Salem Sound Salem Harbor

Total Page:16

File Type:pdf, Size:1020Kb

Salem Sound Salem Harbor Salem Bike Routes Map To Beverly Beverly Kenwood Bridge «1A McCabe/ Kernwood Park Danvers River MBTA Commuter Rail Salem Sound To Newburyport/Rockport To Beverly Memorial Bridge KERNWOOD ST Causeway Miles Park 3 ! ! Salem Willows Park .J ! ! Food & ! I* Amusements ! ! Cabot ! ! Farm ! ! ! ! ! ! ! ! .J ! ! 107 ! .J Juniper Point ! ! Park ! ! ! ! ! ! ! MARCH ST ! ! ! ! ! ! Curtis Park/ ! ! March Street ! ! ! ! Playground MEMORIAL DR ! ¬«1A ! Juniper Cove ! ! ! ! ! WINT To Peabody ! ER ! ! ! ISL ! ! AN ! ! D ! ! R D ! ! ! ! North FORT AVE ! ! McGlew BRIDGE ST ! Park ! River Collins ! ! Collins Cove ! SGT. AYUBE MEMORIAL DRIVE ! Playground 114 Cove ! ! ! ! ! ! ! J Cat Patton Park . J Furlong Gonyea . Park Park Memorial Cove Winter Island I* Park FORT AVE Park ! ! Lighthouse ! WEBB ST f ! ! ¬«1A ! ! ! 2.25 ANDREW! ST ! ! NORTH ST WASHINGTON SQ! E BRIDGE ST ! BRIGGS ST !( ! T !! ! Salem ! Common ! Ledge Hill Park / Mack Park ! Downtown Salem ! ! ! Leslie's Retreat Park WASHINGTON ST WASHINGTON! ! ! SQ S ! ! BLANEYBLANEY STST ! ESSEX ST BRIDGE ST Visitor ! Center ! ! ! ! ! N ! TO OS -II* DERBY ST B I* ! TO E ¡© SALEM I*Jc Y M SPINS R ER CO 114 ESSEX ST ! F EL LEM W Chamber SA RE ! A 107 of S I- Salem Maritime BIKE Commerce I* ! I- Historic Site ¡© ! I* ¬«1A ! I* ! DERBY ST ! Harborwalk ! Peabody South River ! To BOSTON ST Street Peabody High Street Park ! Playground 107 ! 114 WASHINGTON ST Lafayette ! Park CONGRESS ST Splaine Park ! Lighthouse Salem Harbor Mansell ! f Playground and ! Maryjane Lee/ Skate Park Prince Street Park """" ! " Broad " 1.5 Street " Playground " CANAL ST HIGHLAND AVE " Palmer Cove Park and Playground " Palmer ¬«1A ! " ! Cove 107 ! 114" ! ! ! ! LAFAYETTE ST " ! To ! ! LEACH ST Lynn ! " ! " ! SUMMIT AVE ! " Glendale ! 8 ! " Cove ! " ! JEFFERSON AVE ! Pioneer Village " 1630 ! WILSON ST J " . ! ! ! ! ! ! " CANAL ST ! ! Forest River .J " ! I* Park ! ! ! " ! ! ! WEST AVE .J St. Anne's ! Castle Hill Park " J I Playground ¶ t " Hiking and Mountain Biking ¬«1A Trails at 114 " Salem Woods Marblehead 0.75 Rosie's " Pond " Olde Salem Greens LORING AVE " Golf Course Salem State University Jeggle Bicycle Facilities LAFAYETTE ST Island Main Campus " Off-Road Bike Path (paved) ¬«1A " Off-Road Bike Path (unpaved) " SALEM Off-Road Pedestrian Path, Bicycles Allowed SPINS " Salem State University Salem Woods Off-Road Bike Path (Proposed) Central Campus " Off-Road Marblehead Rail Trail (unpaved) ¬«1A " """ On-Street Bike Lane " 0.375 114 " !!!! On-Street Bike Sharrows (shared lane) " Downtown Marblehead Higher Traffic Street Jackman (1.5 miles) Field Lower Traffic Street Pickman Park One-Way Playground To Salem Spins Bike Share Station Marblehead SALEM .J SPINS Points of Interest Salem State University Forest c Salem Ferry South Campus River J t Mountain Biking City of Salem 114 I - 0 I Visitor Information Forest River * Public Restroom Conservation Area I . J Public Beach ¶ J Public Pool MBTA Commuter Rail To Boston © Bike Shop ¬«1A Kimberley Driscoll To Swampscott (¡ Vinnin Square !T MBTA Commuter Rail Station Mayor Parks and Recreation Areas Map No. 12-011 - May 2012 by Salem GIS and Fay, Spofford & Thorndike Passing cars on the right. the on cars Passing l Use of either hand to signal stops and turns. and stops signal to hand either of Use l Massachusetts, a cyclists’s rights allow: rights cyclists’s a Massachusetts, Within the Commonwealth of of Commonwealth the Within recommended. otherwise prohibited. Riding in the road is is road the in Riding prohibited. otherwise outside of business districts, unless unless districts, business of outside Bicycles may only ride on sidewalks sidewalks on ride only may Bicycles l needed, for safety. for needed, Bicycles may use the entire lane of traffic, if if traffic, of lane entire the use may Bicycles l after dark. dark. after Front and rear lights are required if riding riding if required are lights rear and Front l and obey all other traffic laws. traffic other all obey and lights, ride in the same direction as traffic, traffic, as direction same the in ride lights, Bicycles must stop at all stop signs and red red and signs stop all at stop must Bicycles change the signal. the change Salem Greens Golf Course Parking Lot. Parking Course Golf Greens Salem l indicate where to position the front wheel in order to to order in wheel front the position to where indicate Willson Street at the far end of the Olde Olde the of end far the at Street Willson prohibiting bikes have been posted. posted. been have bikes prohibiting light to turn green. Bike-specific pavement markings markings pavement Bike-specific green. turn to light Woods. Trailhead can be found at 75 75 at found be can Trailhead Woods. State highways where signs specifically specifically signs where highways State a motor vehicle or bicycle is waiting for the the for waiting is bicycle or vehicle motor a Mountain Biking is permitted at Salem Salem at permitted is Biking Mountain Mountain Biking Mountain Loop detectors tell the traffic signal when when signal traffic the tell detectors Loop therefore they belong on the road except except road the on belong they therefore Traffic Light Traffic A Trigger Bicycles are considered vehicles, and and vehicles, considered are Bicycles l Campus. Central University’s riders. all for recommended are helmets Hawthorne Blvd., and the other at Salem State State Salem at other the and Blvd., Hawthorne by anyone 16 years of age and under. Bike Bike under. and age of years 16 anyone by cyclists. located stations: one in downtown Salem on on Salem downtown in one stations: located Mass law requires the use of bike helmets helmets bike of use the requires law Mass l motorists to expect to share the road with with road the share to expect to motorists bike lock). It offers two conveniently conveniently two offers It lock). bike cannot be accommodated for, reminding reminding for, accommodated be cannot program (includes bike, helmet, and and helmet, bike, (includes program SPINS bikes and Massachusetts bike laws: bike Massachusetts and bikes SALEM some narrow streets where a full bike lane lane bike full a where streets narrow some Salem Spins is a free public bike share share bike public free a is Spins Salem The top six things you need to know about about know to need you things six top The Program Program Sharrows are pavement markings found on on found markings pavement are Sharrows Sharrows Bike Salem Bike Share Share Bike Salem suits their safety needs. safety their suits lane or in another travel lane as as lane travel another in or lane 2007. October in System Trail Alliance may choose to ride in the bike bike the in ride to choose may as part of the East Coast Greenway Greenway Coast East the of part as park or makes turns. Bicyclists Bicyclists turns. makes or park Bike Path was officially designated designated officially was Path Bike in them, but may cross them to to them cross may but them, in and other non-motored users. The Salem Salem The users. non-motored other and bicycles. Cars should not drive drive not should Cars bicycles. pedestrians, dog walkers, rollerskaters rollerskaters walkers, dog pedestrians, dedicated travel lane just for for just lane travel dedicated should expect to share path with with path share to expect should Some wide streets have a a have streets wide Some Is a paved multi-use path; bicyclists bicyclists path; multi-use paved a Is Bike Lanes Bike Salem Bike Path Bike Salem ON-ROAD BIKE FACILITIES BIKE ON-ROAD OFF-ROAD BIKE FACILITIES BIKE OFF-ROAD Bike Facilities symbols Facilities Bike SALEM BICYCLE ROUTES MAP TAIN BIKING UN MO D N A D A O -R F NOTICE TO BICYCLISTS: F O , This map and accompanying information is intended D solely to assist bicyclists in selecting routes through the A Bring your bike on the train. City of Salem. In providing this information, the City O R Bikes are welcome on all MBTA does not assume liability for bicyclists who choose to - Commuter Rail Trains, except during travel upon any of the routes, trails or lanes shown on N this map, nor does the City guarantee the stability, O weekday peak hours in the peak condition or fitness of any of the listed routes, trails R directions. Folding bikes are allowed or lanes for bicycling. Many of the routes, trails or at all times on all MBTA trains when O lanes identified on this map cross and/or run on F folded. public roads that are exposed to daily wear and tear and degradation due to weather, motorized traffic and other environmental factors. As is true of any Bring your bike on the bus. street, routes may contain pavement imperfections, Bikes are allowed on all MBTA buses including ruts, cracks, bumps, expansion joints, and with external bike racks. Folding debris. It is the responsibility of the individual rider to bikes are allowed at all times on all remain alert at all times as to the conditions of the MBTA buses when folded. road, pedestrian and other traffic on the road, and the inherent potential for conflict in any shared-use space. Route users should always ride with care, wear Bring your bike on the ferry. a helmet, and obey traffic laws for their own safety Bikes are welcome on all Salem Ferry as well as the safety of all other users of the road or trips to and from Boston, at no extra right-of-way. charge. The Salem Ferry is located at 10 Blaney Street in Salem or at SALEM AREA BICYCLE SHOPS Long Wharf in Boston. & REPAIR CENTERS Salem Cycle UrbaneCyclist Bicycle parking. 72 Washington Street 144 Washington St. There are plenty of bike racks 978•741•2222 978•594•5174 conveniently located throughout salemcycle.com theurbanecyclist.com downtown Salem, at the MBTA Commuter Rail Station, the Salem Ferry Pier, various City parks, playgrounds, beaches, etc.
Recommended publications
  • South Essex Sewerage District Salem, Mass
    State Library of Massachusetts State House, Boston COMMONWEALTH OF MASSACHUSETTS South Essex Sewerage District Salem, Mass. THIRTY-THIRD REPORT COVERING THE YEAR 1958 PEABODY, MASSACHUSETTS PAGE & GOODWIN PRINTING COMPANY 1959 COMMONWEALTH OF MASSACHUSETTS South Essex Sewerage District Salem, Mass. THIRTY.THIRD REPORT COVERING THE YEAR 1958 THE SOUTH ESSEX SEWERAGE BOARD JOSEPH C. TOMASELLO, Chairman CLIFTON R. GRINNELL f r a n k j. M cCa r t h y Representative Commissioner of Public Works Town of Danvers, Mass. Peabody, Mass. GORDON T. RICHARDSON NEAL B. M ITCHELL Commissioner of Public Works City Engineer Beverly, Mass. Salem, Mass. C. IAIEJ UCRM tY OF MASSACHUSETTS JUN 25 1959 MASS OFFICIAL* ‘STS*? J 9 5 S r c- J Salem, Massachusetts, December 31, 1958. To The Governor of the Commonwealth, the County Commissioners of Essex County, the Mayor of Beverly, the Mayor of Peabody, the Mayor of Salem, and the Chairman of the Board of Selectmen of the Town of Danvers. G en tlem en : The South Essex Sewerage Board, created by and organized under Chapter 339 of the acts of the year 1925, herewith submits its thirty-third annual report, covering the year 1958. Again this year, there were two statutory changes affecting the District. Chapter 145, a Veteran’s Pension Act, was passed, and became effective on August 26, 1958. Chapter 216, which was a bill providing for the reim­ bursement of the cities of Peabody and Salem for certain unexpended construction monies, was enacted on March 31, 1958. There were several changes in the personnel of the Board this year.
    [Show full text]
  • Ocn962037108.Pdf (2.086Mb)
    Division of Marine Fisheries HubLine Eelgrass Restoration Mid-project Progress Report By The Massachusetts Division of Marine Fisheries Submitted to The Department of Environmental Protection Prepared by: N. Tay Evans, Wesley Dukes and Jillian Carr Paul J. Diodati Director Deval Patrick, Governor Timothy P. Murray, Lt. Governor Richard K. Sullivan, Jr., Secretary Executive Office of Environmental Affairs Mary B. Griffin, Commissioner Department of Fish and Game June 2013 Table of Contents 1.0 Executive Summary ................................................................................................................................. 4 2.0 Background ............................................................................................................................................. 4 3.0 Methods .................................................................................................................................................. 5 3.1 Permitting ........................................................................................................................................... 5 3.2 Site Selection ....................................................................................................................................... 5 Site characteristics ................................................................................................................................ 5 Test plots ..............................................................................................................................................
    [Show full text]
  • CPB1 C10 WEB.Pdf
    338 ¢ U.S. Coast Pilot 1, Chapter 10 Chapter 1, Pilot Coast U.S. 70°45'W 70°30'W 70°15'W 71°W Chart Coverage in Coast Pilot 1—Chapter 10 NOAA’s Online Interactive Chart Catalog has complete chart coverage http://www.charts.noaa.gov/InteractiveCatalog/nrnc.shtml 71°W 13279 Cape Ann 42°40'N 13281 MASSACHUSETTS Gloucester 13267 R O B R A 13275 H Beverly R Manchester E T S E C SALEM SOUND U O Salem L G 42°30'N 13276 Lynn NORTH ATLANTIC OCEAN Boston MASSACHUSETTS BAY 42°20'N 13272 BOSTON HARBOR 26 SEP2021 13270 26 SEP 2021 U.S. Coast Pilot 1, Chapter 10 ¢ 339 Cape Ann to Boston Harbor, Massachusetts (1) This chapter describes the Massachusetts coast along and 234 miles from New York. The entrance is marked on the northwestern shore of Massachusetts Bay from Cape its eastern side by Eastern Point Light. There is an outer Ann southwestward to but not including Boston Harbor. and inner harbor, the former having depths generally of The harbors of Gloucester, Manchester, Beverly, Salem, 18 to 52 feet and the latter, depths of 15 to 24 feet. Marblehead, Swampscott and Lynn are discussed as are (11) Gloucester Inner Harbor limits begin at a line most of the islands and dangers off the entrances to these between Black Rock Danger Daybeacon and Fort Point. harbors. (12) Gloucester is a city of great historical interest, the (2) first permanent settlement having been established in COLREGS Demarcation Lines 1623. The city limits cover the greater part of Cape Ann (3) The lines established for this part of the coast are and part of the mainland as far west as Magnolia Harbor.
    [Show full text]
  • Collins Cove Living Shoreline Presentation, 2/16/2017
    SALEM LIVING SHORELINE PROJECT CZM Green Infrastructure for Coastal Resilience Grant COLLINS COVE LIVING SHORELINE DESIGN SALEM, MA PUBLIC MEETING February 16, 2017 Photo Credit- Salem Sound Coastwatch and LightHawk City of Salem awarded Massachusetts Coastal Zone Management Green Infrastructure for Coastal Resilience Financial & Technical Resources to advance understanding & implementation of natural approaches to mitigate coastal erosion & flooding problems 1. December 2014 – June 2016 for shoreline assessment 2. December 2016 – June 2017 design & permitting 1 site Kathryn Glenn – CZM North Shore Regional Coordinator Julia Knisel – CZM Coastal Shoreline & Floodplain Manager City of Salem – MA CZM – Salem Sound Coastwatch – Chester Engineers Living Shoreline Installations = Natural “Green” Infrastructure • Alternatives or enhancements to bulkheads, seawalls, or revetments • Introduction of a naturalized edge using plants, sand/soil, and the limited use of hard structures BENEFITS: • Stabilizing the shoreline – more resistant to erosion • Protecting surrounding riparian and intertidal environment • Improving water quality via filtration of upland run-off • Creating habitat for aquatic and terrestrial species Climate Change Vulnerability Assessment & Adaptation Plan Focused on 5 Sectors • Critical building infrastructure • Drinking water NOT THE NATURAL COASTLINE • Energy • Stormwater • Transportation • Vulnerable populations Storm Surge Transportation Map City of Salem’s Climate Change Vulnerability & Adaptation Plan 2014 Filled Tide Lands – Chapter 91 Historic high water mark CZM Grant 1 The PROCESS 1. Municipal Shoreline Survey 2. Identify up to 10 possible sites 3. Chose 3 sites 4. Develop 3 Conceptual Designs Created a Matrix to Determine Site Priority 28 Salem Municipal Site Profiles Conceptual Designs for 3 Living Shoreline Projects chose 2 of the 4 general Focus Areas 1.
    [Show full text]
  • Ocm15161026-1969.Pdf (1.370Mb)
    State LiBrarv of M e^ ^ u setts C i - '• ,-s ;• ' - "l COMMONWEALTH OF MASSACHUSETTS South Essex Sewerage District Salem, Mass. FORTY-FOURTH REPORT COVERING THE YEAR 1969 3 go and Goodwin Printing Company Peabody, Massachusetts COMMONWEALTH OF MASSACHUSETTS South Essex Sewerage District Salem, Mass. FORTY-FOURTH REPORT COVERING THE YEAR 1969 THE SOUTH ESSEX SEWERAGE BOARD HOWARD S. WILLARD, Chairman TRACY I. FLAGG HERVF.Y, i LeBOEUF, JR. Representative Commissioner J>f P-ublic Work Town of Danvers, Mass. Peabody, Mass ROM EO E BEAULIEU NEAL B. MITCHELL ommissioner of Public Works City E.iginecr Beverly, Mass. Salern, Mass. AUG 1 01972 STAiL Huuot, bUoiON OfWUiNi- C L , / Salem, Massachusetts December 31, 1969 To the Governor of the Commonwealth the County Commissioners of Essex County the Mayor of Beverly the Mayor of Peabody the Mayor of Salem and the Chairman of the Board of Selectmen of the Town of Danvers. Gentlemen: The South Essex Sewerage Board, created by and organized under Chapter 339 of the Acts of 1925, herewith submits its forty-fourth annual report, covering the year 1969. The Sewerage Board met at twenty meetings during the year. The organization of the Board was altered during the year as follows: Mr. Joseph C. Tomasello, Chairman of the Board, passed away on July 31, 1969. Mr. Howard S. Willard was appointed as Chairman of the Board on October 8, 1969. Mr. Neal B. Mitchell retired from the Board on December 31, 1969. Mr. Joseph Tomasello was Chairman of the Board from August 1946 through December 1956 and again from September 1958 until his untimely death in July 1969.
    [Show full text]
  • Volume 9 Issue 1
    Vol. 9 Issue 1 – March 28, 2012 Welcome to the Massachusetts Bays Window, the newsletter of the Massachusetts Bays National Estuary Program. Our quarterly newsletter reviews the latest Massachusetts Bays Program (MBP) projects and accomplishments. For more information about the MBP, please visit www.massbays.org. Program Highlights Save the Date for these Upcoming Events EVENT DATE DETAILS New England Estuarine Research Society Conference April 12 - 14 More info found here Climate Adaptation Training for Local Governments April 24 - 26 More info found here North & South Rivers Clean Up Day April 28 Email NSRWA for more info Run of the Charles Canoe & Kayak Race April 29 More info found here MBP Research and Planning Grants 2011 PRODUCTS Projects funded by the 2011 MBP Research and Planning Grant Program are completed and the results are impressive. As with previous newsletters, the Bays Window will provide information on these projects’ results and products, which are highlighted with the MBP logo in the articles below. We are thrilled to be a part of these innovative and exciting initiatives. Applause for Award Recipients of the 2012 MBP Research and Planning Grants Following the successful completion of eight projects funded during 2011, MBP is pleased to announce the award recipients of its Fiscal Year 2012 Research and Planning Grant Program. In its second year, this program will support local initiatives and fund projects to identify the causes of coastal habitat degradation, develop plans to address coastal water quality pollution issues, and build local capacity to protect estuarine resources. Grant awards will be provided to the following: • The Town of Danvers to identify a sustainable funding mechanism for stormwater management ($20,000).
    [Show full text]
  • 2008 Salem Harbor Plan Substitution Summary 122 Table 3: 2008 Salem Harbor Plan Amplification Summary 123
    SALEM HARBOR PLAN The City of Salem, Massachusetts Mayor Kimberley Driscoll January 2008 Fort Point Associates, Inc TABLE OF CONTENTS LIST OF FIGURES AND TABLES ii ACKNOWLEDGEMENTS iii 2008 UPDATE OVERVIEW iv I. SUMMARY Introduction 1 The Vision 1 II. INTRODUCTION Overview 4 The Harbor Planning Area 4 The Planning Process 6 A Guide to the Planning Recommendations 9 III. FRAMEWORK FOR PLANNING Summary of Existing Conditions 13 Goals and Objectives 20 IV. PLANNING RECOMMENDATIONS Area-Wide Recommendations 24 South Commercial Waterfront 38 Tourist Historic Harbor 49 North Commercial Waterfront 56 Industrial Port 60 Community Waterfront 63 V. IMPLEMENTATION Oversight and Responsibilities 71 Economic Development 76 Phasing Strategy 78 Resources 80 Implementation - Summary of Proposed Actions 88 VI. REGULATORY ENVIRONMENT Overview: Chapter 91 100 Activities Subject to Chapter 91 102 Designated Port Area 103 Authority of the Salem Harbor Plan and DPA Master Plan 104 Guidance to DEP: Substitute Provisions 105 Guidance To DEP: Non-substitute Provisions 111 Other Local and Federal Regulations and Permits 117 Substitution and Amplification Tables 122 VII. FUTURE PLANNING 124 i APPENDICES A. PUBLIC INPUT - STAKEHOLDER INTERVIEWS B. RECENTLY OR SOON TO BE COMPETED REPORTS Salem Open Space and Recreation Plan (2007) Winter Island Barracks Building Feasibility Reuse Study (Jul 2007) Downtown Salem Retail Market Study: Strategy and Action Plan (May 2007) Salem Wharf Expansion Plan (expected early 2008) C. ENVIRONMENTAL RESOURCE ENHANCEMENT D. BATHYMETRIC
    [Show full text]
  • South Essex Sewerage District Salem, Mass
    COMMONWEALTH OF MASSACHUSETTS South Essex Sewerage District S : Salem, Mass. TWELFTH REPORT COVERING FROM DECEMBER 31, 1936 TO DECEMBER 31, 1937 NEWCOMB & GAUSS CO., Printer, Salem, Massachusetts COMMONWEALTH OF MASSACHUSETTS South Essex Sewerage District Salem, Mass. TWELFTH REPORT COVERING FROM DECEMBER 31, 1936 TO DECEMBER 31, 1937 % THE SOUTH ESSEX-"SEWERAGE BOARD . JAMES B. RYAN, Chairman JAMES W. BL'ACHMEK; • ; • •., ..ElRtEK I’ MORSE Commissioner of Public Works City Engineer Beverly, Mass. Salem, Mass. A. PRESTON CHASE CHARLES A. MOGAVERO Representative Commissioner of Public Worl Town of Danvers, Mass. Peabody, Mass. «u üF «äSÜÄGÜüSEl y 27 \m Stt. u. run ■ 4 6 2 3 - 3/13 3 7 Z*. 1 9 3 7 3 , Salem, Mass., December 31, 1937. To the Governor of the Commonwealth, To the County Commissioners of Essex County, The Mayor of Salem, The Mayor of Beverly, The Mayor of Peabody, The Chairman of the BoarD of Selectmen of the Town of Danvers. Gentlemen : The South Essex Sewerage BoarD, createD by anD or­ ganized unDer chapter 339 of the acts of the year 1925, herewith submits its twelfth annual report, covering the year 1937. There have been no changes in the personnel of the BoarD During the year. CONSTRUCTION Construction Program No new construction was unDertaken by the BoarD Dur­ ing 1937. Grease and Grit Chamber The grounDs arounD the Grease anD Grit Chamber, completed last year unDer a P. W. A. project, have been graDeD anD seeded, anD the item of incluDing the cost of the lanD for FeDeral grant in the project, which haD at first been incluDeD in the project anD later DisapproveD, was again taken up with the P.
    [Show full text]
  • Notice of Submission of a Request to Proceed for the Amendment to The
    Public Notice Notice of Submission of a Request for a Notice to Proceed for the Amendment to the City of Salem Municipal Harbor Plan and Designated Port Area Master Plan pursuant to 301 CMR 23.00 In accordance with the applicable regulations at 301 CMR 23.00, the City of Salem has submitted a Request for a Notice to Proceed (RNTP) to the Secretary of Energy and Environmental Affairs to initiate the state approval for an amendment to the 2008 Salem Municipal Harbor Plan and Designated Port Area Master Plan. Copies of the RNTP may be obtained by contacting Seth Lattrell at [email protected]. Written comments on the RNTP will be considered. Comments must be received by 4:30 p.m. on Friday, July 10, 2020. Comments should be addressed to: Office of Coastal Zone Management 251 Causeway Street, Suite 800 Boston, MA 02114-2136 Attn: Kathryn Glenn Note: Due to the COVID-19 outbreak, the preference is for electronic submission of comments. Comments can also be submitted electronically to [email protected] and copied to [email protected]. Notification Date: June 10, 2020 Salem Municipal Harbor Plan Update Request for Notice to Proceed Kimberley Driscoll Mayor Tom Daniel, Aicp Director City Of Salem, Massachusetts Department Of Planning And Community Development 98 Washington Street Salem, Massachusetts 01970 Tele: 978-619-5685 Dear Ms. Engler, On behalf of the City of Salem, Massachusetts, I’m writing to respectfully request the issuance of a Notice to Proceed with the preparation of an amend- ment to a Municipal Harbor Plan and Designated Port Area (“DPA”) Master Plan (collectively the “Harbor Plan”) by the Massachusetts Office of Coastal Zone Management (“CZM”) in accordance with the provisions of 301 CMR 23.03.
    [Show full text]
  • Franklin County Was 11,057
    84^45' 85^05' 85^00' 84^55' 84^50' 84^20' 84^35' 84^25' 84^30' 85^10' 84^40' TO SUMATRA 1,840,000 1,900,000 1,940,000 2,000,000 1,780,000 1,800,000 1,860,000 1,880,000 1,920,000 1,960,000 1,980,000 1,820,000 TO 2,020,000 ft. R 10 W 1,760,000 ft. R 9 W R 8 W R 7 W R 6 W R 5 W R 4 W TELOGIA R 3 W R 2 W R 1 W L I B E R T Y C O U N T Y L A T 5S 26 25 L 26 O 30 29 28 27 25 30 29 28 c Black Cr. 28 27 26 25 30 29 28 27 25 30 W h U Hog 27 26 25 30 29 Morgan 26 o B ma k P loc K Place ck e Wynns 29 28 27 P A P 30^00' 35 Ldg. P T 5 S Cr. Cre P W TATE'S k 30^00' 36 31 32 33 HELL TO 34 35 36 31 o C 32 33 34 35 36 Creek 36 35 SOPCHOPPY O Wright 31 32 33 34 35 31 32 33 34 36 P 34 31 65 31 32 n U Ldg. P 33 River N ee T Cof 67 360,000 ft. Y 360,000 ft. P P Bear 6 5 B f Br. P P Hickory ee P P 3 B TO PANACEA Landing 5 Tom 5 P 2 Owl Cow 2 1 6 5 3 2 P P 6 5 6 Rock Cr.
    [Show full text]
  • Living Shorelines at Municipal Properties
    Local Planning to Advance Implementation of Living Shorelines at Municipal Properties SALEM LIVING SHORELINE PROJECT CZM Green Infrastructure for Coastal Resilience Grant COLLINS COVE LIVING SHORELINE DESIGN SALEM, MA Introducing Green Infrastructure for Coastal Resilience March 30, 2017 Photo Credit- Salem Sound Coastwatch and LightHawk The Post-Industrial City 1914: Great 1900: Salem Fire Today: Low- 1700s into Industrial destroys 1920s to lying filled 1800s: Grist peak— much of city’s 1980s: areas mills and factories and core, debris Industrial vulnerable to early leather railroads used to decline increasing industry reshape expand flooding landscape landmass 2 Filled Tidelands 3 Local Planning Context Hazard Mitigation Historic Public Art Plan Preservation Master Plan Plan Capital Climate Improvement Adaptation Plan Plan • Green Communities 1996 Master Plan energy reduction & • Rosies Pond flood Downtown Open Space & mitigation 2017 Imagine Salem Renewal Plan Recreation Plan • Green Infrastructure feasibility assessment CDBG Action Harbor Plan Plan • Collins Cove Living Shoreline pilot Comprehensive Neighborhood project Parking Plan Master Plans 4 Local Planning Context Hazard Mitigation Historic Public Art Plan Preservation Master Plan Plan Capital Climate Improvement Adaptation Plan Plan 1996 Master Plan & Downtown Open Space & Renewal Plan 2017 Imagine Salem Recreation Plan CDBG Action Harbor Plan Plan Comprehensive Neighborhood Parking Plan Master Plans 5 New Derby Street Waterfront Park 6 New Derby Street Waterfront Park expand facilities and programs • expand water-related programming • create open space & recreation facilities in dense neighborhoods that lack them • acquire key sites for visual access to the water • acquire open space in current and future flood zones 7 City of Salem awarded Massachusetts Coastal Zone Management Green Infrastructure for Coastal Resilience Financial & Technical Resources to advance understanding & implementation of natural approaches to mitigate coastal erosion & flooding problems 1.
    [Show full text]
  • Report Template
    SENT VIA ELECTRONIC MAIL OCTOBER 21, 2020 October 21, 2020 File No. 18.0171674.04 Mr. David H. Knowlton, P.E. City Engineer/DPS Director City of Salem, MA 98 Washington Street, 2nd Floor Salem, Massachusetts 01970 Re: Preliminary Design Summary Letter Columbus Avenue Seawall Reconstruction Project (EEA #258-2020-3) Salem, Massachusetts Dear Mr. Knowlton: GZA GeoEnvironmental, Inc. (GZA) is pleased to submit this summary letter of preliminary design progress for the Columbus Avenue Seawall Reconstruction Project to the City of Salem (Client). The summary letter is provided in accordance with our agreement for design and permitting services for the above-referenced project, dated January 22, 2020. This summary letter is subject to the Limitations indicated in Attachment A. Elevations provided are referenced to the North American Vertical Datum 1988 (NAVD88). BACKGROUND GZA was retained by the City of Salem to conduct a site visit in May 2018 to inspect and evaluate the existing seawall conditions at the site in response to the coastal flooding and damage that occurred to the seawalls during the March 2018 Nor’easter storm events. GZA has provided the City with a preliminary seawall evaluation letter report dated October 21, 2019 describing the existing conditions and providing the City with alternate repairs/reconstruction recommendations. Based on the March 2018 Nor’Easter Storm Damage Seawall Assessment letter, the City has chosen the option to replace the existing seawall with consideration to raise the height of the seawall for greater protection and resilience to wave surge/flooding conditions. In addition, the City is looking to improve coastal resiliency of the area by implementing an improved living shoreline adjacent to the wall in areas of existing and deteriorated salt marsh habitat.
    [Show full text]