March 5, 2003 MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station DOCKETS: 50-528; 50-529; 50-530 DATE & TIME: March 19, 2003 7 p.m. (MST) LOCATION: Community Room in Estrella Hall Estrella Mountain Community College 3000 Dysart Road Avondale, Arizona 85323 PURPOSE: End-of-cycle public meeting to present the NRC assessment of Palo Verde Nuclear Generating Station’s safety performance and to describe other NRC focus areas for the period January 1 through December 31, 2002 CATEGORY 1: The public is invited to observe this meeting and will have the opportunity to communicate with the NRC after the business portion, but before the meeting is adjourned. PARTICIPANTS: NRC Linda Smith, Chief, Project Branch D, Division of Reactor Projects (DRP) Nancy Salgado, Senior Resident Inspector, DRP Greg Warnick, Resident Inspector, DRP Jim Melfi, Resident Inspector, DRP LICENSEE Gregg Overbeck, Senior Vice President Nuclear Craig Seaman, Director Nuclear Assurance and Nuclear Regulatory Affairs David M. Smith, Director Operations David Mauldin, Vice President Nuclear Engineering Terry Radtke, Director Maintenance MEETING CONTACT: Linda Smith, NRC, RIV 817/860-8137
[email protected] Arizona Public Service Company -2- cc: Gregg R. Overbeck, Senior Vice President, Nuclear Arizona Public Service Company P.O. Box 52034 Phoenix, Arizona 85072-2034 Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, California 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Craig K.