Item No. RE 2014-15 Allocation Particulars
Total Page:16
File Type:pdf, Size:1020Kb
6.1.1 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 NEW LINES (CONSTRUCTION) A - Works in Progress 1 Tirunnavaya-Guruvayur (35 km) Cap. 3,28,26 2 Karur-Salem (85 km) Cap. 19,00,96 3 Angamali-Sabarimala (116 km) Cap. 23,08,86 4 Tindivanam-Gingee-Tiruvannamalai (70 km) Cap. 6,20,00 5 Tindivanam-Nagari (179.2 km) Cap. 12,70,00 6 Attipattu-Puttur (88.30 km) Cap. 11,36 7 Erode-Palani (91.05 km) Cap. 24,87 8 Chennai-Cuddalore via Mahabalipuram (179.28 km) Cap. 2,62,69 9 Madurai-Tuticorin via Aruppukkottai (143.5 km) Cap. 1,10,00 DRF .. 10 Sriperambudur-Guduvanchery; with spur to Irun, Kattukotti - Avadi - Cap. 64,00 Sriperambudur (60 km) TOTAL-WORKS IN PROGRESS Cap. 69,01,00 TOTAL-New Lines (Construction) Cap. 69,01,00 GAUGE CONVERSION A - Works in Progress 11 Tiruchchirappalli-Nagore-Karaikal with extension of Nagapattinam- Cap. 35,70,18 Velankani-Tiruthiraipundi incl. new material modification of Karaikal - Peralam (23 km) new line C.Fund .. DRF .. DF(4) .. R. EBR .. 12 Quilon-Tirunelveli-Tiruchendur & Tenkasi-Virudhunagar (357 km) Cap. 65,48,94 DRF .. DF(4) .. R. 13 Madurai-Rameswaram (161 km) Cap. 1,53,34 C.Fund .. DRF .. DF(4) .. EBR .. 14 Thanjavur-Villupuram (192 km) Cap. .. DRF .. R. Dep(RVN) .. EBR .. 15 Cuddalore-Salem via Vriddhachalam (191 km) Cap. .. DRF .. DF(4) .. Dep(RVN) .. EBR .. 6.1.2 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 GAUGE CONVERSION 16 Trichy-Manamadurai (150 km) Cap. 1,11,04 C.Fund .. DRF .. R. 17 Villupuram-Katpadi (161 km) Cap. 20,00,00 C.Fund .. DRF .. R. 18 Manamadurai-Virudhunagar (66.55 km) Cap. 4,57,46 C.Fund .. DRF .. DF(1) .. R. 19 Dindigul-Polachi-Palghat & Polachi-Coimbatore (224.88 km) Cap. 133,00,00 C.Fund .. DRF .. DF(1) .. R. 20 Mayiladuturai-Tiruvarur-Karaikkudi & Tiruturaipundi-Agastiyampalli, Cap. 80,59,04 incl restoration of Needamangalam-Mannargudi line and Mannargudi- Pattukottai, with new material modification of Thanjavur-Pattukottai (47.2 km) 21 Madurai-Bodinayakkanur (90.41 km) Cap. 8,00,00 DRF .. DF(4) .. TOTAL-WORKS IN PROGRESS Cap. 350,00,00 DRF .. TOTAL-Gauge Conversion Cap. 350,00,00 DRF .. DOUBLING A - Works in Progress 22 Calicut-Mangalore (221 km) Cap. 2,46,77 DRF .. DF(1) .. DF(2) .. DF(4) .. 23 Omalur-Mettur Dam - Doubling with electrification (29.03 km) Cap. 12,21,50 EBR .. 24 Chennai Central-Basin Bridge Jn - 5th & 6th line Cap. 3,00,00 25 Irugur-Coimbatore (17.70 km) Cap. 3,40,55 C.Fund .. DRF .. EBR .. 26 Kumbalam-Thuravur - Patch doubling (15.59 km) Cap. 2,43,00 27 Attipattu-Korukkupettai - 3rd line (18 km) Cap. .. DRF .. Dep(RVN) .. 6.1.3 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 DOUBLING 28 Chennai Beach-Korukkupet - 3rd line (4.1 km) Cap. 10,00,00 C.Fund .. 29 Cheppad-Kayanakulam (7.76 km) Cap. 1,95,00 DRF .. 30 Mavelikara-Chengannur - Patch doubling (12.30 km) Cap. 2,27,12 DRF .. 31 Cheppad-Haripad - Patch doubling (5.28 km) Cap. 1,23,42 DRF .. 32 Chennai Beach-Attipattu - 4th line (22.1 km) Cap. 32,62,51 C.Fund .. 33 Madurai-Dindigul (incl. Ambaduturai-Kodaikannal Road) (62.05 km) Cap. 6,65,00 C.Fund .. DRF .. EBR .. 34 Mulanturutti-Kurruppantara (24 km) Cap. 74,35,56 C.Fund .. DRF .. EBR .. 35 Chinganur-Chingavanam (26.5 km) Cap. 74,00,57 DRF .. 36 Kankanadi-Panambur - Patch doubling (19 km) Cap. 50,60,00 DRF .. 37 Chengalpattu-Villupuram (103 km) with new material modification for Cap. 81,00,00 Tambaram-Chengalpattu - 3rd line by GC of existing MG line alongwith electrification (30 km) C.Fund .. DRF 6,45,33 DF(4) .. EBR .. 38 Kurruppanthara-Chingavanam (26.54 km) Cap. 32,50,00 39 Ambalapuzha-Haripad (18.13 km) Cap. 25,50,00 40 Villupuram-Dindigul (with electrification) (273 km) Cap. .. C.Fund .. Dep(RVN) .. 41 Tiruvallur-Arakkonam - 4th line (26.83 km) Cap. .. Dep(RVN) .. EBR .. 42 Ernakulam-Kumbalam - Patch doubling (7.71 km) Cap. 2,00,00 43 Thanjavur-Ponmalai - Doubling (46.96 km) with bypass line before Cap. 6,79,00 Ponmalai (1.13 km) TOTAL-WORKS IN PROGRESS Cap. 425,00,00 DRF 6,45,33 Dep(RVN) .. 6.1.4 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 DOUBLING B - New Works 44 Works costing below Rs.2.5 crore each Cap. .. DRF .. TOTAL-NEW WORKS Cap. .. DRF .. TOTAL-Doubling Cap. 425,00,00 DRF 6,45,33 Dep(RVN) .. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 45 Kochuveli - 2nd coaching terminal (Stage-II) DF(3) 1,55,00 46 Nagercoil - One single face platform, one stabling line and DF(3) 4,50 simultaneous despatch & reception facilities from Trivandrum side 47 Karuppur - Increasing clear standing length of roads 4, 5 & 6 (down DF(3) .. lines) 48 Chennai Beach - Addl platform DF(3) 2,70,50 49 Arakkonam - Straightening of raods 1 & 2 and extension of platform DF(3) 12,58,13 No 1, 2 & 3 to 24 bogies 50 Kanniyakumari - Addl platform and extension of platform DF(3) 10,00 51 Valliyur-Aralvaymoli - 3-line crossing station DF(3) 10,00 52 Tambaram - Development as coaching terminal DF(3) 6,00,00 53 Korukkupet Goods Yard - Addl. terminl facilities Cap. 3,55,70 54 Tirupur - Direct reception & despatch facilities for goods line Cap. 30,00 EBR .. 55 Ernakulam - One addl pit line & two stabling lines DF(3) 1,19,92 56 Tirunelveli-Sengulam - 2-line crossing station DF(3) .. 57 Nilambur Road - Rake unloading facilities for 20 BCN wagons DF(3) 12,00 58 West Hill - Addl goods shed line Cap. .. 59 Works costing below Rs.2.5 crore each Cap. 2,96,30 DRF 2,36 DF(3) 5,45,00 TOTAL-WORKS IN PROGRESS Cap. 6,82,00 DRF 2,36 DF(3) 29,85,05 B - New Works 60 Works costing below Rs.2.5 crore each Cap. .. DRF .. DF(3) .. TOTAL-NEW WORKS Cap. .. DRF .. DF(3) .. TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 6,82,00 DRF 2,36 DF(3) 29,85,05 6.1.5 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 COMPUTERISATION A - Works in Progress 61 Southern Railway - Extension of RDBMS (Phase-II) DF(3) .. 62 Southern Railway - Implementation of meterial management DF(3) .. inforamation system 63 Southern Railway - Automatic ticket vending machines Cap. .. 64 Southern Railway - Extension of unreserved ticketing system to E- DF(1) 1,48,04 category stations 65 Southern Railway - Extension of automatic ticket vending machines Cap. 9,15,00 66 Works costing below Rs.2.5 crore each Cap. 30,00 DRF 9,16,90 DF(1) 1,04,58 TOTAL-WORKS IN PROGRESS Cap. 9,45,00 DRF 9,16,90 DF(1) 2,52,62 DF(3) .. B - New Works 67 Works costing below Rs.2.5 crore each DRF 2,57,60 DF(1) 42,46 DF(3) .. TOTAL-NEW WORKS DRF 2,57,60 DF(1) 42,46 DF(3) .. TOTAL-Computerisation Cap. 9,45,00 DRF 11,74,50 DF(1) 2,95,08 DF(3) .. LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT A - Works in Progress 68 Leased Assets - Payment of Capital component of lease charges to C.Fund 413,15,00 Indian Railway Finance Corporation TOTAL-WORKS IN PROGRESS C.Fund 413,15,00 TOTAL-Leased Assets - Payment of Capital Component C.Fund 413,15,00 ROAD SAFETY WORKS-LEVEL CROSSINGS. A - Works in Progress 69 Chennai, Palghat, Trivandrum, Tiruchchirappalli & Madurai Divisions - Cap. .. Lifting barriers in lieu of swing gates on double & multiple lines (120 Nos) S.Fund 5,02 70 Madurai Division - Elimination of unmanned level crossings by S.Fund 50,00 diversion of road traffic to adjacent manned level crossings / subways (70 Nos) 71 Palghat Division - Manning (3 Nos) & interlocking (25 Nos) of level Cap. .. crossings S.Fund .. 6.1.6 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 ROAD SAFETY WORKS-LEVEL CROSSINGS. 72 Tiruchchirappalli & Madurai Divisions - Manning (9 Nos) & Cap. .. interlocking (58 Nos) of level crossings S.Fund 28,00 73 Trivandrum Division - Manning (9 Nos) & interlocking (50 Nos) of Cap. .. level crossings S.Fund 30,00 74 Palghat Division - Interlocking of level crossing (23 Nos) & manning S.Fund .. of unmannned level crossings (6 Nos) 75 Salem Division - Interlocking of level crossing gates (18 Nos) S.Fund 5,00 76 Salem Division - Interlocking of level crossing gates (19 Nos) S.Fund 5,00 77 Salem Division - Manning of unmanned level crossing (17 Nos) S.Fund 5,74 78 Trivandrum-Ernakulam-Trichur - Improvements to communication S.Fund 15,00 arrangements at all level crossings (395 km) 79 Palghat Division - Repl of accessories & standardisation of level S.Fund 30,85 crossings (30 Nos) 80 Southern Railway - Manning of unmanned level crossings (200 Nos) S.Fund 2,60,00 81 Shoranur-Kozhikode-Mangalore - Improvements to communication S.Fund 15,00 arrangements at all level crossings (85 km) 82 Southern Railway - Solar panel power supply arrangements for mid- S.Fund .. section level crossing gates 83 Southern Railway - Manning of unmanned level crossing gates (120 S.Fund 85,00 Nos) 84 Thiruvananthapuram Division - Interlocking of level crossing gates S.Fund 2,09,00 (13 Nos) 85 Tiruchchirappalli-Villupuram - Interlocking of level crossings (10 Nos) S.Fund 50,00 and remote terminal units to mid-section interlocked level crossings 86 Mayiladuthurai-Tiruchchirappalli - Repl.