Chilled Water Plant Design Guide Energydesignresources

Total Page:16

File Type:pdf, Size:1020Kb

Chilled Water Plant Design Guide Energydesignresources Chilled Water Plant Design Guide energydesignresources December 2009 TABLE OF CONTENTS 1. Overview ....................................................................................................................... 1-1 Introduction ................................................................................................................... 1-1 Target Audience .............................................................................................................1-1 Organization of Material ................................................................................................ 1-2 How to Use the Guide ................................................................................................... 1-3 2. Chilled Water Plant Loads ........................................................................................... 2-1 Understanding Loads and Their Impact on Design ........................................................2-1 Peak Loads Overview ..............................................................................................2-3 Annual Load Profiles Overview ...............................................................................2-4 Oversizing / Undersizing Considerations ................................................................ 2-4 Determining Peak Loads ................................................................................................ 2-6 Calculations/Simulations ........................................................................................2-6 Site Measurements ..................................................................................................2-7 Rules of Thumb ......................................................................................................2-8 Determining Hourly Load Profiles .................................................................................2-8 Computer Simulation Models................................................................................. 2-8 Site Measurements ................................................................................................2-10 3. Chilled Water Plant Equipment .................................................................................. 3-1 Introduction ................................................................................................................... 3-1 Water Chillers ................................................................................................................ 3-1 Manufacturer Data .................................................................................................3-1 Refrigeration Cycle .................................................................................................3-2 Refrigerants .............................................................................................................3-3 Water Chiller Components ............................................................................................ 3-5 Compressors ...........................................................................................................3-5 Evaporators ...........................................................................................................3-12 Condensers ...........................................................................................................3-14 Safety Controls, Accessories, and Options ............................................................ 3-15 Performance Characteristics and Efficiency Ratings ..............................................3-18 Heat Rejection ..............................................................................................................3-24 Manufacturer Data ...............................................................................................3-24 Cooling Towers ....................................................................................................3-24 Air-Cooled Refrigerant Condensers ......................................................................3-32 Evaporative Condensers ........................................................................................3-34 Pumps .......................................................................................................................... 3-35 Manufacturer Data ...............................................................................................3-35 Pump Types ..........................................................................................................3-36 Pump Performance Curves ...................................................................................3-37 Selecting Pumps ....................................................................................................3-39 Pump Installation and Operation ......................................................................... 3-44 Variable-Speed Drives ..................................................................................................3-44 Manufacturer Data ...............................................................................................3-45 Power Quality Issues .............................................................................................3-46 Drive System Efficiency ........................................................................................3-46 VSD Accessories and Considerations .................................................................... 3-47 COOLTOOLS™ CHILLED WATER PLANT DESIGN GUIDE - TABLE OF CONTENTS i 4. Hydronic Distribution Systems ................................................................................... 4-1 Chilled Water Systems ................................................................................................... 4-1 Introduction ...........................................................................................................4-1 Constant-Flow Chilled Water Systems ................................................................... 4-2 Variable-Flow Chilled Water Systems .....................................................................4-7 Variable-Flow System Design Considerations .......................................................4-16 Condenser Water Systems ............................................................................................ 4-33 Introduction .........................................................................................................4-33 Choosing the Style of Cooling Tower ...................................................................4-33 Locating the Condenser Water Pumps.................................................................. 4-34 Piping Multiple Chillers and Cooling Towers ...................................................... 4-36 Piping for Waterside Economizers ........................................................................ 4-40 Auxiliary Condenser Water Circuits ..................................................................... 4-42 Piping Heat Recovery Options ............................................................................. 4-43 5. Controls and Instrumentation ..................................................................................... 5-1 Introduction ................................................................................................................... 5-1 Choosing Instrumentation Control and Monitor Points .........................................5-1 Point Justification ...................................................................................................5-1 Operating Environment for Controls and Instrumentation .................................... 5-2 Network Connections to Equipment Instrumentation............................................ 5-2 Sensors ........................................................................................................................... 5-3 Typical End to End Accuracy Requirements ...........................................................5-3 Temperature Sensors ...............................................................................................5-4 Humidity Sensors ...................................................................................................5-6 Liquid Flow Sensors ................................................................................................5-7 Pressure Sensors ......................................................................................................5-9 Electric Current Sensors ........................................................................................5-10 Electric Power Sensors ..........................................................................................5-11 Gas Flow Sensors ..................................................................................................5-13 Control Valves ..............................................................................................................5-14 Valve Types ..........................................................................................................5-14 Valve Selection Criteria .........................................................................................5-15 Controllers ................................................................................................................... 5-17 Minimum DDC Controller requirements ............................................................ 5-17 Interfacing with Chillers and Chiller Networks .................................................... 5-18
Recommended publications
  • Advanced Heat Pump Systems Using Urban Waste Heat “Sewage Heat”
    Mitsubishi Heavy Industries Technical Review Vol. 52 No. 4 (December 2015) 80 Advanced Heat Pump Systems Using Urban Waste Heat “Sewage Heat” YOSHIE TOGANO*1 KENJI UEDA*2 YASUSHI HASEGAWA*3 JUN MIYAMOTO*1 TORU YAMAGUCHI*4 SEIJI SHIBUTANI*5 The application of heat pumps for hot water supply and heating systems is expected. Through this, the energy consumption of hot water supply and heating, which account for a substantial proportion of the total energy consumption in a building, will be reduced. The level of reduction can be dramatically increased by use of "sewage heat," which is part of waste heat in an urban area. So far, however, it has been difficult to determine whether sufficient technical or basic data available to widely use sewage heat exists. Therefore, demonstrations on the evaluation method for the potential of sewage heat in an urban area and the actual- equipment scale of verification using untreated sewage were conducted to understand the characteristics of sewage heat, and major technologies for use of sewage heat were developed. The technologies were applied to the system using sewage heat, and the system achieved a 29% reduction in the annual energy consumption and a 69% reduction in the running cost in the hot water system in lodging facilities compared to the conventional system using a boiler. The depreciation timespan of the difference in the initial cost between the conventional system and the heat pump system is about four years, and this system has an economically large advantage. In this report, the results obtained through the development and the demonstrations are systematically organized and the technical information needed for introduction of use of sewage heat is provided.
    [Show full text]
  • World Bank Document
    WATER GLOBAL PRACTICE QUALITY UNKNOWN BACKGROUND PAPER Public Disclosure Authorized Determinants of Public Disclosure Authorized Essayas Ayana Declining Water Quality Public Disclosure Authorized Public Disclosure Authorized About the Water Global Practice Launched in 2014, the World Bank Group’s Water Global Practice brings together financing, knowledge, and implementation in one platform. By combining the Bank’s global knowledge with country investments, this model generates more firepower for transformational solutions to help countries grow sustainably. Please visit us at www.worldbank.org/water or follow us on Twitter at @WorldBankWater. About GWSP This publication received the support of the Global Water Security & Sanitation Partnership (GWSP). GWSP is a multidonor trust fund administered by the World Bank’s Water Global Practice and supported by Australia’s Department of Foreign Affairs and Trade, the Bill & Melinda Gates Foundation, the Netherlands’ Ministry of Foreign Affairs, Norway’s Ministry of Foreign Affairs, the Rockefeller Foundation, the Swedish International Development Cooperation Agency, Switzerland’s State Secretariat for Economic Affairs, the Swiss Agency for Development and Cooperation, U.K. Department for International Development, and the U.S. Agency for International Development. Please visit us at www.worldbank.org/gwsp or follow us on Twitter #gwsp. Determinants of Declining Water Quality Essayas Ayana © 2019 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org This work is a product of the staff of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent.
    [Show full text]
  • Mechanical Systems Water Efficiency Management Guide
    Water Efficiency Management Guide Mechanical Systems EPA 832-F-17-016c November 2017 Mechanical Systems The U.S. Environmental Protection Agency (EPA) WaterSense® program encourages property managers and owners to regularly input their buildings’ water use data in ENERGY STAR® Portfolio Manager®, an online tool for tracking energy and water consumption. Tracking water use is an important first step in managing and reducing property water use. WaterSense has worked with ENERGY STAR to develop the EPA Water Score for multifamily housing. This 0-100 score, based on an entire property’s water use relative to the average national water use of similar properties, will allow owners and managers to assess their properties’ water performance and complements the ENERGY STAR score for multifamily housing energy use. This series of Water Efficiency Management Guides was developed to help multifamily housing property owners and managers improve their water management, reduce property water use, and subsequently improve their EPA Water Score. However, many of the best practices in this guide can be used by facility managers for non-residential properties. More information about the Water Score and additional Water Efficiency Management Guides are available at www.epa.gov/watersense/commercial-buildings. Mechanical Systems Table of Contents Background.................................................................................................................................. 1 Single-Pass Cooling ..........................................................................................................................
    [Show full text]
  • Thermal Desalination Using MEMS and Salinity-Gradient Solar Pond Technology
    Thermal Desalination using MEMS and Salinity-Gradient Solar Pond Technology University of Texas at El Paso El Paso, Texas Cooperative Agreement No. 98-FC-81-0047 Desalination Research and Development Program Report No. 80 August 2002 U.S. Department of the Interior Bureau of Reclamation Technical Service Center Water Treatment Engineering and Research Group Form Approved REPORT DOCUMENTATION PAGE OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suit 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Report (0704-0188), Washington DC 20503. 1. AGENCY USE ONLY (Leave Blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED August 2002 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Thermal Desalination using MEMS and Salinity-Gradient Solar Pond Technology Agreement No. 98-FC-81-0047 6. AUTHOR(S) Huanmin Lu, John C. Walton, and Herbert Hein 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER University of Texas at El Paso El Paso, Texas 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING/MONITORING Bureau of Reclamation AGENCY REPORT NUMBER Desalination Research and Denver Federal Center Development Program Report No.
    [Show full text]
  • Analysis and Optimization of Open Circulating Cooling Water System
    water Article Analysis and Optimization of Open Circulating Cooling Water System Ziqiang Lv 1,2,3, Jiuju Cai 2, Wenqiang Sun 1,2,* and Lianyong Wang 1,2 1 Department of Thermal Engineering, School of Metallurgy, Northeastern University, Shenyang 110819, Liaoning, China; [email protected] (Z.L.); [email protected] (L.W.) 2 State Key Laboratory of Eco-Industry, Northeastern University, Shenyang 110819, Liaoning, China; [email protected] 3 School of Civil Engineering, University of Science and Technology Liaoning, Anshan 114051, Liaoning, China * Correspondence: [email protected] Received: 22 September 2018; Accepted: 26 October 2018; Published: 7 November 2018 Abstract: Open circulating cooling water system is widely used in process industry. For a system with a fixed structure, the water consumption and blowdown usually change with the varying parameters such as quality and temperature. With the purpose of water saving, it is very important to optimize the operation strategy of water systems. Considering the factors including evaporation, leakage, blowdown and heat transfer, the mass and energy conservation equations of water system are established. On this basis, the quality and temperature models of makeup and blowdown water are, respectively, developed. The water consumption and discharge profiles and the optimal operating strategy of the open recirculating cooling water system under different conditions are obtained. The concept of cycles of temperature is proposed to evaluate the temperature relationship of various parts of the open circulating cooling water system. A mathematical relationship is established to analyze the influence of the water temperature on the makeup water rate of the system under the condition of insufficient cooling capacity of the cooling tower.
    [Show full text]
  • Reclaiming Resources: Reducing Water Consumption Through Reuse
    Reclaiming Resources: Reducing Water Consumption through Reuse Although water reuse can be energy-intensive, its use is increasing across numerous industries By: Al Goodman Al Goodman is a principal with 42 years of experience serving clients in water reuse projects at the Louisville, Ky., office of CDM Smith (Boston). Communities and industries around the world are turning to water reuse. The drivers are varied: the need to augment strained water supplies, reduce nutrients in treated effluent, maintain ecological balance, use the most energy-efficient water sources, and reduce cost of purchased and treated water. The major driver is water scarcity in arid and semi-arid regions, though some regions of the world that are not considered to be water-scarce are implementing water reuse. Ecological drivers are becoming more important in evaluating reuse as part of a response to rigorous and costly requirements to reduce or remove nutrients (mainly nitrogen and phosphorus) from discharges to surface waters. Though water reuse can be energy-intensive, depending on the level of treatment required, only a full life-cycle analysis can reveal whether overall resource costs are greater than or less than alternative water supplies. Municipalities are implementing various types of urban water reuse and turning to industry and agriculture as potential customers of reclaimed water. Categories of water reuse applications are presented in the table. This article focuses on considerations relevant for municipal and industrial reuse. For more information on the full range of categories of reuse, refer to the U.S. Environmental Protection Agency’s Guidelines for Water Reuse (2012; http://nepis.epa.gov/Adobe/ PDF/P100FS7K.pdf).
    [Show full text]
  • Temperature & Humidity Control in Surgery Rooms
    This article was published in ASHRAE Journal, June 2006. Copyright 2006 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE. For more information about ASHRAE Journal, visit www.ashrae.org. Health-Care HVAC Temperature & Humidity Control In Surgery Rooms By John Murphy, Member ASHRAE requirements. This analysis focuses on cooling and dehumidification; heating ccupant comfort, infection control, and drying of mucous and humidification are not addressed. coating are some reasons why temperature and humidity Impact on HVAC System Design O The temperature and humidity control control are important in surgery rooms.1 Temperature and humid- requirements for a surgery room, along with the high air change rate, significantly ity ranges, and minimum air-change rates often are prescribed by impact the design of the HVAC system. Using a rule of thumb (such as 400 local codes or by industry-accepted guidelines (Table 1). cfm/ton [54 L/s per kW]) or a traditional temperature-only design approach often Surgeons also have preferences when in Farmington, Maine, said, “We always leads to a system that is unable to meet it comes to temperature and humidity had problems being able to satisfy the requirements. conditions. Reasons for these prefer- surgeons, who wanted the temperature at The American Institute of Architects ences range from personal comfort while 62°F to 65°F (17°C to 18°C), while the (AIA) design guidelines2 recommend 15 dressed in heavy surgery clothing to the anesthesiologists and other staff wanted air changes per hour (ACH) of supply air perception of superior procedure success higher temperatures.” 4 for a surgery room, and 20% of that sup- rates.
    [Show full text]
  • GUIDE to INSULATING CHILLED WATER PIPING SYSTEMS with MINERAL FIBER PIPE INSULATION 33°F to 60°F (0.5°C to 15.6°C)
    GUIDE TO INSULATING CHILLED WATER PIPING SYSTEMS WITH MINERAL FIBER PIPE INSULATION 33°F to 60°F (0.5°C to 15.6°C) First Edition Copyright ©2015 NAIMA, ALL RIGHTS RESERVED GUIDE TO INSULATING CHILLED WATER PIPING SYSTEMS WITH MINERAL FIBER PIPE INSULATION 33°F to 60°F (0.5°C to 15.6°C) First Edition, 2015 Guide to Insulating Chilled Water Systems First Edition, 2015 CONTENTS PREFACE APPENDIX A-1 I Mineral Fiber Pipe Insulation . ii I Information Sources and References . A-2 I Vapor Retarder Jacketing Systems . ii I ASHRAE - American Society of Heating, Refrigerating, I Mineral Fiber Pipe Insulation Standards . ii and Air-Conditioning Engineers, Inc. A-2 I How This Guide Was Developed . ii i I ASTM - American Society for Testing and Materials . A-2 I ICC - International Code Council, Inc. A-2 SECTION 1: PERFORMANCE CRITERIA 1-1 I The National Research Council (NRC) . A-2 I I Role of Pipe Insulation . 1-2 NAIMA - North American Insulation Manufacturers Association . A-2 I Role of Pipe Insulation for Chilled Water Systems I 33°F to 60°F (0.5°C to 15.6°C) . 1-2 NFPA - National Fire Protection Association . A-2 I I General Requirements for Mineral Fiber Pipe National Institute of Building Sciences . A-2 Insulation in Chilled Water Applications . 1-2 I National Insulation Association . A-2 I Thermal Conductivity . 1-2 I ASHRAE Standard 90.1 Minimum Pipe Insulation I Standard Specification for Mineral Fiber Pipe Thickness Recommendations . A-3 Insulations (ASTM C547) . 1-3 I IECC Minimum Pipe Insulation Thickness I Specifications, Performance & Test Standards Recommendations .
    [Show full text]
  • Modified Version of High Efficiency Dehumidification System (HEDS) ESTCP Presentation EW-201344
    FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR November 3-4, 2015 Houston, TX Modified Version of High Efficiency Dehumidification System (HEDS) ESTCP Presentation EW-201344 Hosted by: Original Presentation by: Dahtzen Chu U.S. Army Construction Engineering Research Laboratory Scot Duncan, PE, Retrofit Originality, Inc. Omar Chamma, Trane What We’ll Discuss • This presentation will discuss several different methods that are currently utilized for Relative Humidity (RH) control in DoD facilities and some of their comparative strengths and weaknesses. • The main focus of the discussion will be on the “High Efficiency Dehumidification System” or “HEDS” that is in the process of undergoing testing thru the ESTCP process. • The appendices contain FAQ’s and Psychrometric charts for typical reheat and recuperative designs. Federal Utility Partnership Working Group November 3-4, 2015 Houston, TX Comparative Baselines at DoD and Nationally Baseline for the demonstrated technology comes in several variations. 1. Simplest and most widespread comparative baseline system consists of an AHU with a chilled water or DX refrigerant sourced cooling coil that cools the air down to between 52F and 55F. 1. Removes moisture from the air via condensation, then utilizes a heating coil, either sourced by hot water or an electric reheat coil to raise the supply air temperature to lower the Relative Humidity of the air entering the spaces, drying the spaces out. 2. AHU’s equipped with Run Around coils for reheat duty in various configurations: 1. Upstream of main Cooling Coil (CC) to downstream of main CC, 2. Exhaust air to Supply air, (does not reduce plant energy in this configuration) 3.
    [Show full text]
  • With Chilled Water Systems Get Precise Cooling and Control for Research and Institutional Greenhouse Growing with Chilled Water Cooling Systems
    Control Cooling with Chilled Water Systems Get precise cooling and control for research and institutional greenhouse growing with chilled water cooling systems. Researchers and institutional greenhouse growers need precision, efficiency and reliability in cooling and control. Because this type of growing demands tightly controlled environments, many institutions turn to chilled water cooling. How Greenhouse Chilled Water vs. Cooling Works Evaporative Cooling Hydronics uses water as the heat-transfer medium in Many commercial greenhouses rely on evaporative cooling heating and cooling systems. Large-scale commercial and to cool air to about 10 to 20 degrees below the outside institutional buildings may include both a chilled and heated temperature. These systems lower air temperature using water loop for heating and air conditioning. While boilers mists, sprays, or wetted pads, because they introduce heat the water, chillers and cooling towers are often used water into ventilation air – increasing the relative humidity separately or together to cool the water. while lowering the air temperature. Chilled water cooling is a hydronic process that circulates While this is generally an efficient process, evaporative cooling chilled water through a loop piping system. Circulator is limited by the relative humidity of the outside air introduced pumps force the water through a heat exchanger, and a fan into the greenhouse. Under these conditions, evaporative draws warm air out and cools it as it passes over cold coils. cooling cannot provide effective space temperature control of the greenhouse under all operating conditions. Flexibility and Controlled Climate Growing The Delta T Solutions’ chilled water system uses hydronic cooling to precisely control greenhouse space temperature For flexibility, a chilled water system can be broken up into and humidity.
    [Show full text]
  • HVAC Water Systems
    HVAC Water Systems Dual Temperature Chilled Water Loops Summary Chiller energy can account for 10 to 20% of total cleanroom energy use. The majority of annual chilled water use goes to medium temperature chilled water requirements – 55°F for sensible cooling and 60 to 70°F for process cooling loads. When outside air temperatures are cool and humidity is low (i.e., no low-temperature water is needed for dehumidification), 100% of the chilled water is for medium temperature loop uses. Standard cleanroom chiller plant design provides chilled water at temperatures of 39 to 42°F. While this temperature is needed for dehumidification, the low setpoint imposes an efficiency penalty on the chillers. Typically, heat exchangers and/or mixing loops are used to convert the low temperature, energy intensive chilled water into warmer chilled water temperatures for sensible or process cooling loads. Chiller efficiency is a function of the chilled water supply temperature. All other things equal, higher chilled water temperatures result in improved chiller efficiency. For example, by dedicating a chiller in a dual chiller plant to provide chilled water at 55°F, 20 to 40% of chiller energy and peak power can be saved when compared to both chillers operating at 42°F. Table 1. Chiller Efficiency Chilled Water Supply Efficiency Temperature 42°F 0.49 kW/ton 60°F 0.31 kW/ton 1. The chiller efficiency reported is based on manufacturer’s simulated data of the same chiller. The water-cooled chiller was simulated running at 100% full load and had a condenser water supply temperature 70°F in both cases.
    [Show full text]
  • Barwon Water Biosolids Management Project Operations
    BARWON WATER BIOSOLIDS MANAGEMENT PROJECT OPERATIONS Paper Presented by: Tony Davies Author: Tony Davies, Operations Manager Barwon Water Biosolids Management Project, Water Infrastructure Group 77th Annual WIOA Victorian Water Industry Operations Conference and Exhibition Bendigo Exhibition Centre 2 to 4 September, 2014 77th WIOA Victorian Water Industry Operations Conference & Exhibition Page No. 70 Bendigo Exhibition Centre, 2 to 4 September, 2014 BARWON WATER BIOSOLIDS MANAGEMENT PROJECT OPERATIONS Tony Davies, Ops Manager Barwon Water Biosolids Mgmt Project, Water Infrastructure Group ABSTRACT The Barwon Water Biosolids Management Facility is the first of its kind in Australia, and the largest in the Southern Hemisphere and has now been operating for 18 months. The innovative, small footprint, fully enclosed thermal drying plant produces T1 Treatment Grade pelletised biosolids that are suitable for reuse as farm fertilizer and soil conditioner that can be safely handled and easily transported immediately after processing. T1 classification for biosolids is the microbiological criteria and measure used to inhibit bacterial regrowth and odour. T1 is the highest classification. The plant operates 24/7 and has capacity to treat 60,000 tonne of biosolids per annum. The plant receives biosolids at >13% from seven wastewater treatment plants in the Geelong region and produces pellets at >90% dry solids. The Facility is one of the projects in the water sector to be delivered as a Public Private Partnership. Water Infrastructure Group designed
    [Show full text]