PPP CELL, GOVERNMENT OF Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement Bidding 1 - 4 lane (from 2- Annuity . Road 78.52Bidding MP AKVN Ltd., Indore 2008-2009 17 / (14-08-2013) Concessional lane) 13.826 kms agreement has been executed on 30-09- 2014, concessional period upto 04-06- 2030. As per MPIDC letter No.MPIDC/CE/2021/7 36 dated 03-02-2021, project running successylly. SLEC on 14-Aug-13. Cleared for annuity, though proposed for t+a

2 Eco-Tourism Adventure Park - BOT Indore Tourism 50Bidding Forest Department, GoMP 2012-2013 / (15-02-2013) MPPDF assistance Ralamandal, Indore approved

3 Water-based Tourism DBFOT . Vill Tourism 10Bidding MP Tourism Development 2010-2011 3 / (17-01-2011) (final approval). Bids activities on Indira Sagar Dam - Hanvantiya Corporation invited 1 4 Water-based Tourism DBFOT Khandwa. Vill Tourism 10Bidding MP Tourism Development 2010-2011 3 / (17-01-2011) (final approval). Bids activities on Indira Sagar Dam - Hanvantiya Corporation invited II 5 ADB Pilot - 24x7 and NRW OMT Indore Water Supply 13.94 Bidding Indore Municipal Corporation 2007-2008 / NA RFP last date 15-jan- Water reduction 11. HC granted stay on the project. Single-bid tender cancelled. Rebid on 22-8-12, single bid, rejected for high cost on 30-Jan-13 by PMU, Project UDAY Re-appt of TA proposal sent to MIC, approval awaited

6 Logistics Hub in Katni DBFOT Katni Warehousing 125 Bidding MP State Warehousing and 2015-2016 27 / (23-05-2015) In-principle approval, and Logistics Logistics Corporation final approval accorded for the project by SLEC dated 8-6-2016.

7 - SH 28, 36.15 OMT Bhopal-Vidisha Road 16.22Bidding MP Road Development 2019-2020 34 / (17-12-2019) Approved KM Corporation Ltd. 8 -Mangod SH 37, OMT Road 18.89Bidding MP Road Development 2019-2020 34 / (17-12-2019) Approved 50.41 KM Corporation Ltd. 9 -Rajgarh-Bagh SH OMT Dhar-Rajgarh Road 18.83Bidding MP Road Development 2019-2020 34 / (17-12-2019) In-Principal NH- 65, 50.23 KM Corporation Ltd. Approved 10 Damoh-Hata-Gaisabad SH 55, OMT Damoh Road 28.18Bidding MP Road Development 2019-2020 34 / (17-12-2019) In-Principal NH- 73.42 KM Corporation Ltd. Approved PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 11 Shivpuri-Pohari-Karhal-Goras OMT Shivpuri-Sheopur Road 33.4Bidding MP Road Development 2019-2020 34 / (17-12-2019) In-Principal NH- SH 51, 85.40 KM Corporation Ltd. Approved 12 Badwah- SH 36, OMT -Dhar Road 29.96Bidding MP Road Development 2019-2020 34 / (17-12-2019) Approved 61.92 KM Corporation Ltd. Completed 13 Development of Input-Based OMT Sagar. Energy 30Completed MP Poorv Kshetra Vidyut 2011-2012 / (02-01-2012) Levelised input rate Electricity Distribution System Vitran Co Ltd, Jabalpur Rs. 3.726/kWh in Sagar

14 Construction of 400 KV DBFOT Multiple Energy 282.7Completed MP Power Transmission Co 2011-2012 10 / (02-01-2012) 20+15% Not claimed Planning Commiss Satpura-Ashta DCDS Ltd, Jabalpur Model coz of State Transmission line Project for suitability and VGF Evacuationb of Power from (20+15% for O&M 2x250 MW Extension units at support). LI identified Satpura through PPP Mode (60.75 crs). LoA on 26- Apr-13 to Kalpataru Power Trans Ltd, amended 29-May-13. Project completed and achieved commercial operation on 07-04-2015.

15 Development of Input-Based OMT Ujjain. Energy 70Completed MP Pashchim Kshetra Vidyut 2011-2012 10 / (02-01-2012) Levelised input rate Electricity Distribution System Vitran Co Ltd, Indore Rs. 3.781/kWh in Ujjain

16 Development, Operaration & BOT Multiple. Warehousing 249.92 Completed MP State Warehousing and 2013-2014 19 / (05-02-2014) 20% Not claimed DEA/GoI accorded in maintenance of Steel Silos for and Logistics Logistics Corporation principal approval for wheat (10) 50,000 MTonne 20% VGF. The capacity each Committee recommended the project for in-principle approval by the Cabinet.

17 Eco-tourism park at Arnia BOT Dewas. Vill Arnia Tourism 1Completed MP Ecotourism Development 2009-2010 / (18-01-2010) CA signed 19/05/2010, near Sonkatch (4.5 Hect) Board Date of commencement of work 23/04/2011, COD on 15/08/2013, Concessionaire - M/S Purusarth Engineers & Consultants, Bhopal

18 Fitness Centre O & M of OMT Bhopal. Urban 1Completed Capital Project Administration, 2010-2011 22 / NA CA signed 11 Feb 2011 Prakash Swimming Pool Bhopal 19 Kalpana Nagar Swimming Pool OMT Bhopal. Urban 1Completed Capital Project Administration, 2011-2012 / NA CA signed 11 Feb 2012 O&M Bhopal PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 20 Gwalior to MP/UP Border BOT Road 314.53Completed MP Road Development 2010-2011 / (13-12-2010) CA on 13-12-10 with (Bhind) 2-lane with paved Corporation Ltd. MP Highways Ltd. shoulder (NH-92) 108.00 kms Govt contrib 27 cr

21 - Harda- BOT Road 81Completed MP Road Development 2005-2006 / NA Khandwa intermediate lane Corporation Ltd. (SH-15) 185.00 kms 22 Hoshangabad-Piparia- BOT Road 57Completed MP Road Development 2003-2004 / NA Pachmarhi (SH-22 & 19) Corporation Ltd. 126.00 kms 23 Indore-Edelabad 2-lane (SH- BOT Road 124.05Completed MP Road Development 2003-2004 / NA 27) 203.00 kms Corporation Ltd. 24 Indore-Ujjain 4-lane (SH-27) BOT Road 298Completed MP Road Development 2010-2011 / NA Premium 26.38% of 48.85 kms Corporation Ltd. toll on COD 25 Jabalpur-Narsinghpur-Piparia BOT Road 74.96Completed MP Road Development 2006-2007 / NA intermediate lane (SH-22) Corporation Ltd. 140.00 kms 26 Jaora-Nayagaon section 4- BOT Road 425.71Completed MP Road Development 2011-2012 / NA 15.39 crs lane (SH-31) 127.81 kms Corporation Ltd. premium/year. 94% completed 27 Lebad (SH-31 )-Narayanpura- BOT Road 200.1Completed MP Road Development 2009-2010 / (02-09-2009) Premium 1.01. CA Digthan-Manpur (NH-3) 4- Corporation Ltd. signed on 04/05/2010 lane 34.30 kms

28 Lebad-Jaora section 4-lane BOT Road 589.31Completed MP Road Development 2011-2012 / NA Premium 4.76% of toll (SH-31) 125.00 kms Corporation Ltd. on COD 29 Manawar-Singhana 2-lane BOT Dhar. Road 96.73Completed MP Road Development 2011-2012 7 / (14-07-2011) 27.32 8.41 Crore GoMP VGF (20+14 for O&M) (MDR) 38.23 kms Corporation Ltd. Share 30 Mandsaur-Pratapgarh- BOT(T+A) Road 19.45Completed MP Road Development 2010-2011 1 / (13-12-2010) Annuity 1.17 cr. 86% Rajasthan Border Corporation Ltd. complete intermediate lane (SH-14) 11.526 kms 31 Mandsaur-Sitamau (upto BOT Mandsaur Road 42.34Completed MP Road Development 2008-2009 / NA Toll started on 05 Feb Rajasthan border) 2-lane (SH- Corporation Ltd. 2009 14) 44.00 kms 32 Matkuli-Tamia-Chhindwara 2- BOT Road 213.25Completed MP Road Development 2009-2010 / NA Toll started on 19 lane (SH-19) 112.00 kms Corporation Ltd. March 2010 on 33.38 km 33 -Ghata Billod 4-lane (SH-BOT Road 186.61Completed MP Road Development 2010-2011 4 / (26-02-2011) 25% complete 27) 26.88 kms Corporation Ltd. 34 -Punasa- 2- BOT(T+A) Khandwa Road 124.77Completed MP Road Development 2011-2012 7 / (14-07-2011) lane (MDR) 67.63 kms Corporation Ltd. 35 -Rahatgarh 2-lane (SH- BOT Road 57.72Completed MP Road Development 2006-2007 / NA 42) 101.40 kms Corporation Ltd. 36 Rewa-Shahdol-Amarkantak BOT Road 111.27Completed MP Road Development 2006-2007 / NA intermediate lane (SH-9 & 9A) Corporation Ltd. 246.00 kms

37 Sagar-Damoh 2-lane (SH-14) BOT Road 116.5Completed MP Road Development 2008-2009 / (26-07-2008) 44.28 Crore 20.94 GoMP VGF 44.28. 89.16% 98.90 kms Corporation Ltd. Share released completed PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 38 Sardarpur 2-lane BOT(T+A) Road 91.69Completed MP Road Development 2010-2011 4 / (26-02-2011) Annuity 4.71 cr. 100% With ref. to (SH-35) 42.98 kms Corporation Ltd. complete. 28th SLEC lt.No.7370/195- held on 27-02-2016, 2/MIS dt.30-8- approved revised 2019, inform on project cost from completion 86.75 Crore to 91.69 Crore. Change in project cost be borne by developer and MPRDC as per clause 16.3.2 of Concession agreement.

39 Satna-Maihiar-Umaria BOT Road 53.29Completed MP Road Development 2006-2007 / NA intermediate lane (SH-11) Corporation Ltd. 141.00 kms 40 Seoni-Balaghat-Gondia (SH-26 BOT Road 59.8Completed MP Road Development 2005-2006 / NA & 11) 114.00 kms Corporation Ltd. 41 Silwani-Sultanganj-Sagar 2- BOT(T+A) Road 121.51Completed MP Road Development 2011-2012 5 / (15-04-2011) Annuity to be not lane (SH-15) 76.00 kms Corporation Ltd. more than 16% of TPC. Annuity 9.49 cr. 60% complete 42 Sitamau-Basia-Suwasara BOT(T+A) Mandsaur Road 54.26Completed MP Road Development 2011-2012 7 / (14-07-2011) intermediate lane (MDR) Corporation Ltd. 34.97 kms 43 Tikamgarh-Maheroni 2-lane BOT(T+A) Road 29.38Completed MP Road Development 2010-2011 1 / (13-12-2010) Annuity 1.44 cr. 2% (SH-37) 15.7 kms Corporation Ltd. complete 44 Ujjain-Jhalawad intermediate BOT Road 66.7Completed MP Road Development 2003-2004 / NA lane (SH-27) 134.00 kms Corporation Ltd.

45 Ujjain-Unhel-Nagda-Ghiloda BOT Road 189.29Completed MP Road Development 2009-2010 / (03-07-2009) Premium 1.01 Crore. Road 2-lane (MDR) 95.22 kms Corporation Ltd. CA signed on 06/05/2010. 69% complete 46 AB Road-Magarkhedi-Bamri Annuity Khargone Road 17.19Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 12.61 kms Corporation Ltd. 47 - (MDR) 32.11 Annuity Alirajpur Road 45.31Completed MP Road Development 2011-2012 7 / (14-07-2011) kms Corporation Ltd. 48 Ankhiya-Barkheda- Annuity Bhopal Road 14.13Completed MP Road Development 2011-2012 7 / (14-07-2011) Dongargaon-Nazirabad (MDR) Corporation Ltd. 10.40 kms 49 Ashapur-Khalwa-Singot (MDR) Annuity Khandwa Road 56.9Completed MP Road Development 2011-2012 7 / (14-07-2011) 41.70 kms Corporation Ltd. 50 Ashoknagar-Vidisha (MDR) BOT(T+A) Ashoknagar Road 87.06Completed MP Road Development 2011-2012 7 / (14-07-2011) VGF Not claimed VGF (20+20 for O&M). 35.68 kms Corporation Ltd. Re-SLEC on 25-Apr-12 for Annuity+Toll

51 Badnavvar- (SH-18) BOT(OMT) Road 10.38Completed MP Road Development 2012-2013 12 / (25-04-2012) Toll only on comm 78.80 kms Corporation Ltd. vehicle, from 45 day

52 Badwah-Katekut (MDR) 23.60 Annuity Khargone Road 34.99Completed MP Road Development 2011-2012 7 / (14-07-2011) kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 53 Bahari-Hanumana (MDR) BOT(T+A) Rewa/Sidhi Road 106.78Completed MP Road Development 2011-2012 7 / (14-07-2011) 49.28 kms Corporation Ltd. 54 Bamkhlafata-Dogawa- Annuity Khargone Road 33.99Completed MP Road Development 2011-2012 7 / (14-07-2011) Viaborawa-Savardevala Corporation Ltd. (MDR) 24.00 kms 55 Barwah-Dhamnod (SH-38) BOT(OMT) Road 22.69Completed MP Road Development 2012-2013 12 / (25-04-2012) Toll only on comm With ref. to 61.927 kms Corporation Ltd. vehicle, from 45 day lt.No.7370/195- 2/MIS dt.30-8- 2019, inform on completion 56 -Pati-Bokrata Annuity Road 47.01Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 34.00 kms Corporation Ltd. 57 Beed-Mundi-Devala-Khutala- Annuity Khandwa Road 52.39Completed MP Road Development 2011-2012 7 / (14-07-2011) Attot-NVDA (MDR) 37.00 kms Corporation Ltd.

58 Rewa-Hanumana 4-Lane BOT Road 776.23Completed MP Road Development 2012-2013 / NA MP/UP Border (NH-7) 89.30 Corporation Ltd. kms 59 Betul-Atner (MDR) 34.50 kms Annuity Betul Road 45.39Completed MP Road Development 2011-2012 7 / (14-07-2011) Corporation Ltd. 60 Betul-Sarni-Tikadhan- BOT(T+A) Jabalpur Road 243.24Completed MP Road Development 2010-2011 / (30-08-2010) VGF+Deemed Not claimed VGF+Deemed Shadow Junnardeo-Parasiya 2-lane (SH- Corporation Ltd. Shadow Fee not over 50% of 43) 124.10 kms TPC. Re-SLEC on 08- Feb-13 for (t+a) mode, since CA signed on 12- May-11 terminated coz no FC achieved. No bid in Jun 2012 and in Sep 2012. Concession changed from 25 to 15

61 Bhopal bypass 4 lane 52.00 BOT Road 276.56Completed MP Road Development 2010-2011 / NA Initial CA terminated. kms Corporation Ltd. New agreement signed on 18.11.2010. Premium 21 crs. 98% completed

62 Bijawad-Kushmaniya-Haran- Annuity Dewas Road 109.08Completed MP Road Development 2011-2012 7 / (14-07-2011) Deepgaon (MDR) 75.62 kms Corporation Ltd.

63 Bina-- 2-lane (SH- BOT Road 95.1Completed MP Road Development 2010-2011 / NA VGF 36.68 Premimum VGF 36.68 cr 14) 57.10 kms Corporation Ltd. Crore quated, not sanctioned, but claimed premium quoted 1.06 cr. CAon 23.11.2010. 17% complete PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 64 Damoh-Katni 2-Iane (SH-14) BOT(T+A) Damoh/Katni Road 272.07Completed MP Road Development 2011-2012 11 / (24-02-2012) VGF Not claimed VGF 40% (20% GoMP 117.93 kms Corporation Ltd. share as O&M support). Re-SLEC on 08-Feb-13 for (t+a) mode, since no bid in Jul 2012 under earlier VGF mode, even after extension up to Aug 2012. Concession changed from 30 to 15

65 Damoh-Patharia-Garhakota BOT(T+A) Damoh Road 71.88Completed MP Road Development 2011-2012 7 / (14-07-2011) With ref. to (MDR) 40.50 kms Corporation Ltd. lt.No.7370/195- 2/MIS dt.30-8- 2019, inform on completion 66 Dariapur-Jasaundhi (MDR) Annuity Road 21.16Completed MP Road Development 2011-2012 7 / (14-07-2011) 15.55 kms Corporation Ltd. 67 Datia-Bhander (MDR) 29.18 BOT(T+A) Datia Road 52.83Completed MP Road Development 2011-2012 7 / (14-07-2011) kms Corporation Ltd. 68 Devgularjod-Arandia (MDR) Annuity Shajapur Road 57.84Completed MP Road Development 2011-2012 7 / (14-07-2011) 34.96 kms Corporation Ltd. 69 Dinara-Datia 2-lane (SH-19) Annuity Road 17.02Completed MP Road Development 2011-2012 5 / (15-04-2011) Annuity to be not 8.39 kms Corporation Ltd. more than 16% of TPC

70 Gadarwara-Tendukheda Annuity Narsinghpur Road 60.82Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 32.12 kms Corporation Ltd. 71 Garhakota-Rehli-Devri (MDR) Annuity Sagar Road 72.98Completed MP Road Development 2011-2012 7 / (14-07-2011) 49.30 kms Corporation Ltd. 72 Garra-Waraseoni (MDR) [upto BOT(T+A) Balaghat Road 97.77Completed MP Road Development 2012-2013 13 / (30-08-2012) Annuity 16.30 Crs Maharashtra border] 46.98 Corporation Ltd. kms 73 Gormi-Udotgarh intermediate Annuity Road 39.12Completed MP Road Development 2011-2012 5 / (15-04-2011) SLEC dated 8-6-2016 lane (SH-19) 16.77 kms Corporation Ltd. accorded approval for revised cost from 38.50 Cr to 39.118 Cr.

74 Guna-Ashoknagar-Ishagarh 2- BOT Road 108.5Completed MP Road Development 2010-2011 11 / (29-07-2010) 36.75 13.66 cr. VGF sanctioned 40%. With ref. to lane (SH-20) 76.15 kms Corporation Ltd. cr/15.73 Agreement signed on lt.No.7370/195- gomp share 07.02.201 1 2/MIS dt.30-8- 2019, inform on completion 75 Harda-Chhipaner (MDR) 29.30 Annuity Harda Road 38.57Completed MP Road Development 2011-2012 7 / (14-07-2011) kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 76 Hata-Fatehpur-Rajpura- BOT(T+A) Road 76.8Completed MP Road Development 2010-2011 1 / (13-12-2010) Annuity 4.38 cr. 23% Solapuir-Bajna-Dargawon 2- Corporation Ltd. complete. CA lane (SH-48) 64.42 kms suspended, no substitution by the lenders. Termination done. SLEC 5 Feb 2014 approved documents for balance work, recommended for in principal approval by Cabinet. Concession agreement signed.

77 Itkhedi-Raslakhedi (MDR) 9.34 Annuity Bhopal Road 11.52Completed MP Road Development 2011-2012 7 / (14-07-2011) kms Corporation Ltd. 78 Jaora-Piplodha- Annuity Ratlam Road 60.03Completed MP Road Development 2011-2012 7 / (14-07-2011) Jalandharkheda and Piplodha- Corporation Ltd. Sailana (MDR) 42.27 kms

79 Jawad-Khoh (MDR) 21.00 kms Annuity Neemuch Road 30.86Completed MP Road Development 2011-2012 7 / (14-07-2011) Corporation Ltd. 80 -Jobat-Zeerpanya- BOT Road 162.45Completed MP Road Development 2010-2011 / (30-08-2010) VGF+Deemed Not claimed VGF+Deemed Shadow With ref. to 2-lane(SH-39) 95.50 Corporation Ltd. Shadow Fee not over 50% of lt.No.7370/195- kms TPC. VGF sanction 2/MIS dt.30-8- 62.98 cr, but actual 2019, inform on grant 49 cr, completion

81 Kantaphod-Nachabhor (MDR) Annuity Dewas Road 90.95Completed MP Road Development 2011-2012 7 / (14-07-2011) 60.38 kms Corporation Ltd. 82 Khandwa-Dehtalai-Burhanpur BOT Road 243.24Completed MP Road Development 2010-2011 1 / (13-12-2010) 66.36cr/20.96 18.04 VGF 66.33 Crore. With ref. to 2-lane(SH-50) 127.25 kms Corporation Ltd. gomp share lt.No.7370/195- 2/MIS dt.30-8- 2019, inform on completion 83 Kurawar-Eklara-Talen (MDR) Annuity Rajgarh Road 49.89Completed MP Road Development 2011-2012 7 / (14-07-2011) 39.22 kms Corporation Ltd. 84 Lakhandon-Ghansore upto BOT Road 83.43Completed MP Road Development 2011-2012 5 / (15-04-2011) Not claimed with 25.32 cr VGF. With ref. to Seoni 2-lane(SH-40) 37.93 kms Corporation Ltd. Actual grant 0.54 cr lt.No.7370/195- 2/MIS dt.30-8- 2019, inform on completion 85 -Anadapur-Bhagwantpur Annuity Vidisha Road 24.47Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 22.60 kms Corporation Ltd.

86 Mangawan to MP/UP Border BOT Road 410.72Completed MP Road Development 2011-2012 / NA AsperCE mprdc letter 4-lane (NH-27) 52.07 kms Corporation Ltd. bot/13114 dated3.2.21 87 Mangawar-Bekunthpur (MDR) Annuity Rewa Road 26.29Completed MP Road Development 2011-2012 7 / (14-07-2011) 18.80 kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 88 Ucchera-Nagod-Singpur- BOT(T+A) Satna Road 123.41Completed MP Road Development 2015-2016 7 / (14-07-2011) 28th SLEC held on 27- With ref. to Kalinjer 2-lane (SH-56) 55.60 Corporation Ltd. 02-2016, approved lt.No.7370/195- kms revised project cost 2/MIS dt.30-8- from 115.20 Crore to 2019, inform on 123.41 Crore. Change completion in project cost be borne by developer and MPRDC as per clause 16.3.2 of Concession agreement.

89 NH-86 (Teonda)- Annuity Vidisha Road 46.03Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 37.80 kms Corporation Ltd. 90 Panna-Amanganj-Semariya- BOT(T+A) Panna/Damoh. Road 97.13Completed MP Road Development 2011-2012 7 / (14-07-2011) 14% complete Gaisabad intermediate lane Corporation Ltd. (SH-47) 58.18 kms

91 Paron-Goras intermediate BOT(T+A) Road 106.21Completed MP Road Development 2011-2012 7 / (15-04-2011) Annuity to be not lane (SH-23) upto Raj border Corporation Ltd. more than 16% of 36.48 kms TPC. Annuity 8.05 cr. 25% complete 92 Phoolsagar-Niwas-Shahpur Annuity Mandla/Dindori. Road 156.9Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 83.70 kms Corporation Ltd. 93 Pipliya-Manasa (MDR) 40.19 Annuity Mandsaur Road 63.21Completed MP Road Development 2011-2012 7 / (14-07-2011) kms Corporation Ltd. 94 Poudi-Maharapur- Annuity Satna Road 31.42Completed MP Road Development 2011-2012 7 / (14-07-2011) Parasmaniya (MDR) 25.09 Corporation Ltd. kms 95 Punasa-Mundi-Singhaji Annuity Khandwa Road 24.06Completed MP Road Development 2011-2012 7 / (14-07-2011) (Thermal Power Plant road) Corporation Ltd. and Singhaji Bridge approach (MDR) 17.00 kms

96 Rajpuriya-Petlabad-Bamniya Annuity Jhabua Road 25.73Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 18.18 kms Corporation Ltd.

97 Ratlam-Sailana-Banswara 2- BOT(T+A) Ratlam Road 117.28Completed MP Road Development 2011-2012 11 / (24-02-2012) 40% (20+20) Not claimed VGF 40% (20% GoMP lane (SH-39) 43.58 kms Corporation Ltd. share as O&M support). Re-SLEC on 08-Feb-13 for (t+a) mode, since no bids in Jun 2012 under earlier VGF mode. : Concession changed from 30 to 15

98 Rau-Mhow- 2- BOT Road 181.5Completed MP Road Development 2010-2011 / (30-08-2010) 66.33 Cr. Not claimed VGF 66.33 Crore lane (MDR+1)74.40 kms Corporation Ltd. 99 Rehli-Salwara-Gorjhamar Annuity Sagar Road 28.27Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 18.08 kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 100 Rewa Ring Road 4-lane 8.92 BOT(T+A) Rewa Road 74.2Completed MP Road Development 2012-2013 9 / (29-10-2011) 20%+20% Not claimed VGF 20% (Gol) + 20% kms Corporation Ltd. (GoMP, for O&M). Re- SLEC on 08-Feb-13 for(t+a) mode, since no bids in May 2012 under earlier VGF mode, even after re- bid. Concession changed from 30 to 15

101 Salsalai-Gulana-Gulai Rly Stn Annuity Shajapur Road 31.03Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 19.31 kms Corporation Ltd. 102 Sausar-Mohgaon-Mordongri Annuity Chhindwara Road 58.2Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 29.58 kms Corporation Ltd.

103 Seliora-Majhgawan (MDR) BOT(T+A) Jabalpur Road 92.65Completed MP Road Development 2011-2012 7 / (14-07-2011) 40% (20+20) Not claimed VGF (20+20 for O&M). 39.85 kms Corporation Ltd. Re-SLEC on 25-Apr-12 for Annuity+Toll

104 -Icchawar-Kosmi 2-lane BOT(T+A) Road 91.54Completed MP Road Development 2011-2012 5 / (15-04-2011) Annuity to be not (SH-53) 50.12 kms Corporation Ltd. more than 16% of TPC. Annuity 4.41 cr. 11 % complete 105 Semaria-Manikpur BOT(T+A) Road 34.83Completed MP Road Development 2010-2011 1 / (13-12-2010) Annuity 2.57 cr. 13% intermediate lane (SH-9) Corporation Ltd. complete 16.36 kms 106 Seoni-Katangi (SH-54) upto BOT Road 165.9Completed MP Road Development 2011-2012 5 / (15-04-2011) 54.50 Cr. Not claimed for VGF. Actual 54.50 With ref. to Maha border 75.60 kms Corporation Ltd. cr lt.No.7370/195- 2/MIS dt.30-8- 2019, inform on completion 107 Sheopur-Baroda-Khwajapur BOT(T+A) Sheopur Road 61.8Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 32.29 kms Corporation Ltd.

108 Sijhat-Hinoti-Malgaon- Annuity Satna Road 43.56Completed MP Road Development 2011-2012 7 / (14-07-2011) Khamariya-Ater (MDR) 32.20 Corporation Ltd. kms 109 Singhana-Chikalda (MDR) Annuity Dhar Road 23.04Completed MP Road Development 2011-2012 7 / (14-07-2011) 16.27 kms Corporation Ltd. 110 Sonapipari-Umerth-Monari- Annuity Chhindwara Road 43.73Completed MP Road Development 2011-2012 7 / (14-07-2011) Umbah (MDR) 22.25 kms Corporation Ltd.

111 Soyat-Pidawa (MDR) 6.23 kms Annuity Shajapur Road 8.78Completed MP Road Development 2011-2012 7 / (14-07-2011) Corporation Ltd. 112 Thandla-Limdi intermediate BOT(T+A) Road 56.16Completed MP Road Development 2010-2011 1 / (13-12-2010) Annuity 0.90 cr. 18% lane (SH-18) upto Guj border Corporation Ltd. complete 31.18 kms

113 Ujjain-Simhastha Bypass 2- BOT(T+A) Ujjain Road 94.3Completed MP Road Development 2012-2013 14 / (08-02-2013) lane 14.29 kms Corporation Ltd. 114 Umari-Phoop-Pratappur BOT(T+A) Bhind Road 75.3Completed MP Road Development 2011-2012 7 / (14-07-2011) (MDR) 43.67 kms Corporation Ltd. 115 Waraseoni-Lalbarra (MDR) BOT(T+A) Balaghat Road 42.51Completed MP Road Development 2011-2012 7 / (14-07-2011) 18.30 kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 116 Baretha - Ghodadongri15.10 BOT(T+A) Road 40.87Completed MP Road Development 2013-2014 14 / (05-02-2014) Approved the Project With ref. to kms Corporation Ltd. for in-principle lt.No.7370/195- approval by the 2/MIS dt.30-8- Cabinet. 2019, inform on completion 117 Guna-Aron-Sironj (SH-28) BOT(T+A) Guna-Vidisha Road 199.13 Completed MP Road Development 2013-2014 22 / (15-07-2014) Approved the Project With ref. to Corporation Ltd. for in-principle lt.No.7370/195- approval by the 2/MIS dt.30-8- Cabinet. 2019, inform on completion 118 Agar-Sarangpur Road (SH-41) OMT Shajapur-Rajgarh Road 1.95 Completed MP Road Development 2014-2015 22 / (15-07-2014) Approved the Project With ref. to Corporation Ltd. for in-principle lt.No.7370/195- approval by the 2/MIS dt.30-8- Cabinet. 2019, inform about construction

119 Ashta-Kannod Road (SH-41) OMT Sehore-Dewas Road 1.63Completed MP Road Development 2014-2015 22 / (15-07-2014) Approved the Project Corporation Ltd. for in-principle approval by the Cabinet. 120 Badgawan-Bedhan Road OMT Katni-Singrauli Road 16.67Completed MP Road Development 2014-2015 22 / (15-07-2014) Approved the Project Corporation Ltd. for in-principle approval by the Cabinet. 121 Bhopal-Vidisha (SH-18) OMT Bhopal-Vidisha Road 3.38Completed MP Road Development 2014-2015 / (28-07-2014) DLEC Corporation Ltd. 122 Ghansour-Mandla (SH-40) OMT Seoni-Mandla Road 4.47Completed MP Road Development 2014-2015 / (28-07-2014) DLEC Corporation Ltd. 123 Khalghat-Manawar (SH-38) OMT Dhar Road 6.2Completed MP Road Development 2014-2015 / (28-07-2014) DLEC With ref. to Corporation Ltd. lt.No.7370/195- 2/MIS dt.30-8- 2019, inform about construction

124 -Gadarwara (SH-44) OMT Raisen-Narsinghpur Road 2.06 Completed MP Road Development 2014-2015 / (28-07-2014) DLEC With ref. to Corporation Ltd. lt.No.7370/195- 2/MIS dt.30-8- 2019, inform about construction

125 Vidisha-Kurwai (SH-19) OMT Vidisha Road 2.79Completed MP Road Development 2014-2015 / (28-07-2014) DLEC Corporation Ltd. 126 Procurement & Operation of BOT Bhopal Transport 85Completed Bhopal Municipal Corporation 2011-2012 / NA JNNURM sanction of Modern Low floor buses for Gol. 50:20:30 funding Bhopal city of Gol, GoMP, ULB. 110 buses on 6 routes

127 Procurement & Operation of BOT Indore Transport 59.75Completed Indore Municipal Corporation 2011-2012 / NA 111 buses on 15 Modern Low floor buses for routes. 5 operators Indore city selected. 2 yrs extn for 4, 1 cancelled premature PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 128 Bus stops for city service. 200 BOOT Bhopal Urban 2.25 Completed Bhopal Municipal Corporation 2006-2007 / NA Awarded in Sept 08, sq. ft. advt per stop (100 nos) Rs. 1.24 crs premium, 4 equal annual instalments. 4 months construction. 5 yr concession

129 Commercial Complex BOOT Rewa Urban 20.46 Completed Rewa Municipal Corporation 2010-2011 / (18-11-2010) DLEC. Reserve price construction 1.29 acres and 8.50 cr. Premium O&M of Bus terminal 8,53,00,999 crs. User Charge Notification/Assets handover done by 16.09.11. Expctd COD 15-Sep-13

130 Water supply augmentation BOT Khandwa Water Supply 115.32Completed Khandwa Municipal 2007-2008 / NA Rs. 11.95/KL. FC with and 24x7 supply Corporation IFC - $20L. Intake Well, RWRM, CW Feeder Mains 100%. CWRM 98%. WTP 90%. OHT 88%. Expected COD 30-Jun- 13

131 Four/Six Laning with Paved BOT(T) Dewas Road 286.25Completed MP Road Development 2015-2016 28 / (27-02-2016) Accorded in-principal With ref. to Shoulder of Dewas Bypass Corporation Ltd. approval to the lt.No.7370/195- 19.80 KM project. 2/MIS dt.30-8- 2019, inform on construction 132 Rehab.&Upgradation of two BOT(T) Gwalior Road 76.52Completed MP Road Development 2016-2017 30 / (22-08-2016) In-principal approval With ref. to lane plus paved/hard shoulder Corporation Ltd. accorded lt.No.7370/195- 19KMs road of NH-75 2/MIS dt.30-8- (Gwalior-Jhansi Ghongha 2019, inform about Village (Dabra-Singhpur Road construction via Bilua village)

133 Development of Hostel for BOT Bhopal Technical 45 Completed Capital Project Administration, 2014-2015 22 / (15-07-2014) As CPA construction National Institute of Fashion Education Bhopal divn.No.1,email dated Technology 29-01-2021, project completed. Lett No.EESLEC on 15 July 2014 accorded in- principle approval for the Project

134 Dindayal Chalit Aspatal Yojana BOT Multiple. Health 67 Completed National Rural Health Mission 2010-2011 3 / (17-01-2011) SLEC on 17-01-11 (in- principle+final approval). PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 135 Bela-Govindgarh-Churhat (SH- BOT(OMT) Road 12.2Completed MP Road Development 2013-2014 19 / (25-04-2012) Re-bid. No bids 18) 56.74 kms Corporation Ltd. received. SLEC 5 Feb 2014 approved the revised proposal and recommended for in principal approval by Cabinet

136 Budhni--- BOT(OMT) Sehore/Dewas. Road 5.5Completed MP Road Development 2012-2013 14 / (08-02-2013) Khategaon upgradation & Corporation Ltd. maintenance (SH-22) 87.4 kms

137 Nagda-Gogapur (MDR) 14.98 Annuity Road 40.58Completed MP Road Development 2013-2014 14 / (18-06-2013) kms Corporation Ltd. 138 Ti kamgarh( Dhajrai )-Jatara- BOT(T+A) Tikamgarh/Chhatarp Road 107.34Completed MP Road Development 2012-2013 14 / (08-02-2013) Palera-Nowgaon (MDR) 76.40 ur. Corporation Ltd. kms 139 Badwani-Palsod- BOT(T+A) Road 103.99Completed MP Road Development 2010-2011 1 / (13-12-2010) Annuity 4.97 cr intermediate lane (SH-39) Corporation Ltd. 56.89 kms 140 Bhind-Mihona-Gopalpur 2- BOT Road 82.06Completed MP Road Development 2008-2009 / (26-07-2008) 31.71 cr. 15.13 Cr. VGF 31.71 lane (SH-2) 50.86 kms Corporation Ltd. GoMP Share 15.13 cr.

141 Bhopal-Dewas 4-lane (SH-18) BOT Road 640Completed MP Road Development 2010-2011 / NA 140.79 kms Corporation Ltd. 142 Bina-Khimlasa-Malthon 2-lane BOT Road 69.11Completed MP Road Development 2008-2009 / (26-07-2008) 26.27 cr. 12.44 Cr. VGF 26.27 (SH-42&42A) 39.42 kms Corporation Ltd. GOMP Share 12.45 Cr.

143 Cliandrapur-Alirajpur-Kukshi- BOT Road 144Completed MP Road Development 2009-2010 / NA Toll started on 18 Aug Badvvani (SH-26)99.13 kms Corporation Ltd. 2009 on 41 km

144 Damoh-Jabalpur 2-lane (SH- BOT Road 212.13Completed MP Road Development 2008-2009 / (26-07-2008) 82.71 Cr. 12.73 Cr. VGF 82.71, 94.59% 37) 50.86 kms Corporation Ltd. GoMP Share completed 42.43 Cr.

145 Dewas-Ujjain-Badnagar- BOT Road 49.93Completed MP Road Development 2004-2005 / NA Badnawar (SH-18) 98.26 kms Corporation Ltd.

Construction 146 Dewas Industrial Area Water BOT Dewas. Industry 77.58Construction MP State Industrial 2010-2011 / NA Concessional Supply Development Corporation Ltd agreement has been executed on 07-01- 2018, concessional period upto 15-06- 2037. As per MPIDC letter No.MPIDC/CE/2021/7 36 dated 03-02-2021 PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 147 Logistics Park Pawarkheda BOOT Hoshangabad. Warehousing 138.5 Construction MP Agriculture Marketing 2011-2012 4 / (26-02-2011) Vide (115 acres) and Logistics Board (Mandi Board) Lt.No.Board/Cons/PPP /20-21/1667 dated 05- 02-2021, informed that the project period is extended upto 21-04-2022. Final on 30-Apr-11. CA extendable by 15 yrs.

148 Eco-Tourism and Adventure BOT Rewa. Tourism 15.68Construction MP Ecotourism Development 2012-2013 13 / (30-08-2012) Bidding date Park (5.783 ha) Board 29/08/13, CA signed 28/04/14, Ruchi Realty Holdings Pvt Ltd has formed SPV Rewa Leisure Pvt Ltd for the Project

149 Deharda-Ishagrah BOT(T+A) Road 50.57Construction MP Road Development 2010-2011 / (13-12-2010) Annuity 2.45 cr. 15% intermediate lane (SH-10) Corporation Ltd. complete 32.93 kms 150 Sidhi-Singrauli 4-lane (NH- BOT Road 736.72Construction MP Road Development 2011-2012 / NA As per MPRDC Lett 75E) 102.60 kms Corporation Ltd. No. BOT/13114 dated 3-2-2021 concessioneir default CA terminated, project taken up on EPC Mode

151 Sports City with Cricket/ BOOT Bhopal-Vill Satgarhi Sports 900 Construction Sports and Youth Welfare 2010-2011 / NA Premium 18.10crs. as perletter no. Hockey/ Football/Indoor/ Department, GoMP 6236 dated 03-02- Aquatic/Admin Block/Hostel 21 this metter is on 50 acres plus Star pending in high Hotel/Golf/Residential/Comm court Jabalpur ercial (Tota1172 acres)

152 ITIs Upgradation under Gol BOT Multiple Education 140 Construction Directorate of Technical 2011-2012 / NA Gol int-free loan 2.5 scheme (56) Education and Skill cr/ITI for Inst Mgt Development, MP Committee 153 ITIs upgradation under Gol BOT Multiple Education 15 Construction Directorate of Technical 2011-2012 / NA Gol int-free loan 2.5 Scheme (6) Education and Skill cr/ITI for Inst Mgt Development, MP Committee 154 Conversion of Rajgarh Palace DBFOT Datia Tourism 15Construction MP Tourism Development 2011-2012 9 / (29-10-2011) Concession With. ref. to Fort, 4.15 ha, into hotel Corporation extendable by 15 yrs lt.no.3908/84/MPT B/IP dt.07-9-2019 informed about work in progress PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 155 Check-Post barriers at entry BOT Multiple Transport 1094 Construction Transport Department , GoMP 2010-2011 / NA Agreement signed 10- With ref. to lt. points of MP (24) Nov-10. 2 yr No.8835/35/MPRD construction period C/ISIBC dt.25-9- 2019, informed that out 24, 21 completed

156 Foot Over Bridges BOT Rau, nr Indore. Urban 2.12 Construction Nagar Palika Parishad Rau 2009-2010 / NA CA with Edward (Divn of Swiift Intermedia Convergence, Indore. Expected COD Mar 12, but due to 6-lane road construction at site, FOB length not yet decided, hence, incomplete

157 Multi-Level Parking at Indore BOOT Indore Urban 56Construction Indore Municipal Corporation 2006-2007 / NA 2 complete, 2 (7 sites) construction, 3 with land issues. Initial cost 14 cr 158 Toilets with advt rights (36) BOOT Bhopal Urban 7 Construction Bhopal Municipal Corporation 2006-2007 / NA Premium 7.87 crs. in 14 annual instalments. WO for 20, 7 complete, land issue in others

159 Water supply augmentation BOT Shivpuri Water Supply 80.71 Construction Shivpuri Nagar Palika Parishad 2007-2008 / NA Rs. 15.4/KL. and 24x7 supply Construction underway. Expected COD 30-Jun-13

Pipe Line 160 Establishment of Milk Drying DBFOT Ujjain. Dairy 61.77 Pipe Line Ujjain Cooperative Milk Union 2014-2015 / (19-03-2015) Approved for Cabinet Unit of MPTPD Capacity at Approval Main Dairy Plant of Ujjain Union 161 Upgradation of Employment BOT Multiple. Industry 20.38Pipe Line Directorate of Commerce, 2014-2015 26 / (19-03-2015) SLEC on 19 March Exchanges into Placement Industry and Employment, MP 2015 approved for Centres approval by the Cabinet (Revised) 162 World-Class Zoological Park BOT Bhopal. Tourism 130Pipe Line Forest Department, GoMP 2008-2009 / NA RFP forTA submitted on 350 ha to Dept. PD expense 2 Cr. IIPDF approved

163 Development of Integrated DBFOT Damoh Urban 34.19 Pipe Line Municipal Council Damoh 2018-2019 33 / (10-01-2018) Recommended the Approved Bus Terminal cum Commercial proposal for approval Complex in Damoh from the Cabinet

164 Two State of the Art ITIs for BOT Ujjain & Bhopal Education 176.3Pipe Line Directorate of Technical 2014-2015 21 / (09-05-2014) In-principle approval Advance Vocational Training Education and Skill Development, MP PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 165 Hospital Project at Old Nigam BOOT Gwalior Health 13.64Pipe Line Gwalior Municipal Corporation2011-2012 / NA TA : CRISIL. IIPDF Work Shop, Dholi Bua ka Pull approved. RFQ docs (2330.60 Sq Mts) prep, sent 28.11.11 to UADD. UADD comments sent, no reply. UADD reminders on 7-Aug- 12 and 8-Oct-12, no response

166 Bus Terminals (3) BOOT Bhopal Urban 43.6 Pipe Line Bhopal Municipal Corporation 2012-2013 / NA Feasibility report submitted. IIPDF approved. RFP being prepared. MPRDC is dev terminals all over MP, hence proj dropped. 6-Jun-12, PS asked BMC Commissioner for meet with Div Commissioner, Bpl, and report by 20-J un- 12

167 Commercial Complex and BOT Dewas Urban 45 Pipe Line Dewas Municipal Corporation 2011-2012 / (29-10-2011) Land use to be Office of Municipal changed from Corporation institutional to commercial cum institutional by T&CP. Land title under review by Collector.Docs prep by TA sent to MC on 19- Sep-12. 168 Commercial Complex at Bhais BOT Satna Urban 16 Pipe Line Satna Municipal Corporation 2011-2012 / (29-10-2011) Tender to be Khana on 0.4 ha launched. Letter to Collector to expedite land title issue

169 Commercial Complex at Nagar BOT Jabalpur Urban 31.52 Pipe Line Jabalpur Municipal 2011-2012 / (29-10-2011) Presentation on Nigam Workshop on 0.81 ha Corporation 11.1.12 for JMC. CRISIL to revise cost by 10-Jul-12, done 19- Jul-12. MIC approved docs with amendments, Parishad approval awaited PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 170 Multi Level Parking at Old Bus BOOT Gwalior Urban 26.75Pipe Line Gwalior Municipal Corporation2012-2013 / NA TA: CRISIL. IIPDF Stand Kampoo (731.25 Sq Mts approved. Feasibility and 2027.96 Sq Mts) report on 4-Jun-12, sent UADD 2-Jul-12. UADD letters on 7-8- 12 and 8-10-12 to MC for status, no response.

171 Multi Level Parking in front of BOOT Gwalior Urban 8.2Pipe Line Gwalior Municipal Corporation2006-2007 / NA TA: CRISIL. IIPDF Nigam Shopping Complex approved Daulat Ganj (300.00 Sq Mts)

172 Multi Level Parking at M.P. BOT Bhopal Urban 38.67Pipe Line Bhopal Municipal Corporation 2006-2007 / NA TA appointed. Nagar Feasibility report submitted. Land issue pending at HC

173 Multi Level Parking at New BOT Bhopal. Urban 51Pipe Line Bhopal Municipal Corporation 2012-2013 / NA Feasibility report Mkt under approval. Land issue (Community Centre & Commissioner Office) under Collector consideration. PS asked BMC Commissioner for meet with Div Commissioner, Bhopal, and report by 20-Jun-12

174 Parking Cum Commercial at BOOT Gwalior Urban 100 Pipe Line Gwalior Municipal Corporation 2006-2007 / NA 5 bidders shortlisted. Gandhi Mkt, Maharaj Bada for HC ordered status 300 cars, 252 shops quo. Stay vacated relocation. (5,228 Sq. Mt.) 30.8.11, RfP being prep. UADD comments sent 11-6- 12 to MC. Request from 7 bidders recd 10- Nov-12, under eval. MIC approved RfP on 1 -Apr-13, pari shad to approve

175 Development of Nodal Citizen BOT Bhopal Urban 111.74 Pipe Line Bhopal Municipal Corporation 2014-2015 / (15-07-2014) Accorded in-principle Center and Office Building at approval for the Mata Mandir project. 176 Development of Bus Stand BOT Bhopal Urban 17.79 Pipe Line Bhopal Municipal Corporation 2014-2015 / (15-07-2014) Accorded in-principle and Commercial Complex at approval for the Putlighar project. PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 177 Development of Municipal DBFOT Bhopal Urban 323.17Pipe Line Bhopal Municipal Corporation 2014-2015 / (15-07-2014) Accorded in-principle Solid Waste at Adampur approval for the Chhawni project. 178 Development of Commercial BOT Bhopal Urban 23.36 Pipe Line Bhopal Municipal Corporation 2014-2015 / (15-07-2014) Accorded in-principle Complex at Zone-8, Pulbogda approval for the project. 179 Implementation of Regional DBFOT Katni Urban 35.4 Pipe Line Katni Municipality 2014-2015 / (15-09-2014) Accorded in-principle Integrated Solid Waste approval for the Management Project, Katni project.

180 Implementation of Regional DBFOT Sagar Urban 70.54 Pipe Line Sagar Municipality 2014-2015 / (15-09-2014) Accorded in-principle Integrated Solid Waste approval for the Management Project, Sagar project.

181 Establishment of Aseptic DBFOT Indore Dairy 31.37 Pipe Line Indore Cooperative Milk Union 2015-2016 / (23-05-2015) Approved for Cabinet Packaging Unit of 40,000 LPD Approval. at Indore 182 Integrated Municipal Solid DBFOT Bhopal Urban 465.76Pipe Line Bhopal Municipal Corporation 2015-2016 / (27-02-2016) Accorded in-principal Waste Management Project, approval for the Bhopal (28 ULBs) Project

183 Integrated Municipal Solid DBFOT Rewa Urban 158.67 Pipe Line Rewa Municipal Corporation 2016-2017 28 / (27-02-2016) The Project was Approved Waste Management Project, earlier approved in Rewa (13 ULBs) 28th SLEC meeting and with certain amendments the project is again approved in 31st SLEC meeting on 20-1- 2017.

184 Reginal integrated Municipal DBFOT Gwalior Urban 254.59 Pipe Line Gwalior Municipal Corporation 2016-2017 31 / (20-01-2017) Accorded in-principal Approved Solid Waste Management approval to the Project - Gwalior Project

185 Reginal integrated Municipal DBFOT Indore Urban 475.96 Pipe Line Indore Municipal Corporation 2016-2017 31 / (20-01-2017) Accorded in-principal Approved Solid Waste Management approval to the Project - Indore Project

186 In-Setu Redevelopment of BOT Indore Urban 74.4 Pipe Line Indore Municipal Corporation 2016-2017 31 / (20-01-2017) Accorded in-principal Approved Lodha Colony and PC Sethi approval to the Nagar Slum, Indore under Project Pradhan Mantri Awas Yojana

187 Nagda-Khachrod-Ghinoda OMT Ujjain Road 9.89 Pipe Line Public Works Department 2019-2020 34 / (17-12-2019) Approved (VR) 188 Narsinghgarh-Boda (MP-MD- OMT Rajgarh Road 11.79 Pipe Line Public Works Department 2019-2020 34 / (17-12-2019) Approved 28-12) 189 Pachor-Boda-Borkheda (MP- OMT Rajgarh Road 13.15 Pipe Line Public Works Department 2019-2020 34 / (17-12-2019) Approved MDR-28-09) 190 Badagaon-Sihoniaya-Manpur OMT Morena Road 10.16 Pipe Line Public Works Department 2019-2020 34 / (17-12-2019) Approved Tiraha (MP-MDR-02-05, 04) PPP CELL, GOVERNMENT OF MADHYA PRADESH Status - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. VGF Sanction VGF Remarks Remark New Disbursement 191 Satna-Kotar-Aber-Semariya OMT Satna Road 21.67 Pipe Line Public Works Department 2019-2020 34 / (17-12-2019) Approved (MP-MDR-09-08)

192 Katangi-Polli-Majhauli (MP- OMT Jabalpur Road 2.71 Pipe Line Public Works Department 2019-2020 34 / (17-12-2019) Approved MDR-37-02) 193 Installation of LINACs at 7 DBFOT Bhopal-Indore- Health 105.73 Pipe Line Medical Education, GoMP 2020-2021 34 / (17-12-2019) In-principle with Approved Medical Colleges in MP (Redio Rewa: DBFOT and Dept Proj.Cost of Rs.164.01 Therapy Centres) Jabalpur-Gwalior : Crore. Now the OM revised Project cost is Rs.105.73 Crore approved in 36th SLEC dt 17-12-2020.

194 Setting up of White Label DBFOT Shahdol, Sidhi, Financial 52.02 Pipe Line Tribal Welfare Department 2019-2020 34 / (17-12-2019) Approved ATMs through WLAO in 413 Ratlam, Jhabua, Inclusion Haat Bazars of Tribal Villages Dhar, Khargone, in 89 Blocks of MP Khandwa, Betul, Hoshangabad, Mandla, Chhindwara, Seoni, Balaghat, Anuppur, Burhanpur, Alirajpur, Sheopur, Umaria, Barwani, Dindori

195 Bhopal-Barasia-Sironj SH-10 OMT Vidisha-Bhopal Road 29.28 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved

196 Ganjbasoda-Sinronj Road OMT Vidisha Road 3.67 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved (MDR) 197 Seoni-Katangi Road SH-42 OMT Seoni Road 16.65 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved

198 Balaghat-Behar Road SH-47 OMT Balaghat Road 15.71 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved

199 Nagda-Dhar SH-52 OMT Dhar Road 1.93 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved 200 Khandwa-Mundi Road SH-70 OMT Khandwa Road 7.25 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved

201 Indore-Depalpur SH-27 OMT Indore Road 7.27 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved 202 Jabalpur-Patan-Shahpura OMT Jabalpur Road 9.36 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved Road SH-21A 203 Budhar-Amarkantak Road SH- OMT Anuppur Road 11.01 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved 34 204 Neemuch-Manasa Road SH-7 OMT Neemuch Road 1.87Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved

205 Sujalpur-Akodia Road SH-25 OMT Shajapur Road 9.75 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved

206 Agar-Jaora Road SH-25 OMT Ujjain Road 25.02 Pipe Line Public Works Department 2020-2021 35 / (16-11-2020) Approved

Total Projects : 206 20160.17