Sheet2 Page 1
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Naigaon (Khairgaon) District: Nanded
Mudkhed Village Map Takli(T.B.) Dharmabad Taluka: Naigaon (Khairgaon) District: Nanded Vanzirgaon Loha Barbada Umri Mamnyal Manur Tarf Ba Izatgaon (M) Patoda (T.B.) Antargaon Kahala Bk. Izatgaon Bk Sadakpur µ 2.5 1.25 0 2.5 5 7.5 Kahala Kh Mandni km Rui Bk Kushanoor Sawarkhed Rui Kh Sategaon Somthana Location Index Vanjarwadi Ikalimal Dharmabad Babulgaon Ghungrala Melgaon Hiparga (Janerao) Nilegavhan Sangvi Dhanaj District Index Kuntoor Nandurbar Bhandara Narangal Dhule Amravati Nagpur Gondiya Jalgaon Ransugaon Paradwadi Takbid Akola Wardha Hussa Buldana Ancholi Nashik Washim Chandrapur Yavatmal Aurangabad Degaon Charwadi Raher Palghar Salegaon Jalna Hingoli Gadchiroli Kolambi Talbid Takalgaon Thane Ahmednagar Parbhani Mumbai Suburban Nanded Palasgaon Mumbai Bid Godamgaon Kokalegaon Hangraga Raigarh Pune Latur Bidar Lalwandi Osmanabad Awrala Satara Solapur Kauthala Daregaon Naigaonwadi Ratnagiri Shelgaon Chatri Sangli Sujlegaon Maharashtra State Naigaon Kolhapur Manjram Iklimore NAIGAON Sindhudurg Kandhar Bendri !( Dharwad Khairgaon Betak Biloli Manjramwadi Pimpalgaon (Na) Taluka Index Mustapur Mahoor Kinwat Mokasdara Khandgaon Gadga Hotala Kedar Wadgaon Hadgaon Himayatnagar Kopra Narsi Ardhapur Nawandi Bhokar NandedMudkhed Marwali Tanda Loha Umri Aluwadgaon Kandala Biloli Marwali Dharmabad Naigaon (Khairgaon) Kandhar Tembhurni Biloli Legend Mukhed Deglur !( Taluka Head Quarter Dhanora T.M. Ratoli Kuncholi Mugaon Karla T.M. Dhuppa Railway District: Nanded Takli(T.M.) Mahegaon National Highway State Highway Village maps from Land Record Department, GoM. Bhopala Data Source: Shelgaon (Gauri) State Boundary Waterbody/River from Satellite Imagery. District Boundary Generated By: Mukhed Takli Bk. Taluka Boundary Maharashtra Remote Sensing Applications Centre Village Boundary Autonomous Body of Planning Department, Government of Maharashtra, VNIT Campus, Waterbody/River South Am bazari Road, Nagpur 440 010. -
Report of the Comptroller and Auditor General of India STATUS OF
Report of the Comptroller and Auditor General of India STATUS OF ONGOING PROJECTS IN INDIAN RAILWAYS for the year ended March 2014 Laid in Lok Sabha/Rajya Sabha on_____________ Union Government (Railways) No. 48 of 2015 CONTENTS Paragraph Pages List of Abbreviations i to ii Executive Summary iii to ix CHAPTER 1 - Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion Introduction 1.1 1 Organisation Structure 1.2 2 Audit objectives 1.3 2 Scope and Audit Methodology 1.4 3 Audit Criteria 1.5 3 Audit Findings 1.6 4-35 Conclusion 1.6.14 35 Recommendations 1.6.15 36 CHAPTER 2 - Management of Works Contract in Indian Railways Introduction 2.1 37 Audit Findings 2.2 38-56 Conclusion 2.4 56 Recommendations 2.5 56 CHAPTER 3 - Dedicated Freight Corridor Projects Introduction 3.1 58 About the Project 3.1.1 58 Approval and Planning of the Project 3.2 60 Conclusion 3.4 69 Recommendations 3.5 69 CHAPTER 4 – Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit Introduction 4.1 70 Organisation Structure 4.2 72 Audit Findings 4.4 72 Conclusion 4.6 94 Recommendations 4.7 95 APPENDIX Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion 96-179 Management of Works Contract in Indian Railways 180-181 Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit 182-186 ANNEXURE Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion 187-286 Management of Works Contract in Indian Railways 287-302 Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit 303-316 PREFACE This Report for the year ended March 2014 has been prepared for submission to the President of India under Article 151 of the Constitution of India. -
Kendriya Vidyalaya Crpf Mudkhed Session 2021-22
KENDRIYA VIDYALAYA CRPF MUDKHED SESSION 2021-22 PROVISIONALLY SELECTED LISTS OF CANDIDATES FOR ADMISSION IN CLASS III, IV, VI, VII, VIII DATE OF ADMISSION : 20.04.2021 – 27.04.2021 (ON WORKING DAYS ONLY) TIME OF ADMISSION : 11.00 AM TO 01.00 PM LISTS OF DOCUMENTS REQUIRED AT THE TIME OF ADMISSION 1. Original TC of the student 2. Service certificate of the parent-original 3. Address Proof- Aadhar Card/Light Bill/Ration Card/Affidavit / Rent Agreement etc 4. Caste Certificate –original for verification Important Instructions: 1. Fees: CASH PAYMENT ONLY (please carry exact amount of fees at the time of admission) Admission Fees 25 VVN 1500 Computer Fees 300 Total Fees of one quarter i.e. from April 2021 to June 1825 2021 2. All the parents are requested please follow all the COVID-19 protocol during admission procedure. KENDRIYA VIDYALAYA CRPF MUDKHED SESSION 2021-22 DATE : 19.04.2021 PROVISIONALLY SELECTED LIST OF REGISTERED CANDIDATES FOR ADMISSION IN CLASS -III No. of Transfers Occupation/Departm in last 7 Sr. No. Name of the student DOB Father's Name Mother's Name ent Caste Cat. Empl.Cat. years Previous School Name Contact No. Remark 1 I 3 PRASHANT SAHEB KANGULE 03-07-2012 SAHEB VANITA EX SERVICEMAN OBC MPS ENGLISH SCHOOL, NANDED 7767855906 SELECTED 2 I 0 ANANT GAJANAN KOLI 18-09-2013 GAJANAN GITANJALI CRPF OBC ZP SCHOOL MIRAJ 6264671198 SELECTED SHANTINIKETAN PUBLIC 3 III 0 ARNAV ARVIND SHINGARPUTALE 01-01-2013 ARVIND PRANITA POLICE SC SCHOOL NANDED 7972379618 SELECTED 4 SANSHRUTI ANKOSH PATIL 19-12-2012 IV 2 Universal Public School ANKOSH PATIL SUREKHA ZPCPS MUDKHED GEN Mudkhed 7620331874 SELECTED 5 ABHIDNY SADANAND KAMBLE 03-07-2013 SADANAND ARUNA LECTURER,MSEB SANT SC IV 0 LITTLE SCHOLARS, NANDED 7875552280 WAITING 6 SHREYA RAVINDRA SOLANKE 18-08-2012 GADGEBABA JR. -
The Report of Commission of Inquiry Wakf Board Maharashtra (Aurangabad)
THE REPORT OF COMMISSION OF INQUIRY WAKF BOARD MAHARASHTRA (AURANGABAD) V MAHARASHTRA VIDHANMANDAL SACHIVALAY VIDHAN BHAVAN, MUMBAI 2015 THE REPORT OF COMMISSION OF INQUIRY WAKF BOARD MAHARASHTRA (AURANGABAD) Y 3134—1 THE REPORT OF COMMISSION OF INQUIRY WAKF BOARD MAHARASHTRA (Aurangabad) Date: 1-1-2011 INDEX OF THE REPORT PART -I Sr.No. Description Page 1. Index Reportwise 7 2. Index Complaintwise 12 3. Districtwise list 17 4. Responsibility of Individual 24 5. Misconduct by Advocate 30 PART-II 31 1. Preface 31 2. Preamble 32 3 Scheme 71 PART-III 89 Report 89 1 to 524 1 PART -I Sr. Description Page No. No. INDEX REPORTWISE 7 INDEX COMPLAINTWISE 12 DISTRICTWISE LIST 17 1 Aurangbaad 17 2 Ahmednagar 18 3. Beed 18 3 Jalna 20 4 Jalgaon 20 5 Mumbai 21 6 Nanded 21 7 Osmanabad 22 8 Parbhani 22 9 Pune 23 10 Satara 23 List- Responsibility of Individual. 24 Mr. M.A. Aziz 24 Mr. M.Y. Patel 24 Mr. S.S.Ali Quadari 25 Mr.A.R.Shaikh 26 Member of Board 26 District Wakf Officers 27 Mr.Tareque Anwar 27 Mr.A.U.Pathan 28 Mr. Aziz Ahmed 28 Mr.Muzfar Siddiqui 28 2 Mr.Shaikh Zafar 28 Mutwalli 28 Mr.Maheboob Alam 29 Mr.M.M.Siddiqui 29 Minister 30 Misconduct by Advocate 30 3 PART-II PREFEACE 31 PEAMBLE 32 1 Restrictions of powers 32 2 Burning problems 34 3 Pessimistic Approach 37 4 Non-cooperatin by the CEO Wakf 40 5. Grivance against CEO Wakf of Non-Cooperation (with progress 48 report) 6. -
Project Description the State the State of Maharastra
Preparation of Detailed Project Report for Up-gradation of Ausa – Waranga & Wardha – Butibori Section of NH361 in Project Description the state the state of Maharastra. PROJECT DESCRIPTION 1. INTRODUCTION National Highways Authority of India (NHAI) is engaged in the development of National Highways. As a part of this endeavor, NHAI has decided to upgrade and strengthen the existing two lane State Highway MSH-3 between sections Ausa – Waranga Phata and Wardha – Butibori into 4 – lane configuration. In this regard, NHAI retained the services of M/s. Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. for preparation of the Detailed Project Report for upgradation and strengthening of the existing two lane State Highway MSH-3 between sections Ausa – Waranga Phata and Wardha – Butibori into 4 – lane configuration. The different stretches of the project road that are proposed for the above said development are: PROJECT STRETCH S. No Section Chainage NH No State 1 Ausa – Waranga Phata Km.470.000 to Km.611.200 361 Maharashtra 2 Wardha – Butibori Km 80.000 to 28.800 2. LOCATION OF THE PROJECT AREA MSH-3 originates from Ratnagiri and passes through several districts of Maharashtra like Kolhapur, Sangli, Solapur, Tuljapur, Ausa, Nanded, Hingoli, Yeotmal, Wardha and terminates at Nagpur, having overlaps with several NH and other State Highways.The National Highway No. 361 startes at Tuljapur and passes important towns Ausa, Latur, Chakur, Sirur Tajband, Ahmedpur, Loha, Nanded, Hadgaon, Umerkhaed, Mahagaon, Arni, Yavatmal, Kalamb, Deoli, Wardha and ends at Butibori on NH-44. The section-I of the the project highway starts at Ausa (Km 470.000 on MSH3) run across the districts of Latur, Nanded and Hingoli and ends at Waranga Phata (Km 611.200 on MSH3). -
Chapter 25 TRANSPORT
Chapter 25 TRANSPORT Introduction An efficient transport system is absolutely necessary for sustaining other crucial economic activities. Considering the inadequacies and imbalances in transport, the Ninth Five Year Plan envisaged devising a comprehensive package to address various issues facing the sector. It emphasised the need for improving the capacity and quality of the transportation system through technological upgradation and removing distortions in the inter-modal mix by evolving a rational tariff and investment policy. It also laid stress on improvement of the self-financing capacity of this sector and on the need for ensuring an improved transport system to provide speedy, efficient, safe and economical carriage of goods and people. While the achievement of objectives and targets set for some sub- sectors has been very encouraging, the progress in case of others is not as rosy. The targets set for roads and ports sector are likely to be achieved while in case of railways shortfalls in achievement of physical and financial targets as well as policy objectives are anticipated. In what follows, the position with respect to each sub-sector has been elaborated. RAILWAYS 2. Considering India’s continental size, geography and resource endowment, it is natural that Railways should have a lead role in the transport sector - not to mention other considerations such as greater energy efficiency, eco-friendliness and relative safety. However, Indian Railways has experienced a continuous decline in its position relative to the road transport system. Some reduction in share in favour of road transport was to be expected and is in line with trends elsewhere but there is reason to believe that in India this has been excessive. -
Village Map Taluka: Deglur District: Nanded
Biloli Village Map Manshakarga Taluka: Deglur Apsavargaon Shevala Lakhkha District: Nanded Sugaon Kotekallur Wazarga Shekhapur Nipani Savargaon Limba Nandur Tupshelgaon Alur Ibrahimpur Wannali Rampur P.shahapur Shelgaon Shahapur Alapur Khanapur Antapur Kare Malkapur Chainpur Sujayatpur Tamlur Tadkhel µ 3 1.5 0 3 6 9 Malegoan Munjalga Narangal Bk. Mendankallur km Mukhed Takli Bagam Bomnali Thadi Sawargaon HawargaSundgi Bk. Sangvi Umar Degaon Bk. Degaon Kh Hanuman Hipparga Mandgi Gap_das Sundgi Kh. Kavalgadda DEGLUR Narangal Kh Bhayegaon !( Kurudgi Bk Shiv Achegaon Malkapur Takli Walag Location Index Achegaon Deglur (M Cl) Dhosni Karegaon Bhokaskheda Balegaon Chakur Mailapur (D) Pimpalgaon District Index Nandurbar Kavalgaon Bhandara Amravati Lingankerur Dhule Nagpur Gondiya Mengapur (D) Ballur Jalgaon Akola Wardha Daregaon Sangvi Karadkhed Rampur Bk. Buldana Borgaon Nashik Washim Chandrapur Wadikarkhed Bhaktapur Yavatmal Palghar Aurangabad Amdapur Kutub Shahapurwadi Jalna Gadchiroli Nagral Hingoli Gavandgaon Thane Ahmednagar Parbhani Karadkhed Mumbai Suburban Nanded Hotal Mumbai Bid Kathewadi Raigarh Pune Naiktanda (N.V.) Latur Bidar Osmanabad Walag Kedarkunta Solapur Shivani Satara Devapur Ratnagiri Sangli Pendpalli Yergi Maharashtra State Markhel Zari Kolhapur Udgir Sindhudurg Dharwad Takali Jahagir Davangir Malegaon (M) Taluka Index Mahoor Kinwat Pujarwadi Kini Kinitanda Kshirsamudra Mangajiwadi Ambulga Hadgaon Loni Himayatnagar Tumbarpalli Martoli Ardhapur Hali Bhokar NandedMudkhed Bhutan Hipparga Loha Umri Dharmabad Shilwani Chavanwadi -
Bhokar Assembly Maharashtra Factbook
Editor & Director Dr. R.K. Thukral Research Editor Dr. Shafeeq Rahman Compiled, Researched and Published by Datanet India Pvt. Ltd. D-100, 1st Floor, Okhla Industrial Area, Phase-I, New Delhi- 110020. Ph.: 91-11- 43580781, 26810964-65-66 Email : [email protected] Website : www.electionsinindia.com Online Book Store : www.datanetindia-ebooks.com Report No. : AFB/MH-085-0118 ISBN : 978-93-5293-182-8 First Edition : January, 2018 Third Updated Edition : June, 2019 Price : Rs. 11500/- US$ 310 © Datanet India Pvt. Ltd. All rights reserved. No part of this book may be reproduced, stored in a retrieval system or transmitted in any form or by any means, mechanical photocopying, photographing, scanning, recording or otherwise without the prior written permission of the publisher. Please refer to Disclaimer at page no. 151 for the use of this publication. Printed in India No. Particulars Page No. Introduction 1 Assembly Constituency - (Vidhan Sabha) at a Glance | Features of Assembly 1-2 as per Delimitation Commission of India (2008) Location and Political Maps Location Map | Boundaries of Assembly Constituency - (Vidhan Sabha) in 2 District | Boundaries of Assembly Constituency under Parliamentary 3-8 Constituency - (Lok Sabha) | Town & Village-wise Winner Parties- 2014-PE, 2014-AE and 2009-PE Administrative Setup 3 District | Sub-district | Towns | Villages | Inhabited Villages | Uninhabited 9-19 Villages | Village Panchayat | Intermediate Panchayat Demographics 4 Population | Households | Rural/Urban Population | Towns and Villages -
Railway Timetable
Hazur Sahib Parli Vaijnath Mudkhed Purna Nanded Manma d Secunderabad Akola Parbhani Adilabad Nagpur Khandwa Table No. 26 Towards Manmad Amrava- Hyder- Narasapur Nizam- Ajni Kaki- Vijaya Secun- Secun- Narasa- Vi- Dhanbad Rames- Chennai ti Pune abad - Nagarsol abad Mumbai nada wada - derabad der- pur akapat- Shri Cha- waram- Cen- Express Ajmer Express Mumbai Loka- Town - Sainagar Sainagar abad- Nagar- nam Sai trapathi Okha tral _ TRAIN NAME Express Loka- Manya Sainagar Shirdi Shirdi Jaipur sol Nagar Sahu Express Nagar- manya Tilak(T) Shirdi Express Express Express Express Shirdi Maharaj sol Tilak(T) Express Express Terminus Express Express Train Number 11406 12720 17213 11206 11202 17206 17208 17002 19714 17231 18503 11046 16733 16003 Class of accommodation 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, 2A,3A, SL,II SL,II SL,II SL,II SL,II SL,II SL,II SL,II SL,II SL,II SL,II SL,II SL,II SL,II Days of Operation from M,Tu,W M, Sa M,W Su Fr M, W, Sa Tu Su, F M Su, F Th M F Su originating station. Th,Sa From Table No. 109A 25 25 25 109A 24 24 24 25 25 25 32 25 25 Originating Departure 18.30 20.30 10.25 23.15 16.15 06.15 10.35 16.40 21.20 10.25 09.10 14.00 20.50 09.15 Jalna 204 a 04.58 04.58 03.50 03.25 03.25 03.25 06.28 06.28 07.39 08.13 08.13 d 05.00 05.00 03.52 03.27 03.27 03.27 06.30 06.30 07.40 08.15 08.15 Destination Arrival 13.15 03.05 13.45 13.45 09.15 09.15 09.15 05.55 12.15 04.15 15.15 $ Temporary stoppage Hazur Sahib Parli Vaijnath Mudkhed Table No. -
Mudkhed Tirkaswadi District: Nanded
Hadgaon Village Map Nageli Taluka: Mudkhed Tirkaswadi District: Nanded Ardhapur Patharwadi Barad Shemboli Bhokar µ Borgaonsita Borgaon Nandri 2 1 0 2 4 6 Dongargaon Wadi Kamali Amrapur (Dudhanwadi) km Jawala Pathak Pardi (Vaijapur) Jawala Murhar Hissa Pathrad Vaijapur (Pardi) Pathrad Location Index Saregaon Rajwadi Niwgha Pimpalkoutha (M) Dhanaj District Index Nandurbar Khambala Bhandara Dhule Amravati Nagpur Gondiya Jalgaon Akola Wardha Buldana Mudkhed (M Cl) Nashik Washim Chandrapur MUDKHED Yavatmal !( Palghar Aurangabad Jalna Hingoli Gadchiroli Mugat Mendka Thane Ahmednagar Parbhani Mumbai Suburban Nanded Wardada Mumbai Bid Pune Raigarh Bidar Ijali Latur Osmanabad Satara Solapur Wai Ratnagiri Sangli Wadi Muktapur Kolha Amdura Maharashtra State Nanded Kolhapur Sindhudurg wadi Muktaji Hajapur Chikala Dharwad Dongaon Wadi Niyamtullapur Taluka Index Basri Chikala Tanda Mahoor Kinwat Gopalwadi Shankhtirth Rohi Pimpalgoan Rohi Pimpalgaon Tanda Hadgaon Devapur Himayatnagar Pimpalkautha (Chau) Ardhapur Bhokar NandedMudkhed Pagargaon Loha Umri Kamlaj Dharmabad Naigaon (Khairgaon) Kandhar Biloli Malkautha Legend Daregaonwadi Umri Mukhed Deglur !( Taluka Head Quarter Daregaon Railway District: Nanded Mahati National Highway State Highway Village maps from Land Record Department, GoM. Chilpimpri Data Source: Loha State Boundary Waterbody/River from Satellite Imagery. Khujda District Boundary Takli Generated By: Taluka Boundary Maharashtra Remote Sensing Applications Centre Village Boundary Autonomous Body of Planning Department, Government of Maharashtra, VNIT Campus, Naigaon (Khairgaon) Waterbody/River South Am bazari Road, Nagpur 440 010. -
District Mining Plan of Nanded District
District Mining Plan of Nanded District Prepared by District Mining Officer Senior Geologist Nanded G.S.D.A.Nanded Regional Officer Dy.Conservator of Forest M.P.C.B. Nanded Nanded 1 1. Introduction: – As per rule 58, Chapter IV of Maharashtra Minor Mineral Extraction (Development & Regulation) Rules 2013,a committee has been formed in Nanded district under the chairmanship of District Collector Nanded to prepare District Mining Plan to ensure that the short term Quarry Permits are granted in accordance with the District Mining Plan, vide order No.2013/MSK- 2/MNG/Kawi-801Dtd.31/10/2013. The District Level Committee consists of the following members. 1. District Collector - Chairman 2. Regional Officer - Maharashtra Pollution Control Board -Member 3. Senior Geologist- Ground Water Survey & Development Board – Member 4. Deputy Conservator of Forest – Member 5. District Mining Officer – Member Secretary As per the above directives, District Level Committee has submitted District Mining Plan of Nanded District as follows. 2. Administrative Sub-Divisions & Tahsils of the District:- Nanded district comes under Nanded Administrative Division the district comprises 8 sub divisions and 16 Tahsils. These are given below. Sr.No. Name of Subdivision Name of Tahsil 1 Nanded 1.Nanded 2.Ardhapur 2 Bhokar 1.Bhokar 2. Mudkhed 3 Kandhar 1.Kandhar 2.Loha 4 Biloli 1.Biloli 2. Naigaon 5 Degloor 1.Degloor 2.Mukhed 6 Dharmabad 1 Dharmabad 2 Umri 7 Kinwat 1 Kinwat 2 Mahur 8 Hadgaon 1 Hadgaon 2 Himayatnagar 3. Geography:- Nanded si one of the District out of 35 Districts in Maharashtra State. The District lies between 180 16’ to 190 55’ North Latitude and 760 56’ to 780 19’ East Longitude. -
T AG 13 Km Mumbai CST Lokmanya Tilak
Akola 53 Nagarsol Nagarsol Amravati Manmad Sai Nagar Sai Nagar Sai Nagar Manmad Okha Akola Purna Sri Ajmer Hazur Hazur Hazur Jaipur Sainagar Amritsar Narsapur Narsapur Tirupati Dharma- Shirdi Shirdi Shirdi Secun- Rames- Kache- Patna Ganga- Hydera- Sahib Sahib Sahib Secunde- Shirdi Nanded Express Express Express bad Visakha- Vijayawada/ Secun- derabad waram guda Express nagar bad Nanded Nanded Nanded rabad Visakha Express TRAIN NAME Express patnam Kakinada derabad Ajanta Express Express Hazur Express Santra- Sambal- Viskha- Express patnam Express To wn Express Express Sahib gachi pur patnam Express Express Nanded Express Express Express Express Train Number 17214** 17232* 12766 17687 17205 17207 17001 17063 16734 17640 17610 12486 12719 12767 18310** 18510** 19713 22802 12422 2A,3A 2A,3A 2A,3A CC 2A,3A 2A,3A 2A,3A 2A,3A 3A CC 2A,3A 2A,3A 2A,3A 2A,3A 2A,3A 2A,3A 2A,3A 2A,3A 2A,3A Class of accommodation SL,II SL,II SL,II II SL,II SL,II SL,II SL,II SL,II,P II SL,II,P SL,II SL,II SL,II,P SL,II SL,II SL,II SL,II SL,II From Table No. Days of departure Tu,W,Th at originating station F,Su M,Sa Th,M Daily Tu,Th,Su W M,Sa Daily Sa Daily F F,Tu,Sa W, F M M,Tu,Sa W,Th,Su Sa F M Km Mumbai CST d 9 Dadar d 16 Lokmanya Tilak (T) d 54 Kalyan d 137 Igatpuri d 182 Devlali d 188 Nasik Road d Pune d a 261 Manmad d Sai Nagar Shirdi d 17.10 17.10 17.10 19.10 a 18.50 18.50 18.50 04.55 21.10 261 Manmad d 15.00 18.55 18.55 18.55 21.00 05.00 21.20 a 15.24 19.25 19.25 19.25 21.25 06.00 22.05 286 Nagarsol d 11.15 11.15 15.25 19.30 19.30 19.30 21.30 06.05 22.10 a 12.35