Rebuilding Christchurch in the Wake of the 2010 & 2011 Earthquakes

Total Page:16

File Type:pdf, Size:1020Kb

Rebuilding Christchurch in the Wake of the 2010 & 2011 Earthquakes Rebuilding Christchurch in the Wake of the 2010 & 2011 Earthquakes – A Surveyor's Perspective Lester Simon IRONSIDE, New Zealand Key words: Earthquake, Cadastral Surveying, Infrastructure, Boundary Definition SUMMARY After the 2010 Darfield Earthquake, a 7.1 magnitude earthquake near Christchurch, New Zealand’s second city, the region had been hit by hundreds of aftershocks - many of them widely felt in and around Christchurch, and some of which have caused further damage. Nearly six months later, just as everybody was getting used to post-earthquake life, a magnitude 6.3 earthquake (technically an after shock of the earlier earthquake) hit - just before 1pm on Tuesday the 22nd of February 2011. This time, Christchurch was not so lucky - 185 people lost their lives, with many more injured. Many Christchurch buildings were badly damaged, with some collapsing and 1,200 requiring demolition or major repairs. At 1pm on June 13, a 5.7 magnitude quake rattled Christchurch again, only to be followed nearly two hours later by a 6.3 aftershock; one fatality was reported, and many buildings suffered further damage or collapsed. This paper describes the activities of the private sector surveyors beginning with the 4 September 2010 initial response effort on through the many months of uncertainty to the vision for a new Christchurch. Surveying, Surveyors and Spatial Information have all been identified as key aspects to the many response phases to these events. Many professional disciplines including surveying have played roles in gaining a better understanding of Christchurch now in the hope and preparation for a new future for the city. There are many lessons that can be gleaned from this work and much learned by the surveyors involved through sharing their experiences with others in the wider national and international surveying communities. TS07L - Land Administration in Post Conflict and Post Natural Disaster Areas 1/13 Lester Simon Ironside Rebuilding Christchurch in the Wake of the 2010 & 2011 Earthquakes – A Surveyor’s Perspective FIG Working Week 2012 Knowing to manage the territory, protect the environment, evaluate the cultural heritage Rome, Italy, 6-10 May 2012 Rebuilding Christchurch in the Wake of the 2010 & 2011 Earthquakes - A Surveyor's Perspective Lester Simon IRONSIDE, New Zealand 1. SETTING THE SCENE 1.1 4 September 2010 The Canterbury region of New Zealand’s South Island was hit by a magnitude 7.1 earthquake at 4:35am NZST on Saturday, 4 September 2010. Centred on Darfield, 30km west of Christchurch, the South Island’s most populous centre, at a depth of 10km, the initial quake lasted about 40 seconds and produced some of the strongest ground shaking ever recorded in New Zealand (a country that is seismically active), causing widespread damage in Christchurch, the surrounding towns of Kaiapoi and Rolleston (located to the north and south of Christchurch respectively) with damage or disruption to varying degrees experienced throughout Canterbury (GeoNet, 4/9/10). Fortunately there were no deaths directly attributed to this event. Fatalities were avoided largely due to there being few dwellings of unreinforced construction, although this was also aided by the quake occurring during the early hours of the morning. The Darfield earthquake occurred as a result of strike-slip faulting on a previously unknown fault within the crust of the Pacific plate, near the eastern foothills of the Southern Alps at the western edge of the Canterbury Plains (NZSEE, 4/3/11).The peak ground acceleration (PGA) measured near Darfield was 1.26 g (12.36 m/s 2) and at the time was considered by GNS scientists as an "extremely rare seismic recording made near a fault rupture" (GeoNet, 4/9/10). Geologically the Darfield earthquake was relatively complex, involving movement on at least three interconnected faults. The largest of these previously unknown faults (the Greendale Fault) ruptured through to the ground surface producing a 30km long surface rupture. A feature of the Darfield Earthquake was the damage caused by soil liquefaction, which occurs when saturated, unconsolidated (loose) soils are severely shaken causing water and silt or sand to be ejected to the ground surface. This resulted in subsidence and, in places, lateral spreading (sideways movement) of the ground causing damage to dwellings and underground services. This was particularly the case in the riverside areas of Avonside, Dallington, Burwood, Avondale, and Kaiapoi, and in river delta areas near Bexley, Brooklands, Spencerville, Pines Beach, and Kairaki with other areas being affected to a substantially lesser degree or not at all (Tonkin & Taylor Ltd Stage 1 Report, 2010). S07A - Land Administration in Post Conflict and Post Natural Disaster Areas 2/13 Lester Simon Ironside Rebuilding Christchurch in the wake of the 2010 & 2011 Earthquakes - A Surveyor's Perspective FIG Working Week 2012 Knowing to Manage the Territory, Protect the Environment, Evaluate the Cultural Heritage Rome, Italy, 6-10 May 2012 Damage from liquefaction may have been worsened by the high water table from a wet winter. Liquefaction also caused problems for the gravity-fed sewer network. Buried pipes were forced to the surface, manholes popped out of the ground and sewer pump stations were damaged, causing extensive damage to the reticulated system. Land movement and subsidence in areas affected by liquefaction and lateral spreading generally ceased as water pressures within the soil returned to normal. Although soils regained most of the strength they lost during liquefaction the level of the ground surface changed in many areas raising concerns about the increased risk of flooding due to the low lying nature of the topography (Tonkin & Taylor Ltd. Stage 1 Report, 2010). Water mains were extensively damaged and in some areas, including the Rolleston water supply; supplies were contaminated as a result of the sewer main damage. Residents were asked to boil water until repairs were completed. (CCC Notice 8/9/10) Power to up to 75% of Christchurch was disrupted and Christchurch Hospital was forced to use emergency generators in the immediate aftermath of the quake, however 90% of the electricity in Christchurch was restored by 6:00pm on the day of the earthquake. The repair of electricity was more difficult and took longer in the outlying rural areas. Although many of Christchurch's major landmarks survived intact, most of the badly affected structures in both Christchurch and the surrounding districts were older un-reinforced buildings, including several notable landmarks. Most modern buildings performed as they were designed to do, preserving life rather than keeping the interior in good order. 1.2 22 February 2011 A magnitude 6.3 earthquake hit Christchurch with devastating effect at 12:51pm NZDT on Tuesday, 22 February 2011, six months after the Darfield Earthquake. The Christchurch Earthquake (although technically an aftershock of the 4 September event), was one of the nation's worst natural disasters with 185 fatalities, by far New Zealand's costliest natural disaster and the third-costliest earthquake (nominally) worldwide (Murdoch, 2011). The Christchurch earthquake occurred at a depth of 5km and GNS Science reported that the earthquake arose from the rupture of an 8km x 8km (again previously unknown) fault running east-northeast at a depth of 1 – 2km beneath the southern edge of the Avon-Heathcote Estuary and dipping southwards at an angle of about 65 degrees from the horizontal beneath the Port Hills. Unlike the Darfield event, the rupture was subsurface and initial satellite imagery indicated that the net displacement of the land south of the fault was 50cm westwards and upwards although land movement varied around the area horizontally and vertically (GeoNet, 22/2/11). S07A - Land Administration in Post Conflict and Post Natural Disaster Areas 3/13 Lester Simon Ironside Rebuilding Christchurch in the wake of the 2010 & 2011 Earthquakes - A Surveyor's Perspective FIG Working Week 2012 Knowing to Manage the Territory, Protect the Environment, Evaluate the Cultural Heritage Rome, Italy, 6-10 May 2012 It caused extensive damage across Christchurch, especially in the central city and eastern suburbs. Damage was exacerbated by buildings and infrastructure already weakened by the 4 September event and its aftershocks. The vertical acceleration was far greater than the horizontal acceleration. The PGA in central Christchurch exceeded 1.8 g (i.e. 1.8 times the acceleration of gravity), with the highest recording of 2.2 g at the Heathcote Valley Primary School, contrasting to the highest reading during the 4 September earthquake of 1.26 g. This is the highest PGA ever recorded in New Zealand and one of the greatest ever ground accelerations recorded in the world. It was unusually high for a magnitude 6.3 earthquake and the highest recorded in a vertical direction. It is probable that ‘seismic lensing’ contributed to the ground effect, with the seismic waves rebounding off the hard basalt of the Port Hills back into the city (GeoNet, 22/2/11). Liquefaction, particularly in the eastern suburbs, was worse than the Darfield earthquake, producing over 500,000 tonnes of silt (Rebuild Christchurch, 2011), and this time there were significant landslips and rockfalls on the Port Hills. The hill suburbs, largely unaffected by the 4 September earthquake, sustained considerable damage. In central Christchurch the acceleration occurred mainly in a vertical direction and the upwards acceleration (positive) was greater than the downwards. The PGA was greater than many modern buildings were designed to withstand. Whereas the building code requires a building with a 50-year design life to withstand predicted loads of a 500-year event; initial reports by GNS Science suggested ground motion exceeded even 2500-year design motions and beyond maximum considered events (NZSEE, 4/3/11). By comparison, the earlier Darfield earthquake—in which damage was predominantly to pre-1970s buildings—exerted 65% of the design loading on buildings.
Recommended publications
  • Christchurch City Council
    CHRISTCHURCH CITY COUNCIL MINUTES OF A MEETING OF THE GREATER CHRISTCHURCH URBAN DEVELOPMENT STRATEGY IMPLEMENTATION COMMITTEE (UDSIC) Held in the Civic Building, Christchurch City Council, 53 Hereford Street, Christchurch on Friday 11 May 2012 commencing at 12 PM PRESENT: Urban Development Strategy Independent Chair Bill Wasley Christchurch City Council Councillor Sue Wells Selwyn District Council Mayor Kelvin Coe, Councillors Lindsay Philps and Malcolm Lyall Waimakariri District Council Mayor David Ayers, Councillor Dan Gordon Te Rūnanga o Ngāi Tahu Wally Stone New Zealand Transport Authority Mark Yaxley on behalf of Jim Harland (observer) Canterbury Earthquake Recovery Authority Diane Turner on behalf of Roger Sutton (observer) IN ATTENDANCE: New Zealand Transport Authority Steve Higgs Environment Canterbury Selwyn District Council Laurie McCallum Tim Harris Christchurch City Council Brigette de Ronde Rachael Brown – Committee Adviser DDI: 941 5249 UDS Partnership Keith Tallentire - UDS Implementation Manager DDI: 941 8590 1. APOLOGIES Apologies from Mayor Parker, Councillor Reid, Mark Solomon, Roger Sutton (observer), Jim Gerard and Commissioners Tom Lambie and Peter Skelton were accepted by the Committee. 2. CONFIRMATION OF MINUTES: MEETING OF 9 MARCH 2012 The Committee confirmed the minutes of its previous meeting held on 9 March 2012 as a true and accurate record of the meeting. Greater Christchurch UDS Implementation Committee 19.12.2011 - 2 - 3. MATTERS ARISING FROM THE MINUTES Nil. 4. APPOINTMENT OF DEPUTY CHAIR REPORT The Committee agreed that it: a. create the position of Deputy Chair for the UDSIC b. authorise the Deputy Chair to undertake media statements and interviews on behalf of the UDS partnership c. appoint Mayor David Ayers as the Deputy Chair.
    [Show full text]
  • Strategy and Policy Committee Report Back on Attendance at the Emergency Management Conference
    STRATEGY AND POLICY COMMITTEE 7 MARCH 2013 REPORT 5 (1215/52/IM) REPORT BACK ON ATTENDANCE AT THE EMERGENCY MANAGEMENT CONFERENCE – FEBRUARY 2012 1. Purpose of Report To report back to all Councillors on the Conference including the subjects covered and an opinion of the value of attendance by Elected Members. 2. Purpose of Report It is recommended that the Strategy and Policy Committee 1. Receive the information. 3. Details of the Conference On February 22nd 2011 I was attending an Emergency Management Conference. Guest speakers spoke of how lucky Christchurch was to have survived the previous September 4th quake with no loss of life. We broke for lunch and at 12.51pm Christchurch suffered another major earthquake. This time it was not so lucky and it became obvious, from the experts in the room that this would be serious. The conference was cancelled and I went home to watch the grim news unfold on television. In February 2012 the conference reconvened. This time there was much to discuss. I was unfortunately not able to attend all sessions as a fellow councillor who was to also attend and do some of the sessions was not able to be there. The first day started with keynote speakers: Clive Manley, head of Auckland Council Civil Defence, Hon Chris Tremain Minister of Civil Defence and Mayor Bob Parker. Bob told us 71,000 homes were affected, 40,000 chemical toilets were distributed, half a million tons of silt was moved and $1billion of damage was done to the waste water system alone. After morning tea we heard from Dr Richard Sharpe of BECA.
    [Show full text]
  • Urban Disaster Recovery in Christchurch: the Central Business District Cordon and Other Critical Decisions
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by UC Research Repository Urban Disaster Recovery in Christchurch: The Central Business District Cordon and Other Critical Decisions a) a) b) Stephanie E. Chang, M.EERI, Josh E. Taylor, Kenneth J. Elwood, c) d) e) M.EERI, Erica Seville, Dave Brunsdon, M.EERI, and Mikaël Gartner The Canterbury earthquakes, which involved widespread damage in the February 2011 event and ongoing aftershocks near the Christchurch central business district (CBD), presented decision-makers with many recovery challenges. This paper identifies major government decisions, challenges, and lessons in the early recovery of Christchurch based on 23 key-informant interviews conducted 15 months after the February 2011 earthquake. It then focuses on one of the most important decisions – maintaining the cordon around the heavily damaged CBD – and investigates its impacts. The cordon displaced 50,000 central city jobs, raised questions about (and provided new opportunities for) the long-term viability of downtown, influenced the number and practice of building demolitions, and affected debris management; despite being associated with substantial losses, the cordon was commonly viewed as necessary, and provided some benefits in facilitating recovery. Management of the cordon poses important lessons for planning for catastrophic urban earthquakes around the world. Full citation: Chang, S. E., Taylor, J. E., Elwood, K. J., Seville, E., Brunsdon, D., & Gartner, M. (2014). Urban Disaster Recovery in Christchurch: The Central Business District Cordon and Other Critical Decisions. Earthquake Spectra. doi: 10.1193/022413EQS050M. http://earthquakespectra.org/doi/abs/10.1193/022413EQS050M COPYRIGHT (2014) EARTHQUAKE ENGINEERING RESEARCH INSTITUTE.
    [Show full text]
  • Notes from the Council Earthquake Forum
    CHRISTCHURCH CITY COUNCIL NOTES FROM THE COUNCIL EARTHQUAKE FORUM Held in the Council Chamber, Civic Offices on Thursday 15 November 2012 at 9.30am PRESENT: Mayor Bob Parker (Chairperson) and Councillors Peter Beck, Helen Broughton, Sally Buck, Tim Carter, Jimmy Chen, Barry Corbett, Yani Johanson, Aaron Keown, Glenn Livingstone and Sue Wells. APOLOGIES: Apologies for absence were received and accepted from Councillors Ngaire Button, Jamie Gough and Claudia Reid. 1. IBM SMARTER CITIES PROJECT At the opening of the forum the Mayor announced that Christchurch had been selected, as the only Southern Hemisphere city, to take part in the IBM Smarter Cities Project. 2. BRIEFING FROM ROGER SUTTON, CHIEF EXECUTIVE, CANTERBURY EARTHQUAKE RECOVERY AUTHORITY (CERA) Mr Sutton acknowledged that the pace of getting recovery work underway was still frustratingly slow, but that momentum was gathering in the construction sector and with SCIRT work. He advised that a resolution has been reached with Avoca Valley residents – the loose material behind their residences is to be removed, with the goal that residents could be back in their homes by next winter. The Port Hills Appeals process is underway, regarding whether properties are classified as red or green. Discussions are underway with the owners of uninsured property in the red zone. There are about 70 owners in this situation, which is less than 1 percent of all red-zoned properties. The Draft Central City Transport Plan to be released by the Minister this afternoon. The set-up for the Insurance Advisory Service is well underway, it is expected that this service will be up and running by the end of the year.
    [Show full text]
  • An Evolving Order the Institution of Professional Engineers New Zealand 1914–2014
    An Evolving Order The Institution of Professional Engineers New Zealand 1914–2014 Peter Cooke An Evolving Order The Institution of Professional Engineers New Zealand, 1914-2014 Peter Cooke Published by Institution of Professional Engineers New Zealand, 158 The Terrace, Wellington, New Zealand © 2014 Institution of Professional Engineers New Zealand The author, Peter Cooke, asserts his moral right in the work. First published 2014 This book is copyright. No part of this publication may be reproduced or transmitted in any form or by any means without the prior written permission of the copyright owner. ISBN 978-0-908960-58-3 (print copy) ISBN 978-0-908960-59-0 (electronic book) Book design by Cluster Creative CONTENTS Foreword vii Acknowledgements ix Abbreviations x Chapter 1: Beginnings 1 The arrival of New Zealand’s surveyors/engineers 1 Motivation for engineering independence 4 Local government engineers 1912 6 “One strong society” 8 Other institutions 10 Plumbers, architects, and the New Zealand Society of Civil Engineers 12 First World War 15 Chapter 2: 1920s 21 Engineers Registration Act 1924 21 Getting registered 24 The Society’s first premises 26 Perception of the Society 27 Attempting advocacy 29 What’s in a name? Early debates 30 Benevolence 32 New Zealand engineering and the Society’s history 33 Chapter 3: 1930s 37 A recurring issue: the status of engineers 37 Engineering education and qualifications 38 Earthquake engineering 40 Standardisation 42 Building bylaw 44 Professional etiquette/ethics 45 A test of ethics 47 Professional
    [Show full text]
  • Governing the Recovery from the Canterbury Earthquakes 2010 -11: the Debate Over Institutional Design
    Governing the Recovery from the Canterbury Earthquakes 2010 -11: the Debate over Institutional Design Rachel Brookie Working Paper 12/01 June 2012 INSTITUTE FOR GOVERNANCE AND POLICY STUDIES WORKING PAPER 12/01 MONTH/YEAR June 2012 AUTHOR Rachel Brookie rachel [email protected] ACKNOWLEDGEMENTS The author wishes to acknowledge and thank the following parties for the generous contribution of their time and expertise, their helpful comments, guidance and support: Jonathan Boston, Janet Tyson, James Smart and Rob Laking, Vic Lipski for copy-editing and Berys Cuncannon for administrative support. She also wishes to thank the Summer Scholar Scheme at Victoria University of Wellington for providing the funding to make this research possible. INSTITUTE FOR GOVERNANCE School of Government AND POLICY STUDIES Victoria University of Wellington PO Box 600 Wellington NEW ZEALAND For any queries relating to this working paper please contact [email protected] DISCLAIMER The views, opinions, findings, and conclusions or recommendations expressed in this paper are strictly those of the author. They do not necessarily reflect the views of the Institute for Governance and Policy Studies, the School of Government or Victoria University of Wellington. Contents Part 1 – Introduction .............................................................................................................. 4 Background - A series of unfortunate events ........................................................................ 4 PART 2 – Looking at the literature .........................................................................................
    [Show full text]
  • The Role of Gender in Building a Resilient City
    The Role of Gender in Building a Resilient City: Examining Christchurch New Zealand Rachel Kimber, MPA Arcus Foundation New York, NY 10001 [email protected] November 2014 Presented at the ANZTSR Conference Resilience, Change and the Third Sector 12th Biennial Australian and New Zealand Third Sector Research Conference 18-20 November 2014 Otautahi / Christchurch, Aotearoa, New Zealand The role of gender in building a resilient city 2 Abstract New Zealand has an opportunity to become a global example of the benefits of organizational gender balance by showcasing the Christchurch rebuild as a project that promotes gender diversity. Equal Opportunity policies have not dramatically changed the make-up of corporate boards nor have they resulted in the promotion of women to senior leadership positions. A review of recent research confirms that there are clear organizational benefits to promoting women to decision-making positions and these same benefits can contribute to greater national resilience. The organizations working to rebuild Christchurch need a diversity of perspective to implement creative and innovative strategies for city-wide resilience. The necessary diversity of perspective can be attained through the promotion of women to leadership positions. Keywords: ANZTSR 2014, Leadership, Resilience, Women The role of gender in building a resilient city 3 Introduction New Zealand has led the world in championing gender equality and women's rights. In 1893 New Zealand became the first self-governing country in the world to give women the right to vote in parliamentary elections1 and during the intervening hundred years, New Zealand has maintained its place as a trailblazing country for women’s rights and gender equality.
    [Show full text]
  • Greater Christchurch Urban Development Strategy Implementation Committee (Udsic)
    UNCONFIRMED CHRISTCHURCH CITY COUNCIL MINUTES OF A MEETING OF THE GREATER CHRISTCHURCH URBAN DEVELOPMENT STRATEGY IMPLEMENTATION COMMITTEE (UDSIC) Held in the Council Chamber, Civic Building, Christchurch City Council, 53 Hereford Street on Friday 14 December 2012 commencing at 9.30am PRESENT: Urban Development Strategy (UDS) Independent Chair Bill Wasley Christchurch City Council (CCC) Councillor Sue Wells Environment Canterbury (ECan) Commissioner Rex Williams Selwyn District Council Mayor Kelvin Coe and Councillors Malcolm Lyall and Lindsay Philps Waimakariri District Council (WDC) Mayor David Ayers, Councillors Te Rūnanga o Ngāi Tahu (TRoNT) Wally Stone New Zealand Transport Authority (NZTA) Jim Harland (Observer) Canterbury Earthquake Recovery Authority (CERA) Diane Turner (Observer on behalf of Roger Sutton) 1. APOLOGIES Apologies were received and accepted from Mayor Bob Parker (CCC), Councillors Claudia Reid (CCC), Jim Gerard and Dan Gordon (WDC), Commissioners Tom Lambie and Peter Skelton (ECan), Mark Solomon (TRoNT) and Roger Sutton (CERA). 2. CONFIRMATION OF PREVIOUS MINUTES The minutes of the meeting on Friday 9 November 2012 were confirmed. 3. GREATER CHRISTCHURCH TRANSPORT STRATEGY – SIGN OFF. It was noted that: all partners have signed off the Greater Christchurch Transport Strategy (GCTS) the CCC have suggested changes to be included in the final version (refer Recommendation 2(a) below), copies of the document with these included as tracked changes were tabled at the meeting GREATER CHRISTCHURCH URBAN DEVELOPMENT STRATEGY IMPLEMENTATION COMMITTEE 9. 11. 2012 - 2 - 3. Cont’d an amendment is required to the first priority on page 5, so that freight challenges are not emphasised over community outcomes (refer Recommendation 2(b) below). On the motion of Mayor Kelvin Coe, seconded by Councillor Sue Wells, it was resolved to: 1) Endorse the Greater Christchurch Transport Statement as a key Urban Development Strategy transport implementation tool for a consistent, one-network approach to managing the transport system.
    [Show full text]
  • Media Release Appointments Made for Work on First CBD Anchor
    Media Release Appointments made for work on first CBD anchor projects Release Date: 20 December 2012 Key anchor projects are set to begin taking shape in central Christchurch with the appointment of groups to design and develop the Avon River Precinct and North and East Frames. After a rigorous tender process, a multi-company consortium led by Opus has been selected to design these projects, which are priorities in the Christchurch Central Recovery Plan to promote recreation, business growth and central city living for the people of greater Christchurch. Impact Project Management has been chosen to carry out project management for the projects, and WT Partnership NZ Infrastructure Limited has been selected to carry out quantity surveying. The parties chosen will also provide work on flood management for the river. Work will begin early in the new year on concept design for the projects, with physical construction of the projects to commence later in the year. It is anticipated the projects will take three years to complete. The Canterbury Earthquake Recovery Authority (CERA) is overseeing the projects, along with partners including the Christchurch City Council, Te Runanga o Ngāi Tahu, and Environment Canterbury. CERA chief executive Roger Sutton says the public’s ideas from the Christchurch City Council Share an Idea campaign in 2011 have flowed through to the Recovery Plan’s Blueprint for central Christchurch this year. "With this step forward today, Christchurch residents can take heart that their hard work and their ideas are coming to fruition. We are now moving beyond the Blueprint. We are no longer planning, we are doing," Mr Sutton says.
    [Show full text]
  • Round-Table Report
    3 ABOUT THE RESILIENCE SHIFT The Resilience Shift exists to inspire and empower a global community to make the world safer through resilient infrastructure. More people than ever depend on the critical infrastructure systems that provide essential energy, water, transport and communications services, and underpin food, healthcare and education. When this infrastructure fails the consequences can be catastrophic. Supported by Lloyd’s Register Foundation and Arup, the Resilience Shift provides knowledge and tools for those responsible for planning, financing, designing, delivering, operating and maintaining critical infrastructure systems. Our aim is to ensure infrastructure systems are able to withstand, adapt to, and recover quickly from anticipated or unexpected shocks and stresses - now and in the future. DEFINING RESILIENCE Resilience is the ability to withstand, adapt to changing conditions, and recover positively from shocks and stresses. Resilient infrastructure will therefore be able to continue to provide essential services, due to its ability to withstand, adapt and recover positively from whatever shocks and stresses it may face now and in the future. CITATION REFERENCE Guthrie, P., and MacAskill, K. (March 2019) Lessons for infrastructure resilience from the reconstruction of Christchurch. Resilience Shift Round-table Series. Cambridge University and Resilience Shift, UK. This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the CC BY-NC-ND 4.0 source, provide a link to the Creative Commons license, and indicate if changes were made.
    [Show full text]
  • Greater Christchurch RECOVERY UPDATE Port Hills Zoning Decisions
    Greater Christchurch RECOVERY UPDATE Port Hills zoning decisions Three studies on the life-safety risks Another eight properties on Lucas Lane are at risk of landslip associated with cliff collapse or falling and also require further investigation. A decision is expected “The information they have collected by by the end of October. boulders, known as rock roll, have been mapping thousands of rocks over the Port commissioned on the harder hit Port Hills Earthquake Recovery Minister Gerry Brownlee says it’s the Hills has been fed into the state of the areas, to inform decision-making: life-threat risk that’s created the uncertainty for some people. art modelling system developed by the • The Institute of Geological and Nuclear Sciences (GNS) “A lot of people have worked hard on this and I wouldn’t want Milan University. Those models have been study for the Christchurch City Council anyone to think that the decisions made have been trite or ill- run and re-run to ensure the answers are considered – far from it. We know how serious it is for people consistent. So as frustrating as it may be, • A ground truthing of the resulting GNS model was to receive these decisions, but it also marks a significant step undertaken by the Port Hills Geotechnical Group for the forward for the wider city because it means that we now have it just has to be acknowledged that this Christchurch City Council only a few of our residential properties with some uncertainty work is complex. And these decisions have • A 3D rock fall study was undertaken for CERA by about their future.” not been made lightly.” - Roger Sutton specialist geotechnical engineering firm Geovert “We’re not trying to prolong the pain; we just want to make That’s resulted in the green zoning of more than 1,100 Port sure people get a fair go as the situation is not as clear as it’s Hills homes and the red zoning of 285.
    [Show full text]
  • The Canterbury Earthquake Recovery Authority (A) 2016-189.1
    ANZSOG Case Program From emergency to urgency: the Canterbury Earthquake Recovery Authority (A) 2016-189.1 On 29 March 2011, the New Zealand Government announced the creation of a new government department. To be known as the Canterbury Earthquake Recovery Authority or CERA (pronounced Sarah), it would have extensive powers to override legislation and regulations deemed to stand in the way of a speedy recovery from the earthquake that had devastated the city of Christchurch, causing 185 deaths, a month earlier. The Canterbury Earthquake Recovery (CER) Act, which would pass with multi-party support, outlined a formidable list of tasks for CERA. These included ensuring that greater Christchurch would make a ‘focussed, timely and expedited recovery’ from damage and destruction on an epic scale, enabling community participation in the planning. CERA was to coordinate and direct the repair and rebuilding of affected communities, and restore their ‘social, economic, cultural and environmental wellbeing’. In order to achieve this in its five-year life, the CER Act gave CERA the final say on where, how and in what priority both demolition and reconstruction could take place; CERA could acquire land compulsorily and enter private property, and prosecute people who failed to comply with directions given under the Act.1 The establishment of CERA as a government department meant that its Chief Executive would report directly to its Minister. The Hon Gerry Brownlee, Minister for Canterbury Earthquake Recovery, third-ranked in Cabinet, was a long-serving Christchurch MP. This case was written by Janet Tyson for Associate Professor Michael Di Francesco, the Australia and New Zealand School of Government.
    [Show full text]