STATE ELECTRICITY BOARD Abstract Formation of Sub Engineer offices with collection centre at , Kottiyyoor, Kollakkad and under Electrical Division, – Sanctioned- Orders issued. DISTRIBUTION PROFIT CENTRE B.O.(FM) No.1861/2012(DPC III/ Reforms/ New SE Office/2012-13) Dtd, Trivandrum, 10.10.2012 Read: -1. Report dated 13.9.2012 of Deputy Chief Engineer, Electrical Circle, 2. Note No.DPCIII/Reforms/New SE office/2012-13 dated 17.9.2012 of Member (Distribution)

ORDER Representation has been received requesting the formation of new Sub Engineer offices with collection centre at Kottiyyoor, Kollakkad and Angadikadavu and a new section office at Vallithode under Electrical Division, Iritty of Electrical Circle Sreekandapuram. The Deputy Chief Engineer, Electrical Circle, Sreekandapuram reported that presently,Vallithode area in Payam Panchayath , area in Kottiyoor Panchayath, Kolakkad area in Panchayath,Angadikkadavu area in Panchayath are served by Iritty Section, Kelakam Section, Thondiyil Section, Section respectively and no KSEB offices are existing in the above Panchayaths. The Deputy Chief Engineer also reported that the above section offices are classified under hilly/remote category and their jurisdiction covers areas with inter-state borders sharing mainly with Karnataka State. The consumers are widely scattered and most of the areas are not road connected and difficult to reach in odd hours . Having examined the proposal in all aspects, the Board hereby accords sanction to: 1. start Sub Engineer offices with cash collection facility at Vallithode, Kottiyyoor, Kolakkad and Angadikadavu under Electrical Section Iritty, Kelakam, Thondiyil and Edoor respectively. The offices have to be accommodated in rent free buildings offered by the local self govt. institutions or other non- governmental organizations . 2. deploy staff as per Table-A attached to this Board order. The Chief Engineer (HRM) shall take necessary action for posting two cashier trainees to the Electrical Sub Division, Iritty for taking cash collection in the proposed Sub Engineer offices. Cashier trainee deployment and cash collection will be for one year only or till the any where-any time payment facility is activated whichever is earlier. 3. provide one FCT phone to each Sub Engineer offices as per the existing rules. TABLE A

Category Staff Additional Deployment Pattern Requirement (Total) Sub 1 - Sub Engineer in breakdown wing Engineer of the parent section may be given (Ele.) additional charge Overseer 1 - May be deployed from the parent section Lineman 2 - May be deployed from the parent section Cashier 1 for 2 May be deployed trainee two SE offices By Order of the Board Sd/- S.ROOPAKALA JAGATH SECRETARY To The Chief Engineer, Distribution (North) The Chief Engineer (HRM),KSE Board, The Deputy Chief Engineer, Electrical Circle, Sreekandapuram. Copy to: The Financial Adviser The Chief Internal Auditor The Dy.CE ,System Operation Circle,. The Regional Audit Officer, Electrical Circle ,Sreekandapuram The Director (IT), The TA to Chairman, Member (Distn.)/ Member (Trans)/ Member (Gen-O)/ Member (Gen-Projects) The PA to Member (Finance), Secretary The Fair Copy Superintendent Library/Stock file. Forwarded by Order

Assistant Engineer