Map Timboryn.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Map Timboryn.Pdf Timboryn A single beach cottage sleeping 6 people Location Directions to “Timboryn” Coming from the west – from Knysna – along the N2 Port Elizabeth you should ignore the signs leading to Plettenberg Bay centre and remain on the N2 heading east. About 6 kilometres from the bottom of the hill will cross the Bitou and Keurbooms Rivers. In 1 more kilometre you will see Keurbooms River Tsitsikamma Coastal signs for two turnings to your right: The second sign is National Park for Keurboomstrand. Take the Keurboomstrand turning Nature Reserve (not Keurboomsrivier). In less than a kilometre is another Keurboomstrand sign at Yebo’s restaurant. Turn Right. Coming from the east – from Port Elizabeth – along the N2 there is a sign for a left turn 1 km after the bay comes into view and after you pass the telephone mast at the top of the hill. This is a very sharp left turn which banks Keurboomstrand the wrong way. It must be taken very slowly. In 2.5 kms Keurbooms River you will see the second sign for Keurboomstrand at Yebo’s restaurant. Turn left. East or West you are now at the same point. Proceed along this road for about 4 kms until you reach the stop sign after the left bend. Turn right onto Main Road and proceed over the first speed bump. Just before the second speed bump there are 2 white posts on the right hand side of the road and the wooden sign “Timboryn”. (Garden Street is to your left.) Turn right between the posts and proceed to the cottage closest to the sea. If you land in the sand you’ve gone too far! (If you end at Enrico’s Restaurant then you have also gone too far and so need to turn around and come back about 300 meters to the white posts.) Lagoon Knysna Plettenberg Bay Robberg Nature Reserve Robberg Romyn Heritage Trust | C/o Jock & Jane Worthing | Timboryn Cottage Erf 147 | Main Street | Keurboomstrand | PO Box 1619 | Plettenberg Bay | 6600 | South Africa [email protected] | www.timboryn.co.za | T & F +27 44 535 9674 | M + 27 72 503 3776 Timboryn A single beach cottage sleeping 6 people Limpopo Polokwane Sun City Pretoria Nelspruit Mafikeng Johannesburg North West Gauteng Mpumalanga Ulundi Free State Upington Kwazulunatal Kimberley Bloemfontein Pietermaritzburg Springbok Northern Cape Durban Eastern Cape East London Western Cape Port Elizabeth Cape Town Plettenberg Bay Timboryn Romyn Heritage Trust | C/o Jock & Jane Worthing | Timboryn Cottage Erf 147 | Main Street | Keurboomstrand | PO Box 1619 | Plettenberg Bay | 6600 | South Africa [email protected] | www.timboryn.co.za | T & F +27 44 535 9674 | M + 27 72 503 3776.
Recommended publications
  • Keurbooms-Bitou Estuarine Management Plan
    Keurbooms-Bitou Estuarine Management Plan Draft Final October 2018 Keurbooms Estuarine Management Plan i DOCUMENT DESCRIPTION Document title and version: Keurbooms-Bitou Estuarine Management Plan Project Name: Western Cape Estuary Management Framework and Implementation Strategy Client: Western Cape Government, Department of Environmental Affairs & Development Planning Royal HaskoningDHV reference number: MD1819 Authority reference: EADP 1/2015 Compiled by: Version 1: Enviro-Fish Africa (Pty) Ltd (2011) Version 2: Royal HaskoningDHV (2018) Acknowledgements: Western Cape Government Environmental Affairs & Development Planning Directorate: Biodiversity and Coastal Management Sub-Directorate: Coastal Management Email: [email protected] Date: October 2018 Keurbooms-Bitou Estuarine Management Plan DOCUMENT USE The South Africa National Estuarine Management Protocol (‘the Protocol’), promulgated in May 2013 under the National Environmental Management: Integrated Coastal Management Act (Act No. 24 of 2008, as amended 20141) (ICM Act), sets out the minimum requirements for individual Estuarine Management Plans (EMPs). In 2013/2014, a review was conducted by the Department of Environmental Affairs: Oceans and Coasts (DEA: O&C) (DEA, 2014) on the existing management plans to ensure, inter alia, the alignment of these plans with the Protocol. This revision of the Keurbooms-Bitou Estuarine Management Plan, including the Situation Assessment Report and the Management Plan itself, is in response to the comments received during the
    [Show full text]
  • Water Losses
    Bitou Municipality Engineering Services Water Services Section An Overview - Water Losses Franclyn Samuel Pr Eng (Civil) To infinity and beyond…… Presentation Outline • Introduction to Bitou Municipality Water Services • Non Revenue Water and Water Losses • Bitou Municipality – Water Losses • Planned Interventions (to infinity and beyond) • Closure OVERVIEW BITOU MUNICIPALITY WATER SERVICES BITOU MUNICIPALITY – AT A GLANCE • Bitou Municipality Quick Stats: • 992m2 • Estimated 50,000+ residents • Coastal resorts of Natures Valley, Keurboomstrand • Kurland, Wittedrif, Plettenberg Bay, Kranshoek, Harkerville OVERVIEW– WATER SERVICES • Consistent high achiever – water quality standards • WSA, WSP • 20,600 households – billed for water OVERVIEW - WATER SERVICES Current Demands: 10ML/d (4Mm3/a) • Groot River – Natures Valley ( • Wit River and Boreholes – Kurland ( 6Ml/d= 6053kl/d) • Boreholes - Harkerville (1,9ML/month/ 0.1 ML/d) • Keurbooms River (105l/s or 9ML/d) • Piesangs River off channel storage - Roodefontein Dam – capable of 290l/s, allocation = 145l/s= 12,5ML/d • 7 boreholes – 1Ml/d • Desalination Plant 2Ml/d OVERVIEW - WATER SERVICES continued 32 reservoirs (storage) 70 pump stations Water quality laboratory 2 waste water treatment plants 3 water treatment plants 80+ staff including 14+ process controllers NON REVENUE WATER NON-REVENUE WATER Represented as the % of total amount of water produced NRW = Unbilled Authorised Consumption + Water Losses • Authorised Consumption: metered and un-metered • Authorised Metered : municipal properties, etc. • Authorised Not metered: unplanned activities eg. fire fighting, maintenance activities (sewer lines, stormwater) NON-REVENUE WATER The International Water Association Standard NON-REVENUE WATER Represented as the % of total amount of water produced Authorised Metered (municipal properties) Unbilled Authorised Consumption Authorised Not metered: unplanned activities eg.
    [Show full text]
  • The Garden Route a Journey of Lush Forests, Rugged Sea Cliffs and Modern Safaris
    Destination Showcase: The Garden Route A journey of lush forests, rugged sea cliffs and modern safaris Telephone +27 11 219 5600 Facsimile +27 11 268 2010/1 P O Box 987 Northlands 2116 Johannesburg South Africa www.dragonfly.co.za Southern Africa’s Leading Travel Group The Garden Route Map of the Garden Route Tsitsikamma National Park N2 E G R E B A G U O K Natures Valley PLETTENBERG BAY N2 THE GARDEN ROUTE Cape Town Knysna Jeerys Bay Plettenberg Bay KNYSNA George H3 The Heads S N G I R A E T B N E I U S O S A M N A A U M Q I M N A E K T U O WILDERNESS GEORGE H2 Gondwana Game Reserve The Airport H1 H2 Fancourt H3 Pezula MOSSEL BAY H1 N2 The Garden Route The Garden Route extends over South Africa’s two southernmost provinces, the Eastern and the Western Cape. Officially the Route starts at Heidelberg in the Western Cape and ends at the Storms River on the extreme western reach of the neighbouring Eastern Cape Province. The whale capital, Hermanus, and the safari region of the Eastern Cape, located on either side and just beyond the borders of the Garden Route have also been included in this document. The Garden Route was so named, due to its lush and ecologically diverse vegetation and the numerous lagoons and lakes dotted along the scenic coastline. The region includes quaint coastal towns such as Mossel Bay, Knysna, Plettenberg Bay, Nature’s Valley and George.
    [Show full text]
  • APPENDIX G Specialist Input
    APPENDIX G Specialist Input This Appendix contains the following information: G1. Environmental Sensitivity Report (Compiled by bluepebble independent environmental agency in association with Peet Joubert of Nature Management Services) G2. Heritage Specialist Input (Compiled by Peter Nilssen (PhD) Archaeological and Heritage Specialist) bluepebble independent environmental agency Construction of a dwelling on Erf 569, House Kovarsky, Keurboomstrand, Plettenberg Bay Basic Assessment Report Appendix G: Specialist Input G1. Environmental Sensitivity Report. bluepebble independent environmental agency [email protected] www.bluepebble.biz 082 777 0705 (m) 086 553 8837 (f) 19 March 2010 Environmental Sensitivity Report House Kovarsky, Erf 569, Plettenberg Bay 1. Introduction bluepebble independent environmental agency has been appointed by the landowner to submit an environmental sensitivity report for the proposed design and construction of a dwelling on Erf 569 located in the Keurboomstrand area of Plettenberg Bay. bluepebble has undertaken the commission in association with Nature Management Services (NMS) who have provided the specialist input for the sensitive site under investigation. The site in question is located on the Keurbaai property along the southern Cape coast between Plettenberg Bay and Keurboomstrand, as depicted in Figure 1. Figure 1: Locality Plan for Erf 569, Plettenberg Bay bluepebble independent environmental agency Construction of a dwelling on Erf 569, House Kovarsky, Keurboomstrand, Plettenberg Bay Basic Assessment Report Appendix G: Specialist Input 2. Methodology A desktop study using available information, and on-site inspections, were conducted to determine the conservation status, extent and health of vegetation on the property. Vegetation type and keystone species were mapped as the primary indicators of environmental sensitivity. The remnant of thicket on the site is very dense and almost impenetrable.
    [Show full text]
  • WC Covid 19.Town and Suburb Data. 23 October 2020. for Publication.Xlsx
    Western Cape.COVID-19 cases.Town and Subrb data.
    [Show full text]
  • Coastal Management Lines for Eden District Project Report
    Coastal Management Lines for Eden District Project Report July 2018 Coastal management lines for Eden District i DOCUMENT DESCRIPTION Document title and version: Coastal Management Lines for Eden District: Project Report (March 2018) Project Name: The Technical Delineation of both the coastal management line; the EIA development set- back line as well as an audit of coastal access in the Eden District Municipality Client: Western Cape Government, Department of Environmental Affairs & Development Planning Royal HaskoningDHV reference number: MD2368 Authority reference: EADP1/2016 Authors: Royal HaskoningDHV Gerard van Weele Rafeeqah Alexander Dr. Keming Hu Dr. David Brew Nomcebo Hlanguza Katarzyna Bozek Bronwen Griffiths Coastwise Consulting Tandi Breetzke Acknowledgements: Western Cape Government Environmental Affairs & Development Planning Sub-directorate: Coastal Impact Management Directorate: Spatial Planning and Coastal Impact Management Email: [email protected] and Tel: 021 483 3370/2724 Appreciation is also expressed for all the contributions made by members of the public during the stakeholder engagement process, and the support received from the local municipalities of Hessequa, Mossel Bay, George, Knysna and Bitou, as well as Eden District Municipality. Date: July 2018 Coastal management lines for Eden District ii EXECUTIVE SUMMARY The coastal zone has always attracted people, whether for recreational purposes or for the natural resources that can be harvested from the coast or adjacent marine area. However, this concentration of people necessitates the concentration of developmental activities that are often in conflict with the natural dynamic nature of the coast or the biophysical sensitivities associated with the coastline. The Western Cape Government is under obligation to protect and preserve the inherent value of the Western Cape’s coastal zone.
    [Show full text]
  • Ethembeni Cultural Heritage
    Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Dieprivier-Kareedouw, Kou-Kamma Local Municipality, Cacadu District, Eastern Cape Province, South Africa Prepared for GIBB Engineering & Science 2nd Floor, Greyville House, Cnr Greyville & Cape Roads, Greenacres, Port Elizabeth 6001 Box 63703, Greenacres 6057 Telephone Walter Fyvie 041 392 7510 Fax 086 608 2522 [email protected] Prepared by ETHEMBENI CULTURAL HERITAGE Elizabeth Wahl and Len van Schalkwyk Box 20057 Ashburton 3213 Pietermaritzburg Telephone 033 326 1136 / 082 655 9077 / 082 529 3656 Facsimile 086 672 8557 [email protected] 8 May 2013 Phase 1 AIA of Dieprivier-Kareedouw 132kV Power Line and Substation, Cacadu District, Eastern Cape Province, South Africa MANAGEMENT SUMMARY eThembeni Cultural Heritage was appointed by GIBB Engineering & Science to undertake a Phase 1 Archaeological Impact Assessment of a proposed transmission power line and substation site in the Eastern Cape Province, in terms of the National Environmental Management Act 107 of 1998 as amended, in compliance with Section 38 of the National Heritage Resources Act 25 of 1999, as amended. LOCATION AND ENVIRONMENT Much of the proposed power line is located along or close to the Langkloof and R62 Scenic Routes, roughly parallel to and south of the Suuranysberge and the Krom River. It starts at the proposed Dieprivier Substation west of Humansdorp, passes north of the Churchill Dam and the town of Kareedouw, with the eponymous mountains to the south, before terminating at the existing Kareedouw Substation. Historical agriculture related land-uses have resulted in degradation of portions of the route, most notably as a result of crop and pasture cultivation in flat lower lying areas, and to some extent from regular burning of grazing areas on mountain and hill slopes.
    [Show full text]
  • On a River String
    Farm stays Keurbooms Valley Farm stays Keurbooms Valley Today’s environmen- tally aware farmers offer visitors more than just cuddly creatures to pet. Marion Whitehead found a farm stay with a difference in the Garden Route’s Keurbooms River valley. Green pearls on a river string The Egyptian geese are more skittish than the blesbok. The vigilant parents shep- approving nod from connoisseurs of just that – you wait while owner Ingo to move between the new Garden herding five goslings along the wall the slow food movement. It’s tucked Vennemann goes to scoop your order Route National Park (Wilderness, of the trout dam below my chalet let into a bend of the Keurbooms River from the tank of eating-size brown Knysna and Tsitsikamma), Soetkraal out an urgent warning honk as I go outside De Vlugt, a sleepy village on or rainbow trout. Nature Reserve and Baviaanskloof out onto the deck to admire the Prince Alfred’s Pass which connects ‘In nature, things take time,’ says Wilderness Area. run the farm and guest accommoda- INSET TOP: Mareeán van Rooyen has fun view. Frogs pick up the chorus and Knysna with the Langkloof. Young Ingo. He and his wife, Naomi, are These farmers have diversified into tion of four timber chalets and four camping in one of the blesbok go back to mowing the trout in the hatchery thrive in spark- founder members of the Middle tourism, giving visitors a glimpse into tipis. Apart from fishing, hiking, the tipis at Outeniqua lawn under pecan trees freshly ling mountain water and practically Keurbooms Conservancy, a group ‘green’ life on the land.
    [Show full text]
  • Visual Impact Assessment Final Draft Report Ver
    The Hillside Development Farm 1638 and Remainder Portion 82 of the farm Ruygte Valley 205, Knysna Sedgefield Visual Impact Assessment Final Draft Report ver. 1.4 February 2016 Prepared for: Liberty Lane Trading 111 PTY LTD c/o VPM Planning cc PO Box 173, Knysna, 6570 Prepared by: Megan Anderson Landscape Architect PO Box 517, Bredasdorp, 7280 Table of Contents CURRICULUM VITAE OF VISUAL SPECIALIST 4 DECLARATION OF INDEPENDENCE 7 EXECUTIVE SUMMARY 9 1. INTRODUCTION 12 1.1 BACKGROUND TO THE REPORT 12 1.2 TERMS OF REFERENCE 12 1.3 METHODOLOGY 13 1.4 ASSUMPTIONS AND LIMITATIONS 13 2. THE PROPOSED DEVELOPMENT 13 2.1 SITE LOCATION 14 2.2 DEVELOPMENT DESCRIPTION 16 2.2.1 THE PREFERRED ALTERNATIVE, THE HILL LAYOUT 11 16 2.2.2 ALTERNATIVE 1: THE HILL - LAYOUT 4 17 2.2.3 ALTERNATIVE 2: THE HILL - LAYOUT 9 18 2.3 APPLICABLE POLICIES, PLANS AND GUIDELINES 19 2.3.1 THE WESTERN CAPE PROVINCIAL SPATIAL DEVELOPMENT FRAMEWORK (PSDF) 19 2.3.2 THE KNYSNA SPATIAL DEVELOPMENT FRAMEWORK (SDF) 2008 19 2.3.3 THE COMPATIBILITY RULING MADE BY THE KNYSNA MUNICIPALITY SPECIFICALLY RELATED TO ‘THE HILL’ IN TERMS OF THE SDF. 19 2.3.4 DEA&DP GUIDELINE FOR MANAGEMENT OF DEVELOPMENT ON MOUNTAINS, HILLS & RIDGELINES 19 2.3.5 THE ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) FOR THE GARDEN ROUTE 20 2.3.6 HERITAGE AND SCENIC RESOURCES: INVENTORY AND POLICY FRAMEWORK FOR THE WESTERN CAPE 21 3. VISUAL ASSESSMENT OF THE SITE AND PROPOSED DEVELOPMENT 22 3.1 DESCRIPTION OF THE AFFECTED AREA AND THE SCENIC RESOURCES 22 3.2 VISIBILITY OF THE PROPOSED DEVELOPMENT 25 3.2.1 VIEW CATCHMENT 25 3.2.2 ZONE OF VISUAL INFLUENCE 26 3.3 RECEPTORS 27 3.4 VISUAL EXPOSURE 28 3.4.1 VIEW CORRIDORS 28 3.5 VISUAL SENSITIVITY 30 3.5.1 TOPOGRAPHY 30 3.5.2 LANDFORMS 30 3.5.3 VEGETATION COVER 31 3.5.4 SETTLEMENT PATTERNS 32 3.5.5 VISUAL SENSITIVITY 33 3.6 VISUAL ABSORPTION CAPACITY 3.7 VISUAL INTRUSION 37 The Hillside Development, Sedgefield VIA ver.1.4 Final Draft Report, February 2016 MALA 2 4.
    [Show full text]
  • Keurbooms River and Estuary Reserve Detrmination Study
    KEURBOOMS RESERVE DETERMINATION STUDY Scoping Phase Estuaries Prepared for Department of Water Affairs and Forestry by T.G. Bornman* & J.B. Adams† *Institute for Environmental and Coastal Management, †Department of Botany IECM Research Report No. 44 March 2005 Executive Summary A literature review of available information on the Keurbooms / Bitou and Piesang estuaries was completed. From these data the level of ecological reserve assessment was recommended for the estuaries. The data requirements for the reserve assessments were also identified. KEURBOOMS / BITOU The Keurbooms / Bitou is one of few permanently open estuaries along the South African coastline. It is of national importance and was ranked 18th in South Africa (out of 256 estuaries) based on its biodiversity important. The Plettenberg Bay Coastal Catchment study in 1996 investigated the response of the Keurbooms Estuary to different freshwater inflow scenarios, which represented different on-channel and off-channel dam options. Sedimentation as a result of a reduction in floods and saline intrusion upstream were identified as the two greatest threats to the estuary. Mouth closure would mean an unacceptable ecological change for the estuary. Instream Flow Requirements (IFR) for the Keurbooms / Bitou Estuary was estimated at approximately 144 x 10-6.m-3 per annum or 77% of the present day MAR (1999) at the estuary (Ninham Shand 1999). A conservative approach was followed during this study due to the paucity of information and the uncertainty regarding the response of the estuary to any abstractions (Ninham Shand 1995). The findings of the IFR study were that the estuary required 100% of present day flows (baseflow) due to the absence of information.
    [Show full text]
  • Garden Route National Park Draft Park Management Plan
    Garden Route National Park Draft Park Management Plan For the period 2020 - 2029 1 Invitation to comment South African National Parks (SANParks) hereby provides you with an opportunity to provide information and to express your opinion, on how the Garden Route National Park (GRNP) will be managed over the next 10 years. How to make effective comments It is important to indicate those objectives and management actions you agree with as well as those with which you disagree. Each submission is important, but those that give reasons for concerns give support where appropriate and offer information and constructive suggestions are most useful. To ensure your submission is as effective as possible, please provide the following: • Make it clear and concise; • List your points according to the subject sections and page numbers in the plan; • Describe briefly each subject or issue you wish to discuss; • Say whether you agree or disagree with any or all of the aims or objectives within each subject or just those of specific interest to you – clearly state your reasons (particularly if you disagree) and provide supportive information where possible; and • Suggest alternatives to deal with issues with which you disagree. Where to send your comments Submissions are welcome for five weeks after the release date of the draft management plan and can be made in writing to: Manager: Park Management Plans PO Box 787 Pretoria 0001 Submissions can also be emailed to [email protected] Photo by: ??? Draft Garden Route National Park Management Plan 2020 – 2029 2 Section 1: Authorisation This management plan is hereby internally accepted and authorised as required for managing the Mapungubwe National Park and World Heritage Site in terms of Sections 39, 40 and 41 of the National Environmental Management: Protected Areas Act [(Act No.
    [Show full text]
  • Heritage Impact Assessment with Integrated Set of Recommendations
    HERITAGE IMPACT ASSESSMENT WITH INTEGRATED SET OF RECOMMENDATIONS Proposed Residential Development of Nature's Path Lifestyle Village Portions 9 and 10 of the Farm Matjiesfontein No. 304, Keurboomstrand, Plettenberg Bay By PHS Consulting February 2014 cell: 082 7408 046 | tel: (028) 312 1734 | fax: 086 508 3249 | [email protected] |P.O Box 1752 | Hermanus 7200 i EXECUTIVE SUMMARY Introduction Consideration is being given to the development of the northern parts of Portions 9 and 10 of the Farm Matjiesfontein No. 304. The developable area of the property is approximately 15.8 ha in extent and it is located 3 km from Keurboomstrand, some 7 km north-east of Plettenberg Bay. The remaining (portions of Portions 9 and 10) 16.62 ha of the property, located south of the development, against the coastline is proposed for a nature reserve and the 1 ha historic farm yard and associated resources on Portion 9 will be excluded from the development area. A development application for a retirement village on the property was initially submitted on 13 November 2008 to the Western Cape Department of Environmental Affairs and Development Planning (DEA&DP). A public participation process (PPP) was conducted for the proposal (under DEA&DP Reference number: EG12/2/3/1-D1/8-1158/08) during the period 15 January 2009 to 16 February 2009. A number of specialist studies were also conducted at the time in preparation of submission of the Basic Assessment Report. However, no application had yet been submitted by 2 August 2010 when the NEMA 2010 regulations came into effect and as a result the above file was closed by the DEA&DP.
    [Show full text]