Design Commission Meeting Agenda Monday, October 3, 2011

Public Meeting

1:00 p.m. Consent Items

24267: Construction of an animal holding facility, , boardwalk at West 10th Street, . (Preliminary and Final) (CC 47, CB 13) DCLA/DPR

24268: Installation of a canopy, Signature Theatre Company, 480 West 42nd Street, . (Final) (CC 3, CB 4) DCLA

24269: Installation of Diamond Matrix by Erwin Redl, NYPD training facility, College Point Boulevard, 28th Avenue, Ulmer Street, . (Preliminary) (CC 21, CB 7) DCLA%/DDC 24270: Rehabilitation of the Kips Bay Library, 446 Third Avenue, Manhattan. (Final) (CC 2, CB 6) DDC

24271: Installation of interpretive signage as part of the reconstruction of the Old Douglaston Pumping Station and outfall structure and adjacent site work, Alley Creek Combined Sewer Overflow Retention Facility, Northern Boulevard and Alley Creek, Queens. (Preliminary and Final) (CC 19, CB 11) DEP/DPR

24272: Installation of a salt shed, Mosholu Avenue and Broadway, , Bronx. (Preliminary and Final) (CC 11, CB 7, 8 & 9) DOS/DPR

24273: Reconstruction of the Riegelmann Boardwalk, Phase II, , Brighton 15th Street to , Brooklyn. (Preliminary) (CC 47, CB 13) DPR

24274: Reconstruction of an entrance to the Riegelmann Boardwalk, Brighton Beach, Brighton Second Street, Brooklyn. (Preliminary) (CC 47, CB 13) DPR/DOT

24275: Reconstruction of an entrance to the Riegelmann Boardwalk, Coney Island Beach, West 33rd Street, Brooklyn. (Preliminary) (CC 47, CB 13) DPR/DOT

24276: Reconstruction of a plaza, Athens Square Park, 30th Street and 30th Avenue, Queens. (Preliminary) (CC 22, CB 1) DPR

24277: Construction of Costera restaurant and a support structure and reconstruction of the landscape, Dyckman Marina, , Hudson River at Dyckman Street, Manhattan. (Final) (CC 7, CB 12) DPR

24278: Reconstruction of Playground 123, Phase I, Morningside Park, West 123rd Street and Morningside Avenue, Manhattan. (Final) (CC 9, CB 9) DPR

Design Commission Meeting/ Monday, October 3, 2011/ Page 2

24279: Construction of a playground, artificial turf field and sitting area as Phase II of the renovation and expansion of a recreation center, 533 West 59th Street, Manhattan. (Final) (CC 6, CB 7) DPR

24280: Reconstruction of Lieutenant John H. Martinson (P.S. 55; formerly Double Nickel) Playground, Preston Avenue, Koch Boulevard, Osborn Street, Woods of Arden Road, . (Final) (CC 51, CB 3) DPR

24281: Construction of a maintenance and operations facility, Phase I, Park (formerly elevated rail line), Gansevoort Street and Street, Manhattan. (Final) (CC 3, CB 2) DPR/EDC

Design Commission meetings are held in the conference room on the fifth floor of 253 Broadway, unless otherwise indicated. Please note that all times are approximate and subject to change without notice.

Members of the public are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing at least three (3) business days in advance of the meeting date.

Please note that items on the consent agenda are not presented. If members of the public wish to testify on a consent agenda item, they should contact the Design Commission immediately, so the project can be rescheduled for a formal presentation at the next appropriate public hearing, per standard procedure.

Design Commission 253 Broadway, Fifth Floor Phone: 212-788-3071 Fax: 212-788-3086