Derbyshire Map 3

Total Page:16

File Type:pdf, Size:1020Kb

Derbyshire Map 3 R i P v ennine Bridleway e r N o l e a n a 4,271 275,276 C 3,17 17 ,274 d ,273 l 72 H1, H2 Bamford e 2 ,H2 i Blue John H1 Hope f Treak Cliff s 60,61 e Cavern l Cavern Hope 272 ,273,274 c 199 Furness Goyt Way c 275,276,H1 ,H2 a Vale H1 ,H2 276 M Castleton 1 H2 74 ,271,272 Bamford Bridgemont 190 173 273 H1 Peak Peveril ,274,276 174 Brough H1 ,H Lyme Chinley Cavern Castle 2 Marquis Hall 60 Speedwell 271 174 ,271,272 Buxworth 190 Cavern 272 of Granby Hathersage 275,276 Stoneheads Whaley Bridge 276 Bagshawe H1 ,H2 271 CHESHIRE Townend Bradwell Chapel-en-le- Cavern 272 Horwich End Sparrowpit Hathersage H1 D Frith Limestone H2 Gritstone 60 Fox House Way 199 190 Way 190 174 Peak 173 Longshaw Kettleshulme Shallcross Chapel-en-le-Frith 275 Country Forest 174 276 190 Barmoor Clough Park 61 Grindleford Charles 199 Head 65 Fernilee 65,66 Dove Holes 173,277 60 F Great r 65,66 Grindleford o 199 190 Hucklow Bretton g 174,277 Eyam g 61 173 a 65,66 65 66 Museum t t 277 277 E P Bridleway d ennine 60 Highwayman Fernilee 199 Peak Dale Eyam Hall g e Midshires Reservoir Foolow Eyam 65,66,275 65 60 199 Way Upper 276,277 65,66 174 Limestone Wardlow End 173,174 275 Rainow Blue Boar 68 65,66,174 Way C Batham A 277 Mires 174 190 65 ,66 Housley 275,276 276 u r Gate 174 b Tideswell 73 173 Stoney 277 a ,1 r 65 77 174 Errwood 199 ,2 Middleton E 174 d 60 Reservoir Litton g Wardlow Calver e Brownedge Waterswallows Calver Sough 277 Hurdsfield 190 65 66 B 16,61,65,65A Cliff Walker A a 65 173 s 58 218 174 College l Barn 185,186 o 58 w R 173 alley 218 Macclesfield i 190,199,441 v E d e Cressbrook 275 442,T P, X18 Buxton g r 174 E Ravenstor e 58 Goyt V Monsal Trail 276 60 G 58 65 Baslow Forest o Miller’s 173 y Riv 277 Cottage t 65 X18 65A Dale er Wye Church Poole’s Cavern & Great Hassop Forest Adventure Topley Monsal Dale 173 Longstone 170 Ladmanlow 65A 58 Cat & Fiddle Pike 277 X70 Baslow Chatsworth 185 441 Bridleway 173 P A 218 276 Park ennine 65 X18 Nether End 186 442 65A 65A 58 Midshires ,TP, Monsal 275 Pilsley 170 TP TP X18 A 66 Way 65 Head 218 218 Harpur TP 65A Taddington 173 58 442 58 277 Macclesfield Hill 65A 170 218 Chatsworth House Forest Burlow 441 Ashford-in- A Chelmorton TP TP the-Water 442 65 TP A Edensor 58,217,218 16 185,186 TP 65 X18 Monsal Brierlow 173 Trail TP TP,X18 Bar X18 Gritstone 217 Way Old House Calton Lees 58 Flagg Sterndale Sheldon Museum Bakewell 442 441 Quarnford Moor 6·1,170,171,172 t n (Travellers Rest) 178 173,178,218,275 e Beeley Pomeroy 178 w 276,277,X70 r Limestone 58 Shutts 6·1 e R Earl D ive 58 r Dov Way Lane 171 r e e Sterndale 441 178 178 R v 172 i i v Haddon Hall Monyash e R 217 Hollinsclough High Peak TP r 178 442 Trail 58 58 178 Over 178 Wye 6·1 TP e Gradbach Haddon X18 X18 Rowsley Dan F Bosley er iv Reservoir R 16 Crowdecote 171 Lim Caudwells esto Lathkill Dale 172 Mill 6·1 178 ne W 178 442 441 ay 178 217 Longnor 171 TP Youlgreave Alport Stanton in X18 Peak 178 171 Winking 442 Peak Man 178 Rail Parsley 172 STAFFORDSHIRE Hay 16 Middleton by P Youlgreave E A 441 172 K D I S T R Birchover Darley Bridge I C T N A T I O N A L P A R K 172 Wensley Elton Upper 172 The ‘Moorlands Connect’ Hartington Heathcote Newhaven Hulme flexible on-demand 442 Winster Tittesworth service is available 441 Reservoir within the purple 442 Tissington 442 Trail High Peak Trail Blackshaw bordered area 442 Moor Rudyard Hulme Biggin Limestone W Reservoir End 16 Warslow G ay R i d v l e o r f i D n o a ve M r e v i R.
Recommended publications
  • Derbyshire County Council (Lead)
    Applicant Information Applicant name: Derbyshire County Council (Lead) Other participating local authorities and national park authority include: Peak District National Park Authority, Staffordshire County Council, Barnsley Metropolitan Borough Council, Sheffield City Council. Bid Manager Name and position: Mike Ashworth Deputy Strategic Director – Environmental Services Contact telephone number: 01629 538512 Email address: [email protected] Postal address: Environmental Services County Hall Matlock Derbyshire DE4 3AG This bid will be published: www.derbyshire.gov.uk/transport_roads/transport_plans/transport_funding_bids/default.asp SECTION A - Project description and funding profile A1. Project name: Pedal Peak Phase II – Moving Up A Gear A2. Headline description: Pedal Peak Phase II (PPPII) includes four main infrastructure schemes and is enhanced by a new National Park Cycle Fund. PPPII will connect the already first class network of traffic- free trails in the Peak District National Park with important gateway stations for visitors from Greater Manchester, Derby and Nottingham, supported by Northern Rail and Derwent Valley Community Rail Partnership. They will also provide new feeder cycle ways directly into the national park from Sheffield and Stoke-on-Trent. Our package will enable 3.5 million people in the surrounding urban areas of Greater Manchester, Sheffield, Derby, Nottingham and Stoke-on-Trent to enjoy a day out cycling in the national park, either directly by bike into the national park in less than an hour or by a short train ride of 30 – 70 minutes. A3. Geographical area: The Peak District lies at the centre of England, surrounded by five large cities that are home to approximately one quarter of England’s population, offering a unique opportunity among the UK’s national parks to connect directly to a very large population.
    [Show full text]
  • Cycling in Derbyshire
    Cycling for everyone… Cycling is a great way to explore and experience the beautiful Derbyshire countryside. From rolling hills and limestone dales to the high heather clad moorlands, canal Cycle towpaths and gentle greenways, there’s something for everyone. We have over 430km of traffic-free trails that are family friendly and accessible for all, with inclusive cycling Derbyshire hubs offering a range of electric and adapted cycles to hire. Cycling The connected Whether searching for a quiet route from home or embarking on a long distance can boost your Over mood, improving 430km of journey, this leaflet will help you on your way. the symptoms of cycling county traffic-free some mental health Photograph: Ashley Franklin / Derbyshire County Council Photograph: Phil Sproson / Marketing Peak District & Derbyshire trails conditions. Call the Mental Health Support Line 0800 028 0077 Share with Care We want everyone to be able to enjoy the trails safely, so when out riding be nice, say hi! Whether you are cycling, walk- ing alone or with a dog, buggy pushing, a waterway towpath user or horse riding, the trails are there to be enjoyed by everyone. That means that all users – cyclists, walkers and horse riders alike - need to share the routes responsibly. Keeping active • Give plenty of warning to horse riders you’re approaching and space when overtaking is one of the most • Stay kind, slow down and give way to walkers, wheelchair users and horse riders if there’s not enough space for you to pass important things • Say thank you to those who ‘share with care’ you can do for • Please do not cycle on footpaths as these are for walkers only your health.
    [Show full text]
  • For Public Transport Information Phone 0161 244 1000
    From 29 January Bus TP The 1605 journey from Manchester to Derby on Mondays to Fridays is retimed TP Easy access on all buses Derby Belper Matlock Bath Matlock Bakewell Buxton New Mills Disley High Lane Hazel Grove Stockport Manchester From 29 January 2017 For public transport information phone 0161 244 1000 7am – 8pm Mon to Fri 8am – 8pm Sat, Sun & public holidays This timetable is available online at Operated by www.tfgm.com High Peak PO Box 429, Manchester, M60 1HX ©Transport for Greater Manchester 17-1741–GTP–1500–1117Rp Additional information Alternative format Operator details To ask for leaflets to be sent to you, or to request High Peak large print, Braille or recorded information Hallstead Road, Dove Holes, Buxton, phone 0161 244 1000 or visit www.tfgm.com Derbyshire SK17 8BS Easy access on buses Telephone 01298 814030 Journeys run with low floor buses have no steps at the entrance, making getting on Travelshops and off easier. Where shown, low floor Manchester Piccadilly Gardens buses have a ramp for access and a dedicated Mon to Sat 7am to 6pm space for wheelchairs and pushchairs inside the Sunday 10am to 6pm bus. The bus operator will always try to provide Public hols 10am to 5.30pm easy access services where these services are Manchester Shudehill Interchange scheduled to run. Mon to Sat 7am to 7.30pm Sunday* 10am to 1.45pm and 2.30pm to 5.30pm Using this timetable Stockport Bus Station Timetables show the direction of travel, bus Mon to Fri 7am to 5.30pm numbers and the days of the week.
    [Show full text]
  • P 2014 00548 Design and Access Statement.Pdf
    DESIGN AND ACCESS STATEMENT LAND TO THE EAST OF ASHBOURNE ROAD, ROCESTER ON BEHALF OF BAMFORD PROPERTIES LTD Ref: 2963 DRAFT 1. Introduction 1.1 This Design and Access Statement accompanies the outline planning application made by Bamford Properties Ltd for residential development in Rocester on land to the East of Ashbourne Road. Key 1.2 It is an outline application for up to 53 dwellings along with associated open space and highways works Application Boundary with all matters reserved, save for access. The indicative layout which is submitted in support of this Key application includes: ASHBOURNE ROAD ProposedViewpoint school site • Up to 53 residential properties with associated parking and gardens; • A children’s play area; • Open green space; • Amenity area; • Landscaped areas around the Site boundaries; • Vehicular and pedestrian access from Ashbourne Road; and B5830 • A connection to the footpath network (Rocester 5). 1 This document should be read in conjunction with the accompanying scheme drawings and reports 3 including: • Transport Statement; • Landscape and Visual Appraisal; 2 • Phase 1 Ecology Survey & Great Crested Newt Scoping Survey; NORTHFIELD AVE • Tree Survey; • Flood Risk Assessment; • Heritage Assessment; Site Plan • Planning Statement. 1.3 Design and Access Statements are required by the Planning and Compulsory Purchase Act 2004. The purpose of this document is to: • Provide information concerning the design evolution of the development; • Outline the broad design principles that have led to the form and type of development proposed; • Set the application site in context with its surroundings. Viewpoint 2. View North West across the boundary hedgerow that separates the Ashbourne road Viewpoint 1.Ashbourne Road which bounds the application site to the east.
    [Show full text]
  • Peak District Boundary Walk
    Marsden Holme Greenfield Langsett Glossop Low Bradfield Hayfield Ringinglow Castleton Whaley Bridge Hathersage Peak From BollingtonWinster Market Hall go up East Bank road to an easily-missed Foresttake the bridleway signposted Brassington and the Limestone Way, and 1footpath immediately beyond the Old Bowling Green pub. Turn left in follow it across three fields up to a gateway in the far corner. Millthorpe Peak District front of a cottage, along a tarmac lane and go through the stile behind a 0Cross four more fields on a well-marked path to stiles which lead small bungalow (East View) on the right. Head up diagonally left through 1onto the High Peak Trail. Go right along the trail for over 3.2km of easy Boundary Walk fields, eventually joining a path above fields hummocky from old lead walking (also popular with cyclists) until a low hill topped by a clump of mine working. Keep going up and at a footpath sign beyondBuxton a marooned trees called Minninglow. 200 miles around the edge of the national park squeeze stile join the Limestone Way. As you reach a small wood on the left of the trail, almost opposite Pass through the next field, below Luntor Rocks, and go through the 11 Minninglow, go through a gate on the right and down to a path 2gate in the top right hand corner. Go through a stile/gate in the wall that crosses beneath the trail. Beyond the bridge, follow the track down, on your right, then continue with the wall on your left. Continue through ignoring the gate in the far corner and instead go through the gateway to Marsden Stage 6 fields until the path bends right and up to cross a stile.
    [Show full text]
  • Hope to Hathersage Or Bamford Via Castleton
    Hope to Hathersage (via Castleton) Hope to Bamford (via Castleton) 1st walk check 2nd walk check 3rd walk check 1st walk check 2nd walk check 3rd walk check 17th August 2020 Current status Document last updated Wednesday, 19th August 2020 This document and information herein are copyrighted to Saturday Walkers’ Club. If you are interested in printing or displaying any of this material, Saturday Walkers’ Club grants permission to use, copy, and distribute this document delivered from this World Wide Web server with the following conditions: • The document will not be edited or abridged, and the material will be produced exactly as it appears. Modification of the material or use of it for any other purpose is a violation of our copyright and other proprietary rights. • Reproduction of this document is for free distribution and will not be sold. • This permission is granted for a one-time distribution. • All copies, links, or pages of the documents must carry the following copyright notice and this permission notice: Saturday Walkers’ Club, Copyright © 2019-2020, used with permission. All rights reserved. www.walkingclub.org.uk This walk has been checked as noted above, however the publisher cannot accept responsibility for any problems encountered by readers. Hope to Hathersage or Bamford (via Castleton) Start: Hope Station Finish: Hathersage or Bamford Stations Hope Station, map reference SK 180 832, is 18 km south west of Sheffield, 231 km north west of Charing Cross and 169m above sea level. Bamford Station, map reference SK 207 825, is 3 km south east of Hope Station and 151m above sea level.
    [Show full text]
  • High Peak Local Plan - Preferred Options Contents
    Contents 1 Introduction 3 2 Key characteristics and issues 10 3 Vision and objectives 19 4 Spatial strategy and strategic policies 24 Glossopdale 43 Central Area 48 Buxton Area 52 5 Development management policies 58 Environmental Quality 58 Economy 87 Housing 104 Community Facilities and Services 117 6 Strategic Development Sites 136 Glossopdale 136 Central Area 143 Buxton Area 151 7 Implementation and monitoring 162 Local Plan policies Policy S 1 Sustainable Development Principles 24 Policy S 2 Settlement Hierarchy 32 Policy S 3 Strategic Housing Development 35 Policy S 4 Maintaining and Enhancing an Economic Base 40 Policy S 5 Glossopdale Sub-area Strategy 45 Policy S 6 Central Sub-area Strategy 49 Policy S 7 Buxton Sub-area Strategy 55 Policy EQ 1 Climate Change 60 Policy EQ 2 Landscape Character 65 Policy EQ 3 Countryside Development 67 Policy EQ 4 Biodiversity 70 Policy EQ 5 Design and Place Making 73 Policy EQ 6 Built and Historic Environment 76 Policy EQ 7 Green Infrastructure 80 Policy EQ 8 Trees, woodland and hedgerows 82 High Peak Local Plan - Preferred Options Contents Policy EQ 9 Pollution and Flood Risk 85 Policy E 1 New Employment Development 88 Policy E 2 Employment Land Allocations 90 Policy E 3 Primary Employment Zones 93 Policy E 4 Change of Use on Existing Business Land and Premises 96 Policy E 5 Regenerating an Industrial Legacy 97 Policy E 6 Promoting Peak District Tourism and Culture 101 Policy E 7 Chalet Accommodation, Caravan and Camp Site Developments 103 Policy H 1 Location of Housing Development 104 Policy
    [Show full text]
  • North Derbyshire Local Development Frameworks: High Peak and Derbyshire Dales Stage 2: Traffic Impacts of Proposed Development
    Derbyshire County Council North Derbyshire Local Development Frameworks: High Peak and Derbyshire Dales Stage 2: Traffic Impacts of Proposed Development Draft June 2010 North Derbyshire Local Development Frameworks Stage 2: Traffic Impacts of Proposed Development Revision Schedule Draft June 2010 Rev Date Details Prepared by Reviewed by Approved by 01 June 10 Draft Daniel Godfrey Kevin Smith Kevin Smith Senior Transport Planner Associate Associate Scott Wilson Dimple Road Business Centre Dimple Road This document has been prepared in accordance with the scope of Scott Wilson's MATLOCK appointment with its client and is subject to the terms of that appointment. It is addressed Derbyshire to and for the sole and confidential use and reliance of Scott Wilson's client. Scott Wilson accepts no liability for any use of this document other than by its client and only for the DE4 3JX purposes for which it was prepared and provided. No person other than the client may copy (in whole or in part) use or rely on the contents of this document, without the prior written permission of the Company Secretary of Scott Wilson Ltd. Any advice, opinions, Tel: 01246 218 300 or recommendations within this document should be read and relied upon only in the context of the document as a whole. The contents of this document do not provide legal Fax : 01246 218 301 or tax advice or opinion. © Scott Wilson Ltd 2010 www.scottwilson.com North Derbyshire Local Development Frameworks Stage 2: Traffic Impacts of Proposed Development Table of Contents 1 Introduction......................................................................................... 1 1.1 The Local Development Framework Process..................................................................
    [Show full text]
  • Lathkill Dale Fieldwork Activities
    Name: Stop 1- Q3, 4 & 5 Tutor Group: During walk- Q1 Stop 2 – Q7, 8, 9 & 10 Geography Group: Stop 3 – Q2, 6, 11 & 12 Lathkill Dale Activities 1/ During your walk, mark on your map, where the river first appears from the valley sides. Label source of river 2/ For the following 6 photographs (numbered 1 to 6) match them to the letters A-F on the map. Label the letter next to the photo. Photos 3 and 4 have been done. Photo 1 geography.org.uk Photo 2 Photo 3 F geography.org.uk Photo 4 D Photo 5 geography.org.uk Photo 6 geography.org.uk 3/ On your walk, you will see the rocks in the photo below. Use evidence from the map to work out where these rocks have come from a/ deposited by a glacier 20,000 years ago b/ mined material from the caves c/ waste or spoil from Ricklow Quarry geography.org.uk 4/ You will see this place on your walk. What is the arrow on the photograph pointing to? What is this ? a/ a quarry waste slope b/ a scree slope c/ a ski slope 5/ How has the slope in the above photograph formed ? a/ people have tipped waste from the quarry here b/ freeze thaw weathering of the rocks above c/ the soil has been washed away by the rain; leaving these rocks geography.org.uk 6/ This valley was mined for lead in the 19th century. The lead formed 100 million years ago, after the limestone valley had formed.
    [Show full text]
  • Peak District Boundary Walk
    Marsden Holme Greenfield Langsett Glossop Low Bradfield Hayfield Ringinglow Castleton Whaley Bridge Hathersage Peak Bollington Forest Millthorpe Buxton Wildboarclough Bakewell Beeley From the small car park on the Thorpe-Ilam road, cross the road and 1walk along Digmire Lane until you reach St Leonard’s Church. From Peak District here continue along the lane, bearing right and after about 250m go through a gate where the lane becomes a track. Turn right after Coldwall Boundary Walk Bridge (part of the old Turnpike route to Cheadle and The Potteries) on the Limestone Way. Tittesworth 200 miles around the edge of the national park Cross the bridge (from Derbyshire into Staffordshire) and turn right Hartington 2on the footpath. Contour above the River Dove on your right, Reservoir Winster eventually dropping to the riverside. Follow the riverside path to reach the bridge at Ilam. Marsden Stage 6 Cross the bridge and go past the monument. Continue in front of the Stage 5 3row of cottages to enter the grounds of Ilam Hall via a white metal Holme gate to the left of the main entrance. Follow the path past the church Greenfield Stage 7 to the hall (well worth exploring). Turn left in front of the hall, cross the grass, descend steps and turn right. Follow the path behind the hall Langsett (known as Paradise Walk) with the river on your left for 800m, then go Stage 4 Stage 8 through the gate and left over the footbridge. Cross two fields, heading for a gate stile in the wall at the tree line.
    [Show full text]
  • Part One: Landscape Character Descriptions 2
    Part One: Landscape Character Descriptions 2. White Peak Landscape Character Types • Plateau Pastures ..................... 2.5 • Limestone Slopes ..................... 2.13 • Upland Limestone Pastures ... 2.10 • Limestone Dales ....................... 2.17 White Peak Character Area 52 Part 1 - 2.1 White Peak CHARACTER AREA 52 A gently rolling upland, limestone plateau punctuated by steep sided dales, scattered villages and isolated farmsteads within a pastoral setting. Landscape Character Types • Plateau Pastures • Limestone Slopes • Limestone Dales • Upland Limestone Pastures "... it was veined with a network of old stone walls, dividing the fields, and broken here and there with ruins of old lead-mines and works. A sparse stone farm bristled with six naked sharp trees. In the distance was a patch of smoky grey stone, a hamlet .... stone fences under the sky, looking for the curves downward that indicated a drop to one of the underneath, hidden dales.” DH Lawrence ‘The Virgin and the Gypsy’ Introduction neutral or acidic soils. These soils below ground with water finding its are well-drained, dark brown silt- way into faults and fissures, The White Peak character area is loams farmed as pasture and rough creating caves and caverns. Over located in the west of the county, grazing. The soils of the upper time these would collapse to form most is within the Peak District plateau tend to have deeper steep sided slopes of exposed National Park. It stretches from deposits. Here the drift has formed stone. Some dales still have rivers Castleton in the north, to a matrix with the course, resistant and streams meandering through Wirksworth in the south.
    [Show full text]
  • Pedal Peak District Final Report
    Pedal Peak District Final Report December 2009 – March 2011 Description Pedal Peak District was the Peak District National Park Authority’s premier cycling development project, funded and supported by the Department for Transport and Cycling England, from December 2009 to 31 March 2011. The project was fully supported by Derbyshire County Council, High Peak Borough Council, Derbyshire Dales District Council and Visit Peak District. Pedal Peak District has delivered significant infrastructure development and a social marketing programme. The Infrastructure work constituted a major element of this project. At the time of writing a great deal has been achieved and the works are still continuing for a late spring 2011 opening. The four closed tunnels have been cleared, surveyed and repaired and the entrance doors removed. Work is currently taking place to install a power supply and lighting. The tunnels, structures and a large proportion of the trail is also to be resurfaced and the access improved at Blackwell Mill Cottages, Great Longstone and Coombs Road. New signs will be put up on the trail, along with interpretation about the new route. This will include listening posts outlining the history of the tunnels. This work has involved the balancing of a large number of needs including detailed consideration of the unique landscape, conservation and heritage features of the trail, tunnels and the surrounding area. These features, and the issues that they raise, together with the limited project timescale have meant that the full link to Buxton through Woo Dale cannot be achieved in the project term. Planning consent has been achieved, through Peak Cycle Links, for a section of route to the north of Buxton at Staker Hill.
    [Show full text]