TYLER DISTRICT

DISTRICT PROFILE

The Tyler District plans, designs, builds, operates and maintains the state transportation system in the following counties: Anderson, Cherokee, Gregg, Henderson, Rusk, Smith, Van Zandt and Wood. The district primarily conducts asset preservation and mobility projects to ensure the safety of the traveling public.

FAST FACTS (FY 2020): Population 709,171 Area (Sq. Miles) 6,596 Lane Miles 8,911 Daily Vehicle Miles 18,275,596 District Engineer: Vernon M. Webb, P.E. Registered Vehicles 694,872 TxDOT Employees 316 Physical/Mailing Address: Construction/Maintenance $282 million 2709 W. Front Street Expenditures Tyler, TX 75702

The Tyler District has Percentage of Highway Projects 64.10% Completed On Time Ph: (903) 510-9100 1,198 On-System bridges Percentage of Highway Projects 84.61% Fax: (903) 510-9158 and 637 Off-System Completed Under Budget bridges, for a total of Counties: 1,835 bridges. Anderson, Cherokee, Gregg, Henderson, Rusk, Smith, Van Zandt and Wood KEY PROJECTS UNDERWAY: PLANNED KEY PROJECTS:

■ FM 2206, Gregg County: Widen to 4 lanes from ■ U S 175, Anderson County: Widen to 4 lanes State Senators: Loop 281 to Fisher Road – $15 million from Frankston to CR 3509 – $48 million Sen. Bob Hall (Anticipated Completion Date: Summer 2022) (Letting: December 2021) Sen. Bryan Hughes Sen. Robert Nichols ■ FM 2206, Gregg County: Widen to 4 lanes from ■ US 175, Cherokee County: Widen to 4 lanes Fisher Road to SH 42 – $15 million from CR 3509 to Jacksonville – $125 million State Representatives: (Anticipated Completion Date: Summer 2022) (Letting: June 2023) Rep. Rep. ■ SH 334, Henderson County: Construct new ■ I-20/SH 31 Interchange, Gregg County: Rep. Jay Dean bridge to provide four lanes from Gun Barrel City Remove left exits, reconfigure interchange – Rep. to Seven Points – $42 million $150 million Rep. (Anticipated Completion Date: Spring 2021) (Letting: June 2025) Rep.

■ US 69 at FM 346, Smith County: Construct ■ US 271, Gregg & Smith counties: Widen to 4 Rep. grade-separated interchange – $15.5 million lanes from FM 16 to Loop 485 in Gladewater – Rep. (Anticipated Completion Date: Spring 2021) $54 million (Letting: April 2023) U.S. Senators: ■ FM 2493, Smith County: Widen to 4 lanes Sen. John Cornyn divided with continuous left turn lane from FM ■ FM 2493, Smith County: Widen to 4 lanes from Sen. Ted Cruz 2813 in Gresham to FM 346 in Flint – FM 346 in Flint to Cherokee County Line south $12 million of Bullard – $33 million U.S. Representatives: (Anticipated Completion Date: Summer 2021) (Letting: April 2022) Rep. Louie Gohmert Rep. Lance Gooden

MAINTENANCE: The Tyler District spends approximately $15 million annually on sealcoating projects. We also spend several million each year rehabilitating pavement on our interstate and US highway system. CORRIDORS: The district’s priority corridors are I-20, US 69, US 79, US 175 and SH 31. SAFETY: The district has pursued funding for numerous safety improvement projects, including grade separations, widening of narrow roadways, adding center- and edge-line rumble strips and overlaying roadways with surface mixes that reduce wet weather accidents.