Sr. No District/ Area NHs passing Details of ongoing NH works Remarks . Headquarters in per through the 1000 sq. district km area 1Agra 4,027 NH-2 6 lane of -Agra section of NH-2 (23 km.) Work in progress NH-3 Construction of Agra Bypass connecting NH-2 & NH-3 (32 Work in progress km.) NH-11 Proposal being framed by State PWD for submission to Included in Annual Plan for Ministry. development to two lane with paved shoulder NH-93 Aligarh- Agra Section of NH-93. Feseability study for 4 lane is being taken up. NH-123 DPR being taken up. Newly declared NH. NOC not received.(15 Km in UP). Bids For DPR invited. 2Aligarh 3,747 NH-91 4 laning Ghaziabad - Aligarh Section of NH-91 PCOD has been issued on 23.06.2015 and tolling has started from 24.06.2015. NH-93 Aligarh- Kanpur Section of NH-93. Feseability study for 4 lane is being taken up

3Allahabad 5,425 NH-2 Delhi-Kolkata Section of NH-2 Already 4 laned. 4 lane to 6 NH-27 Work of 4 laning under progress Appointedlbk date issued in May 2016 NH-76 DPR for development is under progress

NH-76E DPR for development is under progress

NH-96 Const of paved shoulder including drain work from km. Work in progress 141.800 to 146.00 of NH-96 4Ambedkar Nagar 2,372 NH-232 2 lane with paved shoulders of Raebareilly-Tanda section Work in progress / Akbarpur of NH-232 NH-233 4 laning of Ghaghra Bridge-Varanasi section of NH-233 Work in progress (Pkg. I) 5Auraiya 2,051 NH-2 6-laning of Etawah-Chakeri section of NH-2 Work in progress NH-91A Strengthening including reconst-ruction / widening of Work in progress culvert from 61.00 to 85.00 of NH-91A 6 Azamgarh 4,210 NH-233 4 laning of Ghaghra Bridge-Varanasi section of NH-233 Work in progress 7 Bagpat 1,389 NH-334B Bids for DPR invited Newly declared NH. NOC not received.(60 Km in UP)

8 5,751 NH-28C and Rehabilitation and upgradation of NH 28 C from km. 43.00 730 to 93.00 (Jarwal road Junction to Bahraich Section )in the State of Uttar Pradesh to two lane with paved shoulder under NHDP IV on EPC Basis (REVISED SANCTION)

Rehabilitation and Up-gradation of Sisiya- section (Km.188.8 to 226.100) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode 9 Ballia 2,981 NH-19 DPR for development is under progress 10 Balrampur 2,927 NH-330 and Widening to 2 lane PSD & Strng from km. 310.00 to Work in progress 730 325.00 of NH-730 EPC MODE Rehabilitation and Up-gradation of Tulsipur- Barhani Bids invited Section (Km 351+000 to Km 385+000) of NH-730 to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh 11 Banda 4,418 NH-76, 232 Rehabilitation and Up-gradation of from Km.285.000 to Bids invited 326.000 of NH-76 (Kalupur-Lalata road) to two lane with paved shoulder on EPC mode in the State of Uttar Pradesh

km 215.00 to 285.00 2 lane with paved shoulder by State Govt Budjet. PR from km 192.00 to 210.00 of NH-76(35) Work in progress

2 lane with paved shoulders of Raebareilly-Banda section Work in progress of NH-232 12Barabanki 3,825 NH-28 Alreay 4 lane under OMT for maintenannce

Page 1 of 6 Sr. No District/ Area NHs passing Details of ongoing NH works Remarks . Headquarters in per through the 1000 sq. district km area NH-28 C Rehabilitation and upgradation of NH-28C from km. 0.00 Work in progress to 43.00 (Barabanki to Jarwal road Junction Section )in the State of Uttar Pradesh to two lane with paved shoulder under NHDP IV on EPC Basis (REVISED SANCTION)

13Bareilly 4,120 NH‐24 Four laning of Bareilly-Sitapur section of NH-24 Work in progress NH‐74 2 lane with paved shoulder of Bareilly-Sitarganj section of Work in progress NH-74

14Basti 3,033 NH‐28 Alreay 4 lane under OMT for maintenannce

NH‐233 Rehabilitation and upgradation of Indo Nepal Border to Rudhauli Section (Km.0+00 to 65+870) of NH‐233 on EPC basis

Rehabilitation and upgradation of Rudhauli to Basti side approach of Ghaghra Bridge Section (Km.65+870 to 122+270) of NH‐233 on EPC basis 15Bijnor 4,561 NH‐119 DPR for development under progress

NH‐74 DPR for development under progress 16 Budaun 5,168 State road Connected by state 4‐Lane road. 4‐Laning by PWD. connectivity 17Bulandshahr 3,717 NH‐91 4/6 laning Ghaziabad - Aligarh Section of NH-91 P-COD has been issued and NH‐235 4 laning of Meerut-Bulandshahar section of NH-235 Work awarded 18Chandauli 2,554 NH‐2, 6 laning of Varanasi-Aurangabad section of NH-2 Work in progress NH‐97 DPR proposed in Annual Plan of the Ministry NH‐219 DPR being taken up Newly declared NH. NOC not received.(5 Km in UP)

19Chitrakoot 3,205 NH‐76 Rehabilitation and Up‐gradation of from Km.285.000 to Bids invited 326.000 of NH‐76 (Kalupur‐Lalata road) to two lane with paved shoulder on EPC mode in the State of Uttar Pradesh km 215.00 to 285.00 2 lane with paved shoulder by State Govt Budjet. NH‐731A DPR being taken up Newly declared NH. NOC not received.(160 Km in UP). Bids for DPR invited 20Deoria 2,535 NH‐727A DPR being taken up Newly declared NH. NOC not received.(100 Km in UP).ids for DPR invited NH‐227A DPR being taken up Newly declared NH. NOC not received.(218 Km in UP).bids for DPR invited 21 Etah 4,446 NH‐91 Aligarh Kanpur section Feseability study for 4 lane is being taken up. 22Etawah 2,288 NH‐2 6 laning of Agra-Etawah section of NH-2 Work awarded 6-laning of Etawah-Chakeri section of NH-2 Work in progress NH‐91A DPR being taken up Bids for DPR invited NH‐92 IRQP & STG work km 0.00 to 60.00, 69.850 to 78.00 (State Govt Bids for DPR invited Budjet) 23Faizabad 2,764 NH‐28 Alreay 4 lane under OMT for maintenannce NH‐96 Strengthening with provision of paved shoulder in km. 0.00 to 46.470 of NH‐96(330) EPC MODE under progres 90% complete

NH‐330A DPR fordevelopment under progress

24 Farrukhabad / 2,279 Not connected Proposed for connectivity by NH. In‐principle declared NH* Fatehgarh 25Fatehpur 4,152 NH‐2 Delhi-Kolkata Section of NH-2 4-lane completed. 4-lane to 6- lane is being taken up.

NH‐232 2 laning with paved shoulders of Raebareilly-Banda section Work in progress of NH-232 26 Firozabad 2,361 NH‐2 6 laning of Agra-Etawah section of NH-2 Work awarded

Page 2 of 6 Sr. No District/ Area NHs passing Details of ongoing NH works Remarks . Headquarters in per through the 1000 sq. district km area 27 Gautam Buddha 1,268 NH‐91 4/6 laning Ghaziabad - Aligarh Section of NH-91 P-COD has been issued and Nagar / NOIDA tolling has started 28Ghaziabad 1,955 NH‐24 Construction of Delhi-Meerut Expressway Pkg. II - Work awarded NH‐58 Initial stretch of 52 Km denotified from the list of NHs

NH‐91 4 laning of Ghaziabad-Aligarh section of NH-91 P-COD has been issued and 29Ghazipur 3,377 NH‐19 DPR for developmetn under progress NH‐29 4 laning of Varanasi-Gorakhpur section of NH-29, Pkg. II Work awarded

NH‐97 DPR being taken up Bids for DPR invited 30Gonda 4,425 NH‐330 DPR being taken up Newly declared NH. NOC not received.(96 Km in UP).Bids for DPR invited NH‐330B DPR being taken up Newly declared NH. NOC not received.(48 Km in UP).Bids for DPR invited 31Gorakhpur 3,321 NH‐28 Alreay 4 lane under OMT for maintenannce NH‐29 4 laning of Gorakhpur-Mau section of NH-29 of Pkg. IV Work awarded

NH‐29E Rehabilitation and upgradation of NH‐29E from km. 0.00 to Work in Progress 80.00 (Sonauli to Gorakhpur section) in the State of Uttar Pradesh to two‐lanes with paved shoulders under NHDP‐IV on EPC Basis. NH‐227A DPR being taken up Newly declared NH. NOC not received.(218 Km in UP). Bids for DPR invited NH‐727A DPR being taken up Newly declared NH. NOC not received.(100 Km in UP). Bids for DPR invited. 32 Hamirpur 4,316 NH‐86 Kanpur - Kabrai Section of NH-86. Already 2 laned + Paved 33 Hardoi 5,986 Not connected In‐principle declared NH #

34 Hathras 1,751 NH‐93 Aligarh- Agra Section of 93 Already 2 laned + Paved Shoulder including Hathras bypass. 35 Jalaun / Orai 4,565 NH‐25 Jhansi Kanpur section of NH-25 existing 4-lane highway completed

36Jaunpur 4,038 NH‐56 4 laning of Varanasi-Sultanpur section of NH-56 (Pkg. I) Work in progress

NH‐231 2 Lane with PS Completed 37Jhansi 5,024 NH‐25 Jhansi-Kanpur section. existing 4-lane highway completed NH‐26 Jhansi-Lalitpur section. existing 4-lane highway completed NH‐75 DPR in progress. NH‐76 Rehabilitation and Up‐gradation of Harpalpur ‐ Sugira section (Km.89.600 to 133.520) of NH‐76 (New NH No.339) in the State of Uttar Pradesh to two lane with paved shoulder under EPC mode PR from km 70.00 to 80.730 of NH‐76(39) 38 Jyotiba Phule 2,320 NH‐24 4 laning work completed Nagar / Amroha 39Kannauj 1,994 NH‐91 Aligarh Kanpur Section of NH-91 Feseability study for 4 lane is being taken up. NH‐91A Strengthening including reconst‐ruction / widening of culvert Bids for DPR invited from 61.00 to 85.00 of NH‐91A. DPR for development of entire reach is being taken up. 40Kanpur Dehat / 3,146 NH‐2 6-laning of Etawah-Chakeri section of NH-2 Work in progress Akbarpur NH‐2A 41Kanpur Nagar / 3,030 NH‐2 6-laning of Etawah-Chakeri section of NH-2 Work in progress Kanpur NH‐25 4 laning of Jajmau-Ramadevi section of NH-25 Work in progress

NH‐86 Kanpur - Kabrai Section of NH-86. work completed

Page 3 of 6 Sr. No District/ Area NHs passing Details of ongoing NH works Remarks . Headquarters in per through the 1000 sq. district km area NH‐91 Widening and Strengthening to 6 lane from km. 414.00 to Work in progress 419.00 of NH‐91under progress. For remainig portion, Feseability study for 4 lane is being taken up from Aligarh to Kanpur. 42 Kaushambi 1,835 731A DPR being taken up Newly declared NH. NOC not received.(160 Km in UP). Bids for DPR invited. 43Kheri / Lakhimpur 7,680 NH‐730 Rehabilitation and Up-gradation of Lakhimpur -Sisiya section Bids invited (Km.140.00 to 180.000) of NH-730 to two lanes with paved shoulder on EP mode in the State of Uttar Pradesh Rehabilitation and Up‐gradation of Puranpur ‐ Khutar section Bids invited (Km38.000 to 82.000) of NH‐730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode NH‐730A Widening & strengthening from km.0.00 to 50.67of NH‐730 Work in Progress (EPC MODE) under progress.

44Kushinagar / 2,910 NH‐28B two lane with paved shoulder of NH‐28B from km. 0.00 to 25.00 Work in Progress Padrauna (State Govt Budget). DPR being taken up for development of entire reach of NH‐28B

NH‐730 Widening & strengthening from km.505.00 to 538.00 of NH‐730 Work in Progress (EPC MODE) NH‐727A DPR being taken up Newly declared NH. NOC not received.(100 Km in UP). Bids for DPR invited. 45 Lalitpur 5,039 NH‐26 Jhansi Lalitpur section of NH-26 Already 4- laned. 46Lucknow 2,528 NH‐24 Delhi Lucknow Section of NH-24 State Capital has been provided NH‐24A Already 4 lane 4- lane connectivity with NH‐24B Lucknow - Raebareli Section of NH-24 various NHs around it, viz., NH- NH‐25 Lucknow - Kanpur Section of NH-25 24, 24B, 28, 25 and 56. In NH‐28 Lucknow - Muzaffarpur Section of NH-28 addition, Lucknow ring road (90 km) has also been proposed.

NH‐56 4 laning of Lucknow -Sultanpur Section from km. 11.500 to Financial bids opened work to 134.700 (km. 123.2) be awarded NH‐25A Already 4 lane Part of Lucknow Ring Road NH‐56A Already 4 lane Part of Lucknow Ring Road NH‐56B Already 4 lane Part of Lucknow Ring Road 47Mahoba 2,849 NH‐76 two lane with paved shoulder of NH‐76 from km. 162.50 to 178.00 (State Govt Budget). DPR for remaining stretches under progress Rehabilitation and Up‐gradation of Harpalpur ‐ Sugira section Bids invited (Km.89.600 to 133.520) of NH‐76 (New NH No.339) in the State of Uttar Pradesh to two lane with paved shoulder under EPC mode NH‐86 IRQP from km 0.00 to 22.00 of NH‐86(34) IN progress 48Maharajganj 2,951 NH‐730 Widening & strengthening from km. 454.00 to 470.90, 474.00 In progress to 484.00 of NH‐730 EPC MODE Widening & strengthening from km.505.00 to 538.00 of NH‐730 In progress (EPC MODE) NH‐29E Rehabilitation and upgradation of NH‐29E from km. 0.00 to In progress 80.00 (Sonauli to Gorakhpur section) in the State of Uttar Pradesh to two‐lanes with paved shoulders under NHDP‐IV on EPC Basis. (REVISED SANCTION) 49Mainpuri 2,746 NH‐91 Aligarh- Kanpur Section Feseability study for 4 lane is being taken up. NH‐92 DPR being taken up Bids for DPR invited 50 Mathura 3,332 NH‐2 6 laning of Agra-Etawah section of NH-2 Work awarded, appointed date is to be given 51 Mau 1,713 NH‐29 6 laning of Delhi-Agra section of NH-2 (km. 83.4) Work in progress 52Meerut 2,521 NH‐58 4 laning of Gorakhpur-Mau section of NH-29, Pkg. IV Work awarded NH‐119 DPR under progress NH‐235 4 laning of Meerut-Bulandshahar section of NH-235 Work awarded NH‐334B DPR being taken up Newly declared NH. NOC not received.(60 Km in UP). Bids for DPR invited. NH‐709A DPR being taken up Newly declared NH. NOC not received.(94 Km in UP). Bids for DPR invited.

Page 4 of 6 Sr. No District/ Area NHs passing Details of ongoing NH works Remarks . Headquarters in per through the 1000 sq. district km area 53Mirzapur 4,522 NH‐7 Varanasi Hanumanah Section of NH-7 Feasibility study is being taken up. NH‐76E IRQP from km 468.00 to 477.00 of NH‐76E(35) DPR for development under progress 54Moradabad 3,646 NH‐24 4 laning of Moradabad-Bareilly section of NH-24 Work in progress, PCOD issued

NH‐93 2 laning with paved shoulders of Moradabad-Aligarh Work awarded section of NH-93 55Muzaffarnagar 4,008 NH‐58 Meerut-Muzaffarnagar-Haridwar section 4-lane completed. NH‐334A DPR being taken up Newly declared NH. NOC not received.(15 Km in UP) 56Pilibhit 3,499 NH‐74 Two lanning with paved shoulders of Sitarganj-Bareilly Work in progress Section of NH-74 NH‐730 Rehabilitation and Up‐gradation of Puranpur ‐ Khutar section Bids invited (Km38.000 to 82.000) of NH‐730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode

NH‐730A Widening of existing single lane carriageway to two lane Work recently awarded in May. carriageway with paved shoulder and strengthening from Appointed date to be given Km.51.000 (50.675) to 105.000 of NH‐730A 57Pratapgarh 3,717 NH‐96 Rehabilitation and Up‐gradation of Pratapgarh to Allahabad Bids invited Bypass Road & Junction section of NH‐96 (New NH No.330) from existing km 100+800 to km 135+230 [Design Ch.100.800 to Ch. 135.500] to four lanes with paved shoulders in the state of Uttar Pradesh under EPC mode

NH‐231 Raebareli Jaunpur Section of NH-231 Work Completed. NH‐731A DPR being taken up Newly declared NH. NOC not received.(160 Km in UP). Bids for DPR invited. NH‐931 IRQP work completed in entire reach 58RaeBareli 4,586 NH‐24B 2 laning with paved shoulders of Raebareilly-Allahabad Work in progress section of NH-24 B NH‐231 Raebareli Jaunpur Section Work Completed. NH‐232 2 laning with paved shoulders of Raebareilly-Banda section Work in progress of NH-232 NH‐330A IRQP from Km.0.00 to 46.00 of NH‐330A. DPR for development DPR for development under of entire stretch is under progress. progress NH‐931A Strengthening work completed in entire reach 59Rampur 2,367 NH‐24 4 laning of Moradabad-Bareilly section of NH-24 Work in progress. PCOD isued

NH‐87 Rampur-Rudrapur section of NH-87 Work awarded. 60Saharanpur 3,689 NH‐73 Dehradun Sahranpur Section of NH-73 Work Awarded. 72A Sahranpur Yamunanager section of NH-72 A Work Awarded. 61Sant Kabir Nagar / 1,442 NH‐28 Alreay 4 lane under OMT for Khalilabad NH‐227A DPR being taken up Newly declared NH. NOC not received.(218 Km in UP). Bids for DPR invited. 62 Sant Ravidas Nagar 959 NH‐2 Delhi-Kolkata Section of NH-2 4-lane completed. 4-lane to 6- / Gyanpur lane is being taken up. 63Shahjahanpur 4,575 NH‐24 Four laning of Bareilly-Sitapur section of NH-24 on DBFOT Work in progress Mode NH‐730A Widening of existing single lane carriageway to two lane Work recently awarded in May. carriageway with paved shoulder and strengthening from Appointed date to be given. Km.51.000 (50.675) to 105.000 of NH‐730A Widng with PS & Strng from Km.0.00 to 50.675 of NH‐730A EPC Work in progress MODE 64 Shravasti 1,126 NH‐730 Rehabilitation and Up‐gradation of Bahraich ‐Shrawasti section Bids invited (Km.248.40 to 310.00) of NH‐730 in the State of Uttar Pradesh to two lanes with paved shoulder 65 Siddharthnagar / 2,752 NH‐233 and 730 PR FROM 385.00 TO 420.00 OF NH‐730. DPR for its (Naugarh) development under progress. 66 Sitapur 5,743 NH‐24 Four laning of NH-24 of Bareilly-Sitapur section of NH-24 Work in progress on DBFOT Mode 67 Sonbhadra / 6,788 NH‐75E Work completed. Robertsganj 68Sultanpur 4,436 NH‐56 4 laning of Lucknow -Sultanpur Section of NH-56 Financial bids opened NH‐96 Strengthening with provision of paved shoulder in km. 0.00 to Work in progress 46.470 of NH‐96(330) EPC MODE Page 5 of 6 Sr. No District/ Area NHs passing Details of ongoing NH works Remarks . Headquarters in per through the 1000 sq. district km area NH‐232 2 lane with paved shoulders Raebareilly-Tanda section of Work in progress NH-232 69Unnao 4,558 NH‐25 Jhansi Kanpur Lucknow Section Work Completed. NH‐232A DPR to be taken up 70Varanasi 1,578 NH‐2 6 laning of Varanasi-Aurangabad section of NH-2 Work in progress NH‐7 DPR for developmetn under progress NH‐29 Widng & Streng PSD from km. 2.225 to 7.600 of NH‐29(31) In progress nearing completion 4 laning of Varanasi-Gorakhpur section of NH-29 of Pkg. II Work awarded

NH‐56 Four laning in Varnasi ‐Babtpur Airport (17Km) . In Progress

Four laning in Varnasi-Sultanpur section of NH-56, Pkg. I Work in progress

NH‐233 Capacity augmentation to 2 lane with paved shoulder configuration on National Highways from km. 288.200 to km 292.00 of NH‐233(28) 4 laning Varanasi-Ghaghra Bridge section of NH-233, Pkg. Work in progress III 71 Manyavar 1,993 State road State Road connectivity by 4‐Lane Road. 4‐Laning by PWD. Kanshiram Nagar connectivity (Kasganj) 72 Prabuddha Nagar / 1,240 NH‐709A DPR being taken up Newly declared NH. NOC not Shamli received.(94 Km in UP). Bids for DPR invited. 73Panchsheel Nagar 1,124 NH‐24 Construction of Delhi-Meerut Expressway Pkg. III - Work awarded / Hapur NH‐235 4 laning of Meerut-Bulandshahar section of NH-235 Work awarded 74 Bhim Nagar 2,422 NH‐93 2 laning with paved shoulders of Moradabad-Aligarh Work awarded (Sambhal) / section of NH-93 75 Chhatrapati NH‐232 2 lane with paved shoulders of Raebareilly-Tanda section Work in progress Shahuji Maharaj of NH-232 Nagar / Gauriganj NH‐330A IRQP from Km.0.00 to 46.00 of NH‐330A in progress DPR for development under progress NH‐931 IRQP work completed in entire reach IRQP work completed in entire reach NH‐931A Strengthening work completed in entire reach Strengthening work completed in entire reach