AREA : 5000 Ha Project Cost : 750.0 Lakhs Khawzawl, Ngaizawl
Total Page:16
File Type:pdf, Size:1020Kb
AREA : 5000 Ha Project Cost : 750.0 Lakhs Khawzawl, Ngaizawl, Neihdawn, Tuipui, Tualpui. Prepared by BDO, Khawzawl. 1 INDEX CHAPTER Page No. 1. Introduction ----------------------------------------- 3 2. Project Profile ----------------------------------------- 6 3. History of Project Villages & ----------------------------------------- 11 Basic Information 4. Participatory Rural Appraisal ----------------------------------------- 16 5. Problem Typology ----------------------------------------- 17 6. Project Intervention Plan ----------------------------------------- 20 7. DPR Plan Abstract ----------------------------------------- 21 8. Preparatory Phase. ----------------------------------------- 22 9. Work Plan Details ----------------------------------------- 23 10. Consolidation and Withdrawal Phase. --------------------------------- 25 11. Capacity Building Institute Identified --------------------------------- 26 12. Institutional & Capacity building Plan --------------------------------- 27 13. Basic Profile of the project location -------- ------------------------ 29 14. Maps of the project --------------------------------- 30 15. Institutional mechanism& Agreements. --------------------------------- 34 16. SWOT Analysis of PIA. --------------------------------- 35 17. PIA & Watershed Committee details. ---------------------------------36 18. Convergence Plans. --------------------------------- 37 19. Expected Outcomes. --------------------------------- 39 20. Expected Estimate Outcomes. --------------------------------- 41 21. Monitoring & Evaluation. --------------------------------- 42 22. Plan, Estimate & Drawing --------------------------------- 49 23. Micro-Watershed work Plan for one cluster Area under IWMP.--- ----- 55 24. Beneficiary Card Sample --------------------------------------------------------- 56 2 1. INTRODUCTION: Due to the practice of shifting cultivation in Mizoram. There was a decline in productivity, reduction of top soils as a result of enormous soil erosion. In order to regenerate fertility of land, check loss of top soil, reduce run off speed of rain water, regenerate vegetative cover, a multi-dimensional approach should be applied with participation of the mass at all level to ensure results. Since, jhumming is the mainstay of livelihood of the people in Mizoram since long time back, its stoppage at a very short span of time is impractical. Therefore, the approach will be systematic and holistic to win the confidence of the people. The IWMP project concentrate its effort to achieve the objective of the programme through treating under-productive and hitherto unproductive lands and taking up allied activities for the benefit of the rural poor and landless. This project will adopt a common strategy of multi-resource management involving all stakeholders within the watershed, who together as a group, will co-operatively identify the resources, issues and concerns of the watershed as well as develop and implement a watershed plan with solutions that are environmentally, socially and economically sustainable. The objective of the project will be:- 1. Developing water, land/degraded land and abandoned jhum land on watershed basis, keeping in view the capacity of land, local conditions and needs. 2. Promoting overall economic development and improving Socio-economic condition of the poor and disadvantaged section inhabiting the project area. 3. Restoring ecological balance by harnessing, conserving and developing natural resources. i.e. land, water and vegetative cover. 4. Encouraging village community for sustainable community action for operation and maintenance of assets created and further development of potential of natural resources in the watershed. 5. Employment generation, poverty alleviation, community empowerment and development of human and other economic resources of the village. Watershed Management works will be taken up in multi-tier approaches as below:- 1. First Tier-Canopy/Ridge Area Treatment (a) Stoppage of Shifting Cultivation: Under IWMP farmers are encouraged to practice permanent farming in compact areas. All the areas which were previously used for cultivation will be left fallow and in due course of time natural forest growth will be regenerated. (b) Afforestation: Besides the natural forest areas, more areas are proposed for afforestation under IWMP and other Schemes. Increased forest area will result in decrease of runoff water, soil water content and increased precipitation/rainfall, increased underground water table. (c) Prevention of soil erosion: Due to the hilly nature of Mizoram and deforestation, rain water easily erodes the fertile top soil. Fertility decreases considerably in places of minimal forest cover. To prevent more soil erosion, construction of terraces, afforestation and other means are proposed so that there will be minimum soil content in the runoff water. 2. Second Tier-Horticulture Crop Area Treatment (a) Construction of water harvesting structures and better utilization of water resources: Rainfall is still moderate and whatever rainfall we get, if we have proper harvesting structures, is more than enough for every household use without any other source of water. In place of permanent cultivation where natural streams are available for water harvesting using gravity and in those places where water is not available by gravity also, water harvesting should be encouraged. The harvested water 3 can be used both for human consumption as well as for irrigating farmlands and will provide the required water during dry season. (b) Land Development: The areas covered under IWMP project are planned to be developed in such a way that the productivity will increase. The areas proposed for afforestation will be developed by making terrace. Construction of terrace will prevent unnecessary water runoff, thereby, recharging the water table. In places where permanent cultivation will be practiced, depending on the slope of the terrain, terrace, bench terrace and contour trench will be constructed. Cultivation of commercial crops will be practiced in such places and irrigation facilities for dry season will be provided. (c) Gestation period treatment: The Permanent Horticulture crops planted in the 2nd Tier- Area will be mostly Orange, Hatcora, Nimbu, Litchi, Mango, Avocado and other cash crops. These crops will be harvested only after 5 years or more. During the gestation period, farmers and cultivators will be encouraged and assisted to introduce annual cash crops to meet their daily weeks. 3. Third Tier-Agriculture Crop Area Treatment: (a) Wet Rice Cultivation & Mixed Farming: In places of permanent cultivation, the land will be prepared in such a way that 2 – 3 crops can be planted in a year. This cannot be achieved with only the natural fertility of the land; therefore, provision will be made so that the cultivators can raise domestic animals in their farmland. The manure collected from animals can be used to fertilize the land making the crops produced in these farms entirely organic. Organic products are easier to export and have a larger market. (b) Multiple cropping: If water and manure are available in plenty, farmers can plant different varieties of crop depending on the season. Even during the dry season, cultivation can be done and also permanent crops can be raised. 4. Rural – Urban migration: Due to lack of employment opportunities and for various other reasons, rural populations migrate to urban areas. In urban areas there is deficit of work due to large influx of population from rural areas, resulting in poverty and creating problem for resettlement to rural areas. Using IWMP this rural-urban migration is hoped to be kept in check by providing them with means for secure income. 5. Women empowerment: For an accelerated Socio-economic development of any community active participation of women is essential. In a social set up like ours, i.e., Patriarchal family system, the participation of women in the development process has to be ensured through tangible measures at various levels which result in empowerment of women in the real sense. This project will address to decrease the workload of women in the project area. Time spent for collecting drinking water will be reduced which will result in positive impact on the quality of life and health of women and the family. 6. Provision of livelihood for Asset-less families: The Asset-less families will be provided with a scope of micro-entrepreneurship, they will be assisted and trained to take up those activities identified under the project. Livestock farming, handicraft, mechanics, black smithy, Tin smithy, Petty trade etc. will be encouraged by the PIA for this Asset-less people. Necessary financial and technical support will be provided from the project fund. 7. Creation of Assets: Using IWMP Project, plans are made to provide durable assets to the rural population. These assets will last long after the completion of this project and will be handed over to the public on completion of this project. The management, repair, renovation or augmentation of these assets will be the responsibility of the people. Plans are made in such a way that once the project is completed the public will be able to restore or augment these assets without Government help. A minimal charge will be collected from the user of these assets; this collection along with WDF will be used for maintenance of these assets. 4 8. Convergence with other Programmes: An opportunity for convergence with other programmes of Government