Planning Committee Report Title: Development Manag

Total Page:16

File Type:pdf, Size:1020Kb

Planning Committee Report Title: Development Manag Item No. Classification: Date: Meeting Name: 5.1 OPEN 25/09/19 & 30/09/19 Planning Committee Report title: Development Management planning application: Application 18/AP/1604 for: Full Planning Application Address: Land bounded by Lower Road, Redriff Road, Quebec Way and Surrey Quays Road and Site at Roberts Close, SE16 Proposal: Hybrid application seeking detailed planning permission for Phase 1 and outline planning permission for future phases, comprising: Outline planning permission (all matters reserved) for the demolition of all existing structures and redevelopment to include a number of tall buildings (up to 138m AOD) and up to 656,200sqm (GEA) of floorspace comprising the following mix of uses: retail (Use Classes A1-A5), workspace (B1), hotel (C1), residential (C3), assisted living (C2), student accommodation, leisure (including a cinema) (D2), community facilities (including health and education uses) (D1), public toilets, nightclub, flexible events space, an energy centre, an interim and permanent petrol filling station, a primary electricity substation, a secondary entrance for Surrey Quays Rail Station, a Park Pavilion, landscaping including open spaces and public realm, works to the Canada Water Dock, car parking, means of access, associated infrastructure and highways works and demolition or retention with alterations of the Press Hall and Spine Building of the Printworks; and Detailed planning permission for the following Plots in Phase 1: • Plot A1 (south of Surrey Quays Road and west of Deal Porters Way) to provide uses comprising retail (A1-A5), workspace (B1) and 186 residential units (C3) in a 6 and 34 storey building (129.4m AOD), plus a basement; • Plot A2 (east of Lower Road and west of Canada Water Dock) to provide a leisure centre (D2), retail (A1-A5), and workspace (B1) in a 4, 5 and 6 storey building plus a basement. • Plot K1 (east of Roberts Close) to provide 79 residential units (C3) in a 5 and 6 storey building. • Interim Petrol Filling Station (north of Redriff Road and east of Lower Road) to provide an 8-pump petrol filling station with kiosk, canopy and forecourt area. Each plot with associated car parking, cycle parking, landscaping, public realm, plant and other relevant works. The application is accompanied by an Environmental Statement submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended). Wards Rotherhithe and Surrey Docks From: Director of Planning Application Start Date 11/05/2018 Application Expiry Date 31/08/2018 Earliest Decision Date 20/07/2019 PPA Date 1 Contents Chapter Theme Page Executive Summary 3 Recommendation 12 Chapter 1 Background Information 13 Chapter 2 The Proposed Development 16 Chapter 3 Relevant Planning History 30 Chapter 4 The Development Plan 34 Chapter 5 Consultation Summary 39 Chapter 6 Principle of Development 50 Chapter 7 Environmental Impact Assessment 55 Chapter 8 Density 61 Chapter 9 Housing and Viability 65 Chapter 10 Town Centre 75 Chapter 11 Community Infrastructure 95 Chapter 12 Transport 100 Chapter 13 Design and Heritage Impacts 126 Chapter 14 Quality of Accommodation 162 Chapter 15 Neighbour Impacts 170 Chapter 16 Green Infrastructure and Ecology 204 Chapter 17 Energy and Sustainability 212 Chapter 18 Infrastructure and Utilities 224 Chapter 19 S106 Agreement and Community Infrastructure Levy 228 Chapter 20 Statement of Community Involvement, Equalities and Human 231 Rights Chapter 21 Conclusion 239 Appendix 1 Draft Decision Notice Appendix 2 Consultation Undertaken Appendix 3 Development Consultation Charter Appendix 4 Relevant Planning Policies Appendix 5 Detailed Daylight, Sunlight and Overshadowing Results Appendix 6 Summary of Cumulative Environmental Impacts Appendix 7 Index of figures and tables 2 Executive Summary This hybrid planning application, submitted by British Land, is the culmination of over 5 years of engagement with the Council, with statutory bodies, and with local people groups and other stakeholders. The submitted Masterplan would lead to the complete transformation of the Canada Water core area, creating a major new town centre with a diverse mix of jobs, shops, homes, leisure activities and cultural facilities. This report describes and assesses the application, including its impacts on the local area. The extent to which the application complies with the development plan is explained, including how it addresses the key objectives of the Canada Water Area Action Plan. The recommendation of the Director of Planning is that planning permission should be granted, subject to conditions and completion of a satisfactory s106 legal agreement. The resolution of the Planning Committee would be required to be referred to the Mayor for London, and the final decision notified to the Secretary of State. The report is set out as a series of chapters, relating to the following material planning considerations. More detail on each of the topics is set out in the body of the report, and supported where relevant by additional information in Appendices to the report. Chapter 1: Background information describes the site and its context. Chapter 2: The Proposed Development sets out nature of the planning application and a summary of the proposal for redevelopment of the site, including land uses, building form and heights and a description of the key documents which would be approved if planning permission is granted. Chapter 3: Relevant Planning History details the planning permissions issued on the site and key decisions relevant to neighbouring sites. Chapter 4: The Development Plan summarises the policy documents most relevant to the assessment of this planning application and the extent to which these are material considerations. Chapter 5: Consultation Summary provides an overview of the responses received to the rounds of consultation undertaken for this planning application from the public, groups and statutory bodies. The public responses were broadly supportive of the proposed redevelopment but objections were raised to specific aspects, such as the building heights, transport, daylight and sunlight impacts, and construction phase impacts. The different aspects raised by the consultation responses are considered in the different topic chapters in this report. Chapter 6: Principle of Development The principle of the redevelopment of Canada Water is established in the development plan. Policies in the Core Strategy and Canada Water Area Action Plan (AAP) support the creation of a new town centre with increased retail space, and a more intensive form of development to provide around 2,500 new homes and 2,000 jobs. Surrey Quays Shopping Centre, Surrey Quays Leisure Park and Harmsworth Quays Printworks are identified as site allocations in the AAP. The London Plan (2016) identifies Canada Water as an Opportunity Area, with minimum targets of 2,000 new jobs and 3,300 new homes with significant potential for mixed use regeneration so that the Town Centre could evolve from a District to a Major Town Centre 3 (with potential for a substantial increase above the minimum targets). Canada Water is now also a Housing Zone, with the draft London Plan establishing it as a Major Town Centre with high potential for commercial and residential growth. The proposed land uses within the Masterplan would accord with the AAP and would be suitable for a mixed use town centre. The proposal has been assessed against the series of overarching themes and objectives set out in the AAP. The scale of development is significantly higher than anticipated in the AAP and Core Strategy but is commensurate with that now set out in the draft London Plan. In principle, this level of development is considered acceptable. Later chapters of this report will consider the different environmental impacts of this scale of development. Chapter 7: Environmental Impact Assessment The proposed development exceeds all three of the suggested thresholds for an urban development project in the EIA Regulations. Therefore an Environmental Statement has been provided with the application, in line with the topics required in the council’s ‘Scoping Opinion’ issued in April 2018. The ES models the ‘worst case’ scenario of the outline part of the proposal (given its inherent flexibility) plus the detailed plots. The environmental impacts are summarised in Appendix 8. Alternative proposals and the cumulative effects both as a combination of different effects associated with the development on defined sensitive receptors, and the combined effects with other reasonably foreseeable developments near the Masterplan site are also considered. The environmental information must be taken into account when reaching a decision on this application. The particular environmental effects and mitigation measures are detailed in the relevant chapters of this report, but it is recognised that overall the development would result a range of positive environmental effects and a range of adverse environmental effects, including some adverse residual environmental effects after mitigation measures. The flexibility sought for the outline component of the development does provide an opportunity for some of the adverse effects which have been identified to be ‘designed-out’ through the subsequent Reserved Matters process. The adverse impacts must therefore be weighed in the balance with all of the other benefits and dis-benefits arising from the application, and Members are referred to the conclusion to this report which draws these issues together. Chapter
Recommended publications
  • Iris Murdoch
    Sunday 9th August 2020 www.rmmc.org.uk Facebook: www.facebook.com/groups/tempRMMC/ Last week I shared the first part of the story of Arthur & Ada Salter that had impressed me as I walked the Thames Path. Part Two included today with Part One as reference if you want to re-read! Zoom Church Service Aug 9, 2020 6pm led by Cathy Smith https://astrazeneca.zoom.us/j/99881042054?pwd=UWU3QmE0VkNYNXBMNENLd2dkVmh4QT09 Meeting ID: 998 8104 2054. Password: 562655 0203 481 5237 or 0800 260 5801 7.30pm Monday 10th August The Prayer Course Session 1: Why Pray? https://us02web.zoom.us/j/84151838035?pwd=WFpkZTBjUW9MSW9VL2VMRDBYcU9iUT09 ID: 841 5183 8035 Passcode: 483980. Landline: 0203 051 2874 ‘Prayer is simply paying attention to God, which is a form of love.’ Iris Murdoch Unlike the last course I am thinking of this one being once or twice a month, and with a different aspect of prayer each time it will be easy for people to attend as many sessions as they like and are able. I look for- ward to us learning together. Living Streets and Highways We pray for the living streets in our neighbourhood, where our daily travels begin and end, and our love of God inspires our interactions with our neighbours. In our walks and our rides and our drives and our deliveries, God keep us safe and looking out for others. Somebody during the post-service coffee session on last Sunday's zoom call asked for more de- tails about the Highway Code Consultation. In summary the proposed changes support a heirar- chy of road-users, prioritising people who are most vulnerable to harm, starting with pedestrians, (especially children, older adults and people with disabilities) and stating more clearly how all oth- er road users can reduce the danger they may pose to others.
    [Show full text]
  • In a Rather Emotional State?' the Labour Party and British Intervention in Greece, 1944-5
    ORE Open Research Exeter TITLE 'In a rather emotional state?' The Labour party and British intervention in Greece, 1944-5 AUTHORS Thorpe, Andrew JOURNAL The English Historical Review DEPOSITED IN ORE 12 February 2008 This version available at http://hdl.handle.net/10036/18097 COPYRIGHT AND REUSE Open Research Exeter makes this work available in accordance with publisher policies. A NOTE ON VERSIONS The version presented here may differ from the published version. If citing, you are advised to consult the published version for pagination, volume/issue and date of publication 1 ‘IN A RATHER EMOTIONAL STATE’? THE LABOUR PARTY AND BRITISH INTERVENTION IN GREECE, 1944-45* Professor Andrew Thorpe Department of History University of Exeter Exeter EX4 4RJ Tel: 01392-264396 Fax: 01392-263305 Email: [email protected] 2 ‘IN A RATHER EMOTIONAL STATE’? THE LABOUR PARTY AND BRITISH INTERVENTION IN GREECE, 1944-45 As the Second World War drew towards a close, the leader of the Labour party, Clement Attlee, was well aware of the meagre and mediocre nature of his party’s representation in the House of Lords. With the Labour leader in the Lords, Lord Addison, he hatched a plan whereby a number of worthy Labour veterans from the Commons would be elevated to the upper house in the 1945 New Years Honours List. The plan, however, was derailed at the last moment. On 19 December Attlee wrote to tell Addison that ‘it is wiser to wait a bit. We don’t want by-elections at the present time with our people in a rather emotional state on Greece – the Com[munist]s so active’.
    [Show full text]
  • Red Flag Over Bermondsey - the Ada Salter Story
    7.00 pm SATURDAY 5 DECEMBER 2015 RED FLAG OVER BERMONDSEY - THE ADA SALTER STORY Written and performed by Lynn Morris Directed by Dave Morris Where to start with Ada Salter? She was a true radical, campaigner for equal rights, socialist, republican, pacifist, environmentalist, trade union activist and a leading light in the transformation of the Bermondsey slums in the early part of the 20th century. Born into Methodism, she moved to London and became involved with the Bermondsey Settlement. She became a Quaker in 1914. She and her GP husband, Alfred Salter, dedicated their lives to the people of Bermondsey, living and working right in the heart of their community – and having to accept the tragic consequences of their choice. She and her husband were among the founders of the Independent Labour Party in Bermondsey. Ada herself broke through the glass ceiling of her time, becoming both the first woman councillor in London, and then the first woman mayor. Red Flag over Bermondsey explores the private and the public lives of Ada from 1909 until 1922, interwoven with her beloved Ira Sankey hymns and her passion for Handel. Further background about Ada (1866–1942) is to be found at www.quakersintheworld.org The performance lasts 65 minutes without interval. Lynn and Dave Morris are Journeymen theatre and they are committed to performing their work in any venue, theatre or non-theatre. Lynn and David attend Stourbridge Quaker Meeting. Visit the website at: www.journeymentheatre.com for details about the company, current and future productions, and reviews. Contact us at: [email protected] or [email protected] Admission FREE: All profits and donations from Red Flag over Bermondsey will be used to support our work with the Women’s Co-operative of Seir, West Bank, Palestine.
    [Show full text]
  • Parks, People and Nature
    Parks, People and Nature A guide to enhancing natural habitats in London’s parks and green spaces in a changing climate Natural England works for people, places and nature to conserve and enhance biodiversity, landscapes and wildlife in rural, urban, coastal and marine areas. We conserve and enhance the natural environment for its intrinsic value, iithe wellbeing and enjoyment of people, and the economic prosperity it brings. Parks, People and Nature A guide to enhancing natural habitats in London’s parks and green spaces in a changing climate Introduction My vision for London is of a green city, and a fair city, where everyone has access to a high quality green space in which wildlife can be encountered close to where they live and work. London has some of the Ýnest parks of any capital city in the world. Yet it also has some areas lacking in green space, and many more where the quality of the green spaces could be better. This booklet provides a valuable practical guide on how to improve access to nature in parks and green spaces, complimenting my London Plan Implementation Report on Improving LondonersÔ access to nature. Appropriate design and management of our parks and green spaces will be one of the key challenges that will enable the City to adapt to climate change. Park managers need to be working now to plant the trees that will provide shade for a much warmer city in the 2080s. We also need to start thinking now how our parks can help in addressing broader environmental challenges such as Þood risk management.
    [Show full text]
  • Appendix 1.Pdf
    APPENDIX 1 Bermondsey and Rotherhithe Community Council Project suggestions for approval S106 CIL Update Greening Tyers estate No - not mitigation Yes St Mary Magdalene Churchyard path to Tanner Street Park to create a path to improve access to/from park. Yes - open space Yes Relocating the traffic lights at the junction of Tanner Street and Tower Bridge Road, to make the junction safer for cyclists and pedestrians. Yes - transport Yes Footway improvements (uneven paving) to Shad Thames, Yes- public realm Yes Environmental improvements to Tower Bridge Road as Yes - public realm, whole transport Yes Likely to be Bermondsey Wall West and Chambers Street footway Yes - public realm, funded in 2014- and carriageway improvements transport Yes 2015 Improved street lighting on Coxon Way Yes- public realm Yes Fountain Green Square - resurfacing and pond improvements. Yes- public open space Yes Lighting on the approaches to the doctor's surgery near St James' Church Yes- public realm Yes Improve lighting, cleaning and pigeon proofing Crucifix Lane railway bridge Yes- public realm Yes Resurface/pave uneven footpath on Clements Road Yes- public realm Yes Bermondsey Community Nursery physical improvements and add accessibility improvements to the nursery Yes -community facilities Yes Old Kent Road flyover, create a New York City “High Line” style park Yes - open space Yes Green links between Russia Dock Woodland and Southwark Park Yes - open space Yes The old Fish Farm nursery, create a ‘green’ walkway through to Southwark Park from the old Fish Farm
    [Show full text]
  • New A4 Pages (Page 4)
    HEALTH AND SOCIAL CARE 2006 BERMONDSEY AND ROTHERHITHE HEALTH AND SOCIAL CARE 2006 BERMONDSEY AND ROTHERHITHE GP Practices Southwark PCT Premises Pharmacies 1 The New Mill Street Surgery (Dr A Campion) 1 Mary Sheridan House 1 A.R. Chemists 1 Wolseley Street, SE1 2BP 11-19 Thomas Street, SE1 9RY 176-178 Old Kent Road, SE1 5TY Tel: 020 7252 1817 2 Mabel Goldwin House Tel: 020 7703 4097 2 Parkers Row Family Practice (Dr S Bhatti) 49 Grange Walk, SE1 3DY 2 ABC Pharmacy 2 Wade House, Parkers Row, SE1 2DN 3 Woodmill Building 243 Southwark Park Road, SE16 3TS Tel: 020 7237 1517 Neckinger, SE16 3QN Tel: 020 7237 1659 3 Alfred Salter Medical Centre (Dr S Bhatti) 4 Bermondsey Health Centre 3 Amadi Chemist 6-8 Drummond Road, SE16 4BU 108 Grange Road, SE1 3BW 107 Abbey Street, SE1 3NP Tel: 020 7237 1857 5 John Dixon Clinic Tel: 020 7771 3863 4 The Grange Road Practice (Dr M Brooks) Prestwood House, 4 Bonamy Pharmacy Bermondsey Health Centre, 201-209 Drummond Road, SE16 4BU 355 Rotherhithe New Road, 108 Grange Road, SE1 3BW Bonamy Estate, SE16 3HF Tel: 020 7237 1078 6 Albion Street Health Centre 87 Albion Road, Rotherhithe, SE16 7JX Tel: 020 7231 9988 5 Bemondsey and Lansdowne Medical Mission, 5 Boots The Chemist PLC (Dr R Torry) 7 St Olave's Nursing Home 15 Ann Moss Way, SE16 2TJ Unit 11-13 Surrey Quays Shopping Centre, Decima Street, SE1 4QX Redriff Road, SE16 9SP 8 Surrey Docks Health Centre Enquiries: 020 7407 0752 Tel: 020 7252 0084 Appointments: 020 7403 36186 Downtown Road, Rotherhithe, SE16 1NP 6 Boots The Chemist PLC 9 Silverlock Clinic 6
    [Show full text]
  • UK Jubilee Line Extension (JLE)
    UK Jubilee Line Extension (JLE) - 1 - This report was compiled by the OMEGA Centre, University College London. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A INTRODUCTION Type of Project Location Major Associated Developments Current Status B BACKGROUND TO PROJECT Principal Project Objectives Key Enabling Mechanisms and Timeline of Key Decisions Principal Organisations Involved • Central Government Bodies/Departments • Local Government • London Underground Limited • Olympia & York • The coordinating group • Contractors Planning and Environmental Regime • The JLE Planning Regime • The Environmental Statement • Project Environmental Policy & the Environmental Management System (EMS) • Archaeological Impact Assessment • Public Consultation • Ecological Mitigation • Regeneration Land Acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route Description Main Termini and Intermediate Stations • Westminster
    [Show full text]
  • Canada Water Area Action Plan
    Canada Water Area Action Plan November 2015 1 Proposals sites referred to in the AAP Cover photo of library: © Peter Durant 2 Contents PART 1 INTRODUCTION ............................................................................. 6 1.1 What is the Canada Water AAP? ...................................................... 6 1.2 What are we trying to achieve? ......................................................... 6 1.3 What will change? ............................................................................. 8 1.4 Other important documents you need to know about ........................ 8 1.5 Supporting documents for the Canada Water AAP ......................... 10 1.6 Finding your way around the AAP ................................................... 10 PART 2 CANADA WATER TODAY ............................................................. 11 2.1 Characteristics of the AAP area ....................................................... 11 2.2 Challenges and opportunities .......................................................... 12 2.3 Working with our neighbours ........................................................... 14 PART 3 OUR STRATEGY FOR CANADA WATER .................................... 16 3.1 What we are trying to achieve ......................................................... 16 3.2 The themes and objectives (how we will achieve our vision) ........... 18 PART 4 THE POLICIES .............................................................................. 20 4.1 Introduction .....................................................................................
    [Show full text]
  • Alfred Salter Weekly
    Alfred Salter Weekly st 21 May 2021 News from Alfred Salter Primary School Headteacher’s Message Alfred Salter’s Birthday It has been another busy week in school as We will be marking what would have been we near the end of this half term. I Alfred Salter’s birthday on Wednesday conducted a few more tours this week for 16th June 2021, which falls during D&T our new Reception parents and the feedback and week. The focus will be on the humanitarian work comments have been very positive. As these tours which he and his wife Ada Salter did for the have been very successful, we will be doing the community and the love they had for Bermondsey same after half term for our new Nursery families and Rotherhithe. We are hoping that the weather who will be joining the school in September. will be kind to us and that we can bring the whole I held several parental consultation meetings on the school together on the astroturf, in socially new statutory Relationships and Sex Education distanced bubbles, so that we can experience being (RSE) and health education curriculum on Thursday. together as a whole school after so long apart. We Thank you to all the parents and carers that will be sharing details shortly. attended. There were some really important queries Class Photos raised and questions asked. I hope that you found Braiswick, the school photographer will the meetings informative and any hesitations or be in on the morning of Monday 14th worries around RSE have been eased.
    [Show full text]
  • Project Sheet
    Alan Camp Architects LLP 88 Union Street, London, SE1 0NW 020 7593 1000 www.alancamp.com mail@alancamp @AC_Architects AC_Architects Alan Camp Architects Portfolio Practice Who We Are What We Do How We Work What We Believe In Alan Camp Architects is an established, We are firmly based in all stages of project These days there are no “easy” projects: site constraints, We make places for people. Our projects slot into and medium-sized housing and mixed-use practice development, from feasibility to post-completion. funding, planning and public opinion challenges augment existing neighbourhoods and communities, based in central London, specialising in solving abound. providing new places for people to live, work and play. complex development challenges by brokering We work with a varied client base including developers, Our buildings are contemporary, innovative, reactive collaborative solutions. housing associations, contractors, local authorities and At ACA we make projects happen: bringing together to their surroundings and built around the human. We local charities. clients, statutory authorities, construction professionals like utility and only use materials which age and last. and the local community we broker collaborative We have extensive experience in residential solutions which balance the needs of all parties. and mixed use projects, from single dwellings to large developments along with commercial, Through consistent repeat business we build ongoing retail, community and education. We undertake relationships with our clients, local and statutory masterplanning and the team has major projects authorities; these help us deliver optimum solutions via experience. the shortest possible path. Alan Camp Architects LLP 88 Union Street, London, SE1 0NW 020 7593 1000 / www.alancamp.com / [email protected] ACA|MIXED-USE | 5 Cantium, Southwark client Aviva / Galliard Homes local authority LB of Southwark cost £600M status Planning approved 2019 | | ACA MIXED-USE 7 6 | ACA PORTFOLIO Mixed-Use 1.
    [Show full text]
  • Southwark Life
    Southwark LifeWinter 2017 #TalkSouthwark Join the Conversation about our changing borough Festive Fun A look at what’s going on this Christmas Top of the Class Why Southwark’s schools are standing out Your magazine from Southwark Council Winter 2017 Contents 4 Need to know – All your Southwark news and festive information this winter welcome... 8 Southwark Conversation As 2017 draws to a close, it’s natural to look back over the year – Find out how to make your that’s passed. For Southwark, and London, 2017 was a year where voice heard as part of the we faced true tragedy on our doorsteps, with terrorist attacks in Southwark Conversation London Bridge and Borough, Westminster and beyond, as well as 10 Top of the class – Read why the awful fire at Grenfell Tower that claimed so many lives. We Southwark has some of the best learned a huge amount from these heartrending incidents, not schools in London least about how resilient we are as a borough and a city, pulling 12 Building a healthy together in the face of horror, offering our help and support to borough – What can we do to help people be healthier? strangers, refusing to give in to hate, but love instead. 15 Conversation – Our pull out Of course, we won’t ever forget those who lost their lives, or pages for you to complete and join in the conversation were hurt or scarred by these events, and we are working with Southwark Cathedral, Borough Market, the police, and anyone 20 Is Universal Credit else who wants to get involved on plans for a permanent memorial working? – We speak to people affected by the to those harmed on June 3rd.
    [Show full text]
  • ROTHERHITHE 2) (B) Dockmasters Office and Clock Tower (1892) Mid C19 Steam Grain Mill and Warehouse
    Sites of interest (numbered on map overleaf) 26) Old School House (1697) Est. 1613 for education of 8 sons of seamen by Peter Hills. Moved here 1795 1) (A) Deal Porters Statue, by Philip Bews Dockers carrying heavy timber across shoulders 27) Thames Tunnel Mills ROTHERHITHE 2) (B) Dockmasters Office and Clock Tower (1892) Mid C19 steam grain mill and warehouse. Site of steam ferry. Early residential conversion Rotherhithe, originally called Redriff from C13 and frequently 3) King George’s Field (public open space dedicated to King George V (1865-1936) 28)* (R) Mayflower Inn (1780) (formerly Spreadeagle) mentioned by the C17 diarist Samuel Pepys, came from the Site of All Saints Church. Destroyed during WWII List of passengers who sailed on the Mayflower. Licensed to sell US and UK stamps Anglo Saxon for a haven where cattle were landed. It was closely connected to Bermondsey Abbey, as well as having 4) Metropolitan drinking trough (from 1865) 29) (B) (D) Rotherhithe Picture Research Library & Sands Films Studios (Grice's Granary ancient river crossing points associated with shipbuilding and Fountains established by public subscription for humans, then troughs for horses and dogs, 1795) Library includes section on Rotherhithe. Film studio, production and costume making following C19 out breaks of cholera due to contaminated drinking water facilities. Houses one of London's smallest cinemas. www.sandsfilms.co.uk supporting trades (from C17 and probably from the middle ages), and seafaring is recorded in church memorials and 5) (B) Site of St. Olave's Hospital (1870-1985) 30)* (A) (B) (R) (D) Brunel Museum and Cafe (1842) gravestones.
    [Show full text]