GOVERNMENT OF Abstract Planning & Economic Affairs Department - Development Package - Funds for 2015-16 allocated - Orders Issued. PLANNING & ECONOMIC AFFAIRS (A) DEPARTMENT G.O.(Ms) No.3/2016/Plg. Thiruvananthapuram, Dated :14 .01.2016 Read: - 1.G.O.(Rt) No.392/2013/Plg. dated, 10/10/2013. 2.G.O.(Rt) No.84/2014/Plg. dated, 20/02/2014. 3. Letter No.1539/2015/KDP/DPO/KSD., dated 26/09/2015 of District Collector, Kasaragod. 4.G.O.(Rt)No.2029/15/AD., dated 09/12/2015. 5.G.O.(Rt)No.544/15/Plg., dated 22/12/2015. 6.Minutes of the meeting of Empowered Committee meeting held on 28.12.2015.

O R D E R

As per the G.O. read as first paper above Government have constituted an Empowered Committee for the implementation of Dr. P. Prabakaran Commission Report on Kasaragod Package. The Planning and Economic Affairs Department is the Administrative Department for the implementation of the Package.

2. Government have earmarked Rs.85 crore under the H/A 2551-60-101-97 during the financial year 2015-16 for Kasaragod Package based on the Report of Dr. P. Prabakaran Commission.

3. As per the letter read as 3rd paper above the District Collector, Kasaragod has submitted proposals for issuing Administrative Sanction for a number of Projects to be implemented under the Package during this financial year. Based on the decisions taken in the SLEC Meeting held on 27/11/2015 Administrative Sanction was accorded for 4 projects at an estimated cost of Rs.4.5777 crore. As per G.O. read as 4th above Agriculture Department has sanctioned Rs.3.75 crore to a power supply project from the funds under Kasaragod Package. Hence total allocation made under the package during this financial year is Rs.8.3277 crores. At present an amount of Rs.76.6723 crore is available as balance. The Empowered Committee meeting held on 28.12.2015 discussed the proposed Projects in detail and had given its approval to 82 projects for an amount of Rs. 71.4768 crore.

4.The Committee has examined the proposal for allocation of Rs.5.1955 crore for construction of RoB Chathankai, which is not included in Dr.Prabhakaran Commission report. Committee has decided to allocate funds for the above project and also decided to exclude the

works with lowest priority and having even expenditure from the Commission report so that there will not be any change in the total allocation of the package.

5. Government have examined the decisions taken by SLEC and are pleased to issue Administrative Sanction to the 83 projects for a total amount of Rs.76.5755 crore under Kasaragod Package for the financial year 2015-16. The expenditure on this will be debited under the Head of account 2551-60-101-97. List of projects for which Administrative Sanction granted is appended.

(By Order of the Governor), C.Valsala, Additional Secretary to Government.

To The Additional Chief Secretary (Finance), The Additional Chief Secretary(Planning), The District Panchayath President, Kasaragod, The District Collector, , The Chief Agriculture Division, State Planning Board, The District Planning Officer, Kasaragod, The Principal Accountant General (Audit/A&E),Kerala, Thiruvananthapuram, Stock File / Office copy.

Forwarded/By Order,

Section Officer.

Copy to :- P.S to Minister (Planning), P.S to Minister (Public Works Department), P.S to Chief Secretary, The Director, I&PRD.

KASARAGOD DEVELOMENT PACKAGE List of Sanctioned works Sl. Amount Name of Schemes No. Allotted 1. Agriculture Comprehensive Arecanut & Coconut Development Micro irrigation in coconut and 1 55.00 arecanut garden (150 Ha) 2 Mobile Soil Service support of organic Farmers 20.00 3 Crop Development Programme 200.00 Total 275.00 2. Minor Irrigation 4 Construction of Check Dam across Manjeswar thodu at Poyya in GP 45.00 5 Construction of Check Dam across Muchilotu thodu in Ward no.V of GP 40.00 6 Check dam across Chalanbidi thodu in Pallikkara GP 38.00 7 Construction of VCB cum Tractor passage at Alampady 45.00 8 Renovation of Padanna Anicut at Edachakkai in Padanna Panchayath 192.00 9 Constructing VCB across Klayikkodu-Kizhakke Karavayal in GP 28.00 10 Construction of a VCB at Kottappara thodu in Pallikkara GP 60.00 Construction of Check Dam across Bangaramanjeswar river in Korattamogaru 11 60.00 Manjeswar GP 12 Construction of VCB across Payaradka river at Payaradka in GP 65.00 Construction of a VCB cum Tractor track across Vannathikanam thodu at Thekkekara 13 50.00 in GP 14 Construction of Panchadippara VCB in GP 40.00 15 Construction of VCB at Thalakkalakana in GP 25.00 16 Construction of VCB across Malenky Peruvathody thodu at Adwala in Bellur GP 58.00 Constructing a VCB across Palakochi-Alamthatta thodu at Madathinthazhe in Kayyur 17 20.00 Cheemeni GP Construction of VCB cum tractor way across Laloor Modagram thodu at 18 50.00 Chunnamkulam in Belur GP Construction of VCB cum tractor way across Kuthaje thodu at Kalthaje in 19 90.00 GP Renovation of SWE dam cum bridge across Aravathmukkund Thodu at Mouvval 20 100.00 Kuthirakod in Pallikkare GP 21 Renovation of Kolamkode VCB cum bridge at GP 85.00 Total 1091.00 3. Animal Husbandry 22 Mechanisation support to livestock farmers 150.00 Total 150.00 4. Dairy Development 23 Mobile Quality Control Laboratory 10.00 24 Hostel for Dairy Training Centre (Nayikkapp) 164.00 Total 174.00 5. Harbour Engineering 25 Tsunami colony Road construction in Kasaragod 25.00 26 Bevinje Star Nagar Pazhaya Kadavu Kangal Road construction in Chengala GP 100.00 27 Panalam-Chengala-Akkarangara Kadavu-Cheroor Road Construction in Chengala GP 100.00 28 Cheroor Kadavu- Thookupaalam- Elinja- Chengala road in Chengala GP 75.00 29 Patla-Mogar Masjid road in Madur GP 41.00 30 Shamnad Vayal Thottathil Road in Kasaragod Municipality 15.00 31 Bangarakunnu Road in Kasaragod Municipality 12.00

32 Road from Kizhoor Beach to Kasaragod harbour in Chemmanad GP 25.00 33 Maara Masjid Road in Chengala GP 27.00 34 Thalangara west pallam coastal road in kasaragod Municipality. 200.00 35 Mogar Masjid- Kottakkunnu Road (Mogral Puthur GP) 45.00 36 Hosabettu Fisheries Road (Manjeshwaram GP) 20.00 37 K K Puram Road construction at Mogral Kadavu (Kumble GP) 46.00 38 Kaje Kuthiru Road in Manjeswaram GP 69.00 39 Shanthigiri Kubhannur Road in Mangalpady GP 69.00 40 Gate Malabar Road in Mangalpady GP 30.00 41 FWC- Nangi Road in Kumble GP 20.00 42 Bangara Manjeswar Katta Road in Manjeswaram GP 31.00 43 Mussodi Adikka Kuluppulu Road in Mangalpady GP 70.00 44 KW Kottuva Road in Kumble GP 77.00 45 CHC Kundaduka Road in Kumble GP 34.00 46 Construction of Manjeswaram Fisheries Harbour Bridge 200.00 Total 1331.00 6. Roads and Bridges 47 Hosdurg Road (Chemberi-) 500.00 48 Olavara- Udumbumthala- Vellappu road (0/000 to 6/500) 200.00 49 Painikkara Bridge 250.00 Total 950.00 7. Drinking Water 50 Water Supply Scheme at Hosabettu 95.00 RWSS to Enmakaje and Adjoining villages - Construction of an RCC Weir across 51 430.00 river at Adukkasthala 52 WSS to Endosulfan hit Area, Kallar GP 350.00 Total 875.00 8. Health 53 Sewage Treatment Plant at Genaral Hospital Kasaragod 125.00 54 Sewage Treatment Plant at DH 125.00 55 CSSD and centralized oxygen and suction system at DH Kanhangad 150.00 56 X-ray unit at Taluk Hospital Nileswar 30.00 57 Taluk Hospital Building at 100.00 58 Digital X-ray Unit for General Hospital ,Kasaragod 15.00 59 Lab upgradation CHC 20.00 60 Lab upgradation at CHC Panathadi (Poodamkallu) 20.00 61 Lab upgradation at CHC Mangalpady 20.00 62 Lab upgradation at CHC Periya 20.00 Total 625.00 9. School Education 63 Infrastructure to GHSS Kundamkuzhy 50.00 64 Infrastructure to GFHS Kanhangad 18.00 65 Infrastructure to GHSS Thayannur 60.00 66 Infrastructure to GHSS Kalichanadukkam 36.00 67 Infrastructure to GHSS Uppala 60.00 68 Infrastructure to GHS Kanhirapoil 100.00 69 Infrastructure to GHS Soorambail 50.00 70 Infrastructure to GHSS Alampady 25.00 71 Infrastructure to GHSS Mogral Puthur 17.50 72 Infrastructure to GHSS 35.00

73 Infrastructure to GHSS Madikkai II 50.00 74 Infrastructure to GUPS Banam 85.00 75 Infrastructure to GUPS Paraklayi 85.00 76 Infrastructure to GFHS 50.00 77 Infrastructure to GHSS Shiriya 68.00 Total 789.50 10. Sports 78 Mini Indoor Stadium at Kanhangad 300.00 Total 300.00 11. Tribal Development 79 Recreational hall at Model Residential School 27.50 Total 27.50 12. Enhancing Public Service Delivery 80 Bachelors Hostel 100.00 Total 100.00 13. Industries 81 Infrastructure Development in DA&DP Ananthapuram 200.00 Total 200.00 14. Railway Sector 82 Beericheri RoB (Km 7/00) 250.00 83 Construction of ROB at Chathankai 519.55 Total 769.55 Grand Total 7657.55