The Rail User Express. We Continue with the Usual Roundup of News Items from Groups Around the UK. Please Keep Your C
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Railfuture Response to National Infrastructure
RAILFUTURE RESPONSE TO NATIONAL INFRASTRUCTURE COMMISSION RAIL NEEDS ASSESSMENT FOR THE MIDLANDS AND THE NORTH – CALL FOR EVIDENCE FOLLOWING INTERIM REPORT Contribution from Railfuture East Midlands Branch – August 2020 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Interim report https://www.nic.org.uk/wp-content/uploads/RNA-Interim-Report-Final.pdf Introduction: The Railfuture response dated 29th May 2020 to the first round of this consultation https://www.railfuture.org.uk/display2324 placed considerable emphasis on freight. In contributing to the August call for evidence, we in East Midlands Branch: Re-submit our May 2020 Rf EM Branch submission for previous NIC RNA call for evidence. This is on pp6-15 below in red text with a few subsequent additions in blue. Attempt to answer the NIC’s broad questions Q1 to Q4 below. References are to the pages and tables in the NIC’s Interim Report (see header.) Prepared by: Steve Jones, Branch Secretary, Railfuture East Midlands Branch [email protected] including contributions from members of EM Branch. Question 1: Please provide specific sources for evidence that the Commission could use in estimating costs and the impact of proposals on journey time and capacity. For schemes already proposed other than by Railfuture, such as those listed on p36, much information is already available from Network Rail, SNTBs (TfN, Midlands Connect), local and combined authorities, TOCs, DfT. Campaign organisations. For additional schemes put forward by Railfuture, further work would need to be done, though campaign groups such as SENRUG, SELRAP, MEMRAP and CRIL may have initial estimates for specific lines or areas. -
Derwent Valley Line
Prices correct at November 2018 November at correct Prices (Newark) – Nottingham – Derby – Matlock – Derby – Nottingham – (Newark) derbyshire.gov.uk/bline long as one end of your journey is in Derbyshire. in is journey your of end one as long © Matt Jones Matt © . Receive 25% off local train fares as as fares train local off 25% Receive 01629 533190 01629 Derbyshire Call Derbyshire b_line Card Holders Holders Card b_line Derbyshire This publication is available in other formats from from formats other in available is publication This most local bus services (Wayfarer cannot be purchased on the train). the on purchased be cannot (Wayfarer services bus local most eastmidlandstrains.co.uk/derwentvalleyline and other staffed stations, from Tourist Information Centres and on on and Centres Information Tourist from stations, staffed other and 01629 538062 538062 01629 for seniors or child. Tickets can be purchased at Derby, Long Eaton Eaton Long Derby, at purchased be can Tickets child. or seniors for Hall Matlock DE4 3AG. 3AG. DE4 Matlock Hall except on Sundays. Adult tickets £13.00 including one child, £6.50 £6.50 child, one including £13.00 tickets Adult Sundays. on except Council, Economy, Transport and Communities Department, County County Department, Communities and Transport Economy, Council, travel before 0900 Monday to Saturday or on the Transpeak bus bus Transpeak the on or Saturday to Monday 0900 before travel Derwent Valley Line Community Rail Partnership, Derbyshire County County Derbyshire Partnership, Rail Community Line Valley Derwent train services in Derbyshire and the Peak District. Not valid for rail rail for valid Not District. Peak the and Derbyshire in services train day rover tickets are valid on most bus and and bus most on valid are tickets rover day Derbyshire Wayfarer Derbyshire tourism and railway organisations. -
Submissions to the Call for Evidence from Organisations
Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee. -
Derwent Valley Line Line Valley Derwent
Prices correct at April 2019 April at correct Prices derbyshire.gov.uk/bline long as one end of your journey is in Derbyshire. in is journey your of end one as long (Newark) – Nottingham – Derby – Matlock – Derby – Nottingham – (Newark) Receive 25% off local train fares as as fares train local off 25% Receive Derbyshire b_line Card Holders Holders Card b_line Derbyshire purchased on the train). the on purchased © Matt Jones Matt © . Centres and on most local bus services (Wayfarer cannot be be cannot (Wayfarer services bus local most on and Centres 01629 533190 01629 Derbyshire Call This publication is available in other formats from from formats other in available is publication This Derby, Long Eaton and other staffed stations, from Tourist Information Information Tourist from stations, staffed other and Eaton Long Derby, one child, £6.70 for seniors or child. Tickets can be purchased at at purchased be can Tickets child. or seniors for £6.70 child, one eastmidlandstrains.co.uk/derwentvalleyline travel before 0900 Monday to Friday. Adult tickets £13.40 including including £13.40 tickets Adult Friday. to Monday 0900 before travel 01629 538062 538062 01629 train services in Derbyshire and the Peak District. Not valid for rail rail for valid Not District. Peak the and Derbyshire in services train Hall Matlock DE4 3AG. 3AG. DE4 Matlock Hall day rover tickets are valid on most bus and and bus most on valid are tickets rover day Derbyshire Wayfarer Derbyshire Council, Economy, Transport and Communities Department, County County Department, Communities and Transport Economy, Council, Derwent Valley Line Community Rail Partnership, Derbyshire County County Derbyshire Partnership, Rail Community Line Valley Derwent fares (when booked in advance). -
Great Western Route Utilisation Strategy March 2010 Foreword
Great Western Route Utilisation Strategy March 2010 Foreword I am delighted to present the Great Western Development of this strategy has followed Route Utilisation Strategy (RUS), which sets a now well-established process. Initially, an out the strategic vision for the future of this analysis was carried out into the capacity and vital part of the rail network. As well as the capability of the existing network and train Great Western Main Line itself, the strategy services taking into account major changes covers the network north to Ashchurch and planned over the next 10 years. Future Bicester Town and south to Basingstoke, demand was then analysed with a number of Salisbury and Dorchester. “Gaps” identified and options to resolve these gaps appraised. Those which demonstrated This August will see the 175th anniversary the best value for money are included in of the Great Western Railway. Today, that the strategy. railway carries tens of millions of passengers a year through the Thames Valley, the West The dominant issue is the need to provide Country and Wales. Working closely with our sufficient capacity on peak services, train operating customers, Network Rail is specifically to and from London but also for delivering an ever improving service for those Bristol and Exeter. In the short to medium term passengers, and for freight users. the approach focuses on enabling longer trains to serve these routes, particularly through the More people are choosing to travel by train, introduction of IEP, which will increase capacity and high levels of growth are predicted through new rolling stock and an enhanced to continue, particularly around London timetable, but also through train lengthening Paddington and Bristol. -
Strategic Corridor Evidence Base
Transport Strategy for the South East ___ Strategic Corridor Evidence Base Client: Transport for the South East 10 December 2019 Our ref: 234337 Contents Page 4 Introduction 4 Definitions 5 Sources and Presentation 6 Strategic Corridor maps Appendices SE South East Radial Corridors SC South Central Radial Corridors SW South West Radial Corridors IO Inner Orbital Corridors OO Outer Orbital Corridors 3 | 10 December 2019 Strategic Corridor Evidence Base Introduction Introduction Definitions Table 1 | Strategic Corridor definitions 1 This document presents the evidence base 5 There are 23 Strategic Corridors in South East Area Ref Corridor Name M2/A2/Chatham Main Line underpinning the case for investment in the South England. These corridors were identified by SE1 (Dartford – Dover) East’s Strategic Corridors. It has been prepared for Transport for the South East, its Constituent A299/Chatham Main Line SE2 Transport for the South East (TfSE) – the emerging Authorities, and other stakeholders involved in the South (Faversham – Ramsgate) East M20/A20/High Speed 1/South Eastern Main Line SE3 Sub-National Transport Body for South East England development of the Economic Connectivity Review. (Dover – Sidcup) A21/Hastings Line – in support of its development of a Transport Since this review was published, the corridors have SE5 (Hastings – Sevenoaks) A22/A264/Oxted Line Strategy for South East England. been grouped into five areas. Some of the definitions SC1 (Crawley – Eastbourne) and names of some corridors cited in the Economic South M23/A23/Brighton -
Derwent Valley Walks 1
station walks station 4 scenic station to station scenic 4 by using the town map in the inset. inset. the in map town the using by orld Heritage Site Heritage orld W Mills alley V Derwent station is easily followed through some of Old Belper Belper Old of some through followed easily is station River Derwent River This leaflet was produced by Derbyshire County Council for the the for Council County Derbyshire by produced was leaflet This urn left here and the route to the the to route the and here left urn T Lane. Swinney el: (01629) 823204 (01629) el: T TION A ST urn left at the entrance and cross fields to reach reach to fields cross and entrance the at left urn T op Visitor Centre, Visitor op T Middleton DUFFIELD . Cemetery Belper to path a down left soon then right TION INFORMA MORE FOR urn urn T road. main the to on continue and these Ascend footpath which leads eventually to steps on the right. right. the on steps to eventually leads which footpath ALKING! W HAPPY urn left at the first road and soon right onto a a onto right soon and road first the at left urn T left and then on into the housing estate in the distance. the in estate housing the into on then and left MILFORD leaflets’ more two several fields for nearly half a mile to pass a wood on the the on wood a pass to mile a half nearly for fields several in in detailed are walks eight other The . -
The Cranleigh Railway Line
Reinstating Rail and River Routes from Guildford - The Cranleigh Railway Line This article relates to a planning application WA/2020/0004 dated 02 January 2020 and placed before Waverley Borough Council by the Wey and Arun Canal Trust. It concerns the conflicts of interest that arise between various organisations; together with a wider question about transport infrastructure and connectivity at both local and national levels Our colleagues at Gru- Guildford Railway Users Group recently alerted us that a Waverley Council decision is still pending for the planning application to which both Gru, The Guildford Society and others have objected. Since the application date, various transport reports and government announcements have also been made which we feel have a bearing on this decision. Opened In 1816, The Wey & Arun Junction Canal linked the Wey Navigation near Guildford to the south coast via the Arun Navigation. It was intended to provide a safe, efficient route from the River Thames and London to Portsmouth to carry goods supplying the naval dockyards. However, the arrival of the railways led to its demise and by 1871 it was formally closed and over the passing years the canal fell into a state of disrepair and non-use. WACT is gradually trying to reinstate the canal that used to connect these two navigable rivers between the Thames and the South Coast and have had loyal support and much success in restoring many miles of waterway for use by leisure craft. However, a number of canal sections remain to be joined up and the WACT have various projects towards this aim. -
London and South Coast Rail Corridor Study: Terms of Reference
LONDON & SOUTH COAST RAIL CORRIDOR STUDY DEPARTMENT FOR TRANSPORT APRIL 2016 LONDON & SOUTH COAST RAIL CORRIDOR STUDY DEPARTMENT FOR TRANSPORT FINAL Project no: PPRO 4-92-157 / 3511970BN Date: April 2016 WSP | Parsons Brinckerhoff WSP House 70 Chancery Lane London WC2A 1AF Tel: +44 (0) 20 7314 5000 Fax: +44 (0) 20 7314 5111 www.wspgroup.com www.pbworld.com iii TABLE OF CONTENTS 1 EXECUTIVE SUMMARY ..............................................................1 2 INTRODUCTION ...........................................................................2 2.1 STUDY CONTEXT ............................................................................................. 2 2.2 TERMS OF REFERENCE .................................................................................. 2 3 PROBLEM DEFINITION ...............................................................5 3.1 ‘DO NOTHING’ DEMAND ASSESSMENT ........................................................ 5 3.2 ‘DO NOTHING’ CAPACITY ASSESSMENT ..................................................... 7 4 REVIEWING THE OPTIONS ...................................................... 13 4.1 STAKEHOLDER ENGAGEMENT.................................................................... 13 4.2 RAIL SCHEME PROPOSALS ......................................................................... 13 4.3 PACKAGE DEFINITION .................................................................................. 19 5 THE BML UPGRADE PACKAGE .............................................. 21 5.1 THE PROPOSALS .......................................................................................... -
Dorking Transport Package (Phase 1) Submission to Coast to Capital LEP
Dorking Transport Package (Phase 1) Submission to Coast to Capital LEP Surrey County Council December 2014 Coast to Capital Local Transport Body Sustainability and Resilience Schemes Application Form WHO - Scheme Promoter and Partners LTA/ Surrey County Council Scheme name & Dorking Proposer: [District/ Transport Borough]: Package (Phase 1) Mole Valley District Contact Lyndon Mendes Partners [in joint First Great details: [email protected] submissions]: Western WHAT & WHERE – Outline description, scope & maps Type of scheme: Sustainability package Scheme description The project is a package of sustainable transport centred on Dorking Deepdene station. It will improve access to the station, inter- connectivity between this station and Dorking main station, improve road safety and support modal shift away from the private car. C2C Dorking Transport Package (December 2014) Page 1 of 26 Maps HOW MUCH & WHEN – Estimated construction costs and construction timetable Est. Costs: £800,000 Start and end of June 2015 – Phase 1 construction: March 2016 Spend 2015-16: 2016-17: 2017-18 2018-19: 2019-20: 2020-21: Profile (£ million) (£ million) (£ million) (£ million) (£ million) (£ million) £0.8 Funding C2C Capital grant funding £600,000 expectations First Great Western £200,000 (see Annex D First Great Western letter). (List sources of funds) C2C Dorking Transport Package (December 2014) Page 2 of 26 WHY IT SHOULD BE FUNDED Summary of the Key Scheme Benefits Structure of the key scheme benefits 1. Introduction and need for the project (Annex A) 2. Dorking stations phased approach 3. Interchange and Wayfinding (Annex B) 4. Dorking Deepdene and Dorking main stations -walking and cycling improvements 5. -
East Midlands Rail Franchise Stakeholder Briefing Document and Consultation Response
East Midlands Rail Franchise Stakeholder Briefing Document and Consultation Response Driving Growth in the East Midlands June 2018 Stakeholder Briefing Document | East Midlands Rail Franchise Stakeholder Briefing Document | East Midlands Rail Franchise The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website in English and Welsh. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard, please contact the Department: Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website: www.gov.uk/government/organisations/department-for-transport General enquiries: https://forms.dft.gov.uk © Crown copyright 2018 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or write to The Information Policy Team, The National Archives, Kew, London TW9 4DU. Further contact details are available on http://apps.nationalarchives.gov.uk/Contact/ Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Stakeholder Briefing Document | East Midlands Rail Franchise Stakeholder Briefing Document | East Midlands Rail Franchise Contents 1. Foreword Foreword by the Secretary of State 3 2. Introduction What is this document for? 7 3. -
Derwent Valley Line Community Rail Partnership Annual Report 2018-2019
Derwent Valley Line Community Rail Partnership Annual Report 2018-2019 Read About: Restoring historic stations Station adoption projects Improved access to Whatstandwell Marketing initiatives Derby Resignalling project Whistlestop Café opens at Matlock Bath Station In Bloom Award for Belper Duffield Station Garden completed Whatstandwell Access Improvements Launch of Pentrich Revolution Bicentenary Panel Whatstandwell Station Landscaping Message from the Chair This last year has seen major investment, but also significant disruption of the local railway network in and around Derby. These major projects need to take place and from what I saw and understand, the major upgrade to both Derby station and re-signalling all went to plan. The Derwent Valley Line and our passengers were arguably impacted upon more, than any other route. Yet an enhanced level of rail replacement services for the Derwent Valley, which was well organised and promoted, helped to minimise the impact. During the line closure, I am especially pleased that opportunities have been taken locally to carry out significant improvements at local stations to benefit our passengers. The fantastic restoration of the Whistlestop at Matlock Bath, canopy refurbishment at Matlock, platform enhancements at Cromford and smaller scale improvements and maintenance at Whatstandwell, have all made a real positive impact at our stations. Considerable work has gone on behind the scenes by the Community Rail Partnership working with the rail industry and other local stakeholders to ensure that these local enhancements took place, during this window of opportunity. The partnership has also obtained significant funding to help make many of these projects happen. Working with Derbyshire Wildlife Trust, we have brought an additional £40,000 through the rail industry to match Heritage Lottery and others, to enable the long awaited regeneration of the station building.