H19011 Project Information Sheet
Total Page:16
File Type:pdf, Size:1020Kb
PROJECT INFORMATION SHEET PROJECT DESCRIPTION CONSTRUCTION OF A SURFACING STRUCTURE on Highway No. 6 from the urban city limits of Regina to 6.54 km north; CONSTRUCTION OF A SURFACING STRUCTURE on the Highway No. 11 Pasqua Street Interchange and the CONSTRUCTION OF ONE INTERSECTION TREATMENT; CONSTRUCTION OF A SUBGRADE AND SURFACING STURCTURE for a commercial vehicle inspection station on Highway No. 6 from 3.74 km north of its junction with Highway No. 11 to 4.58 km north, for a TOTAL DISTANCE OF 19.23 km. PROJECT DETAILS The contractor for this project is Pasqua Paving, A Division of WF Botkin Construction Ltd. Contract supervision will be provided by Tetra Tech personnel. The contractor is expected to begin road work on June 29, 2020 and is expected to complete the project, weather permitting, by October 9, 2020. The estimated cost of this project is $6.8 million. Public traffic can expect minor delays and disruptions to their normal travel schedules as one lane will be open most of the time (with a few exceptions) for continuous flowing traffic. The contractor will provide traffic accommodation. Nightly ramp closures on Pasqua Street Interchange are expected until July 17, 2020. For additional information, please contact: Leane Campbell, P. Eng. Jackie Clark, Engineering Licensee Herrol Sadler, P. Eng. Regional Manager Senior Project Manager Director, Construction Delivery Tetra Tech MHI MHI 20 - 3942 Burron Avenue 221 Winnipeg Street N 221 Winnipeg Street N Saskatoon, SK S7P 0E1 Regina, SK S4R 8T6 Regina, SK S4R 8T6 Phone: 306-659-6106 Phone: 306-787-2294 Phone: 306-787-4956 Cell: 306-716-2092 Cell: 306-539-5781 Authorized By: Josh Richer Executive Director, Construction Branch H19011 CONSTITUENCIES: Lyle Stewart, MLA, Lumsden-Morse Christine Tell, MLA, Regina Wascana Plains Laura Ross, MLA, Regina Rochdale Yens Pedersen, MLA, Regina Northeast MUNICIPALITIES: R.M. of Sherwood No. 159; [email protected] City of Regina; [email protected] Town of Lumsden; [email protected] INTERNAL: cc: Josh Richer, Executive Director, Construction Branch Herrol Sadler, Director, Construction Delivery Jackie Clark, Senior Project Manager, Construction Delivery DATE PREPARED: June 15, 2020 .