil erosion disposed off site to an plan proper • Biomass generation is and increase in surface approved dumpsite. management practices approximately 12,921.01 runoff. • Open burning is strictly on-site will help tons for estimated old palm • If not disposed off prohibited , as it would lead to prevent excessive and shrubs at the Project properly, can lead to air pollution problems. water quality Site area. water quality • The undergrowth and small deterioration. deterioration and attract woody plants such as unwanted pests and high branches of secondary organic loading in the vegetations as well as river shredded oil palm fronds and • Open burning of biomass trunks can be mulched on or solid waste shall site. generate soot and dust. • Implementation of best • Earthwork and management practice on-site construction activities (i.e., turfing, temporary earth limited nesting and drains and sediment basins) habitat of faunas within • The Contractor should place the Project Site area. heavy emphasis in soil conservation by adopting environmentally integrated measures to counter against soil erosion. d-iv EIA for the Proposed Development at Leisure Farm, Mukim Pulai and Mukim Tanjung Kupang, Daerah Johor Bahru, Johor Darul Takzim for Leisure Farm Corporation Sdn. Bhd. Cont…. PHASE OF DEVELOPMENT ACTIVITIES POTENTIAL IMPACTS MITIGATING MEASURES SIGNIFICANCE REMARKS Impact of earthworks. • The cut and fill quantities • The main impact • Site clearing and earthworks Short term are approximated to generated from of the proposed development 625,022 m3 and 571,040 m3 earthworks activities is will be conducted in 9 stages • The cut and fill respectively. probably in the form of phases and twelve (12) activity are • Surplus earth of soil washout into the river sediment basins to minimize spread out up to approximately 54,000 m3 is especially during heavy the extent of the bare soil 1 year. envisaged. rain. exposure and subsequently, • Earthworks are • Excavation of higher • Settlement of the soil erosion problems. carried out in grounds to form platforms, underlying subsoil by the • Any sediment generated from stages according roads and other area as load imposed after filling. the site shall be retained in to its stages. shown in design drawings • If not properly compacted, the silt structure before being • Surplus earth will • Filling to lower area to form fill areas is susceptible to discharged into any water be reused on- embankments and platform erosion, slipping and bodies. site. to design levels subsidence. • Covering of platform should • If the cuttings are too be carried out immediately at steep and are not properly all exposed areas. Measures protected, stability such as mulching, problems may arise hydroseeding, installation of • The leveling of ground and turf mats or other suitable the use of heavy geotextiles are suggested to machinery for the promote vegetation growth. compaction of the fill • The heavy vehicles will have material during land to observe speed limits and development and any damage done to the construction activities will transportation routes should give rise to dust and noise be repaired. pollution. d-v EIA for the Proposed Development at Leisure Farm, Mukim Pulai and Mukim Tanjung