Fosbr Newsletter September 2014 More Trains Stop at Parson St And
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Swindon Bus Station
What is this document? We (primarily Lee) have looked at what the bus network might look like under option 24/7 in a pilot area, at the request of Philip Whitehead (meetings March and April 2016) The area selected was from (in the north) the Bath – Corsham – Chippenham – Calne – Royal Wootton Bassett corridor through to the Bath – Bradford-on-Avon – Trowbridge – Westbury – Warminster corridor to the West, covering all of West Wilts, services within that area out to Devizes. There is always considerable overlap across boundaries with public transport services, so you'll find significant services off the edge listed here, many of which are adjustments of ongoing supported services to continue to provide a logical, useful service. The suggestions here reduce the number of vehicle diagrams in the area from 59 to 52 – a saving of around 14%. The number of drivers required would be reduced somewhat less due to extension of some ENCTS time only services to cover journeys to and from work and in the evening and on Sundays and perhaps where appropriate a night bus. In general, very very few places / streets have lost their services, whilst areas such as the Pewsham Estate in Chippenham and Pickwick Road in Corsham see regular buses return, having been withdrawn under the current system. A number of new journey opportunities are provided too (some significant, some making use of much better bus / train connectivity) but there are cases where a change of vehicle will now be needed in place of a through service. Currently commercial services which thrive as “turn up and go” operations remain hardly changed – we are not proposing messing with what works – keeping the good. -
Saltford Parish Council
SALTFORD PARISH COUNCIL Saltford Library, 478a Bath Road, Saltford, Bristol BS31 3DJ 01225 873300 [email protected] www.saltfordparishcouncil.gov.uk 19 November 2018 THE RE-OPENING OF SALTFORD RAILWAY STATION Saltford Parish Council wishes it to be known by all relevant bodies that the re-opening of Saltford railway station as part of the Metro West rail project remains a high priority for this Council. The ‘Saltford Station: Feasibility Study’ dated October 2014 prepared by CH2MHill was very encouraging. Option 1, re-opening a station on the existing large (historic) site, was estimated to cost £4 million under scenario A, have a benefit-cost ratio of 2:1, and a net “new” fare revenue forecast of £770,000 per annum based on two trains per hour. This does not include a further revenue stream from parking charges. Patronage was estimated at some 200,000 users/annum. Saltford Parish Council is aware that the availability of parking at or near the existing site has been misreported by some, possibly in order to undermine the case for the station. Demand for car-park spaces is predicted at 159 in 2021 rising to 236 in 2043. There are 144 car-park spaces available on the existing site (Ref. Study - Annex Diagram). This could be considerably increased with a two-storey layout. Furthermore, there is an identified site within 400m of the station which could provide an additional 175 spaces and “thus has the potential to cater for an increased demand for parking at the station” (Ref. Feasibility Report 6.3). Local knowledge suggests that there are further potential sites for car-parking in this vicinity. -
The Case for Reopening Saltford Railway Station
The case for re-opening Saltford Railway Station The development of a Greater Bristol Metro rail service and the electrification and re- signalling of the GW mainline that passes through Saltford offer an opportunity for Saltford station to be re-opened. Cost The station site as it is today Latest cost estimates are around £5.5 million for a two platform design. With the line, signalling, pedestrian bridge and “station footprint” in place, a basic station can be re-instated at modest cost. Business case A re-opened commuter station would serve 4,200 residents in Saltford, over 1,000 residents in the villages of Corston and Newton St. Loe (Duchy of Cornwall), and 4,600 students and staff on-site daily at Bath Spa University’s Newton Park Campus which is only 1 ½ miles from Saltford station. Residential places at the campus are set to increase from 400 to 900. 29,000 vehicles pass Saltford Station daily each weekday on the A4; some of this traffic would be able to park and use the railway service. The GW mainline Route Utilisation Strategy (2010) envisages an hourly shuttle train service from Bath Spa to Bristol Temple Meads. This service should serve a re-opened Saltford station. It would be a missed opportunity in the new in which over 400 said that they would be regular franchise if this commuter shuttle was able to users of a Saltford station. stop at all the existing stations but pass through The proximity of the Bath Spa University Saltford because it did not have a station. -
Community Rail 2017 2 3
1 Great Western Railway Community Rail 2017 2 3 Contents Foreword Foreword 3 It’s been another great year for our TransWilts Community Rail Partnership 4 Community Rail Partnerships, which The Heart of Wessex Rail Partnership 6 make a vital contribution to the local economy, promoting tourism as well Severnside Community Rail Partnership 8 as being a lifeline for residents, helping Three Rivers Rail Partnership 10 to overcome the very real problems North Downs Line Community Rail Partnership 12 associated with rural isolation. Devon and Cornwall Rail Partnership 14 GWR Community Rail Conference 2017 17 Apart from the obvious travel benefits The innovation and investment you all borne out by increasing passenger put into running your partnerships is very Customer and Communities Improvement Fund (CCIF) 18 numbers, the partnerships also strengthen humbling and sets an example for us all. ACoRP Community Rail Awards 2017 20 local communities as many different I’m delighted to see the Community Involving Diverse Groups 21 organisations, and individuals of all ages, come together to promote their Rail Partnerships growing in stature and Involving Children and Young People 22 partnerships and keep stations along the recognition, so thank you all once again lines in ‘tip top’ condition. for your hard work. I wish all of you the Best Marketing or Communications Campaign 24 best for the coming year. Most Enhanced Station Buildings and Surroundings 26 In recent years we’ve seen significant passenger growth on our community Innovation in Community Rail 29 rail lines and I’m sure the work we have Small Projects Award – Under £500 30 focused on together has helped us to achieve this. -
Transwilts Rail - 2015
TransWilts Rail - 2015 - Passenger journeys up from 183,400 to 230,000 (est) - Melksham station journeys up from 23,930 to 51,858 - 2 weeks minimal service in July - 4 weeks of diverted trains throughout August - Proof of capacity for hourly service plus freight Report to TransWilts CIC AGM Portsmouth train @ Swindon by Graham Ellis (Community Rail Officer) 13th February 2014, Jury's Inn, Swindon [email protected] Some 2015 promotions Weymouth Wizard - Weymouth Wizard; 350 per train x 4 - Santa now on 2 trains not just one, with MRDG - "Small Line Big Reach" campaign – thank you Lisa Ellis - FGW (as was) and Social Media for Wizard - Ticket Wallets and integrated timetables - Lisa - Video with Wiltshire Council Measuring Passenger Metrics Autumn Passenger counts (every train / 3 days) - Strong positive passenger sentiment - Wide variety of journeys - Busiest section Melksham to Chippenham - Full and standing 5 or 6 days a week - Very strong Saturday, Sunday off peak usage Service Changes - Sunday train changes more even so much better timetable - Extension of lunchtime train to Frome - Retiming of 15:14 to 15:12 1 hour faster to Soton due to new connection Activities looking forward Rail / Bus integration - Data to support inputs for future Melksham Rail link bus - GWR direct award and SWT franchise inputs WITHDRAWN July 2015 - Consideration of XC and Crossrail 2 was running at circa 7000 journeys p.a. 234 Chippenham – Melksham - Trowbridge - Briefing of candidates prior to May 2015 election WITHDRAWN August 2015 and liaison -
An Uphill Struggle for the Right to Travel by Train
AN INDEPENDENT VOICE FOR RAIL USERS No 154 £2 December 2017 An uphill struggle for the right to travel Picture: Paul Tattam by train SEE PAGE 2 PAGE ONE PICTURE: Chinley (and many other stations) deserve better access Our page one picture shows red- The sun should be setting on diesels up there too. The £70 million coated MP Ruth George surrounded national initiative for full accessi- By Chris Austin by people on the footbridge steps of bility on the railways launched in [email protected] Chinley station in October. 2016 by Transport Minister Alex- Since the shock announcement The High Peak MP promised to ander Dobrindt started, interest- from Transport Secretary Chris deliver an 800-signature petition ingly, with smaller stations with Grayling in July which brought to the Department for Transport, Picture: Paul Tattam less than one 1,000 entries/exits to a close the ambitious electri- calling for better access to the per day. Additionally the Ger- fication programme supported station. man “Northern Powerhouse” of previously by industry and Gov- Lifts and ramps can be life- Nordrhein-Westfalen has its own ernment, Railfuture has been Picture: NETWORK RAIL transforming for people with £900 million programme for the working to understand the issues disabilities but they help virtually modernisation of 150 of its 697 and what is best for the passen- everyone else, especially those with stations between 2017 and 2023, ger, the freight customer and the prams, luggage and bicycles too. by which date 80% of its stations railway which serves them. And Chinley is typical of many other will have step-free access (cur- None of us believes that the pres- stations throughout Britain where rently 73%). -
Severnside Branch Newsletter No. 41 Whitsun 2019 Contributions to the Newsletter Are Welcome and Should Be Sent to the Branch Secretary, Nigel Bray
Severnside Branch Newsletter No. 41 Whitsun 2019 Contributions to the Newsletter are welcome and should be sent to the Branch Secretary, Nigel Bray. Email: [email protected] (note the email address include ‘2’) 23 James Way, Hucclecote, GLOUCESTER GL3 3TE. Tel. 01452 615619. More information about campaigns is available on the Railfuture national website. Railfuture Severnside branch meeting near Bristol Parkway station – 10th June 2019 The next meeting will be on Monday 10th June at 7 pm in St. Michael’s Church Centre, The Green, Stoke Gifford, Bristol BS34 8PD – see https://www.stmichaelsbristol.org/. The venue is about five minutes’ walk from Bristol Parkway station. If coming by train, turn left outside the station exit and walk past the bus shelters and the bicycle racks on your left. Cross over the zebra crossing to the opposite pavement and turn right into a footpath signposted Stoke Gifford through an ornamental gate, then walk through the churchyard. The Church Centre, a stone building with maroon signboards, is about 100 yards across a green. The meeting will start planning our proposed regional recruiting leaflet, so please bring along ideas and photographs promoting recent successes and current campaigns. We hope this venue and evening meeting will be more convenient for people who have been unable to attend Saturday afternoon meetings. Your chance to help Railfuture at the WSRA Steam Fayre, 3rd and 4th August 2019 The Severnside branch is planning to have a stand at the West Somerset Railway Association (WSRA) Steam Fayre, at Norton Fitzwarren near Taunton, Saturday 3rd and Sunday 4th August. -
Campaigning for a Bigger, Better Railway No 162 £3 December 2019 Pictures: INTERCITY RAILFREIGHT Pictures: INTERCITY
Published by RAILFUTURE – campaigning for a bigger, better railway No 162 £3 December 2019 Pictures: INTERCITY RAILFREIGHT Pictures: INTERCITY Inter-city trains and bikes How rail freight can help combat the climate emergency: See page 2 RAILFUTURE CAMPAIGNER OF THE YEAR 2020 Railwatch contents HS2 must be just the start of a rail future CLIMATE Further to the inaugural recognition we would like 2 Chris Page award at Railfuture’s to hear about them. We will By Graham Nalty annual general meeting require a written statement 3 High speed rail in Cardiff in 2019, of no more than 500 4 East Anglia and East Midlands High Speed Two must be EMERGENCY and in recognition of words identifying how the given the go-ahead because the page one picture the dedication and nominee has contributed to 5 Pennine fast track benefits of faster north-south rail achievements of Railfuture Railfuture’s mission to be links and additional capacity 6 North East Rover Picture: XINHUA volunteers, we will be the number one advocate outweigh the increase in costs to Our front page pictures from presenting the award for for rail users and the rail 7 Investment stasis £88 billion. Campaigner of the Year at industry, and how they 8 Your views The verdict came from the intercity railfreighT show the annual general meeting have enhanced Railfuture’s Oakervee report which was a cycle courier in Oxford in Birmingham on Saturday campaigning for a bigger, 10 Severnside and Wessex leaked in November in the face bringing a pathology 27 June 2020. better railway. -
Robbery and Attempted Murder at Beanacre, Near Melksham
Robbery and Attempted Murder at Beanacre, near Melksham One of the most audacious acts of robbery, accompanied with violence, that has taken place in the country for a long time past, was perpetrated at Beanacre, a short distance from the Melksham Railway Station, last Sunday evening. The first farm house on the road from Melksham to Lacock is occupied by Mr. Butler; and it appears that for a long time past Mr. Butler, whilst attending his place of worship on Sunday evenings has been in the habit of getting his brother Ralph, who lives nearby, and who himself a married man with a family (but in rather humble circumstances), to remain in the house and take care of its contents. He was so engaged last Sunday evening, when he heard a tap at the front door, and on opening it, he was (according to the account he had since given) somewhat surprised to see his brother-in-Law, Worthy Rich, who had recently been working as a porter in London, and of whose presence in the neighbourhood he had not previously been aware. After the usual salutation of “How are you, Ralph?” and “What’s that you, Worthy?” the brother-in-Law walked in, and the two sat down by the fire. Many minutes however had not elapsed before Worthy suddenly jumped up, seized a blunderbuss that was over the mantel-piece, and with it dealt Ralph Butler a blow across the head, which had the effect of partially depriving him of consciousness. A scuffle however appears to of taken place, in which the blunderbuss was used with almost deadly effect, breaking Ralph Butler’s jaw bone in two places, knocking out six of his teeth, and beating him with such ferocity about the face as to expose the cheekbones, besides inflicting severe injuries at the back part of the head. -
Infrastructure Funding Statement
Infrastructure Funding Statement Appendix C: The CIL Infrastructure List 1 April 2019 to 31 March 2020 Published: December 2020 APPENDIX C Wiltshire Community Infrastructure Levy Infrastructure List December 2020 Introduction The CIL Amendment Regulations 2019 abolished the Regulation 123 List and replaced it with the ‘Infrastructure List’, part of the Infrastructure Funding Statement that CIL charging authorities are required to publish annually by 31 December. This is the Infrastructure List. It comprises the infrastructure projects from the Regulation 123 List. They have been split into separate tables of ‘essential’ and ‘place-shaping’ infrastructure. This distinction is set out in paragraphs 4.41 and 4.42 of the Wiltshire Core Strategy. Core Policy 3 priorities essential infrastructure in the event of competing demands. An explanation of why these projects are on the Infrastructure List has been included. For the purpose of this first Infrastructure List, the list of infrastructure projects broadly reflects those in the Council’s Regulation 123 List. While no new projects have been added at this time other than the Trowbridge Bat Mitigation Strategy, some projects have been removed. A final table groups the projects that have been removed and explains why. The List will be updated during 2021 to reflect any new projects that need to be included following a review of the Infrastructure Delivery Plan and the Council’s governance arrangements for prioritising CIL. 1 Essential Infrastructure Essential Infrastructure (As set out in paragraphs 4.41 and 4.42 of the Wiltshire Core Strategy. Core Policy 3 priorities essential infrastructure in the event of competing demands.) Infrastructure that may be funded, in whole or in part, by the Community Infrastructure Levy Category Project Explanation Education Expansion of the following schools to provide additional In December 2018, Cabinet approved an initial allocation of secondary school places: £119,000 of CIL funding for a feasibility study on expanding Abbeyfield Secondary School. -
Wiltshire Retail and Town Centres Study 2020 Volume 1: Main Text
Wiltshire Retail and Town Centres Study 2020 Volume 1: Main Text November 2020 Client: Wiltshire Council Report Title: Wiltshire Retail and Town Centres Study 2020 Contents 1. Introduction ............................................................................................................................................................ 1 2. Policy Review ......................................................................................................................................................... 5 3. Retail and Town Centre Trends ............................................................................................................................ 9 4. Town Centre Health Checks ...............................................................................................................................19 5. Need Assessment .................................................................................................................................................91 6. Site Assessments ..................................................................................................................................................115 7. Policy Advice ......................................................................................................................................................132 8. Summary and Conclusions ................................................................................................................................139 Appendices (Bound Separately) I Study Area Plan II Quantitative -
Revised Regulation 123 List
Wiltshire Local Development Framework Wiltshire Community Infrastructure Levy Revised Regulation 123 List September 2016 Wiltshire Council Information about Wiltshire Council services can be made available on request in other languages including BSL and formats such as large print and audio. Please contact the council on 0300 456 0100, by textphone on 01225 712500 or by email on [email protected]. Wiltshire Revised Community Infrastructure Levy Regulation 123 List September 2016 Infrastructure that may be funded, in whole or in part, by the Community Infrastructure Levy Category Projects Education Expansion of the following schools to provide additional secondary school places: • St Lawrence Secondary School, in Bradford on Avon • John Bentley Secondary School, in Calne • Abbeyfield School, in Chippenham • Devizes School and Lavington School, in Devizes and Market Lavington • Gillingham Secondary School, in Dorset (to accommodate pupils from Mere) • Pewsey Vale School, in Pewsey • Trafalgar Secondary School, in Downton • Shaftesbury Secondary School, in Dorset (to accommodate pupils from Tisbury) Sustainable transport The following Chippenham Transport Strategy projects: • A350 Chippenham Bypass Dualling – Badger to Chequers • M4 Junction 17 Part-Signalisation Improvements • Malmesbury Road Roundabout Additional Capacity Improvements • Bridge Centre Gyratory Capacity Improvements • B4528 Hungerdown Lane / Sheldon Rd Junction Upgrade • Timber Street Safety Scheme • A420 Marshfield Rd / Dallas Road Safety Scheme • Alternative provision for long stay car parking outside town centre • Chippenham Railway Station car parking capacity enhancements and parking controls • Improvements to Chippenham Station: interchange, accessibility, security • Chippenham Station Redevelopment • Frogwell to Town Centre pedestrian/cycle scheme • Bumpers Farm to Town Centre pedestrian/cycle scheme • Cepen Park North to Town Centre pedestrian/cycle scheme • Cycle and pedestrian access to Lackham Campus from Chippenham (i.e.