E®>©9© ©Ess© T3tia>©». @ <§»©)© CONTENTS

Total Page:16

File Type:pdf, Size:1020Kb

E®>©9© ©Ess© T3tia>©». @ <§»©)© CONTENTS CL CONTENTS Page Acknowledgement 1 Abstract 2 Introduction 3 Methodology 7 Inferences & Analysis 10 Discussion 15 Recommendations 17 References e®>©9© ©ess© t3tia>©». @ <§»©)© jg Appencjixl 19 Appendix II 27 70816 LIST OF TABLES (Appendix I) Page Table 2.1 Rail passengers - coastline 20 Table 2.2 Passengers rail and bus 21 Table 2.3 Average trip length 22 Table 3.1 Regression analysis - passenger forecast 23 Table 3.2 Tally of passengers - rail (23.09.98) 24 Table 3.3 Tally of passengers - rail (25.09.98) 25 Table 3.6 Passenger distribution in carriages 26 Annexure 1 Origin - destination matrix (passengers) 1-12 (1991 -1996) Annexure 2 Origin - destination matrix (passenger km) 1-12 (1991 -1996) LIST OF FIGURES (Appendix II) Page Figure 1.1 Administrative divisions of Sri Lanka 28 Figure 3.1(a) Traffic flow 29 Figure 3.1 (b) Urban sections 3 0 Figure 3.2 Transport network in Sri Lanka 31 Figure 3.3 Vehicle volumes and accidents 32 Figure 3.4 Traffic growth 33 Figure 3.5 Speed - Flow Relationships 34 Figure 3.5(a) Urban hierarchy 35 Figure 3.6 Comparison of ixmning times on bus & train 36 Acknowledgement The author wishes to place on record, the appreciation for the invaluable guidance and encouragement given by Prof. Dayantha Wijeyesekera, Prof. L.L. Ratnayake of University of Moratuwa and Mr. D.S. Jayaweera of the Transport Studies Planning Centre , throughout this project, along with the swift and timely assistance rendered by Mr. U.E. Storm World Bank Consultant Srilanka Railway and Mr. Sunil Peiris Planning officer, National Transport Commission without which collecting the data would have been difficult. 2 ABSTRACT This study is on "Examination of change of patterns and trends in the interaction of public transport in Colombo - Matara corridor - Bus and Rail, to provide an improved service." The study was centered on the coastal belt of Sri Lanka where the rail and road run parallel from Colombo to Matara. The study area included two provinces namely the Western and Southern provinces and included five districts viz. Colombo, Kalutara, Galle, Matara and Hambantota,fig. 1.1.(Appendix 11). The requirement was to process the modal shift of passengers between bus and rail in relation to increase in Regional Gross Domestic Product (RGDP), increase in fares, and development in Western and Southern provinces. The present status of both road and rail has been highlighted along with the anticipated growth in road traffic thus justifying the necessity to carry out the particular study, in order to propose means of improvement of the present level of bus and rail services, and to realise optimum potential from the available resources. Regression analysis using Lotus package was adopted to evaluate and analyse the behaviour between bus and rail with the increase in the regional gross domestic product and fares. Regression analysis was centered mainly around the effect on rail demand with increase in RGDP. It is inferred from the calculations, that an appreciable increase in rail demand is not reflected due to certain limitations in policy, operations, and facilities, existing as at present, in the rail service. The economics of operation, for both bus and rail were analysed with the available bus and rail passenger statistics. Thus the potential of each mode was evaluated. The limitations were then analysed individually, and their affects on the rail demand were discussed. Recommendations have been made how to overcome them, so that an effective modal shift from road to rail can transpire. 3 1.0 INTRODUCTION The Colombo - Matara corridor is being served both by the road and the rail which run almost parallel to each other. The rail has been constructed in a straight alignment while the road which crosses the rail at no less than three locations, viz Paiyagala, Bentota,and Warahena, has emerged with social, occupational, and habitational requirements of the natives. This coastal belt of 160 km has elegant sandy beaches, bays, lagoons, and natural harbours and is obviously an attraction to tourists. The climate is more wet, with the natural vegetation being tropical rain forest. The atmosphere near the coastal belt is rather humid with temperature ranging from 28Ac-33*c. The main agricultural products of this region are paddy, low grown tea, rubber, coconut, and a variety of other crops varying from vegetables, yams, and spices. Most of the crops other than coconuts are grown in the hinterland around 2-3 km from the coastal belt, while tea is found 15 -20 km from the coastal belt. The coastal belt is also rich in limestone and mining of limestone has become a lively hood of a few people in the recent past, specially with the boom in the building industry. From the ancient times, one of the prime occupations in the area has been fishing and as a result almost all those who were engaged in this profession lived by the sea. This could be one of the main reasons for road and subsequently the rail to be constructed bordering the fishing villages. The other main occupation by the coast is toddy tapping. The toddy so tapped is collected and transported to distilleries in the region for manufacture of alcoholic brews. It could be well assumed, that those in the hinterland would have transacted their agricultural products with the catch of fish, and alcoholic brews, and thus the need for the former foot paths, and cart tracks to be developed as country roads. The development in the Colombo district and with the establishment of various government organisations under the British rule from beginning of the twentieth century, attracted the southerners, to educate their succeeding generations to take up white collar jobs in state sector which enabled them to secure a firm and a fixed income while providing them with a status in society. By the middle of the century more people opted to work as state employees and the need for a good transport System was felt. The bus transport service which was dominated by a few private entrepreneurs did not run much inter city services and could not cater for this need. On the other hand railway handled about 70% of inter city passengers and 50%-60% of freight. In late fifties the bus companies were nationalised and such nationalised services catered for long distance travel. The train service too was improved with the diesolisation, colour light signalling, and running of a few express trains such as Ruhunu Kumari. Rickshaws, passenger carts pulled by ponies and bulls were a common sight in this region and predominantly was the transport of the less effluent classes of the society, specially for short distances. At this stage the A2 trunk road had to be widened while some of the southerners migrated to areas closer to their work places, and thus generated urbanization and commercialization of towns south of Colombo. From here onwards railway had to surrender a major portion of its passengers and freight to the road, specially since railway is serving a single corridor between Colombo and Paiyagala, and further more buses were competing rather than complementing, and were operating at higher and regular frequencies than the trains. The same time buses as well as freight hauliers were providing a door to door service which the railway was unable to do. By late 1970s with the advent of the open economy, railway lost a fair amount of its freight business to the road and as a result had to close down some of its freight outlets and goods agencies. The region has a population of around 2.7 million and is expected to rise up to 3 million by 2007. Sri lanka in the ancient time has been well known as a centre for trade and shipping due to its strategic geographical location on the main east -west sea route. Although Colombo is the leading harbour for the country, it has its own limiting factors prohibiting future expansion due to low water depths, already experiencing high lead times,(where vessels have to wait outside harbour until other vessels already berthed inside are attended and despatched), and" limited facilities for off shore expansion. On the other hand Galle harbour could accommodate only smaller vessels due to its limited water depth. However in the past smaller vessels called over at Galle harbour and freight was handled by way of export of coir products, coconut products and sheet rubber. The railway with its port link from Magalle to Galle port made its contribution to the freight haul. 1.1 Development It was very evident that the south did not receive much investment for development of its infrastructure over the years and this was one of the reasons for youth up rising in 1971 and subsequently in 1988/1989. As a result of this youth unrest the successive governments made plans to develop the southern area. The Koggala free trade zone is one of such developments, where many youth of the area have gained employment in industries in the zone. The Kirinda fisheries harbour is also another project. Many other projects which were commenced in late 60s and 70s and completed had to be revitalized such as the Lunugamvehera project and the Nilwala scheme. There was also a plan to extend the southern railway line to Kataragama mostly for socio-economic reasons. However the work has been since suspended as economists are of the opinion that at the moment the investment should be made in projects which would bring a better return. In the highway net work the main A2 has been widened at a few locations easing off certain bottle necks, for example Pinwatte, Beruwala, Balapitiya, a new stretch of road was constructed between Moratuwa and Panadura along with a new bridge, since the old bridge was causing congestion.
Recommended publications
  • Environmental Assessment and Management Framework (EAMF)
    Environmental Assessment & Management Framework - SCDP 33333333Environmental Assessment and Public Disclosure Authorized Management Framework Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Megapolis and Western Development January 2016 January, 2016 Page 1 Environmental Assessment & Management Framework - SCDP Table of Contents CHAPTER 1: PROJECT DESCRIPTION ...........................................................................1 1.1 Project concept & objective ....................................................................................... 1 1.2 Project Description ..................................................................................................... 1 1.3 Objective of the Environmental Assessment and Management Framework (EAMF) ........................................................................................................................ 2 CHAPTER 2: POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK .............4 2.1 Overview of Environmental Legislation ................................................................ 4 2.2 Detail Review of Key Environmental and Urban Services Related Legislation 5 2.3 World Bank Safeguard Policies .............................................................................. 16 2.4 World Heritage Convention ................................................................................... 21 CHAPTER 3: DESCRIPTION OF THE PROJECT AREA ............................................22
    [Show full text]
  • 10 3.0. INFERENCES and ANALYSIS the Rail Travel in the Coastal Belt
    10 3.0. INFERENCES AND ANALYSIS The rail travel in the Coastal belt from Colombo to Matara is about 32% of the total passenger traffic. The congestion on the roads is very heavy in the suburbs of Colombo and within the City limits. The study on change of patterns and present trends in the interaction of public transport, revealed the problems, deficiencies and limitations encountered and these have been analysed in the following paragraphs. 3.1 Existing Traffic The existing traffic vehicular volumes over the A2 highway varies with the distance from Colombo. From the studies done for the Southern transport corridor project the following pattern is observed, fig.3.1(a) (Appendix 11). (a) Over 40,000 v.p.d. on the approaches to Colombo (bi Up to 15,000 v.p.d. as far as Kalutara {cL Between 6500 and 10,000 v.p.d. as far as Galle. (di Around 4500 - 5000 v.p.d. beyond Galle. It is also noted that higher volumes are observed locally in the vicinity of urban areas, fig 3.1(b) (Appendix 11). The overall journey time to Matara for a car is 3 hr. 45 min while for express bus is 4 hrs. 30 min. The average rural road speed of around 40 kph up to Aluthgama and 50-60 kph beyond is observed however in urban areas such as Panadura, Aluthgama, Ambalangoda, Hikkaduwa and Galle the speed is reduced further. In some of these towns such as, Panadura, Ambalangoda, and Galle although by passes have been constructed, their purposes have been since lost, due to permitting commercial activities to flourish on either side.
    [Show full text]
  • World Bank Document
    Draft Environmental Assessment & Management Framework - SCDP Final Environmental Public Disclosure Authorized Management & Assessment Framework Strategic Cities Development Project (SCDP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Defense and Urban Development January 2014 January, 2014 Page 1 Draft Environmental Assessment & Management Framework - SCDP Table of Contents Chapter 1 – Project Description 1.1 Project Concept and objective . .. .. .. .. .. .. .. .. 1 1.2 Project Description .. .. .. .. .. .. .. .. .. .. 1 Chapter 2 – Policy, Legal and Administrative Framework 2.1 Overview of Environmental Legislation.. .. .. .. .. .. .. .. 4 2.2. Detail Review of Key Environmental and Urban Services Related Legislation. .. .. 4 2.3 World Bank Safeguard Policies.. .. .. .. .. .. .. .. .. 11 Chapter 3 – Description of the Project Area 3.1 Kandy.. .. .. .. .. .. .. .. .. .. .. .. 16 3.1.1 Urban Morphology.. .. .. .. .. .. .. .. .. .. 18 3.1.2 Physical Environment.. .. .. .. .. .. .. .. .. 18 3.1.2.1 Topography.. .. .. .. .. .. .. .. .. 18 3.1.2.2 Climate.. .. .. .. .. .. .. .. .. .. 18 3.1.2.3 Main Water bodies and flow regimes.. .. .. .. .. .. 18 3.1.3Ecologically Important/Sensitive Habitats.. .. .. .. .. .. .. 20 3.1.3.1 UdawatteKelle Sanctuary.. .. .. .. .. .. .. .. 20 3.1.3.2 Dulumadalawa Forest Reserve and the Hantana Range.. .. .. .. 22 3.1.3.3 Kandy Lake and Surrounding Catchment.. .. .. .. .. .. 22 3.1.4 Built Environment.. .. .. .. .. .. .. .. .. .. 23 3.1.5 Historical and Cultural
    [Show full text]
  • Sri Lanka Rupee (Rs) Rs1.00 = $0.009113278 $1.00 = Rs109.730000
    Resettlement Plan May 2011 Document Stage: Draft SRI: Additional Financing for National Highway Sector Project Katurukunda–Neboda Highway (B207) Prepared by Road Development Authority for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2011) Currency unit – Sri Lanka rupee (Rs) Rs1.00 = $0.009113278 $1.00 = Rs109.730000 ABBREVIATIONS ADB – Asian Development Bank CEA – Central Environmental Authority CSC – Chief Engineer’s Office CSC – Construction Supervision Consultant CV – Chief Valuer DSD – Divisional Secretariat Division DS – Divisional Secretary ESD – Environment and Social Division GN – Grama Niladhari GND – Grama Niladhari Division GOSL – Government of Sri Lanka GRC – Grievance Redress Committee IOL – inventory of losses LAA – Land Acquisition Act LARC – Land Acquisition and Resettlement Committee LARD – Land Acquisition and Resettlement Division LAO – Land Acquisition Officer LARS – land acquisition and resettlement survey MOLLD – Ministry of Land and Land Development NEA – National Environmental Act NGO – nongovernmental organization NIRP – National Involuntary Resettlement Policy PD – project director PMU – project management unit RP – resettlement plan RDA – Road Development Authority ROW – right-of-way SD – Survey Department SES – socioeconomic survey SEW – Southern Expressway STDP – Southern Transport Development Project TOR – terms of reference WEIGHTS AND MEASURES Ha hectare km – kilometer sq. ft. – square feet sq. m – square meter NOTE In this report, "$" refers to US dollars. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Challenges in Implementing Best Practices in Involuntary Resettlement a Case Study in Sri Lanka
    Challenges in Implementing Best ChALLengeS in impLementing BeSt pr Practices in Involuntary Resettlement A Case Study in Sri Lanka Infrastructure projects sometimes physically displace households and disrupt income sources and livelihoods. The Asian Development Bank offers several good governance practices to its borrowers to minimize such adverse impacts, especially since the absorption of such best practices by countries is usually slow and erratic. This book presents an in-depth case study from a complex and sensitive infrastructure project in Sri Lanka, where international best practices in involuntary resettlement were successfully merged with local legal systems. The book demonstrates that the application of best practices to infrastructure projects needs continuous consultations with affected people and a firm commitment of resources. AC About the Asian Development Bank tiCeS in i ADB’s vision is an Asia and Pacific region free of poverty. Its mission is to help its developing member countries reduce poverty and improve the quality of life of their people. Despite the region’s many successes, nvo it remains home to a large share of the world’s poor. ADB is committed ChAllenges In ImPlementIng Best to reducing poverty through inclusive economic growth, environmentally LuntA sustainable growth, and regional integration. PRACtICes In InvoluntARy Resettlement Based in Manila, ADB is owned by 67 members, including 48 from the ry A Case Study in Sri Lanka region. Its main instruments for helping its developing member countries reSettLement
    [Show full text]
  • 3 Anthropology and Disaster
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by OTHES DIPLOMARBEIT Titel der Diplomarbeit „Gender and Tsunami – Vulnerability and Coping of Sinhalese Widows and Widowers on the South-West Coast of Sri Lanka “ Verfasserin Julia Veronika Doppler angestrebter akademischer Grad Magistra der Philosophie (Mag. phil.) Wien, 2009 Studienkennzahl lt. A 307 Studienblatt: Studienrichtung lt. Kultur- und Sozialanthropologie Studienblatt: Betreuerin / Betreuer: Univ. Prof. Dr. Elke Mader Acknowledgements I would like to thank all those, who were directly or indirectly involved in the completion of this thesis, for their support. First of all I would like to thank my interlocutors and especially Mr. Ranjith and his family for sharing their life and experiences with me. Especially I would like to express my gratitude to my supervisor Prof. Dr. Elke Mader, Department of Social and Cultural Anthropology, University of Vienna, for her advice and support. Further I would like to thank Prof. Kalinga Tudor Silva, Department of Sociology, University of Peradeniya, without his advice and support this thesis would never have become a reality. I would like to thank the staff at the Department of Sociology, University of Peradeniya, for the knowledge and experience I gained while studying there. I also would like to thank my fellow students at the Faculty of Arts, University of Peradeniya, for the great time I had while studying there. A special thank-you to Danoja Perera, Niranjani Rupasinghe, Kethakie Nagahawatte and Chaminda Jayasinghe for their support and companionship. I would like to thank Amal and his family for caring for me after the Tsunami, they saved my life.
    [Show full text]
  • FEASIBILITY of a ONE-WAY TRAFFIC SYSTEM for COLOMBO CITY IMP ART •Pwrhsiu Q| MORATUWA.Smuuw| MORATUWA * U
    LB/DON/lft/:<l FEASIBILITY OF A ONE-WAY TRAFFIC SYSTEM FOR COLOMBO CITY IMP ART _ •PWrHSIU Q| MORATUWA.SmUuW| MORATUWA * U. L. Tissa This thesis was submitted to the Department of Civil Engineering University of Moratuwa in partial fulfilment of the requirements for the Degree of Master of Engineering. o^v Supervised by \ Professor Amal S. Kumarage Department of Civil Engineering University of Moratuwa Sri Lanka UN I'ne5l5 March 2004 80146 I Diversity of Moratuwa S0146 DECLARATION The work included in this thesis is part or whole, has not been submitted for any other academic qualification at any institution. U.L.Tissa Prof. Amal S. Kumarage ABSTRACT Traffic management in main cities has become an absolute need due to the increase in the number of vehicles in the limited road space, at present. There are numerous limitations that restrict the widening of roads to cater to the demand of the ever-increasing vehicular load in an already congested city such as Colombo. The question is how are we going to differentiate between the benefit and the cost of development. It is very important to look for cost effective methods by minimizing the adverse effects on the economy in a developing country like Sri Lanka. The objective of this research was to check the suitability of a One-way traffic system in a selected area of the Colombo City. The most congested areas, which could be expanded later, depending on the results obtained, have been selected first. The study area was confined to Northern and Southern banks of Beira Lake in Colombo Fort area.
    [Show full text]
  • Proposed Supplementary Loan and Technical Assistance Grant Democratic Socialist Republic of Sri Lanka: Southern Transport Development Project
    Report and Recommendation of the President to the Board of Directors Project Number: 26522 February 2008 Proposed Supplementary Loan and Technical Assistance Grant Democratic Socialist Republic of Sri Lanka: Southern Transport Development Project CURRENCY EQUIVALENTS (as of 13 February 2008) Currency Unit – Sri Lanka rupee/s (SLRe/SLRs) SLRe1.00 = $0.0093 $1.00 = SLRs108.05 ABBREVIATIONS ADB – Asian Development Bank CEA – Central Environment Authority CRP – Compliance Review Panel CSC – construction supervision consultant EIA – environmental impact assessment EIRR – economic internal rate of return EMP – environment management plan ESD – Environment and Social Division GDP – gross domestic product ICB – international competitive bidding IRP – income restoration program JBIC – Japan Bank for International Cooperation km – kilometer LAR – land acquisition and resettlement LARC – land acquisition and resettlement committee LIBOR – London interbank offered rate MOHRD – Ministry of Highways and Road Development NDF – Nordic Development Fund OCR – ordinary capital resources PMU – project management unit RDA – Road Development Authority RIP – resettlement implementation plan ROW – right of way SDR – special drawing rights SL – supplementary loan Sida – Swedish International Development Cooperation TA – technical assistance UDA – Urban Development Authority VOC – vehicle operating cost NOTES (i) The fiscal year of the Government and its agencies ends on 31 December. (ii) In this report, “$” refers to US dollars Vice President L. Jin, Operations Group 1 Director General K. Senga, South Asia Department (SARD) Director K. Higuchi, Transport and Communications Division, SARD Team leader D. N. Utami, Senior Environment Specialist, SARD Team members M. Alam, Senior Infrastructure Specialist, SARD N. M. Amerasinghe, Project Implementation Officer (Agriculture and Environment), SARD A. Gamaathige, Social Sector/Resettlement Officer, SARD R.
    [Show full text]
  • ADB Accountability Mechanism Compliance Review Panel On
    ADB Accountability Mechanism Compliance Review Panel Final Report to the Board of Directors on CRP Request No. 2004/1 on the Southern Transport Development Project in Sri Lanka (ADB Loan No. 1711-SRI[SF]) 22 June 2005 Contents Page About the Compliance Review Panel.......................................................................................iii Acknowledgements ...................................................................................................................iv Abbreviations, Glossary and Currency ....................................................................................v Map.............................................................................................................................................vii Executive Summary.................................................................................................................viii I. Introduction..........................................................................................................................1 II. Description of the Project ...................................................................................................3 A. Scope ....................................................................................................................3 B. Agencies and Financing ........................................................................................3 C. Status of Project ....................................................................................................4 III. Request for Compliance
    [Show full text]
  • Govt Allocates Rs. 24 Million for Emergency Relief to Drought Hit
    The Island Home News Page Three Friday 30th October, 2009 3 No air conditioning, no surgery, patients suffer Govt allocates Rs. 24 million for by Lalith Chaminda and S. K. Kaluarachchi Galle Corrs. emergency relief to drought hit districts Surgery at the Karapitiya Hospital in Galle came to an District were affected. tate 60 to 70 tanks in the district and com- Sammanthurai, Erangana, Lahugala, abrupt halt as a result of the by Franklin R. Satyapalan The badly affected Divisional mence a clean drinking water supply proj- Pottuvil, Tirukovil, Alyadivembu and hospital’s air conditioner being The Government will provide Rs. 24 Secretariat areas are Siyambalanduwa, ect to pump water from the Menik Ganga Addalachchenai were badly affected and out of order for the last three million to nine drought affected districts – Madulla, Buttala, Moneragala, in Nakkala in the Badalkumbura area. action was taken to provide water round weeks. Ampara, Batticaloa, Badulla, Matale, Tanamalwila, Sevenagala, Medagama and Sarath Perera also said that Rs 2.4 mil- the clock utilising 15 or more bowsers. Surgery to be performed on Moneragala, Polonnaruwa, Hambantota, Wellawaya. Initial action had been taken to lion had been allocated to the Ampara dis- Additional District Secretary of cancer patients and others suf- Kurunegala and Puttalam as a first step to utilise 20 bowsers to provide drinking trict, Rs. 595,000 to Matale , Rs. 16.6 million Ampara Asanka Abeywardena said water to these villagers. to Moneragala, Rs. 2.1 million to Batticaloa, fering from serious ailments provide emergency relief to 200,000 or more requests have been forwarded to provide Ratnasiri said that in coordination with Rs.
    [Show full text]
  • Environmental Assessment Vocational Education Reconstruction
    Sri Lanka Tsunami Reconstruction Program (SLTRP) USAID Contract # 386-C-00-05-00166-00 Environmental Assessment Vocational Education Reconstruction Component December 2006 SLTRPR-0040 In association with EML Consultants, Chemonics International Inc, DEVTECH, FNI, Engineering Consultants Ltd., Lanka Hydraulic Institute, MICD, and Uni-Consultancy Service SRI LANKA TSUNAMI RECONSTRUCTION PROGRAM ENVIRONMENTAL ASSESSMENT FOR VOCATIONAL EDUCATION CENTER List of Abbreviations and Acronyms......................................................................................iii Executive Summary.................................................................................................................... iv CHAPTER ONE: INTRODUCTION ........................................................................................1 1.1 Overview ...............................................................................................................1 1.2 Site Selection Process ...........................................................................................3 1.3 Purpose of the Environmental Assessment Report .........................................6 1.4 Scope and Objectives of the EA report ..............................................................7 1.5 Definition of the Project Impact Area................................................................8 1.6 Use of Construction Materials ............................................................................8 1.7 Alternatives ...........................................................................................................9
    [Show full text]
  • Ministry of Power Brochure
    Upcoming infrastructure project pipeline in Sri Lanka As per new Ministerial Allocations in the Gazette issued on 09 August 2020 Ministry of Power Extension of the Lakvijaya Coal Power Plant - additional 300MW - approx. USD 450 Mn The largest power station in Sri Lanka and the only coal plant in the country. Fully owned by the Govt. of Sri Lanka (GoSL) through Ceylon Electricity Board (CEB). 900 MW capacity was commissioned in 2011. The GoSL is currently in discussion with China Machinery Engineering Corporation (CMEC) to carryout this extension. CMEC was the Engineering Procurement and Construction (EPC) contractor that was responsible for development of the Lakvijaya Power Plant as well. The conversion of Kalanithissa Thermal Power Plant to a LNG Power Plant (Sojitz Kelanitissa/ former AES Kelanitissa) 163 MWcapacity - one of the initial Independent Power Purchase agreements (IPP) in Sri Lanka - 20 year. The Power Purchase Agreement (PPA) will expire in 2023 and expected to be operated as a CEB plant until 2033. Currently owned and operated by Sojitz Corporation, Japan. The plant is currently running on Diesel/Heavy Fuel (i.e. diesel-fired combined cycle power plant). It requires additional investment to convert to LNG Power Plant. Estimated at USD 921Mn - inclusive of the Land Based Terminal cost and the Floating Storage Regasification Unit (FSRU); as per CEB Long Term Generation Expansion Plan 2020 - 2039 Ministry of Power Expansion of Kerawalapitiya Power Plant Phase 01 - 300 MW capacity - comissioned in 2007/2010. Currently, it is an IPP till 2035 owned by West Coast Power Ltd (major shareholders include GoSL. EPF, LECO, Lakdhanavi Ltd/ LTL holdings plus other shareholders).
    [Show full text]