Detailed Hydrographic Survey
Total Page:16
File Type:pdf, Size:1020Kb
INLAND WATERWAYS AUTHORITY OF INDIA, A-13, SECTOR-1, NOIDA DIST-GAUTAM BUDHA NAGAR, UTTAR PRADESH, PIN- 201 301(UP) “DETAILED HYDROGRAPHIC SURVEY KOSI RIVER (NW-58) (233.040 km)” FROM “CONFLUENCE OF KOSI WITH GANGA RIVER AT KURSELA TO KOSI BARRAGE” SURVEY PERIOD FROM 10.05.16 TO 29.09.16 ` KOSI RIVER FINAL REPORT ON HYDROGRAPHICAL SURVEY OF KOSI RIVER, BIHAR REPORT SUBMISSION DATE- 28.03.2019 SUBMITTED BY: PRECISION SURVEY CONSULTANCY “Vichitra” SP -45, (Kolkata West International City) Salap Junction, Howrah Amta Road & Bombay Road Crossing, NH- 6, Howrah – 711 403 e-mail – [email protected] Visit us –www.precisionsurvey.co.in FINAL SURVEY REPORT “DETAILED HYDROGRAPHIC SURVEY IN KOSI RIVER, BIHAR” (233.040 KM) Acknowledgement Precision Survey Consultancy (PSC), Salap, Howrah express its sincere gratitude to IWAI for awarding the work and guidance for completing this Project of detailed Hydrographic Survey Report of Kosi River from “Confluence of Kosi with Ganga River at Kursela to Kosi Barrage, Bihar (233.040 km)”. We would like to use this opportunity to pen down our profound gratitude and appreciations to Shri Jalaj Srivastava, IAS, Chairman, IWAI for spending their valuable time and guidance for compleing this project of ― Detailed Hydrographic and Topographic survey in Kosi River.‖ PSC would also like to thanks Shri Pravir Pandey, Vice-Chairman, IA&AS. Shri Shashi Bhushan Shukla, Member (Traffic), Shri Alok Ranjan, Member (Finance) and Shri S.K.Gangwar, Member (Technical). PSC wishes to express their gratitude to Capt. Ashish Arya, Hydrographic Chief, IWAI, Cdr. P.K. Srivastava, Ex. Hydrographic Chief, Shri S.V.K. Reddy, Chief Engineer-I, IWAI for his guidance and inspiration for this project. PSC would also like to thank Shri Rajiv Singhal, S.H.S., IWAI for invaluable support and suggestions provided throughout the survey period. PSC is pleased to place on record our sincere thanks to other staff and officers of IWAI for their excellent support and co-operation throughout the survey period. Document History: Final Survey Report of River: Kosi, Bihar 2 | P a g e Survey Period: From 10.05.16 to 29.09.16 FINAL SURVEY REPORT “DETAILED HYDROGRAPHIC SURVEY IN KOSI RIVER, BIHAR” (233.040 KM) List of Abbreviations CD Chart Datum DGPS Differential Global Positioning Systems ETS Electronic Total Station GPS Global Positioning Systems LBM Local Bench Mark MSL Mean Sea Level RL Reference Level SD Sounding Datum SBAS Satellite-Based Augmentation System TBC Trimble Business Centre FRP Fiber Reinforced Plastic Table 1- List of Abbreviations Document History: Final Survey Report of River: Kosi, Bihar 3 | P a g e Survey Period: From 10.05.16 to 29.09.16 FINAL SURVEY REPORT “DETAILED HYDROGRAPHIC SURVEY IN KOSI RIVER, BIHAR” (233.040 KM) Table of Contents Section-1: Introductory Considerations .......................................................................................................... 14 1.1- River Course: Background information, Historical Information, Origin, End: - ..................................... 14 1.2 - Tributaries / Network of River/ Basin:- .................................................................................................. 15 1.3 - State / District through which river passes:- ........................................................................................... 15 1.4 - Project Site Location Map:- .................................................................................................................... 15 1.5 - Scope of work:- ....................................................................................................................................... 16 Section-2: Methodology Adopted to undertake Study ................................................................................... 17 2.1 Methodology Adopted including Resources and equipment used and calibration:- ................................. 17 2.1.1 Recee:- ................................................................................................................................................17 2.1.2 Survey Resources and Methodology:- ...............................................................................................17 2.1.3 Survey Launch:- .................................................................................................................................17 2.1.4 Survey Equipment:- ............................................................................................................................18 2.1.5 Topographic Survey:- .........................................................................................................................18 2.1.6 Bathymetry Survey:- ..........................................................................................................................19 2.2 - Description of Bench Marks (B.M) / authentic Reference Level used: - ................................................ 21 2.3 - Tidal Influence Zone and tidal variation in different stretches: -............................................................ 22 2.4 - Methodology to fix Chart Datum/ Sounding Datum: - ........................................................................... 22 2.5 - Six years minimum Water Levels to arrive at Chart Datum (CD) / Sounding Datum (SD):- ................ 23 2.6 -Transfer of Sounding Datum table for Tidal Rivers:- .............................................................................. 23 2.7 –Table indicating tidal variation at different observation points (say at every 10KM):- .......................... 23 2.8 - Salient features of Dam, Barrages, Weirs, Anicut, Locks and Aqueducts etc.:-..................................... 24 2.9 - Description of erected Bench mark pillar:- ............................................................................................. 25 2.10- Description of erected Tide Gauges: - ................................................................................................... 26 2.11- Chart Datum / Sounding Datum and Reductions details:- ..................................................................... 27 2.12- High Flood Level (H.F.L.) at known gauge stations and cross-structures: - ......................................... 28 2.13 - Graph: Sounding Datum and HFL vs. Chainage:- ............................................................................... 29 2.14 - Average Slope: - .................................................................................................................................. 30 2.15 -Details of Dam, Barrages, Weirs, Anicut, etc. w.r.t. M.S.L:- ................................................................ 30 2.16- Details of Locks:- ................................................................................................................................... 30 2.17- Details of Aqueducts:- ........................................................................................................................... 31 2.18- Details of existing Bridges and Crossings over waterway: - ................................................................. 31 2.19 - Details of other Cross structures, pipe-lines, and underwater cables: - ................................................ 31 2.20 - High Tension Lines / Electric lines / Tele-communication lines: - ...................................................... 32 2.21 - Current Meter and Discharge details:- .................................................................................................. 32 2.22 - (a) Soil Sample Locations:- .................................................................................................................. 33 (b) Water Sample Locations:- ......................................................................................................................... 34 Section-3: Description of waterway ........................................................................................................... 35 3.1 From Chainage 0.00 Km to Chainage 10.00 Km (Patthar Tola village to Madrauni Pachhiarital village):-35 3.2 From Chainage 10.00 Km to Chainage 20.00 Km (Madrauni Pachhiarital village to Bhaua Parbal village):- 39 3.3 From Chainage 20.00 Km to Chainage 30.00km (Bhaua Parbal village to Dadpur village):- .................. 42 3.4 From Chainage 30.00 Km to Chainage 40.00 Km (Dadpur village to Gobindpur Gobind village):- ....... 46 3.5 Chainage 40.00 Km to Chainage 50.00 Km (Gobindpur Gobind village to Goari village):-.................... 49 Document History: Final Survey Report of River: Kosi, Bihar 4 | P a g e Survey Period: From 10.05.16 to 29.09.16 FINAL SURVEY REPORT “DETAILED HYDROGRAPHIC SURVEY IN KOSI RIVER, BIHAR” (233.040 KM) 3.6 From Chainage 50.00 Km to Chainage 60.00 Km (Goari village to Kapasia village):- ........................... 52 3.7 From Chainage 60.00 Km to Chainage 70.00 Km (Kapasia village to Baltara village):- ......................... 55 3.8 From Chainage 70.00 Km to Chainage 80.00 Km (Baltara village to Murus village):- ........................... 58 3.9 From Chainage 80.00 Km to Chainage 90.00 Km (Murus village to Dhamhara village):- ...................... 62 3.10 From Chainage 90.00 Km to Chainage 100.00 Km (Dhamhara village to Muria village):- ................... 65 3.11 From Chainage 100.00 Km to Chainage 110.00 Km (Muria village to Khochardewa village):- ........... 69 3.12 From Chainage 110.00 Km to Chainage 120.00 Km (Khochardewa village to Ghoghsan village):- ..... 72 3.13 From Chainage 120.00 Km to Chainage 130.00