Item No. RE 2014-15 Allocation Particulars

Item No. RE 2014-15 Allocation Particulars

6.1.1 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 NEW LINES (CONSTRUCTION) A - Works in Progress 1 Tirunnavaya-Guruvayur (35 km) Cap. 3,28,26 2 Karur-Salem (85 km) Cap. 19,00,96 3 Angamali-Sabarimala (116 km) Cap. 23,08,86 4 Tindivanam-Gingee-Tiruvannamalai (70 km) Cap. 6,20,00 5 Tindivanam-Nagari (179.2 km) Cap. 12,70,00 6 Attipattu-Puttur (88.30 km) Cap. 11,36 7 Erode-Palani (91.05 km) Cap. 24,87 8 Chennai-Cuddalore via Mahabalipuram (179.28 km) Cap. 2,62,69 9 Madurai-Tuticorin via Aruppukkottai (143.5 km) Cap. 1,10,00 DRF .. 10 Sriperambudur-Guduvanchery; with spur to Irun, Kattukotti - Avadi - Cap. 64,00 Sriperambudur (60 km) TOTAL-WORKS IN PROGRESS Cap. 69,01,00 TOTAL-New Lines (Construction) Cap. 69,01,00 GAUGE CONVERSION A - Works in Progress 11 Tiruchchirappalli-Nagore-Karaikal with extension of Nagapattinam- Cap. 35,70,18 Velankani-Tiruthiraipundi incl. new material modification of Karaikal - Peralam (23 km) new line C.Fund .. DRF .. DF(4) .. R. EBR .. 12 Quilon-Tirunelveli-Tiruchendur & Tenkasi-Virudhunagar (357 km) Cap. 65,48,94 DRF .. DF(4) .. R. 13 Madurai-Rameswaram (161 km) Cap. 1,53,34 C.Fund .. DRF .. DF(4) .. EBR .. 14 Thanjavur-Villupuram (192 km) Cap. .. DRF .. R. Dep(RVN) .. EBR .. 15 Cuddalore-Salem via Vriddhachalam (191 km) Cap. .. DRF .. DF(4) .. Dep(RVN) .. EBR .. 6.1.2 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 GAUGE CONVERSION 16 Trichy-Manamadurai (150 km) Cap. 1,11,04 C.Fund .. DRF .. R. 17 Villupuram-Katpadi (161 km) Cap. 20,00,00 C.Fund .. DRF .. R. 18 Manamadurai-Virudhunagar (66.55 km) Cap. 4,57,46 C.Fund .. DRF .. DF(1) .. R. 19 Dindigul-Polachi-Palghat & Polachi-Coimbatore (224.88 km) Cap. 133,00,00 C.Fund .. DRF .. DF(1) .. R. 20 Mayiladuturai-Tiruvarur-Karaikkudi & Tiruturaipundi-Agastiyampalli, Cap. 80,59,04 incl restoration of Needamangalam-Mannargudi line and Mannargudi- Pattukottai, with new material modification of Thanjavur-Pattukottai (47.2 km) 21 Madurai-Bodinayakkanur (90.41 km) Cap. 8,00,00 DRF .. DF(4) .. TOTAL-WORKS IN PROGRESS Cap. 350,00,00 DRF .. TOTAL-Gauge Conversion Cap. 350,00,00 DRF .. DOUBLING A - Works in Progress 22 Calicut-Mangalore (221 km) Cap. 2,46,77 DRF .. DF(1) .. DF(2) .. DF(4) .. 23 Omalur-Mettur Dam - Doubling with electrification (29.03 km) Cap. 12,21,50 EBR .. 24 Chennai Central-Basin Bridge Jn - 5th & 6th line Cap. 3,00,00 25 Irugur-Coimbatore (17.70 km) Cap. 3,40,55 C.Fund .. DRF .. EBR .. 26 Kumbalam-Thuravur - Patch doubling (15.59 km) Cap. 2,43,00 27 Attipattu-Korukkupettai - 3rd line (18 km) Cap. .. DRF .. Dep(RVN) .. 6.1.3 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 DOUBLING 28 Chennai Beach-Korukkupet - 3rd line (4.1 km) Cap. 10,00,00 C.Fund .. 29 Cheppad-Kayanakulam (7.76 km) Cap. 1,95,00 DRF .. 30 Mavelikara-Chengannur - Patch doubling (12.30 km) Cap. 2,27,12 DRF .. 31 Cheppad-Haripad - Patch doubling (5.28 km) Cap. 1,23,42 DRF .. 32 Chennai Beach-Attipattu - 4th line (22.1 km) Cap. 32,62,51 C.Fund .. 33 Madurai-Dindigul (incl. Ambaduturai-Kodaikannal Road) (62.05 km) Cap. 6,65,00 C.Fund .. DRF .. EBR .. 34 Mulanturutti-Kurruppantara (24 km) Cap. 74,35,56 C.Fund .. DRF .. EBR .. 35 Chinganur-Chingavanam (26.5 km) Cap. 74,00,57 DRF .. 36 Kankanadi-Panambur - Patch doubling (19 km) Cap. 50,60,00 DRF .. 37 Chengalpattu-Villupuram (103 km) with new material modification for Cap. 81,00,00 Tambaram-Chengalpattu - 3rd line by GC of existing MG line alongwith electrification (30 km) C.Fund .. DRF 6,45,33 DF(4) .. EBR .. 38 Kurruppanthara-Chingavanam (26.54 km) Cap. 32,50,00 39 Ambalapuzha-Haripad (18.13 km) Cap. 25,50,00 40 Villupuram-Dindigul (with electrification) (273 km) Cap. .. C.Fund .. Dep(RVN) .. 41 Tiruvallur-Arakkonam - 4th line (26.83 km) Cap. .. Dep(RVN) .. EBR .. 42 Ernakulam-Kumbalam - Patch doubling (7.71 km) Cap. 2,00,00 43 Thanjavur-Ponmalai - Doubling (46.96 km) with bypass line before Cap. 6,79,00 Ponmalai (1.13 km) TOTAL-WORKS IN PROGRESS Cap. 425,00,00 DRF 6,45,33 Dep(RVN) .. 6.1.4 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 DOUBLING B - New Works 44 Works costing below Rs.2.5 crore each Cap. .. DRF .. TOTAL-NEW WORKS Cap. .. DRF .. TOTAL-Doubling Cap. 425,00,00 DRF 6,45,33 Dep(RVN) .. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 45 Kochuveli - 2nd coaching terminal (Stage-II) DF(3) 1,55,00 46 Nagercoil - One single face platform, one stabling line and DF(3) 4,50 simultaneous despatch & reception facilities from Trivandrum side 47 Karuppur - Increasing clear standing length of roads 4, 5 & 6 (down DF(3) .. lines) 48 Chennai Beach - Addl platform DF(3) 2,70,50 49 Arakkonam - Straightening of raods 1 & 2 and extension of platform DF(3) 12,58,13 No 1, 2 & 3 to 24 bogies 50 Kanniyakumari - Addl platform and extension of platform DF(3) 10,00 51 Valliyur-Aralvaymoli - 3-line crossing station DF(3) 10,00 52 Tambaram - Development as coaching terminal DF(3) 6,00,00 53 Korukkupet Goods Yard - Addl. terminl facilities Cap. 3,55,70 54 Tirupur - Direct reception & despatch facilities for goods line Cap. 30,00 EBR .. 55 Ernakulam - One addl pit line & two stabling lines DF(3) 1,19,92 56 Tirunelveli-Sengulam - 2-line crossing station DF(3) .. 57 Nilambur Road - Rake unloading facilities for 20 BCN wagons DF(3) 12,00 58 West Hill - Addl goods shed line Cap. .. 59 Works costing below Rs.2.5 crore each Cap. 2,96,30 DRF 2,36 DF(3) 5,45,00 TOTAL-WORKS IN PROGRESS Cap. 6,82,00 DRF 2,36 DF(3) 29,85,05 B - New Works 60 Works costing below Rs.2.5 crore each Cap. .. DRF .. DF(3) .. TOTAL-NEW WORKS Cap. .. DRF .. DF(3) .. TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 6,82,00 DRF 2,36 DF(3) 29,85,05 6.1.5 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 COMPUTERISATION A - Works in Progress 61 Southern Railway - Extension of RDBMS (Phase-II) DF(3) .. 62 Southern Railway - Implementation of meterial management DF(3) .. inforamation system 63 Southern Railway - Automatic ticket vending machines Cap. .. 64 Southern Railway - Extension of unreserved ticketing system to E- DF(1) 1,48,04 category stations 65 Southern Railway - Extension of automatic ticket vending machines Cap. 9,15,00 66 Works costing below Rs.2.5 crore each Cap. 30,00 DRF 9,16,90 DF(1) 1,04,58 TOTAL-WORKS IN PROGRESS Cap. 9,45,00 DRF 9,16,90 DF(1) 2,52,62 DF(3) .. B - New Works 67 Works costing below Rs.2.5 crore each DRF 2,57,60 DF(1) 42,46 DF(3) .. TOTAL-NEW WORKS DRF 2,57,60 DF(1) 42,46 DF(3) .. TOTAL-Computerisation Cap. 9,45,00 DRF 11,74,50 DF(1) 2,95,08 DF(3) .. LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT A - Works in Progress 68 Leased Assets - Payment of Capital component of lease charges to C.Fund 413,15,00 Indian Railway Finance Corporation TOTAL-WORKS IN PROGRESS C.Fund 413,15,00 TOTAL-Leased Assets - Payment of Capital Component C.Fund 413,15,00 ROAD SAFETY WORKS-LEVEL CROSSINGS. A - Works in Progress 69 Chennai, Palghat, Trivandrum, Tiruchchirappalli & Madurai Divisions - Cap. .. Lifting barriers in lieu of swing gates on double & multiple lines (120 Nos) S.Fund 5,02 70 Madurai Division - Elimination of unmanned level crossings by S.Fund 50,00 diversion of road traffic to adjacent manned level crossings / subways (70 Nos) 71 Palghat Division - Manning (3 Nos) & interlocking (25 Nos) of level Cap. .. crossings S.Fund .. 6.1.6 SOUTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE No. 2014-15 ROAD SAFETY WORKS-LEVEL CROSSINGS. 72 Tiruchchirappalli & Madurai Divisions - Manning (9 Nos) & Cap. .. interlocking (58 Nos) of level crossings S.Fund 28,00 73 Trivandrum Division - Manning (9 Nos) & interlocking (50 Nos) of Cap. .. level crossings S.Fund 30,00 74 Palghat Division - Interlocking of level crossing (23 Nos) & manning S.Fund .. of unmannned level crossings (6 Nos) 75 Salem Division - Interlocking of level crossing gates (18 Nos) S.Fund 5,00 76 Salem Division - Interlocking of level crossing gates (19 Nos) S.Fund 5,00 77 Salem Division - Manning of unmanned level crossing (17 Nos) S.Fund 5,74 78 Trivandrum-Ernakulam-Trichur - Improvements to communication S.Fund 15,00 arrangements at all level crossings (395 km) 79 Palghat Division - Repl of accessories & standardisation of level S.Fund 30,85 crossings (30 Nos) 80 Southern Railway - Manning of unmanned level crossings (200 Nos) S.Fund 2,60,00 81 Shoranur-Kozhikode-Mangalore - Improvements to communication S.Fund 15,00 arrangements at all level crossings (85 km) 82 Southern Railway - Solar panel power supply arrangements for mid- S.Fund .. section level crossing gates 83 Southern Railway - Manning of unmanned level crossing gates (120 S.Fund 85,00 Nos) 84 Thiruvananthapuram Division - Interlocking of level crossing gates S.Fund 2,09,00 (13 Nos) 85 Tiruchchirappalli-Villupuram - Interlocking of level crossings (10 Nos) S.Fund 50,00 and remote terminal units to mid-section interlocked level crossings 86 Mayiladuthurai-Tiruchchirappalli - Repl.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    43 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us