TRAFFIC CONGESTION in the BOSTON REGION: BEYOND the DAILY COMMUTE Traffic Congestion in the Boston Region

Total Page:16

File Type:pdf, Size:1020Kb

TRAFFIC CONGESTION in the BOSTON REGION: BEYOND the DAILY COMMUTE Traffic Congestion in the Boston Region TRAFFIC CONGESTION IN THE BOSTON REGION: BEYOND THE DAILY COMMUTE Traffic Congestion in the Boston Region Beyond the Daily Commute Project Manager Ryan Hicks Project Principal Mark Abbott Data Analysts Ryan Hicks Paul Reim Julian Chen Ben Erban Graphics Jane Gillis Kenneth Dumas Cover Design Jane Gillis Kim DeLauri The preparation of this document was supported by the Federal Highway Administration and Federal Transit Administration of the US Department of Transportation through MPO Planning Contracts #101725 and #105757, and MPO Transit §5303 Contracts #102694 and #106374. Central Transportation Planning Staff Directed by the Boston Region Metropolitan Planning Organization. The MPO is composed of state and regional agencies and authorities, and local governments. March 2019 IPSWICH TOPS- ROCKPOR HAMILT ESSEX GLOUCESTER MIDDLE- ON TON WENHAM NORTH MANCHESTER READING DANVERS WILMING- BEVERLY TON LYNNFIELD LITTLE- READING PEABODY TON CARLISLE WAKE- BUR-LING SALEM MARBLEHEAD BOX- BEDFORD STONEHA FIELD TON SAUGUS BOR- ACTON LYNN OUGH LEXINGTON SWAMPSCOTT CONCORD WOBURN MELROSE WINCHESTER NAHANT BOLTON STOW MAY- MALDEN ARLINGTOMEDFORD NARD LINCOLN REVERE BELMONT EVERETT SOMERVILLE CAMBRIDGE CHELSEA HUDSON WALTHA SUDBURY WESTON WINTHROP WATERTOW MARLBOROUGH FRAMINGHAM NEWTON WAYLAND SOUTH-B WELLESLEY BROOKLINE OROUGH BOSTON HULL NATICK NEEDHAM ASHLAND DEDHAM SHERBORN WESTWOOD QUINCY DOVER MILTON COHAS HOPKINTON SET SCITU MEDFIELD HINGHAM HOLLISTON RANDOLPHBRAINTREE -M ATE NORWOOD OUTH MILLIS WEY CANTON NORWELL MILFORD ROCKLAND MEDWAY HOL-BR WALPOL OOK NORFOLK MARSHFIELD SHARON FRANKLIN FOXBOROUGH BELLINGHAM WRENTHAM To request additional copies of this document or copies in an accessible format, contact: Central Transportation Planning Staff State Transportation Building Ten Park Plaza, Suite 2150 Boston, Massachusetts 02116 (857) 702-3700 (617) 570-9192 (fax) (617) 570-9193 (TTY) [email protected] www.bostonmpo.org Traffic Congestion in the Boston Region: Beyond the Daily Commute March 2019 Abstract Traffic conditions in the Boston region are monitored through the Boston Region Metropolitan Planning Organization’s Congestion Management Process (CMP). The purpose of the CMP is to identify locations where congestion occurs and the factors that contribute to it, and to develop strategies to alleviate the congestion. While most of the CMP’s traffic monitoring focuses on congestion caused by the recurring travel of the daily commutes residents in the region take to and from work in the morning and afternoon and evening peak travel periods, this study examined incidents when congested roadway conditions developed during times other than the traditional commuting hours or because of traveling associated with special events or holidays. Seven case studies are included in this report detailing roadway congestion levels, times when congestion occurred, and specific roadway locations where congestion was the worst. The report discusses strategies that could be implemented in the future to address congestion when similar events occur. When events affected roadways on which MBTA buses operate, bus on-time performance was evaluated. Page 3 of 133 Traffic Congestion in the Boston Region: Beyond the Daily Commute March 2019 Page 4 of 133 Traffic Congestion in the Boston Region: Beyond the Daily Commute March 2019 TABLE OF CONTENTS PAGE Executive Summary ............................................................................. 11 Chapter 1—Congestion in the Boston Region ............................................ 13 Chapter 2—Selection and Analysis of Available Data Sources ....................... 15 2.1 Data Selection .........................................................................15 2.2 Dataset Recommendations ..........................................................16 Chapter 3—Performance Measures .......................................................... 17 3.1 Highway Performance Measures ...................................................17 3.1.1 Congested Time.............................................................17 3.1.2 Average Travel Speed .....................................................17 3.1.3 Corridor/Segment Delay ...................................................18 3.1.4 Bottleneck Factor ...........................................................18 3.1.5 Travel Time Index ...........................................................18 3.1.6 Planning Time Failure Index ..............................................18 3.1.7 Minutes of Planning Time Failure ........................................19 3.2 Safety Performance Measure .......................................................19 3.2.1 Number of Crashes during the Day of Event ...........................19 3.3 Transit Performance Measure .......................................................19 3.3.1 On-Time Performance .....................................................19 3.4 Freight Performance Measure ......................................................20 3.4.1 Level of Travel Time Reliability...............................................20 Chapter 4—Methodology ....................................................................... 21 4.1 Selection of Events for Study ........................................................21 4.2 Selection of Bottlenecks ..............................................................21 4.3 Content of the Case Studies .........................................................21 Chapter 5—Case Study: New England Patriots Regular Season Games ........... 25 5.1 Description of Event and Location ..................................................25 5.2 Performance Measure Summary ...................................................26 5.2.1 Roadways ....................................................................26 5.2.2 Safety .........................................................................34 5.2.3 Findings ......................................................................35 Page 5 of 133 Traffic Congestion in the Boston Region: Beyond the Daily Commute March 2019 5.2.4 Strategies and Recommendations .......................................35 Chapter 6—Case Study: Red Sox Weekday Games ..................................... 37 6.1 Description of Event and Location ..................................................37 6.2 Performance Measure Summary ...................................................38 6.2.1 Roadways ....................................................................38 6.2.2 Safety .........................................................................45 6.2.3 Findings ......................................................................48 6.2.4 Strategies and Recommendations .......................................48 Chapter 7—Case Study: Saturdays .......................................................... 49 7.1 Description of Event and Location ..................................................49 7.2 Performance Measure Summary ...................................................49 7.2.1 Roadways ....................................................................49 7.2.2 Safety .........................................................................56 7.2.3 Bus Service ..................................................................59 7.2.4 Findings ......................................................................60 7.2.5 Strategies and Recommendations .......................................60 Chapter 8—Case Study: Super Bowl Parade .............................................. 63 8.1 Description of Event and Location ..................................................63 8.2 Performance Measure Summary ...................................................64 8.2.1 Roadways ....................................................................64 8.2.2 Safety .........................................................................70 8.2.3 Findings ......................................................................70 8.2.4 Strategies and Recommendations .......................................71 Chapter 9—Case Study: Wednesday before Thanksgiving ............................ 73 9.1 Description of Event and Location ..................................................73 9.2 Performance Measure Summary ...................................................73 9.2.1 Roadways ....................................................................73 9.2.2 Safety .........................................................................89 9.2.3 Findings ......................................................................90 9.2.4 Strategies and Recommendations .......................................91 Chapter 10—Case Study: Fridays ............................................................ 93 10.1 Description of Event and Location ..................................................93 Page 6 of 133 Traffic Congestion in the Boston Region: Beyond the Daily Commute March 2019 10.2 Performance Measure Summary ...................................................93 10.2.1 Roadways ....................................................................93 10.2.2 Safety ....................................................................... 102 10.3 Findings ............................................................................... 103 10.4 Strategies and Recommendations ............................................... 103 Chapter 11—Case Study: Black Friday ....................................................105 11.1 Description of Event and Location ...............................................
Recommended publications
  • Traffic Control Strategies for Congested Freeways and Work Zones
    Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA/TX-08/0-5326-2 4. Title and Subtitle 5. Report Date TRAFFIC CONTROL STRATEGIES FOR CONGESTED FREEWAYS November 2007 AND WORK ZONES Published: October 2008 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Geza Pesti, Poonam Wiles, Ruey Long (Kelvin) Cheu, Praprut Songchitruksa, Report 0-5326-2 Jeff Shelton, and Scott Cooner 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 Project 0-5326 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Technical Report: Research and Technology Implementation Office September 2005-August 2007 P. O. Box 5080 14. Sponsoring Agency Code Austin, Texas 78763-5080 15. Supplementary Notes Project performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration. Project Title: Improved Techniques for Traffic Control for Freeways and Work Zones URL: http://tti.tamu.edu/documents/0-5326-2.pdf 16. Abstract The primary objective of the research was to identify and evaluate effective ways of improving traffic operations and safety on congested freeways. There was particular interest in finding condition-responsive traffic control solutions for the following problem areas: (1) end-of-queue warning, (2) work zones with lane closure, and (3) queue spillover at exit ramps. Available techniques considered by this research include combination of static and dynamic queue warning systems, dynamic merge control in advance of freeway lane closures, and various traffic control strategies, such as traffic diversion and ramp metering, to mitigate queue spillover at exit ramps.
    [Show full text]
  • Impact of Highway Capacity and Induced Travel on Passenger Vehicle Use and Greenhouse Gas Emissions
    Impact of Highway Capacity and Induced Travel on Passenger Vehicle Use and Greenhouse Gas Emissions Policy Brief Susan Handy, University of California, Davis Marlon G. Boarnet, University of Southern California September 30, 2014 Policy Brief: http://www.arb.ca.gov/cc/sb375/policies/hwycapacity/highway_capacity_brief.pdf Technical Background Document: http://www.arb.ca.gov/cc/sb375/policies/hwycapacity/highway_capacity_bkgd.pdf 9/30/2014 Policy Brief on the Impact of Highway Capacity and Induced Travel on Passenger Vehicle Use and Greenhouse Gas Emissions Susan Handy, University of California, Davis Marlon G. Boarnet, University of Southern California Policy Description Because stop-and-go traffic reduces fuel efficiency and increases greenhouse gas (GHG) emissions, strategies to reduce traffic congestion are sometimes proposed as effective ways to also reduce GHG emissions. Although transportation system management (TSM) strategies are one approach to alleviating traffic congestion,1 traffic congestion has traditionally been addressed through the expansion of roadway vehicle capacity, defined as the maximum possible number of vehicles passing a point on the roadway per hour. Capacity expansion can take the form of the construction of entirely new roadways, the addition of lanes to existing roadways, or the upgrade of existing highways to controlled-access freeways. One concern with this strategy is that the additional capacity may lead to additional vehicle travel. The basic economic principles of supply and demand explain this phenomenon: adding capacity decreases travel time, in effect lowering the “price” of driving; when prices go down, the quantity of driving goes up (Noland and Lem, 2002). An increase in vehicle miles traveled (VMT) attributable to increases in capacity is called “induced travel.” Any induced travel that occurs reduces the effectiveness of capacity expansion as a strategy for alleviating traffic congestion and offsets any reductions in GHG emissions that would result from reduced congestion.
    [Show full text]
  • Increasing Highway Capacity Unlikely to Relieve Traffic Congestion
    October 2015 Increasing Highway Capacity Unlikely to Relieve Traffic Congestion Susan Handy Department of Environmental Science and Policy Contact Information: University of California, Davis [email protected] Issue Reducing traffic congestion is often Increased roadway capacity induces proposed as a solution for improving fuel additional VMT in the short-run and even efficiency and reducing greenhouse gas more VMT in the long-run. A capacity (GHG) emissions. Traffic congestion has expansion of 10% is likely to increase VMT traditionally been addressed by adding by 3% to 6% in the short-run and 6% to additional roadway capacity via constructing 10% in the long-run. Increased capacity entirely new roadways, adding additional can lead to increased VMT in the short-run lanes to existing roadways, or upgrading in several ways: if people shift from other existing highways to controlled-access modes to driving, if drivers make longer freeways. Numerous studies have examined trips (by choosing longer routes and/or the effectiveness of this approach and more distant destinations), or if drivers 3,4,5 consistently show that adding capacity to make more frequent trips. Longer-term roadways fails to alleviate congestion for effects may also occur if households and long because it actually increases vehicle businesses move to more distant locations miles traveled (VMT). or if development patterns become more dispersed in response to the capacity An increase in VMT attributable to increases increase. One study concludes that the BRIEF in roadway
    [Show full text]
  • Directions to Arsenal Field: from Boston/Cambridge: Take Either Memorial Drive Or Storrow Drive/ Soldiers Field Road to Greenough Boulevard
    Directions to Arsenal Field: From Boston/Cambridge: Take either Memorial Drive or Storrow Drive/ Soldiers Field Road to Greenough Boulevard. From Memorial Drive bear left at the split which leads to the Fresh Pond Parkway (when you bear left you want to go Past Buckingham, Brown and Nichols School-this is Greenough Blvd). From Storrow Drive Soldiers Field Road at the intersection past the Harvard stadium/fields continue over the bridge to cross the River into Cambridge (the Buckingham Brown and Nichols school will be right in front of you and you want to bear left onto Greenough Blvd.). At the end of Greenough Blvd. Bear right onto Arsenal Street. Proceed on Arsenal street west past the Arsenal Mall parking garage to the main entrance of the mall (extreme western end of Arsenal mall-there is a Marshall’s at this end). Take a left at the light at the main entrance to the mall (not the parking garage) and then take the first right in the parking lot. When you get to a stop sign to enter the Harvard Pilgrim Health Building take a left. Proceed over the speed bumps between the Marshall’s end of the Mall and the HPHC building and you will come to the parking lot for Arsenal field. From Wyeth: Take Fresh Pond parkway all the way to Greenough Blvd. And follow the directions above. If you stay to the extreme right after the Mt Auburn street intersection (don’t go on either Memorial Drive or Storrow Drive-stay to the extreme right lane) you will pass the BB&N school and end up on Greenough Blvd..
    [Show full text]
  • Congested Development: a Study of Traffic Delays
    Congested Development A Study of Traffic Delays, Access, and Economic Activity in Metropolitan Los Angeles September 2015 A Report to the John Randolph and Dora Haynes Foundation Andrew Mondschein, PhD (University of Virginia) Taner Osman, PhD (UCLA) Brian D. Taylor, PhD (UCLA) Trevor Thomas (UCLA) Institute of Transportation Studies UCLA Luskin School of Public Affairs 3250 Public Affairs Building Los Angeles, CA 90095-1656 (310) 562-7356 [email protected] www.its.ucla.edu ii Executive Summary For years Los Angeles has been ranked among the most traffic congested metropolitan areas in the U.S., often the most congested. This past year the Texas Transportation Institute (TTI) ranked LA second only to Washington D.C. in the time drivers spend stuck in traffic. Such rankings are lists of shame, tagging places as unpleasant, economically inefficient, even dystopian. Indeed, the economic costs of chronic traffic congestion are widely accepted; the TTI estimated that traffic congestion cost the LA economy a staggering $13.3 billion in 2014 (Lomax et al., 2015). Such estimates are widely accepted by public officials and the media and are frequently used to justify major new transportation infrastructure investments. They are based on the premise that moving more slowly than free-flow speeds wastes time and fuel, and that these time and fuel costs multiplied over many travelers in large urban areas add up to billions of dollars in congestion costs. For example, a ten mile, ten minute suburb-to-suburb freeway commute to work at 60 miles per hour might occasion no congestion costs, while a two mile, ten minute drive to work on congested central city streets – a commute of the same time but shorter distance – would be estimated to cost a commuter more than 13 minutes (round trip) in congested time and fuel costs each day.
    [Show full text]
  • SCANNED Firstsearch Technology Corporation
    SCANNED FirstSearch Technology Corporation Environmental FirstSearch Report TARGET PROPERTY: 3607 WASHINGTON ST BOSTON MA 02130 Job Number: 95-E-017 PREPARED FOR: Web Engineering Associates, Inc. 104 Longwater Drive Norwell, MA 02061 11-04-05 FIRSTS Tel: (781) 551-0470 Fax: (781) 551-0471 Environmental FirstSearch is a registered trademark of FirstSearch Technology Corporation. All rights reserved. EnvironmentalFirstSearch Search Summary Report Target Site: 3607 WASHINGTON ST BOSTON MA 02130 FirstSearch Summary Database Sel Updated Radius Site 1/8 1/4 1/2 1/2> ZIP TOTALS NPL Y 05-17-05 1.00 0 0 0 0 0 0 0 CERCLIS Y 08-01-05 0.50 0 0 0 0 - 0 0 NFRAP Y 08-01-05 0.25 0 0 0 - - 1 1 RCRA TSD Y 09-22-05 0.50 0 0 0 0 - 0 0 RCRA COR Y 09-22-05 1.00 0 0 0 0 0 0 0 RCRA GEN Y 06-13-05 0.25 0 1 1 - - 3 5 ERNS Y 12-31-04 0.25 0 0 1 - - 47 48 State Sites Y 09-16-05 1.00 0 1 / 4 7 22 11 45 Spills-1990 Y 09-16-05 0.50 0 2/ 8 27 - 63 100 Spills-1980 Y 03-10-98 0.15 0 3 0 - - 76 79 SWL Y 04-06-05 0.50 0 0 0 0 - 5 5 REG UST/AST Y 05-27-05 0.25 0 1 6 - - 0 7 Leaking UST Y 09-16-05 0.50 0 1 " 4 5 - 3 13 State Wells Y 06-08-05 0.50 0 0 0 0 - 0 0 Aquifers Y 06-15-04 0.50 0 0 0 0 - 0 0 ACEC Y 05-16-05 0.50 1 0 4 7 - 0 12 Floodplains Y 05-13-98 0.50 0 0 0 4 - 0 4 Releases(Air/Water) Y 12-31-04 0.25 0 0 0 - - 124 124 Soils Y 09-26-03 0.25 3 3 9 - - 0 15 - TOTALS - 4 12 37 50 22 333 458 Notice of Disclaimer Due to the limitations, constraints, inaccuracies and incompleteness of government information and computer mapping data currently available to FirstSearch Technology Corp., certain conventions have been utilized in preparing the locations of all federal, state and local agency sites residing in FirstSearch Technology Corp.'s databases.
    [Show full text]
  • Analysis of Historical Traffic Speeds in Chicago C
    Analysis of Historical Traffic Speeds in Chicago C. Scott Smith, PhD AICP Assistant Director Chaddick Institute for Metropolitan Development DePaul University [email protected] 562-221-5107 (cell) 312-362-5770 (office) This analysis briefly summarizes geographic and temporal trends in arterial traffic speeds in Chicago. The analysis was carried out using traffic congestion data made available by the City of Chicago. The dataset reports traffic congestion or vehicle speeds by traffic region. Traffic regions are groupings of two or three adjacent community areas that are thought to have similar traffic conditions. The dataset summarizes average speeds for each traffic region over a five-year period beginning January 2013 through February 2018 (although seven months of data are missing for 2015). The speed data are logged as part of the City of Chicago Traffic Tracker program which estimates traffic congestion on Chicago’s arterial or non-freeway streets continuously via GPS traces received from Chicago Transit Authority (CTA) buses. Congestion by traffic region provides average speeds for all arterial street segments within a region. The data must be interpreted with some caution given that there can be considerable volatility in traffic segment speed due to a broad number of factors including frequent transit stops, crashes and construction. The city emphasizes that, “[s]peed on individual arterial segments can fluctuate from heavily congested to no congestion and back in a few minutes” although, when averaged over a 24-hour period, the estimates likely provide an adequate representation of actual traffic patterns. The dataset used for the following analysis has a total of 6,275,764 records, each of which includes information on bus counts, reads, average daily speeds and traffic region.
    [Show full text]
  • Directions to the Howard Gotlieb Archival Research Center (Formerly Special Collections) at Boston University
    Directions to the Howard Gotlieb Archival Research Center (formerly Special Collections) at Boston University 771 Commonwealth Avenue, 5th Floor Boston, Massachusetts 02215 Tel: 617-353-3696 Fax: 617-353-2838 Web: www.bu.edu/archives Email: [email protected] From South or West: Take the Massachusetts Turnpike (1-90) East to Exit 18, Allston/ Cambridge. Exit left. Follow signs to Cambridge to the second set of lights. Turn right at the lights; this is Soldiers Field Road/ Storrow Drive. Exit Storrow Drive at the Kenmore exit. Follow Local Directions below. From Southeast: Take I-93/Route 3 (Southeast Expressway) North to Boston. Exit onto Storrow Drive (Exit 26). Continue on Storrow Drive to the Kenmore exit. Follow Local Directions below. From North: Take 1-93 or Route 1 South to Boston. Exit onto Storrow Drive (Exit 26). Continue on Storrow Drive to the Kenmore exit. Follow Local Directions below. From the North Shore: Take Route 1-A through the Sumner Tunnel. Follow signs onto the Expressway North. Take the Back Bay/Storrow Drive exit, and follow signs onto Storrow Drive. Continue on Storrow Drive to the Kenmore exit. Follow Local Directions below. Local Directions: From Kenmore Square/Commonwealth Avenue exit of Storrow Drive. At the first set of traffic lights, turn right onto Beacon Street. Immediately at this point, the road forks (to the right and left of the bright red "Myles Standish Hall" sign); the right fork is Bay State Road. The left fork will take you into Kenmore Square. Stay to the left of the fork, in the right-hand lane.
    [Show full text]
  • Storrow Drive Eastbound Bridge Replacement Project Limits
    Storrow Drive Eastbound Bridge Replacement Project Limits BRIDGE B-16-365(4FK) Existing Condition Storrow Drive Bridge Eastbound over Ramps • Heavy steel corrosion • Concrete cracking & spalling • Deteriorated foundation with settlement issues Additional Deficiencies Storrow Drive/Bowker Interchange • Left Exits • Difficult Merges • Low Clearance(s) • Missing Ped – Bike Connections Alternatives Report Storrow Drive Eastbound Bridge Replacement Boston, MA Project File No. 606728 July 13, 2018 Opportunity For Transformative Improvements 1. DeadPrepared-end pedestrian for: pathways 2. Trapped historic monuments 3. Buried Muddy River 4. Unmitigated drainage into impaired waterways 5. Fragmented and inaccessible landscape areas 6. Minimal connection to Esplanade Reconnect Emerald Necklace Connection Severed since 1951 Restore Usable Open Space Along Charles River Improve Storm Water Management for Impaired Waterways Alternative 1A • Footprint of the Eastbound bridge • Includes a temporary bridge Alternative 1A – Analysis Advantages • Short project development, design and construction schedule • Low cost to re-establish groundcover landscape Disadvantages • Minimal Storrow EB roadway improvements • Storrow Drive WB left-hand exits remain • Esplanade and Emerald Necklace remain disconnected • Emerald Necklace remains inaccessible to the urban context • No improvement to stormwater run-off water quality • No new recreation opportunities Alternative 1B • Footprint of Eastbound bridge • On adjusted alignment Alternative 1B - Analysis Advantages
    [Show full text]
  • Urban Traffic and Transport Data I Chi Ci I in Chinese Cities
    Country Report: Urban Traffic and Transport data in Chinese Cit ies Dr. Guo Jifu Beijing Transportation Research Center Contents • Introduction • Data System • New TdTrends About the Country Urbanization rate in China, US and Japan • United states: urbanization rate increased from 10 % in 1840 to 73 % in 1970, taking 130 years USA • Japan: urbanization rate China increase d from 11. 7% in 1898 to Japan 72 % in 1970, taking 100 years • China:maybe less than 50 years 3 Urban Sprawl 北京 Beijing成都 Chengdu 年 2003年 2009年 1993 1980年 1994年 454km² 1180km² 1350km² 60km² 106km² 上海 Shangh ha i 广州GhGuangzhou 1991年 2003年 2008年 1505km² 2288km² About the Country The Sixth Census in 2010 By the end of 2010, there are 657 Baoding Beijing cities, total 666 million urban Shijiazhuang 保定市 北京市 10.16million 1119万人 1961万人 population in China 19.61million 石家庄市 11.19million Harbin 1016万人 10.64million 哈尔滨市 1064万人 The Sixth Census: Tianjin 12.94million 天津市 13 cities with a population of over 1294万人 10 million and Suzhou 10.47million 苏州市 303 cities with over 1million in Shanghai 1047万人 23.02million 2010 上海市 万人 2302 广州市 12. 70m illion Shenzhen 10.36million 1270万人 Jing-Jin-Ji, Yangtze Delta, Pearl Chengdu 深圳市Guangzhou 14.05 million 1036万人 Rive Delta, and Chengdu- 成都市 1405万人 Chongqing Chongqing city clusters have been 28. 85 million 重庆市 formed 2885万人 5 Motorization From 1985 to 2010, the average annual growth rate of national civilian vehicle is 13.7% and that of private car shows 24% Evolution of national civilian vehicles and private cars Private Car Total Vehicles
    [Show full text]
  • FORM B  BUILDING Assessor’S Number USGS Quad Area(S) Form Number
    FORM B BUILDING Assessor’s Number USGS Quad Area(s) Form Number 52-0-6 Lowell DRA.46 MASSACHUSETTS HISTORICAL COMMISSION MASSACHUSETTS ARCHIVES BUILDING 220 MORRISSEY BOULEVARD Town/City: Dracut BOSTON, MASSACHUSETTS 02125 Place: (neighborhood or village): Dracut Center Photograph (view from S) Address: 28 Arlington Street (Formerly 30 Arlington Street) Historic Name: Moses Greeley Parker Library Uses: Present: public library Original: public library Date of Construction: 1922 (with later additions) Source: legend applied to the building Style/Form: Georgian Revival/gambrel block Architect/Builder: Coolidge and Carlson, Johnson Roberts Associates, Inc. Exterior Material: brick Foundation: Locus Map (north is up) Wall/Trim: brick/wood Roof: slate Outbuildings/Secondary Structures: none Major Alterations (with dates): additions in 1939, 1979 and 2005 Condition: Excellent Moved: no yes Date: Acreage: 41,300 square feet Setting: The library is located in the institutional center of Dracut near the intersection of Arlington and Bridge streets and abuts Town Hall, the Yellow Meeting House and the Grange Hall; other nearby uses include commercial and residential. Recorded by: John D. Clemson Organization: Dracut Historical Commission Date (month / year): April, 2017 12/12 Follow Massachusetts Historical Commission Survey Manual instructions for completing this form. INVENTORY FORM B CONTINUATION SHEET DRACUT 28 ARLINGTON STREET MASSACHUSETTS HISTORICAL COMMISSION Area(s) Form No. 220 MORRISSEY BOULEVARD, BOSTON, MASSACHUSETTS 02125 DRA.46 Recommended
    [Show full text]
  • Directions and Parking
    Directions and Parking One Ashburton Place 21st Floor, Conference Room 2&3 Boston, MA 02108 One Ashburton Place, also known as the John W. McCormack Building, is located adjacent to the eastern side of the Massachusetts State House, between Bowdoin and Somerset Streets. Driving Directions: Customized driving directions are available via Google Maps: By car from the North Take Interstate 93 SOUTH to Exit 26, Storrow Drive and North Station. Stay in the LEFT lane and follow signs to Storrow Drive. Once out of the tunnel stay in LEFT lane and take the first exit on the LEFT towards Government Center and Kendall Square. At the end of the exit ramp, go straight across under the Red Line tracks following signs to Government Center which bears to the left onto Cambridge Street. At the seventh light (a little under a half a mile) turn right onto Somerset Street. Somerset Street turns onto Ashburton Place at the top of the hill. One Ashburton Place will be on the RIGHT. By car from the South Take Interstate 93 NORTH. Take Exit 23, Government Center. Stay in the LEFT lane of the exit ramp and turn left at the first light onto North Street. Go straight through one set of lights. At the second set of lights, turn LEFT onto Congress Street. At the first intersection turn RIGHT onto State Street. State Street turns into Court Street. Turn LEFT onto Tremont Street. At the first light turn RIGHT onto Beacon Street. Turn RIGHT onto Somerset Street. Turn LEFT onto Ashburton Place. One Ashburton Place will be on the RIGHT.
    [Show full text]