197 Bn, Crpf, Chaibasa, West Singhbhum

Total Page:16

File Type:pdf, Size:1020Kb

197 Bn, Crpf, Chaibasa, West Singhbhum OFFICE OF THE COMMANDANT – 197 BN, C.R.P.F., CHAIBASA, WEST SINGHBHUM (JHARKHAND) TELE:06582-255300 Cost of Tender-Rs-200-00 (Rupees Five Hundred) only No. L.VII-9/2016 -17-MT/197 Dated the September’2016 LIMITED TENDER NOTICE The Commandant-197 Bn,CRPF,Welfare Department Building ,Chaibasa,Near railway station Chaibasa ( Near Zila school ) West Singhbhum,Jharkhand for and on behalf of the President of India invites tenders under two bid system (Technical & commercial Bids) on the prescribed format for repairing of Accidential vehicles TATA-407 at 197 Bn, CRPF, unit Hqr Chaibasa,Jharkhand . Details are as under:- SL.NO. DESCRIPTION QTY SPECIFICTION EMD (RS) DATE OF OPENING OF OF STORES TENDER 1. REPAIRING 01 NO ATTACHED AS RS-10,000/- a)TIME & DATE OF OF ACIDENTIAL APPENDIX-‘’A’’ (RUPEES TEN RECEIPT OF TENDER VEHICLE TATA -407, THOUSAND ) UPTO 1400 HRS MODEL -2006 ON 17 /010/2016. b)TIME & DATE OF OPENING OF TENDER AT 1600 HRS ON 17/010/2016. For more details visit our WEBSITE WWW.CRPF GOV.IN.NIC and 197 BN E-MAIL I/D – [email protected] . Thanking you. Yours faithfully (T.H.KHAN ) Commandant-197 BN CRPF Chaibasa, Jharkhand For and on behalf of the President of India ::2:: APPENDIX-A SL.NO. DESCRIPTION OF PARTS Qty 1. ASSY PLASTIC GRILL WITH T-ELBEM 01 NO 2. ASSY PLASTIC GRILL L.H. SIDE BONNET 01 NO 3. ASSY PLASTIC GRILL R.H. SIDE BONNET 01 NO 4. ASSY E-CERT H/L W/E MARK BULBS LH-RH. 01 NO 5 ASSY E-CERT H/L W/E MARK BULBS LH-RH. 01 NO 6 ASSY BLINKER LAMP RH WITH WITH E-CERT 01 NO 7 ASSY BLINKER LAMP LH WITH E-CERT. 01 NO 8 ASSY RADIATOR AL-CORE PLASSTIC TANK. 01 NO 9 RUB MOULD W/S GLASS EPDM. 01 NO 10 ASSY AUXILARY TANK WITH CAP. 01 NO 11 KIT FOR W/S WASHER UNIT OFFER DRG. 01 NO 12 ASSY 10 INCH VACCUM BOOSTER. 01 NO 13 ASSEMBLY AIR CLEARNER SFC-410. 01 NO 14 ASSY OIL SUMP. 01 NO 15 GLASS PANE REGULATING WINDOW GREEN. 01 NO 16 DOOR HANDLE OUTER LH-RHD. 01 NO 17 FAN ASSY 400 DIA PLASTIC. 01 NO 18 PLASTIC FAN SHROUD. 01 NO 19 RUB MTG PAD RAD BOTTOM. 02 NOS 20 ASSY RADIATOR MTG PAD TOP COMP. 02 NOS 21 CROSS MEMBER MTG. 01 NO 22 EMGIME MTG PAD FRT LH. 01 NO 23 ASSY HE ROD 40 . 01 NO 24 ASSY UNITSHED PROP SHAFT. 01 NO 25 ENGIME MTG RR. 01 NO 26 ALTERNATON 12 V 35A. 01 NO 27 RUBBER HOSE. 01 NO 28 RUBBER HOSE EPDM. 01 NO 29 MOUNTING BRACKET RR. 01 NO 30 W/S GLASS LAMIN SFC 407. 01 NO 31 SIDE INDI LAMP LH-MS HARNESS. 01 NO 32 SIDE INDI LAMP RH-MS HARNESS. 01 NO 33 WINDOW REGULATOR LH. 01 NO 34 SHOCK ABSORBER FRONT. 02 NOS 35 V-BELT COGGED 1185 MM. 01 NO JOB WORK. 1 W/S GLASS REPLACEMENT. 01 JOB 2 COMPLETE CABIN DENTING SETTING. 01 JOB 3 COMPLETE CABIN PAINTING. 01 JOB 4 ALL UPHOLSTERY ITEM REMOVAL & RE-INSTALL. 01 JOB 5 RADIATOR REPLACEMET INCLUDING FAN. 01 JOB 6 ALL ELECTRICAL SYSEM RECTIFICATION 01 JOB 7 CHASIS FRAME STRAIGHTING. 01 JOB (T.H.KHAN ) Commandant-197 BN CRPF Chaibasa, Jharkhand For and on behalf of the President of India ::3:: NAME OF FIRM SL. NO. NAME OF FIRM 1 M/S A.J. INTERNATIONAL ,133/54-P, RATTU,T.P. NAGAR,KANPUR-208023 2 M/S MANISH KUMAR IRON MARCHANTS LOHAR PATT UPPAR BAZAR, RANCHI, JHARKHAND 3 M/S SUDIP KUMAR GUPTA, DUBEY LANE SASTRI CHOWK, LOHARDAGA, RANCHI, JHARKHAND M/S STATIC SYSTEM ELECTRIONICS PVT LTD,488P, PACE CITY-II SECTOR-37 GURGAON 4 122001, HARYANA . M/S SICON(i) 102-103-SS COMPLEX,GROUND FLOOR,HINOO CHOWK, 5 RANCHI834002(JHARKHAND 6 M/S SHREE SHYAM ENTERPRISES,1ST FLOOR KAMLA MARKET MOKAMA GHAT (PATNA) 7 M/S SRI SAI TRADERS, NAMKUM BAZAR,P.O. NAMKUM, RANCHI,JHARKHAND M/S S.D. ENTERPRISES,NEAR SHIV MANDIR, MAIN GATE, SAHARPURA, SINDRI ,DHANBAD 8 ,JHARKHAND 9 M/S ANURAG KUMAR SINGH,17-Q NEW AREA MOREBADI, RANCHI 834008,JHARKHAND . 10 M/S S.K. ENTERPRISES,H-332, ADARSH NAGR DHURWA, RANCHI,834004 , JHARKHAND 11 M/S ARMY SALE, DEEPATOLI, NABRI, VIKASH, RANCHI, JHARKHAND 835217 12 M/S J.K UDYOG,NEAR NEWWW CINEMA ,MAIN ROAD, P.O. MOKAMA -8033004(PATNA) M/S A.Y ENTERPRISES, FLAT NO.441,GROUND FLOOR, POCKET-3 SHAHEED BHAGAT SINGH 13 APARTMENT, SECTOR 14, DWARKA,NEW DELHI-1110078 14 M/S VISHAL SALES & SERVICE L2/7 BABAI ROAD SAKCHI , JAMSHEDPUR -01 M/S S.T. ENTERPRISES, BANIAHARI,74A,CO-OPERATIVE COLONEY, BOKARO STEL CITY- 15 828111 M/S NEXGEN INFOTECH, DT-2520 PANI TANKI SIDE,PO DHURWA RANCHI (JHARKHAND ) 16 877001 17 M/S A.G. ENTERPRISES, HOUSE NO. K1-60 SHAHARPURA, SINDRI( JHARKHAND ) (T.H.KHAN ) Commandant-197 BN CRPF Chaibasa, Jharkhand For and on behalf of the President of India All the bidders are required to submit one Tender Sample of MT Parts and Job work as Tender Sample along with the lab test certificate in original, from any of the laboratories approved by the National Accreditation Board for testing and Calibration Laboratories ( NABL) . Authorization certificate of Lab. Issued by NABL should be enclosed with the tender enquiry without authorization certificate, tender will be rejected. 2. DELIVERY PERIOD: - Within 30 days from the date of supply order or earlier. 3. While opening the tenders, the technical bid will be opened first and on scrutiny of all the samples/ documents enclosed by the tenders, a comparative study will be made. If a tender fails to fulfill all the conditions stipulated in tender notice/fails to enclose the documents as asked or fails to arrange Technical inspection of samples specified, then his tender will be rejected out rightly and his name will not be included for the price bid. Names of successful tenderers who fulfilled all the conditions in the technical bids after testing protection level practically will be prepared separately and only their tender will be opened for price bid. The price bid given by the unsuccessful bidder in the technical bid will not be opened and kept as it is ( Form for submitting the Technical Bid and Price Bid are enclosed). 4. DISPTACH :- (1) Store are required to be delivered to The Commandant-197 Bn, CRPF, Chaibasa, Distt-West Singhbhum-833201 (Jharkhand) on the own risk and cost of the concerned suppliers. (2) Only those who will be able to demonstrate their quoted make/ model before placement of supply order should only submit tender. (3) The information format should invariably be filled in and duly signed by the authorized signatory and the terms and condition should strictly be followed before submitting the quotation. (5) TWO BID SYSTEM :- All bidders are required to submit their offers in two separate covers as under :- (a) FIRST COVER ( Technical Bid) should contain the following :- (i) Tender documents duly completed and signed but without indicating or quoting rates. (ii) Earnest Money ( Not required in this case firm registered with DGS & D and NSIC ) (iii) Delivery terms, delivery period must be quoted. (iv) Performance statement of last three years. (v) It should contain one sample and counter lab test sample after duly signed by Concerned Lab Officer separately with Lab test report. (vi) Any other relevant documents which the firms wishes to submit. (b) SECOND COVER ( Commercial /Price Bid) should contain the following :- (i) Details of rates, Taxes,duties and discount, if any quoted by the bidder. These details should be submitted on their letter pad. (ii) Rates must be clearly written in figures as well as in words. (i) There should not be any cutting/over writing. Both the above mentioned covers should be sealed separately, and super scribed with the Tender No. Stores and date of tender opening./ This cover should thereafter, be kept in a third cover and again sealed. This cover should be super scribed with the tender No. Stores and date of tender opening. 6. The quotations may be addressed to the Commandant-197 Bn,CRPF,Distt-Welfare Department Building Complex, Near Chaibasa Railway Station( West Singhbhum District ) Jharkhand. LIQUIDATED DAMAGE :- 7.The rate of items should be quoted alongwith inclusive all taxes, which can be supplied within the specified period mentioned in the supply order . For any delay in the supply of goods be the specified date, a liquidated damage of @ 2% of supply of goods by the delayed goods for 30 days will charged for which the equipment/items is supplied after the specified date given in the supply order. 8. Quotations must reach by the date mentioned in the tender notice ( latest by 1500 hrs on 17/10/2016) to this office. 9.Quotations i.e. Technical bids only will be opened on 17/10/2016 at 1600 hrs Tenderers or their resentatives may be present at the time of opening the quotations ( Technical bids) if so desire. Date for opening of financial bids will be intimated to bidders later on. 10.Quotations received after due date and time will be rejected. 11.The price quoted should be for complete terms of reference. 12.Full particulars of the MT parts and job work should also be furnished with the quotations. 13.The tenderer will submit quotations along with a certified copy of its latest Income Tax clearance certificate. 14.Quotations should be valid upto 60 days. Quotations valid for a shorter period shall be rejected as non-responsive.
Recommended publications
  • Office of the Civil Surgeon, West Singhbhum, Chaibasa List of Eligible Candidate for the Post of LAB TECHNICIAN CHC NCD CLINIC Post Code - 15, Advt
    Office of the Civil Surgeon, West Singhbhum, Chaibasa List of Eligible Candidate for the Post of LAB TECHNICIAN CHC NCD CLINIC Post Code - 15, Advt. No 01 2017 Technical Qualification Inter Jharkhand (DMLT) State Experie Knowle Form Paramedic nce Sl. Father's Date of Home Residen Categor dge of Amo Sl. Name Mobile no Permanent Address Present Address al counl, (Min. Remarks Bank Name DD No DD Date No. Name Birth District tial y Compu unt No. Marks Marks Ranchi - 02 Total Total ter Obtaine % Obtaine % Registrato Years) Marks Marks d d n AT - SURYA NARSING VILL - DUDRI, PO - TOKLO, HOME, THANA ROAD, SUSHIL WEST PNB, NIRANJAN CHAKRADHARPUR, DIST - WARD NO 02, PO - YES OBC 04 Y 01 1 4 KUMAR 12-Jan-1990 9934978075 SINGHB 500 280 56.00% 700 503 71.86% NA NA ASANTALI 818130 11-Sep-2017 MAHTO WEST SINGHBHUM, CHAKRADHARPUR, DIST - (SDO) (SDO) M MAHTO HUM A 400.00 JHARKHAND WEST SINGHBHUM, JHARKHAND VILL - ABHAYPUR, PO - VILL - ABHAYPUR, PO - SANJAY URKIYA, PS - URKIYA, PS - WEST CANARA PRAYAG YES OBC 2 59 KUMAR 15-Feb-1985 9438509940 MANOHARPUR, DIST - MANOHARPUR, DIST - SINGHB 900 460 51.11% 700 422 60.29% NA 02 M NA BANK, 967913 09.16.2017 MAHTO (SDO) (CO) MAHTO WEST SINGHBHUM, WEST SINGHBHUM, HUM CHAIBASA 400.00 JHARKHAND JHARKHAND VILL - BHOGRA, VILL - GUA, GUASAI, PO - MHANTISAI, PO - WEST GEETA KHAGESHW GUA, DIST - WEST 03 Y 02 3 75 27-Dec-1986 7091265622 JAGANNATHPUR, DIST - SINGHB 500 235 47.00% 1900 1409 74.16% NA NA SBI, GUA 407515 16-Sep-2017 KUMARI AR PAN SINGHBHUM, M WEST SINGHBHUM, HUM 400.00 JHARKHAND JHARKHAND VILL - SIDMA BARU
    [Show full text]
  • Review of Asian Species/Country Combinations Subject to Long-Standing Import Suspensions
    Review of Asian species/country combinations subject to long-standing import suspensions (Version edited for public release) SRG 54 Prepared for the European Commission Directorate General Environment ENV.E.2. – Environmental Agreements and Trade by the United Nations Environment Programme World Conservation Monitoring Centre November, 2010 UNEP World Conservation Monitoring PREPARED FOR Centre 219 Huntingdon Road The European Commission, Brussels, Belgium Cambridge CB3 0DL DISCLAIMER United Kingdom Tel: +44 (0) 1223 277314 The contents of this report do not necessarily Fax: +44 (0) 1223 277136 reflect the views or policies of UNEP or Email: [email protected] Website: www.unep-wcmc.org contributory organisations. The designations employed and the presentations do not imply ABOUT UNEP-WORLD CONSERVATION the expressions of any opinion whatsoever on MONITORING CENTRE the part of UNEP, the European Commission or contributory organisations concerning the The UNEP World Conservation Monitoring legal status of any country, territory, city or Centre (UNEP-WCMC), based in Cambridge, area or its authority, or concerning the UK, is the specialist biodiversity information delimitation of its frontiers or boundaries. and assessment centre of the United Nations Environment Programme (UNEP), run cooperatively with WCMC, a UK charity. The © Copyright: 2010, European Commission Centre's mission is to evaluate and highlight the many values of biodiversity and put authoritative biodiversity knowledge at the centre of decision-making. Through the analysis and synthesis of global biodiversity knowledge the Centre provides authoritative, strategic and timely information for conventions, countries and organisations to use in the development and implementation of their policies and decisions. The UNEP-WCMC provides objective and scientifically rigorous procedures and services.
    [Show full text]
  • Pre- Feasibility Report 1. Executive Summary
    PRE- FEASIBILITY REPORT OF KAMALPUR FIRE BRICK CLAY DEPOSIT OF M/s K.S.D. BRICKS, PROP.-SHRI KHURSID ALI, AREA – 2.47 ACRES, PLOT NO –211(P), KHATA NO.– 46, IN VILLAGE – KAMALPUR, DISTRICT – SARAIKELA-KHARSAWAN,JHARKHAND. PRE- FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Spread over an area of 2.47 Acres (0.999 ha.), the proposed project is to extract Brick Clay (Earth) for Fire Bricks by M/s K.S.D. Bricks at Plot No –211 (P), Khata No. – 46, Mauza- Kamalpur, P.S. - Saraikela, Distt. - Saraikela-Kharsawan, Jharkhand. The essential information about the project is summarized below in Table 1. Table 1: Basic Information Sl. Item Details No 1. Name of the Applicant M/s K.S.D. Bricks Proposed Mining Lease Area Area :- 2.47 acres or 0.999 Ha 2. (As per Agreement Deed) 3. Land Use Undeveloped Gora Land 4. Land Ownership Private Ownership 5. Lease period 5 years 6. River Sona River (250 m approx.) Name of protected areas, None as notified under the Wildlife (Protection) 7. Wildlife Sanctuary, Eco Act, 1972 sensitive area 0 0 8. Site Co-ordinates Latitude: Between 22 46’ 22.15’’N to 22 46’ 25.05’’N. Longitude: Between 850 56’15.42’’E to 850 56’ 22.40’’E. Khata No. 46, Plot No. Plot no –211 (P), M/s 9. Location K.S.D. Bricks, Mouza: Kamalpur, P.S.: Saraikela, District: Saraikela -Kharsawan, Jharkhand. 10. Toposheet No. 73 F/13 (F45H13). 11. Topography Flat land 12. Minerals of mine Brick Clay To cast granted Six lakh bricks / season, Only Brick Clay will be extracted 1740.00 cum/season (Six 13.
    [Show full text]
  • Jharkhand Road Projects Implementation Company Limited (Jrpicl)
    JHARKHAND ROAD PROJECTS IMPLEMENTATION COMPANY LIMITED (JRPICL) EIGHTH ANNUAL REPORT 2016-17 Overview and Achievements The Government of Jharkhand (GoJ) and Infrastructure Leasing & Financial Services Limited (IL&FS) entered into a Programme Development Agreement (PDA) dated February 06, 2008 to form a Joint Venture for upgradation of about 1,500 lane kms of roads in the State of Jharkhand under Jharkhand Accelerated Road Development Programme (JARDP). Pursuant to the aforesaid PDA, GoJ and IL&FS incorporated a Special Purpose Entity (SPE) in the name of Jharkhand Accelerated Road Development Company Limited (JARDCL) for successful implementation of the JARDP including planning, designing and procurement of contractors, financing, construction, operation and maintenance of the road stretches identified under the JARDP. As per the terms of the PDA, the financing, construction, operation and maintenance of road projects may be taken up either by JARDCL or through another Project SPV to be incorporated either by GoJ and/or IL&FS, as mutually agreed. With the approval of GoJ, IL&FS on August 04, 2009 incorporated the Project SPV namely Jharkhand Road Projects Implementation Company Limited (JRPICL) to carry out the implementation work under the JARDP. 1500 Lane km of road was mandated to be developed under Jharkhand Accelerated Road Development Programme (JARDP), out of which till date over 768.61 Lane Km of road has been assigned to our Company. Your Company has successfully completed 5 road projects namely Four Sections of Ranchi Ring Road (Section III, IV, V & VI), Ranchi Patratu Dam Road, Patratu Dam – Ramgarh Road Project, Adityapur – Kandra Road and Chaibasa – Kandra Chowka Road Projects within the timeline set by the Government of Jharkhand from time to time and also commenced the Operation & Maintenance work of all these projects.
    [Show full text]
  • Kolhan University, Chaibasa (Examination Department)
    KOLHAN UNIVERSITY, CHAIBASA (EXAMINATION DEPARTMENT) Examination Centre for B.A./B.Sc./B.Com. Part-III (H/G/Voc) Exam. 2017. (2014-17) Reporting Time : 9.30 A.M. Time : 10.00 A.M. to 01.00 P.M. Sl. Name of the Centre Name of the College attached Name of the Centre No Superintendent. 1. Tata College, Chaibasa 1. Mahila College, Chaibasa Principal, 2. G.C. Jain Comm. College, Chaibasa Tata College, Chaibasa 2. Mahila College, Chaibasa 1. Tata College, Chaibasa Principal, 2. Noamundi College, Noamundi Mahila College, Chaibasa 3. J.L.N. College, 1. J.L.N. College, Chakradharpur Principal, Chakradharpur 2. VAS College, Sonua J.L.N. College, Chakradharpur 3. St. Augustine College, Manoharpur 4. K.S. College, 1. K.S. College, Saraikella Principal, Saraikella K.S. College, Saraikella 5. Singhbhum College, 1. Singhbhum College, Chandil Principal, Chandil S.B. College, Chandil 1. Jsr.Co-operative College, Jamshedpur Principal, J.K.S. College 6. 2. Patamda Degree College, Jalla J.K.S. College, Jamshedpur Jamshedpur 3. NSIBM, Pokhari, Jamshedpur 7. The G.S.C. for Women, 1.Karim City College, Jamshedpur Principal, Jamshedpur The G.S. C. for Women, Jsr. 8. L.B.S.M. College, 1. A.B.M. College, Jamshedpur Principal, Jamshedpur L.B.S.M. College, Jamshedpur 9. A.B.M. College, 1. J.K.S. College, Jamshedpur Principal, Jamshedpur 2. AJK College, Asanboni A.B.M. College, Jamshedpur 3. Jain college, Jamshedpur 4. Mrs. KMPM Voc. College, Jamshedpur 5. GIIT College, Jamshedpur 10. Jsr. Co-operative College, 1. Jsr. Workers’ College, Jamshedpur Principal, Jamshedpur Jsr.
    [Show full text]
  • SUSTAINABLE DEVELOPMENT: Emerging Issues in India's Mineral
    SUSTAINABLE DEVELOPMENT Emerging Issues in India’s Mineral Sector Sponsored by Planning Commission Government of India May 2012 Institute for Studies in Industrial Development 4, Institutional Area, Vasant Kunj, New Delhi SUSTAINABLE DEVELOPMENT: Emerging Issues in India’s Mineral Sector A research study sponsored by Planning Commission Research Director Shri Nilmadhab Mohanty Research Associate Aarushi Goyal Institute for Studies in Industrial Development 4, Institutional Area, Vasant Kunj, New Delhi - 110 070 Phone: +91 11 2676 4600 / 2689 1111; Fax: +91 11 2612 2448 E-mail: <[email protected]> Website: <http://isid.org.in> CONTENTS Abbreviations v-ix Preface & Acknowledgements xi-xii Executive Summary xiii-xx Introduction 1–4 Section I SUSTAINABLE DEVELOPMENT AND MINERAL PRODUCTION 5–34 Chapter 1: Why Sustainable Development Today? Chapter 2: Sustainable Development: Concepts, Principles and Applications Chapter 3: Sustainability and Mineral Cycle Section II INDIAN MINING INDUSTRY: BREIF PROFILE AND REGULATORY REGIME 35–82 Chapter 4: Indian Mining Industry: A Brief Profile Chapter 5: Legal Regime and Role of Government Chapter 6: Environmental Policy and Laws for Mining Sector Section III EXPERIENCE IN SUSTAINAIBILITY PRACTICES IN INDIAN MINERALS SECTOR: A FEW CASE STUDIES 83–154 Chapter 7: Odisha Chapter 8: Goa Chapter 9: Karnataka Chapter 10: Jharkand Section IV INTERNATIONAL EXPERIENCE IN SUSTAINABILITY PRACTICES IN MINING: SELECTED CASES 155–176 Chapter 11: Sustainability Practices in Canada, Australia, South Africa and Papua New
    [Show full text]
  • Table 4. 5 List of MOU's in Jharkhand
    Table 4. 5 List of MOU's in Jharkhand Name of the Company Product to be manufactured Proposed Investment District I Proposed Site (Rs. In crore) 1 Mis Monnet !spat Limited, Integrated Steel Plant (DRI based) 1400 Hazaribagh 2 Mis Vallabh Steel Limited, Sponge Iron, Power Plant, Steel Plant 288 Saraikela-Kharsawan 3 Mis Aadhunik Allov &Power Ltd. Sponge Iron, Power Plant, Steel Plant 970 Saraikela-Kharsawan Sponge Iron, Power Plant, Steel Plant, 4 Mis Nilanchal Iron & Power Ltd. Mining 450 Saraikela-Kharsawan 5 Mis Jharkhand Ispat Pvt. Ltd., Sponge Iron, Steel Plant, 400 Ramgrah Sponge Iron, Captive Coal Mine, 6 Mis Abhijeet Infrastructure Pvt. Ltd. Ferro Allov 300 Hazaribag 7 Mis AML Steel & Power Ltd. Integrated Steel Plant 2000 Saraikela-Kharsawan Sponge Iron, Captive Coal Mine, 8 Mis Corporate IsPat Alloy Limited, Ferro Allov 300 Hazaribagh Sponge Iron, Captive Coal Mine, 9 Mis Annpuma Global Ltd, Power Plant 500 Mis Prasad Groups, Resources, Pvt Sponge Iron, Power Plant, Steel IO Ltd. Plant, Mining 400 Ramgarh Sponge Iron , Captive Coal Mine 11 MlsPrakash !spat , Crushing Unit 71.4 Chaibasa Sponge Iron , Captive Coal Mine 12 MlsHorizon Eximp Ltd. ,Crushing Unit 74.15 Chaibasa Sponge Iron , Captive Coal Mine 13 MlsSpectrum Mercantile Pvt. Ltd., Crushing Unit 74.15 Chaibasa 14 Mis Chaibassa Steel Pvt. Ltd. Sponge Iron 74.15 Chaibasa 15 Mis Tech Al Corporation Allumina Plant 6500 16 Mis Electro steel Casting Ltd. Soonge, Steel & Power 200 Lohardaga 17 MIS Balajee Industrial Product Ltd. Sponge Iron, Pig Iron, Steel Making 122 Chaibasa 18 Mis Pawaniai Steel & Power Ltd. Sponge Iron, Steel Making 1000 Lohardaga Sponge Iron &Induction Furnace, 19 Mis R G Steels Pvt.
    [Show full text]
  • Interstate Routes in Between Odisha and Jharkhand
    .,-. AIFEE LIST OF VACANT -INTERSTATE •ROUTES IN BETWEEN ODISH A AND JHARKHAND No., . Permits to No. of SI Distance of the Route in KMs Name of the routes be issued Trips Nature of No. J . by Service Jharkh W. Total Length Odisha Bihar Odisha Odisha and Bengal of the Route 1 2 3 4 5 6 7 8 9 10 ,Bhadrak to Tata via.Balasore, 1 255 Baripada, Rairangpur, Tiring 40 0 0 295 1 1 Express Baripada to Chakulia 2 41 via.Jamsola 39 0 0 80 2 ' 4 Ordinary _ Bolani to Chaibasa via.Barbil, 3 40 Nalda, Badajamda 107 0 0 147 1 2 Ordinary Baripada to Bokaro 4 via.Rairangpur, Tiring, Tata, 118 166 0 64 348 2 2 -Express Purulia . Baripada to Musabani 5 40 via.Jamsola 45 0 0 85 3 6 Ordinary - . Chaibasa to Rairangpur 6 45 via.Tiring, Hata 120 0 . 0 165 1 • 2 Ordinary Chaibasa to Barbil via.Cha mpua, 7 65 Jayantgarh 67 0 0 132 1 2 Ordinary . Deoghar to Baripada via.Giridih, 8 Hazaribag, Ranchi, Tata, 118 500 0 0 618 2 2 •ExpFess . Rairangpur, Tiring • • 9 Gumla to Baripada via.Sisai, 118 270 0 Ranchi, Tata, Tiring, RaWangpur 388 2 2 express 10 Jharadihi to Saraikela via.Tata, Tiring 95 0 135 1 2 Ordinary Ranchi to Keonjhar via.Khunti, 11 195 0 0 Chaibasa, Champua 249 2 2 Ordinary Rourkela to Gua via.Barbil, 12 Nalda 20 0 0 194 1 2 Ordinary Simdega to Sundergarh 13 via.Subdega, Rouldega, 88 60 0 0 148 Sagbahal 1 2 Ordinary Simdega to Debgarh 14 via.Birmitrapur, Rourkela, 190 48 0 0 238 Panposh, Bonai, Barkot 1 1 Ordinary 15 Joda to Gumla via.Lasthikata, 175 130 0 0 Rourkela, Biramitrapur 305 1 1 .Express Baripada to Chatra via.Jamsola, 16 40 355 0 0 Tata, Ranchi 39'5 1 1 Express Baripada ato Daltanganj 17 via.Rairangpur, Tiring, Tata, 118 395 0 0 513 Ranchi 1 1 Express Berhampur to Tata via.Baripai 18 da, Jamsola renamed 483 235 0 0 as Berhampur to Ranchi 718 1 1 Expr-ess via.Jamsola, Tata • LIST OF VACANT INTERSTATE ROUTES PLYING BETWEEN ODISHA AND BIHAR PASSING THROUGH JHARKHAND THE .
    [Show full text]
  • DIPS-Saraikela-Kharsawan.Pdf
    Contents S. No. Topic Page No. 1. General Characteristics of the District 1 1.1 Location & Geographical Area 1 1.2 Topography 1 1.3 Availability of Minerals. 1 1.4 Forest 2 1.5 Administrative set up 2 2. District at a glance 2 2.1 Existing Status of Industrial Area in the District Seraikela-Kharasawan 5 3. Industrial Scenario Of Seraikela-Kharasawan 5 3.1 Industry at a Glance 5 3.2 Year Wise Trend Of Units Registered 6 3.3 Details Of Existing Micro & Small Enterprises & Artisan Units In 6 The District 3.4 Large Scale Industries / Public Sector undertakings 7 3.5 Major Exportable Item 8 3.6 Growth Trend 8 3.7 Vendorisation / Ancillarisation of the Industry 8 3.8 Medium Scale Enterprises 8 3.8.1 List of the units in Seraikela-Kharasawan & near by Area 8 3.8.2 Major Exportable Item 12 3.9 Service Enterprises 12 3.9.1 Coaching Industry 12 3.9.2 Potentials areas for service industry 12 3.10 Potential for new MSMEs 12 4. Existing Clusters of Micro & Small Enterprise 13 4.1 Detail Of Major Clusters 13 4.1.1 Manufacturing Sector 13 4.1.2 Service Sector 13 4.2 Details of Identified cluster 13 5. General issues raised by industry association during the course of 14 meeting 6. Steps to set up MSMEs 15 7. Additional information if any 16 ii Brief Industrial Profile of Saraikela-Kharsawan District 1. General Characteristics of the District This district was carved out from West Singhbhum district in 2001.
    [Show full text]
  • Saraikela District Saraikela District
    ASSESSMENT AND MAPPING OF SOME IMPORTANT SOIL PARAMETERS INCLUDING SOIL ACIDITY FOR THE STATE OF JHARKHAND (1:50,000 SCALE) TOWARDS RATIONAL LAND USE PLAN SARAIKELA DISTRICT G a n g a R GoddaSahibganj . BIHAR BIHAR Pakur Son R. Kodarma Dumka N o r th Koel R Giridih Deoghar Garhwa Palamu . Chatra Jamtara Hazaribag Dhanbad r R. Bokaro oda Latehar Dam Lohardaga CHHATTISGARH WEST BENGAL Gumla Ranchi Saraikela Simdega East Singhbhum West Singhbhum ORISSA ORISSA National Bureau of Soil Survey and Land Use Planning (ICAR) Regional Centre, Kolkata ICAR In collaboration with : Deptt. Of Soil Science & Agricultural Chemistry, BAU, Ranchi, Jharkhand Sponsored by : Department of Agriculture & Cane Development, Govt. of Jharkhand 1. INTRODUCTION Reliable information on the location, extent and quality of soil and land resources is the first requirement in planning for the sustainable management of land resources. The components of land i.e., soils, climate, water, nutrient and biota are organised into eco-system which provide a variety of services that are essential to the maintenance of the life support system and the productive capacity of the environment. Our land mass is fixed, but the competition among different kinds of uses for this land is increasing because of rapidly rising global population. Therefore, integrated land resource planning and management are required to resolve these conflicts and soil resource survey seems to be a viable means in this process and knowledge of soil fertility status and problems of soils like soil acidity/alkalinity become essential for sustainable land use plan. Soil fertility is an aspect of the soil-plant relationship.
    [Show full text]
  • Bio Data Personnel Information
    BIO DATA PERSONNEL INFORMATION 1. Name : Dr. Manish Kumar Jain 2. Father's name : Er. Sudhir Kumar Jain 3. Address : Dr. Manish Kumar Jain Associate Professor, Centre of Mining Environment Department of Environmental Science and Engineering, Indian Institute of Technology (ISM), Dhanbad Dhanbad - 826004 Email: [email protected] , [email protected] Phone: (O) +91-326-2235476, +91-9431711095 (M) Fax: +91-326- 2296624, 2296603/2296607 4. Date of birth : 14th December 1974 6. Category : General 7. Sub Category : Minority 8. Field of activity : Mine Environment ACADEMIC PROFILE S. Qualification Year Board/ % of Grade/ Major Subjects No. University marks Division 1. Ph. D. 2005 Indian Institute - - Fly ash as a mine void filling (Mining Engineering) of Technology material Kharagpur 2. M. Tech. 2000 Indian School OGPA First Air, water, soil, noise and (Environmental of Mines 4.19/ * With social pollution, their control Science & Dhanbad 5.00 Distinction measures and equipment, Engineering) EMP, EIA and legislation 3. B. E. 1997 Nagpur 71.8 First All subject related to Mining (Mining Engineering) University and allied science *OGPA (Overall Grade Point Average on Five Point Scale) EXPERIENCE S. Post Organization Duration Nature of Job No. 1. Associate Dept. of Environmental Science & Engineering, On Going Teaching & Professor Indian Institute of Technology (ISM) Dhanbad, (2010 - Till date) Research Jharkhand 2. Assistant Dept. of Environmental Science & Engineering, (2007 –2010) Teaching & Professor ISM Dhanbad, Jharkhand Research 3. Lecturer Dept. of Mining Engineering, NIT Rourkela, (2006 - 2007) Teaching & Orissa Research 4. Lecturer Dept. of Mining Engineering, (2004 -2006) Teaching & Anna Univ. Main Campus, Chennai, Tamilnadu Research 5. Research Department of Mining Engineering, IIT (2004 -2004) Research Associate Kharagpur, West Bengal.
    [Show full text]
  • PRE-FEASIBILITY REPORT for EXPANSION of NOAMUNDI IRON
    PRE-FEASIBILITY REPORT For EXPANSION OF NOAMUNDI IRON ORE MINE (ML Area 1160.06 HA), FROM 10 MTPA TO 19 MTPA (ROM) WITH TOTAL EXCAVATION OF 27.0 MTPA, ENHANCEMENT OF IRON ORE BENEFICIATION CAPACITY (Feed to Plant) FROM 18 MTPA TO 27 MTPA IN TOTAL PROJECT AREA 1230.42 HA OF NOAMUNDI ALONG WITH IRON ORE SLURRY PIPELINE FROM NOAMUNDI TO JAMSHEDPUR at NOAMUNDI VILLAGE, PO: NOAMUNDI, WEST SINGHBHUM DISTRICT JHARKHAND STATE by: Noamundi Iron Mine Noamundi Village, West Singhbhum District, Jharkhand-833217 Submitted to: Ministry of Environment, Forest & Climate Change (MoEF&CC) New Delhi Environment Consultant: Vimta Labs Ltd. 142, IDA, Phase-II, Cherlapally, Hyderabad–500 051, Telangana State [email protected], www.vimta.com (QCI/NABET Accredited and ISO 17025 Certified Laboratory, Recognized by MoEF, New Delhi) September, 2019 Pre-Feasibility Report for Expansion of Noamundi Iron Ore Mine (ML Area :1160.06 Ha), From 10 MTPA to 19 MTPA (ROM) With Total Excavation of 27 MTPA, Enhancement of Iron Ore Beneficiation Capacity (Feed to Plant) From 18 MTPA to 27 MTPA in Total Project Area 1230.42 ha at Noamundi Along with Iron Ore Slurry Pipeline from Noamundi to Jamshedpur Pre Feasibility Report 1.0 EXECUTIVE SUMMARY Tata Steel Limited (TSL) holds the Noamundi iron ore mine lease over an area of 1160.06 ha located at Noamundi, West Singhbhum district of Jharkhand state and is being worked for winning of iron ore. Noamundi Iron ore mine was granted lease from 01.01.1922 for a period of 30 years over an area of 1160.06 ha.
    [Show full text]