Nation Building Lives in All Our Hearts Property Insight Prestigious
Total Page:16
File Type:pdf, Size:1020Kb
FREEHOLD JUJUL - SEPTT 2016 PP PP1 P P1 891 8 6/1 6 /1 1 1/2 / /2 0 015 15 5 (0 (03 43 437 Introducing A New Level Of 7 9 ) Experience A Life Full of Discovery & Diversity Time to cash in on Cheras Retail opportunity EkoCheras SERVICE APARTMENT Property Insight Nation Building Lives IN THE HEART OF Prestigious Developer KL CITY In All Our Hearts Eko Awards 2016 HAPPY MALAYSIA DAY vest Tower Ekovest Berhad EkoTTittiiwwanggssa OPEN FOR SALES EkoRiver Centre EkoTitiwangsa is located along Titiwangsa, DUKE Highway and KL River City. It comprises 3 blocks of freehold service apartments with a total of 696 units and retail spaces (approximately 42,000 sf). The luxury suites have built-up size ranging from 820sf – 1340sf. The modern contemporary design includes highly unique exterior and interior decoration to create an inspiring living space full of natural light and yet maintaining the importance of comfort. EkoTitiwangsa is connected to a 7 storey shopping mall (approximately 600,000sf) with a breathtaking view of the spectacular KL skyline. For those who demand modern conveniences as well as secured living, EkoTitiwangsa offers 24-hour CCTV surveillance with 3-tier security feature complete with smart card access and guard patrol. BEST MIXED DEVELOPMENT EkoRiver Centre (KL River City) EKOVEST BERHAD by Ekovest Berhad DEVELOPER HEAD OFFICE EKOVEST BERHAD SALES GALLERY Ekovest Land Sdn Bhd Ground Floor, Wisma Ekovest, No. 118, No 122, Jalan Desa Gombak 1, +603 4032 1881 (549480-K) Jalan Gombak, 53000 Kuala Lumpur. 53000 Kuala Lumpur. (A wholly owned subsidiary of Ekovest Berhad) T : +603-4021 5948 F : +603-4032 1771 GPS Co.: N 3°11'38.6" E 101°42'18.5" www.ekotitiwangsa.com E : [email protected] fb.com/Ekovest Berhad Developer's License No : 13673-1/09-2016/0899 (L) • Advertising & Sales Permit No : 13673-1/09-2016/0899 (P) • Validity Period :06/09/2014 - 05/09/2016 • Total Units : Block A-246 (Service Apartment) ; Block B-180 (Service Apartment) ; Block C-270 (Service Apartment) • Approving Authority : Dewan Bandaraya Kuala Lumpur • Building Plan Reference No : BP U2 OSC 20132882 • Land Tenure : Freehold • Expected Date of Completion : July 2018 • Selling Price : RM591,986 (min) - RM1,725,630 (max) • Land Encumbrances : Public Bank • Bumiputra Discount : 5% • All information contained herein is subject to change without notification as may be required yb the relevant authorities or developer's architect and cannot form part of an offer or contract. All illustrations and pictures are artist's impressions only. All measurements are approximate. Whilst every care has been taken in providing this information, the owner, developer and managers cannot be held liable for any inaccuracy. All above items are subject to variations, modifications and substitutionsas may be required by the relevant Authorities or recommended by the Architects or Engineers. EKOVESTaccess DUKE 1 . DUKE 2 . DUKE 3 EKOVEST It used to be that youth, vigour and hope was all that was the name synonymous with building required of our young and growing generations to secure construction and civil engineering a better future in their lives. Today, these values are still 03 excellence was formed by a group of EKOVESTproperty highly enterprising, self-motivated very much upheld but with the addition of a modern and individuals and highly qualified EkoTitiwangsa . EkoCheras . Oasis Kajang very significant input...Vision. experienced professionals. Indeed, it was the new concept of 'being visionary' before 09 the millennia that made leaps and bounds in the way we lived, worked and even play. And that same concept of being visionary today where we are well into the new millennia has continued to drive many a commitment to greater heights in both success and recognition. All this is what has kept Malaysia at the fore of ASEAN as a thriving nation in many respects of nation building and we at Ekovest are very much in tune with these vital qualites made possible with having 'a vision'. ContentEkovest, Putting its citizens first. EKOVESTfuture Ekovest Berhad was established since 1985 and listed in KL River City . River of Life Let Us All Share The Vision... Bursa Malaysia since 1993. Ekovest is one of the world-class leading construction company in Malaysia Happy Merdeka & Malaysia Day involved in all aspects of construction work including 17 major civil engineering and building works such as EKOVESTnews To All Our Readers turnkey-design, build projects and project management. EKOVEST Media We strive to provide optimum value in functionality, and innovative thoughts to fulfil our client’s satisfaction. 21 In year 2004, Ekovest had signed a concession EKOVESTevent agreement to undertake the Build, Operate & Transfer Dignity for Children - Learning Beyond Classroom (BOT) contract with the government for Duta-Ulu Kelang Mycity 2050 Competition Expressway (DUKE), spanning across 18km from Konvensyen Usahanita Binaan KUBINA 2016 northern-east to northern-west of Kuala Lumpur city. IEM Award DUKE was completed and commenced operations on the Editorial 23 Ekovest Graduate Attachment Programme 9th of January 2009. Later on in 2013, Ekovest undertook (EGAP 2016) Team the expansion of DUKE highway by signing on a supplement concession agreement on 2013 and construction works is in progress. EKOVESThighlights CIDB SEMINAR - Sustainable & Resilient Infrastructure as the Game Changer We are a visionary and innovative company that provides only high quality services and thoughtful design. This is Property Insight Prestigious Developer 29 Awards 2016 what makes us better and worthy for your investment. EKOVEST Sustainability EKOVESTaccess Developed by MN Solutions Sdn. Bhd., ICMS is a cloud based intelligent complaint management system that enables it’s users to access their Introduction of respective department complaints anytime, anywhere. The major benefits of ICMS are the management will be able to monitor any complaints data and reports regarding any specific expressways with just a click of a button. ICMS also will enhance the response time of the public I – Complaint complaint replied to the complainant. Furthermore, ICMS also help to saves time as any public complaints records will accessible with minimum amount of time, without needing to look up piles of files. It also encourages prioritization Management System of work as any unsolved will be alerted to the assignee on a daily basis. In conclusion, ICMS is a welcomed addition provides an operational environment that easily enables central management of asset information ICMS which available 24/7 within the organization. ICMS has been introduced to cater rapid information sharing and decision making support tools, availability STARTING 1ST JUNE 2016 FOR DUKE of complete information, which leads to elimination of various delay downtimes in operational thus improving customer satisfactions. Starting 1st June 2016 the i – Complaint Management System has been introduced to manage all public complaints involving Duta – Ulu Kelang (DUKE) Phase 1, DUKE Phase 2 Project, and Setiawangsa – Pantai Expressway (SPE) Project replacing the manual public complaint management method that was previously used. 03 HIGHWAY 04 EKOVEST Sustainability EKOVESTaccess The Duta Ulu – Kelang Expressway (DUKE) Phase 2 is a highway compromising two links namely the Sri Damansara Link and Tun Razak Link. DUKE Phase Two is a value provider as to enhance DUKE by providing alternatives routes for commuters travelling to and from the city centre (Jalan Tun Razak) and north western catchments (Rawang, Sg. Buloh etc). Current Construction Activities for TRL & SDL as follows: Sri Damansara Link Tun Razak Link Tun Razak Link (TRL) Description Commences at the Menjalara Commences at Jalan Tun Bored pile works at MCDO and MCTO (CBP) Interchange at Bandar Razak near Kuala Lumpur Menjalara on the west and General Hospital/IJN and Spun pile works at MCPO and MCTO (VBC) traversing eastward to the traverses northwards along Segambut Interchange at Jalan Pahang and Jalan Stone column works MCGO, SR-MC30, MCE3 and MCEO Jalan Segambut 9/48A to connect to the Structure works such as concreting work for cross head, existing Jalan Gombak after beam launching, ground slab, parapet walls and others crossing existing DUKE at Sentul Pasar Interchange Sri Damansara Link (SDL) Length 7KM 9KM Main activities at SDL are construction of superstructure Carriageway Dual-Three carriageway (6 lanes) for bridges at the mainline and structure for the RSA building at the toll plaza area. Interchanges and Ramps Two Interchanges and a pair One trumpet interchange & of directional ramps near directional ramps at DUKE Desa Park City & Jalan Tun Razak System Toll Electronic Toll Collection Construction Period 3 Years (Commencing end of 2013) DUKE 2: EXECUTIVE SUMMARY Tun Razak Sri Damansara Overall Month Link Link DUKE 2 Jan 2016 65.43% 75.91% 70.87% Feb 2016 68.15% 78.65% 73.54% DUKE Mar 2016 71.88% 81.16% 76.57% Apr 2016 75.89% 84.73% 80.20% HIGHWAY May 2016 81.77% 86.15% 82.80% 05 06 EKOVEST Sustainability EKOVESTaccess KL CITY BYPASS AND PARK & RIDE STATIONS The Integration of Public & Private Transport What makes this KL City Bypass unique is the proposal to construct, under Phase 1, 10 Integrated Park & Ride stations on top of, besides or under the Expressway depending on locations. Each Park & Ride station shall have some 2,000 parking bays and shall be constructed next to public transportation systems such as the KTM Komuters, Monorail, LRT and MRT. This will encourage motorists to park their cars in any of these 10 stations and hopped onto the Komuters, Monorail, LRT or MRT to get into the city. As these stations are all on top of, besides or under the Expressway, motorists do not have to get out of the KL City Bypass and do not have to go through traffic crawls on the local roads to get to these stations. This differs from the present situation where some of these Park & Ride Stations are located along congested local roads, making them not easily accessible.