Mary River Basin – New Weir and Water Storage Improvements Part of the South East Queensland Infrastructure Plan Detailed Site Investigations

Total Page:16

File Type:pdf, Size:1020Kb

Mary River Basin – New Weir and Water Storage Improvements Part of the South East Queensland Infrastructure Plan Detailed Site Investigations Natural Resources and Mines Managing Queensland's natural resources...for today and tomorrow water series Mary River Basin – New Weir and Water Storage Improvements Part of the South East Queensland Infrastructure Plan detailed site investigations. However, before any As part of the South East Queensland Infrastructure field work is commenced, affected landowners will Plan and Program, the State Government has set be contacted and given information about the work aside funds for a new weir on the Mary River and a to be carried out and its possible impact on them. future major storage in the Mary Basin. Potential weir sites, that could provide a significant Final decisions about the provision of additional boost to urban and rural supplies on the Sunshine supplies from dams and weirs and related Coast and the Mary Valley, have been identified infrastructure, their need, the timing and sequencing near Moy Pocket and Coles Crossing. The Coles are dependent on findings from the second stage of Crossing site is on the Mary River Weir about 20 development of the South East Queensland kilometres south of Gympie downstream of the Regional Water Supply Strategy (SEQRWSS), confluence with Yabba Creek. Subject to more which is anticipated to be completed by the end of detailed assessment, the Coles Crossing Weir is 2006. currently preferred, as it would act as a regulating weir for Borumba Dam. The Moy Pocket Weir site is Investigations upstream of the Yabba Creek confluence about 10 kilometres north of Kenilworth. A broad range of options for meeting the water requirements of the SEQ region are being assessed Detailed weir investigations, including foundation under the SEQRWSS. drilling, environmental and social studies and designs will commence during 2006. It is anticipated These will include not only new infrastructure but that construction would commence about 2009. also demand management measures, the reuse of treated wastewater, desalination, domestic rainwater The Draft Mary Water Resource Plan is due to be tanks, integrated urban water management systems, released for public comment later in 2005 and will expansion of and improvements to reticulation be finalised in 2006. systems including leakage management and other Any future infrastructure development will have to be initiatives to improve water use efficiency. operated in a way that is consistent with the The investigations of new infrastructure will include environmental flow objectives and water allocation consideration of a further raising of the Borumba security objectives established in the Water Dam and a dam on Amamoor Creek. These were Resource Plan. previously identified in a 1994 “Appraisal Study of Water treatment plants, pumping stations and Water Supply Sources for the Sunshine Coast and pipelines may need to be constructed to convey the the Mary River Valley”. water to the area to be served. As a result of the 1994 Appraisal Study, an initial Land acquisitions for these projects will need to raising of Borumba Dam of some 2.5 metres was commence at an appropriate time. All affected carried out in 1997. A further 20 metre raising of this landholders will be contacted at an early stage. structure is possible. A dam on Amamoor Creek was identified as a possible longer term source of supply. (See map on reverse side) Further Information The investigations of new infrastructure will also For further information on the Mary River water include a review of other practical dam site options storage improvements, contact Scott Smith on (07) that may be identified during the preparation of the 3406 2510 or 0418 700 328 (mobile). SEQRWSS. It may also be necessary to carry out W93 September 2005 Produced by: Water Planning, Brisbane QNRM05239 Queensland the Smart State Natural Resources and Mines WOODGATE BURRUM HEADS CHILDERS HERVEY BAY Burrum Weir No.1 Burrum Weir No.2 Lenthalls Dam Fraser Island BIGGENDEN MARYBOROUGH Tinana Barrage Mary River Barrage BROOWEENA Teddington Weir TIARO Tallegalla Weir RAINBOW BEACH MIVA TIN CAN BAY WOOLOOGA KILKIVAN Goomeri Weir GYMPIE GOOMERI Cedar Pocket Dam MURGON AMAMOOR Amamoor Creek Dam Site Coles Crossing Weir Site SixMileCkDam Kandanga Creek Weir NOOSA COOROY IMBIL Imbil Weir Borumba Dam Raising Borumba Dam Moy Pocket Weir Site Cooloolabin Dam Wappa Dam KENILWORTH South Maroochy Poona Dam Cairns Intake Weir NAMBOUR Burketown Moreton Sugar Mill Weir Petrie Creek Weir MAROOCHYDORE JIMNA MountNANANGO Isa Queensland Baroon Pocket Dam Longreach Rockhampton W Bundaberg Birdsville Mary Basin Gympie MALENY Maleny Weir BRISBANE Ewen Maddock Dam CALOUNDRA LOCALITY MAP Projection: UTM (MGA Zone 56) Datum: GDA94 LEGEND Potential Infrastructure Town............................................................... Investigations 05 1020304050Potential Infrastructure Site............................ Existing Infrastructure Site............................. South East Queensland Kilometres Infrastructure Plan Mary Basin Boundary..................................... and Program.
Recommended publications
  • Seqwater Recreation Guide WAPPA
    Wappa Dam RECREATION GUIDE seqwater.com.au About OUR VISION Wappa Dam To manage access to recreation Wappa Dam is located west of Yandina in the Sunshine Coast opportunities while protecting hinterland. The dam was constructed in 1963 on the South Maroochy natural resources and water quality. River and supplies drinking water to the interconnected supply network. The lake has a catchment area of approximately 69.7km2 and holds 4694 megalitres of water at full supply. Spillway Lookout The lookout at Jack Harrison Park located at Wappa Park Road, Kiamba, is a great place to view the dam when it is spilling. RECREATION REVIEW UPDATE Seqwater is committed to providing quality recreation facilities that everyone can enjoy. We wanted to know what the community thought of current facilities and what suggestions you had for the future, so in 2013 we started a full Recreation Review across our assets. We appreciate the efforts of everyone who took the time to participate in our workshops and online surveys. While we want to implement as many ideas as possible, Seqwater must remain committed to protecting our natural environment and minimising the risks to water quality. Some of the changes will be implemented at a later date, once further funding has been secured and all environmental impact analysis has been completed. Progress updates, along with details of the feedback received is available at seqwater.com.au/recreview. We value the unique status of the Jinibara People as the original owners and custodians of the land and water around Wappa Dam. 2 Wappa Dam RECREATION GUIDE Wappa Dam RECREATION GUIDE 3 Protecting our waterways & the environment We all need to do our part to ensure we keep our • cleaning and drying anything that came into waterways healthy.
    [Show full text]
  • Cedar Pocket Water Supply Scheme Annual Network Service Plan
    Cedar Pocket Water Supply Scheme Annual Network Service Plan December 2013 Contents 1. Introduction ............................................................................................................................ 3 2. Scheme Details ...................................................................................................................... 3 2.1 Scheme background and context ............................................................................................ 3 2.2 Infrastructure details ................................................................................................................ 3 2.3 Customers and water entitlements serviced ........................................................................... 4 2.4 Water availability and use ........................................................................................................ 4 2.5 Water trading ........................................................................................................................... 5 2.6 Irrigation Customer Consultation ............................................................................................. 5 2.7 Customer service standards .................................................................................................... 5 3. Financial Performance .......................................................................................................... 5 3.1 Tariffs ......................................................................................................................................
    [Show full text]
  • Water for South East Queensland: Planning for Our Future ANNUAL REPORT 2020 This Report Is a Collaborative Effort by the Following Partners
    Water for South East Queensland: Planning for our future ANNUAL REPORT 2020 This report is a collaborative effort by the following partners: CITY OF LOGAN Logo guidelines Logo formats 2.1 LOGO FORMATS 2.1.1 Primary logo Horizontal version The full colour, horizontal version of our logo is the preferred option across all Urban Utilities communications where a white background is used. The horizontal version is the preferred format, however due to design, space and layout restrictions, the vertical version can be used. Our logo needs to be produced from electronic files and should never be altered, redrawn or modified in any way. Clear space guidelines are to be followed at all times. In all cases, our logo needs to appear clearly and consistently. Minimum size 2.1.2 Primary logo minimum size Minimum size specifications ensure the Urban Utilities logo is reproduced effectively at a small size. The minimum size for the logo in a horizontal format is 50mm. Minimum size is defined by the width of our logo and size specifications need to be adhered to at all times. 50mm Urban Utilities Brand Guidelines 5 The SEQ Water Service Provider Partners work together to provide essential water and sewerage services now and into the future. 2 SEQ WATER SERVICE PROVIDERS PARTNERSHIP FOREWORD Water for SEQ – a simple In 2018, the SEQ Water Service Providers made a strategic and ambitious statement that represents decision to set out on a five-year journey to prepare a holistic and integrated a major milestone for the plan for water cycle management in South East Queensland (SEQ) titled “Water region.
    [Show full text]
  • Irrigation Infrastructure Renewal Projections - 2013/14 to 2046/47 Report - Cedar Pocket Tariff Group
    Irrigation Infrastructure Renewal Projections - 2013/14 to 2046/47 Report - Cedar Pocket Tariff Group September 2012 Irrigation Infrastructure Renewal Projections - 2013/14 to 2046/47 Report - Cedar Pocket Tariff Group © Queensland Bulk Water Authority 2012 This document is and shall remain the property of Queensland Bulk Water Authority. The document may only be used for the purposes for which it was prepared. Unauthorised use of this document in any form whatsoever is prohibited. Document Status Version Date Author Reviewed PCG Approval 1 20/4/12 AL/GH MD 2 23/4/12 GH MD 3 19/9/12 GH MD Filename: Seqwater_IrrigRen_Tarrif Group Summary_CedarPkt_Ver 3_Sept12 Irrigation Infrastructure Renewal Projections - 2013/14 to 2046/47 Report - Cedar Pocket Tariff Group Contents 1. Introduction 4 2. Asset Information 5 2.1 Irrigation Infrastructure 5 2.2 Relevant Asset Information 5 3. Projections 6 3.1 Summary 6 3.2 Significant Projects 6 3.3 Additional Commentary 8 Table Index Table 1 Summary of Irrigation Infrastructure 5 Table 2 Significant Projects 6 Table 3 Summary of Renewal Projections 7 Appendices A Water Supply Scheme Schematic B Renewal Projections Filename: Seqwater_IrrigRen_Tarrif Group Summary_CedarPkt_Ver 3_Sept12 Irrigation Infrastructure Renewal Projections - 2013/14 to 2046/47 Report - Cedar Pocket Tariff Group 1. Introduction Seqwater owns and operates the following seven irrigation schemes: Central Lockyer WSS; Lower Lockyer WSS; Logan River WSS; Mary River WSS; Cedar Pocket WSS; Warrill Valley WSS; and Central-Brisbane WSS. Seqwater also owns and operates a distribution system, the Morton Vale Pipeline. There are nine tariff groups associated with these schemes. To assist with the determination of price paths, a forecast of future renewal expenditure is required at the individual tariff group level.
    [Show full text]
  • Darling Downs - DD1
    Priority Agricultural Areas - Darling Downs - DD1 Legend Railway Regional Plans boundary Parcel boundary C o g o Lake and dam o n R i Priority Agricultural Area ver DD4 DD7 DD1 DD5 DD8 M a r a n o a DD2 DD3 DD6 DD9 R iv e r r ive e R onn Bal 02.25 4.5 9 13.5 18 Ej Beardmore Dam kilometres B a l o n To the extent permitted by law, The Department of State Development, n e Infrastructure and Planning gives no warranty in relation to the material or R i information contained in this data (including accuracy, reliability, v e r completeness or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage arising from its use. Priority Agricultural Areas - Darling Downs - DD2 Legend Bollon St George Railway Regional Plans boundary Parcel boundary Lake and dam Priority Agricultural Area DD4 DD7 Ba DD1 DD5 DD8 lo n n e R i v DD2 DD3 DD6 DD9 e r r e iv R n a rr Na Dirranbandi ive r lgo a R Cu r e v i R a 02.25 4.5 9 13.5 18 ar k h kilometres Bo To the extent permitted by law, The Department of State Development, Infrastructure and Planning gives no warranty in relation to the material or information contained in this data (including accuracy, reliability, Lake Bokhara completeness or suitability) and accepts no liability (including without limitation, Hebel liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage New South Wales arising from its use.
    [Show full text]
  • Seqwater's 17 August Submission / Response To
    SEQWATER’S 17 AUGUST SUBMISSION / RESPONSE TO QCA REQUEST OF 10 AUGUST 10 August 2012 The Authority provides, herewith, another formal (consolidated) information request to Seqwater. [Questions outlined below prior to Seqwater responses.] A response would be appreciated by Friday 17 August 2012. From: Colin Nicolson Sent: Friday, 17 August 2012 11:30 AM To: Angus MacDonald Cc: Matt Bradbury Subject: NEW DATA REQUEST 10 AUGUST 2012 Angus Here are our responses to the data request and supplementary data request (addendum) of 10 August 2012. QCA Question 1 Past Renewals Data We have been reviewing the past renewals data prepared by The Indec. Some of the items, appear to be more closely related to operational activities. The definition used to determine the capex/opex split endorsed in the 2006 SunWater review (with see refer Tier 1 Working Paper 10) is as follows: “Based on industry best practice, expenditures related to standard operating activities and other expenditures more closely aligned to corrective and preventative maintenance activities have been reclassified out of the refurbishment [renewals] database and into the general operating and maintenance budgets [opex].” a) In relation to the above definition, where relevant, please clarify the exact nature of each of the following types of expenditure [as per your headings and data provided to us]: • “Recreation Maintenance • Infrastructure Maint - Reactive Maint • Infrastructure Maint - Scheduled Maint • Dam Ops - irrigation schemes • Operational Maintenance Services.” b) Also, there appear to be some flood damage repair costs included in past renewal expenditure. Refer Atkinson Dam Flood Renewal (Lower Lockyer Valley WSS). Your main submission indicates that Seqwater does not intend to recover flood damage costs.
    [Show full text]
  • WATER SECURITY STATUS REPORT December 2020
    WATER SECURITY STATUS REPORT December 2020 SEQ Water Grid capacity Average daily residential consumption Grid operations and overall water security position (L/Person) Despite receiving rainfall in parts of the northern and southern areas The Southern Regional Water Pipeline is still operating in a northerly 100% 250 2019 December average of South East Queensland (SEQ), the region continues to be in Drought direction. The Northern Pipeline Interconnectors (NPI 1 and 2) have been 90% 200 Response conditions with combined Water Grid storages at 57.8%. operating in a bidirectional mode, with NPI 1 flowing north while NPI 80% 150 2 flows south. The grid flow operations help to distribute water in SEQ Wivenhoe Dam remains below 50% capacity for the seventh 70% 100 where it is needed most. SEQ Drought Readiness 50 consecutive month. There was minimal rainfall in the catchment 60% average Drought Response 0 surrounding Lake Wivenhoe, our largest drinking water storage. The average residential water usage remains high at 172 litres per 50% person, per day (LPD). While this is less than the same period last year 40% 172 184 165 196 177 164 Although the December rain provided welcome relief for many of the (195 LPD), it is still 22 litres above the recommended 150 LPD average % region’s off-grid communities, Boonah-Kalbar and Dayboro are still under 57.8 30% *Data range is 03/12/2020 to 30/12/2020 and 05/12/2019 to 01/01/2020 according to the SEQ Drought Response Plan. drought response monitoring (see below for additional details). 20% See map below and legend at the bottom of the page for water service provider information The Bureau of Meteorology (BOM) outlook for January to March is likely 10% The Gold Coast Desalination Plant (GCDP) had been maximising to be wetter than average for much of Australia, particularly in the east.
    [Show full text]
  • Appendix 8.1 Capital Expenditure Disclosures for the Grid Service Charges Information Returns 2012-2013
    Appendix 8.1 Capital Expenditure Disclosures for the Grid Service Charges Information Returns 2012-2013 Seqwater Capital Expenditure 2011-2012 Project ID Project Description Asset Name and Type Asset Location Construction Start/ Acquisition Date Commissioning Date New/ Ongoing life Asset Opening Balance 2011-12 2011-12 Interest Capitalised Total Capital Cost WTP, Dam, Pipeline Years QCA approval Est Act Seqwater Drought Infrastructure Capitalised by 30 June 2012 C201000217 Wyaralong Dam Acquisition (see Note 1 below) Wyaralong Dam Beaudesert Jul-11 Jul-11 New 150 373,473,000 373,427,243 - 373,427,243 C201000119 Wyaralong Dam - transfer - owner costs Wyaralong Dam Beaudesert Jul-11 Jul-11 New 150 385,000 400,000 365,000 - 750,000 C200900032 Hinze Dam Stage 3 (Construction) Hinze Dam Nerang Pre 1-Jul-11 Nov-11 New 150 371,502,000 11,300,000 13,949,376 57,986,000 443,437,376 Hinze Dam Stage 3 - Land Hinze Dam Nerang Pre 1- Jul-12 Nov- 11 New 0 - 8,950 , 000 8,950 , 000 - 8,950 , 000 C200900032 Hinze Dam Stage 3 (Defects Liability) Hinze Dam Nerang Pre 1-Jul-11 Jun-12 New 150 10,000,000 9,968,970 - 9,968,970 C200900085 Ewen Maddock WTP Upgrade Ewen Maddock WTP Sunshine Coast Jul-11 Jun-12 Ongoing 30 100,000 260,000 - 260,000 Total Seqwater Drought Infrastructure Capitalised by 30 June 2012 404,223,000 406,920,589 57,986,000 836,793,589 Approved Seqwater Non-drought Infrastructure Capitalised by 30 June 2012 C201000232 Mt Crosby WTPs Critical Chemical Dosing Systems Mt Crosby WTPs Mt Crosby Jul-11 Jun-12 Ongoing 20 705,000 705,000 - 705,000
    [Show full text]
  • Cedar Pocket Water Supply Scheme
    Final Report Seqwater Irrigation Price Review 2013-17 Volume 2 Cedar Pocket Water Supply Scheme April 2013 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile (07) 3222 0599 [email protected] www.qca.org.au © Queensland Competition Authority 2013 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. Queensland Competition Authority Table of Contents TABLE OF CONTENTS PAGE GLOSSARY III EXECUTIVE SUMMARY IV 1. CEDAR POCKET DAM WATER SUPPLY SCHEME 1 1.1 Scheme Description 1 1.2 Bulk Water Infrastructure 1 1.3 Network Service Plans 3 1.4 Consultation 3 2. REGULATORY FRAMEWORK 4 2.1 Introduction 4 2.2 Regulatory Framework and Risk Allocation 4 3. PRICING FRAMEWORK 8 3.1 Tariff Groups 8 3.2 Tariff Structure 8 3.3 Water Use Forecasts 10 4. RENEWALS ANNUITY 12 4.1 Introduction 12 4.2 Seqwater’s Opening ARR Balance (1 July 2013) 13 4.3 Forecast Renewals Expenditure 17 4.4 Seqwater’s Consultation with Customers and Reporting 29 4.5 Allocation of Headworks Renewals Costs 31 4.6 Calculating the Renewals Annuity 31 5. OPERATING COSTS 33 5.1 Background 33 5.2 Historical Operating Costs 33 5.3 Forecast Total Operating Costs 34 5.4 Prudency and Efficiency of Direct Operating Costs 41 5.5 Prudency and Efficiency of Non-Direct Operating Costs 54 5.6 Allocation of Non-Direct Operating Costs 60 5.7 Cost Escalation 62 5.8 Summary of Operating Costs 64 6.
    [Show full text]
  • Rising to the Challenge
    Rising to the challenge Annual Report 2010-11 14 September 2011 This Annual Report provides information about the financial and non-financial performance of Seqwater for 2010-11. The Hon Stephen Robertson MP It has been prepared in accordance with the Financial Minister for Energy and Water Utilities Accountability Act 2009, the Financial and Performance PO Box 15216 Management Standard 2009 and the Annual Report City East QLD 4002 Guidelines for Queensland Government Agencies. This Report records the significant achievements The Hon Rachel Nolan MP against the strategies and activities detailed in the Minister for Finance, Natural Resources and the Arts organisation’s strategic and operational plans. GPO Box 611 This Report has been prepared for the Minister for Brisbane QLD 4001 Energy and Water Utilities to submit to Parliament. It has also been prepared to meet the needs of Seqwater’s customers and stakeholders, which include the Federal and local governments, industry Dear Ministers and business associations and the community. 2010-11 Seqwater Annual Report This Report is publically available and can be viewed I am pleased to present the Annual Report 2010-11 for and downloaded from the Seqwater website at the Queensland Bulk Water Supply Authority, trading www.seqwater.com.au/public/news-publications/ as Seqwater. annual-reports. I certify that this Annual Report meets the prescribed Printed copies are available from Seqwater’s requirements of the Financial Accountability Act 2009 registered office. and the Financial and Performance Management Standard 2009 particularly with regard to reporting Contact the Authority’s objectives, functions, performance and governance arrangements. Queensland Bulk Water Authority, trading as Seqwater.
    [Show full text]
  • Science Forum and Stakeholder Engagement Booklet
    Urban Water Security Research Alliance Science Forum and Stakeholder Engagement Building Linkages, Collaboration and Science Quality 28-29 September 2010 Brisbane, Queensland Program and Abstracts UWSRA Science Forum and Stakeholder Engagement – Program and Abstracts ISSN 1839-1230 (Print) UWSRA Science Forum and Stakeholder Engagement – Program and Abstracts ISSN 1839-1249 (Online) The Urban Water Security Research Alliance (UWSRA) is a $50 million partnership over five years between the Queensland Government, CSIRO’s Water for a Healthy Country Flagship, Griffith University and The University of Queensland. The Alliance has been formed to address South-East Queensland's emerging urban water issues with a focus on water security and recycling. The program will bring new research capacity to South-East Queensland tailored to tackling existing and anticipated future issues to inform the implementation of the Water Strategy. For more information about the: UWSRA - visit http://www.urbanwateralliance.org.au/ Queensland Government - visit http://www.qld.gov.au/ Water for a Healthy Country Flagship - visit www.csiro.au/org/HealthyCountry.html The University of Queensland - visit http://www.uq.edu.au/ Griffith University - visit http://www.griffith.edu.au/ Enquiries should be addressed to: The Urban Water Security Research Alliance PO Box 15087 CITY EAST QLD 4002 Ph: 07-3247 3005; Fax: 07- 3405 3556 Email: [email protected] Begbie, D.K. and Wakem, S.L. (eds) (2010), Science Forum and Stakeholder Engagement: Building Linkages, Collaboration and Science Quality, Urban Water Security Research Alliance, 28-29 September, Brisbane, Queensland. Copyright © 2010 CSIRO To the extent permitted by law, all rights are reserved and no part of this publication covered by copyright may be reproduced or copied in any form or by any means except with the written permission of CSIRO.
    [Show full text]
  • Ewen Maddock Dam – Mooloolah State School Pool Agreement
    Frequently asked questions Ewen Maddock Dam - Mooloolah State School Pool Agreement Dams supply our drinking water and play a very important role in the SEQ Water Grid – making sure everyone in South East Queensland has water to live, work and play. Like all major infrastructure, dams are regularly assessed and upgraded to comply with improving engineering standards and guidelines. What is the Ewen Maddock Dam are permitted at Lake Macdonald, Baroon Pocket Upgrade? Dam, Enoggera Dam and Borumba Dam. Ewen Maddock is one of a number of dams across South East Queensland scheduled for an upgrade Please refer to the recreation map here for more as part of Seqwater's Dam Improvement Program. information on the recreation changes to Ewen The upgrade is needed to ensure Ewen Maddock Maddock Dam as part of the upgrade. Dam meets the latest national guidelines into the future. The upgrade will be delivered in two stages. How long is the pool free for? The first stage, referred to as Stage 2A will include lake lowering and embankment work. This phase of The Mooloolah State School pool will be free to all work will involve raising and strengthening the users between Sunday 13 December 2020 and existing embankment walls with significant Thursday 1 April 2021. As part of this partnership, improvements to the recreation area. This stage the pool will have increased opening hours which began in April 2020 and is expected to take 18 are: months to complete, subject to weather and unexpected site conditions. Sunday 13 December 2020 to Saturday 23 January 2021 The next stage, Stage 2B will involve strengthening work on the spillway structure.
    [Show full text]