From: @gmail.com To: TCCS FreedomOfInformation Cc: Subject: foi request Community Path Priority List Date: Thursday, 28 January 2021 2:55:03 PM

CAUTION: This email originated from outside of the ACT Government. Do not click links or open attachments unless you recognise the sender and know the content is safe.

Hello to FOI Coordinator Transport and City Services Directorate.

How are you today.

Can I please submit a foi request for the most up-to-date "Community Path Priority List", as at the date of your response to this request.

Thank you kindly for your help.

From OFFICIAL

Mr By email: gmail.com

Dear

n ainR R n 21 008

I refer to your application received by Transport Canberra and City Services (TCCS) on 28 January 2021. It is my understanding you are seeking access to “the most up-to- date "Community Path Priority List", as at the date of your response to this request”.

I am an Information Officer appointed by the Director-General under section 18 of the Act to deal with access applications made under Part 5 of the Act.

A decision on access to government information was due to you by 25 February 2021 and was not made within the allowed timeframe. In accordance with section 39(3) of the FOI Act, TCCS have decided to continue process your application outside of time.

ii n na A search of records held by TCCS has been completed and an electronic database was identified to contain information relevant to your application. Relevant information held in this database was extracted on 16 February 2021 into a singular record (18 pages).

As the list of community path requests is linked directly to requests made through Fix My Street, the list is altered daily. Requests are prioritised based on the following 5 factors:

1. Safety; 2. Strategic (how the request completes routes identified as part of the Active Travel Infrastructure strategic path network); 3. Community (proximity to community attractions and trip generators, shops, schools, residential areas); 4. Public transport- proximity to relevant public Transport facilities such as bus stops; and 5. Demand.

Available funding is also considered in the management of these requests. While a request may be listed in the database, the fulfilment of a request depends on the above listed factors and in some instances the request may not be fulfilled. In accordance with section 17 of the Act, I have considered the public interest in relation to information within this document and have provided you with partial a g a n 02 620 72987 aga

Page 1 of 3 OFFICIAL

access to this record. I have refused access to some information within this record as I have found the information to be contrary to the public interest. My decision is detailed further in the following statement of reasons. The record is enclosed at Attachment A with deletions to information which is contrary to the public interest.

Statement of Reasons In making my decision on disclosing government information, I must identify all relevant factors in schedule 1 and 2 of the FOI Act. I must also determine, on balance, where the public interest lies. In reaching my access decision, I have taken the following into account:

Factors favouring disclosure in the public interest (Schedule 2.1) • Schedule 2.1(a) (ii) - contribute to positive and informed debate on important issues or matters of public interest. • Schedule 2.1(a)(iii) - inform the community of the government’s operations, including the policies, guidelines and codes of conduct followed by the government in its dealings with members of the community; • Schedule 2.1(a)(iv) - ensure effective oversight of expenditure of public funds; and • Schedule 2.1(a)(viii) - reveal the reason for a government decision and any background or contextual information that informed the decision.

Factors favouring non-disclosure (Schedule 2.2) • Schedule 2.2 (a)(ii), prejudice the protection of an individual’s right to privacy.

In reviewing the information within the record, it was identified that the disclosure of most of the information would contribute to a transparency of process, inform the community on government operations, and reveal the reason for a government decision.

Personal information about third parties have also been identified within the documents subject to this request. Personal information means information or an opinion whether true or not about an individual whose identity is apparent or can be ascertained from the information or opinion. The Information Privacy Act 2014 prescribes how government collects, uses, shares, and stores this information. It is my understanding that this information was provided specifically for the purpose of making an application to TCCS and the information may not be currently available to the public. I have considered the likelihood that disclosing this type of information would prejudice an individual’s right to privacy or any other right under the Human Rights Act 2004.

In this instance, I find that the disclosure of the personal information within this document is contrary to the public interest.

[email protected] | phone: (02) 620 72987 | www.act.gov.au

Page 2 of 3

CP Ref Num Type Suburb Region Street Name/Address Project Comment Ranking Proposed Treatment Length (m) Width (m) Est. Cost ($) Score Assessment Comment South-east verge of Worgan St near the intersection CP 17/07/15 Off-road Phillip (D) Worgan Street with Melrose Drive. A short footpath section is 1 Concrete - New 12 2 8,600.00 71.00 Missing link missing. Desireline near Luxton St bridge above Joynton CP 20/07/09 Off-road Belconnen Luxton Street Smith Dr through a shared path into the end of 2 Concrete - New 65 2.5 24,400.00 71.00 Ranken Pl. Community path connection near the raised CP 20/07/10 Off-road Casey Kingsland Parade pedestrian crossing at the northern end of Casey 3 Concrete - New 10 2.5 4,500.00 70.00 Market Town. Widen the access point for pedestrian crossing and CP 20/09/114 Off-road Phillip Woden Valley Melrose Drive install a rail on the western side of intersection of 4 Concrete - Widening 3 1.5 4,000.00 70.00 Melrose Drive with Worgan Street. The path is currently 1.2 m wide. It is proposed to widen the path to 2 m which will be consistent with CP 19/08/27 Off-road Dickson Cowper Street 5 Concrete - Widening 155 2 55,800.00 69.00 the existing footpath that runs from Aquatic centre carpark in western direction along Cowper Street. CP 19/08/19 Off-road Dickson North Canberra Antill Street Southern verge from Hawdon Place to Phillip Ave 6 Concrete - New 850 1.5 229,500.00 65.00 Northern verge of Anketell Street connection from CP 19/08/40 Off-road Greenway Anketell Street 7 Concrete - New 70 1.5 18,900.00 64.00 existing footpath near Bartler Pl to Bus Stop 1408. Upgrade/Widen the existing footpath from CP 16/05/04 Off-road Braddon North Canberra (D) Torrens Street 8 Asphalt - Widening 600 1.5 108,000.00 63.00 Cooyong St to Girrawheen St. From Lampard Cct to the bus stop #4008 on Haydon CP 20/02/07 Off-road Bruce Belconnen Lange Place 9 Concrete - New 200 1.5 45,000.00 60.00 Drive through Lange Place southern verge. Upgrade the footpath on eastern verge between CP 20/02/22 Off-road Barton Macquarie Street 10 Concrete - Widening 265 1.5 71,600.00 59.00 Broughton Street and Blackall Street. (1) Eastern verge of Burke Cr continues connecting to the southern verge of Canberra Ave through the CP 19/10/12 Off-road Griffith South Canberra Canberra Avenue median. (2) Eastern verge of McMillan Cr continues 11 Concrete - New 60 1.5 16,200.00 59.00 connecting to northern verge of Canberra Ave through the median. Upgrade the existing (1) western footpath from northern Starke St to bus stop #4365 and install CP 20/07/04 Off-road Holt Belconnen Hardwick Crescent 12 Concrete - Widening 1150 2.5 517,500.00 58.00 new F/P on (2) eastern verge from bus stop 4366 to southern Starke St. Southern verge between Burnie St and Melrose Dr, CP 17/07/15 Off-road Phillip Woden Valley (D) Corinna Street 13 Concrete - New 100 2 36,000.00 56.00 next to Melrose Gradens Residence. The desire line on the eastern side between Luxton St underpass and Emu Bank has not been filled in. CP 20/08/06 Off-road Belconnen Belconnen Joynton Smith Drive 14 Concrete - New 60 1.8 19,400.00 56.00 There is a very clear desire line which is regularly used by residents. Desireline on the kerbside of Edinburgh Avenue CP 19/11/25 Off-road City North Canberra Edinburgh Avenue (next to Ian Potter House) near Marcus Clarke 15 Concrete - New 82 2 29,500.00 54.00 Street intersection. Running along the kerbside of northern verge of CP 14/10/01 Off-road Bruce Belconnen Thynne Street Thynne Street, from 43 Thynne Street to open 16 Concrete - New 80 1.5 21,600.00 53.00 space connection (opposite to 126 Thynee Street) Western verge of Callam Street between Matilda CP 15/09/14 Off-road Phillip Woden Valley Callam Street 17 Concrete - New 110 3 61,400.00 52.00 Street and Bowes St. Asphalt shared path running from Kings Avenue CP 19/08/43 Off-road Barton South Canberra (D) Bowen Drive 18 Asphalt - Widening 750 2 366,000.00 52.00 Bridge underpass to Bowen Park Pavilion. Between Gilmore Cr and Yamba Dr next to Canberra CP 20/07/06 Off-road Garran Woden Valley Kitchener Street Hospital. It is a mix of new footpath and existing 19 Concrete - New 330 2 148,500.00 51.00 footpath widening The desireline extending from the asphalt CP 20/07/12 Off-road Gilmore Tuggeranong Heagney Crescent sharepath coming out of Rolph Place at North 20 Concrete - New 28 2 10,100.00 50.00 intersection with Louisa Lawson Crescent. Southern verge of Telopea Park near Gipps Street intersection, connecting to the existing kerb ramp CP 20/09/103 Off-road Barton South Canberra Telopea Park 21 Concrete - New 35 2 12,600.00 50.00 at 21 Telopea Park with existing footpath perpendicular to Telopea Park. At Aspinall Street and Zeilling Street roundabout CP 19/09/09 Off-road Watson North Canberra Aspinall Street north-western location. It is a missingl link between 22 Concrete - New 26 1.5 7,600.00 50.00 Watson Terminus Aspinall Street and Zelling Street. The priority of the proposed path is debatable, but presumably moderate Southern verge from pedestrians crossing light based on the traffic condition on CP 20/02/46 Off-road Casey Gungahlin Clarrie Hermes Drive between Overall Ave and Kingsland Parade 23 Concrete - New 761 1.5 205,500.00 50.00 Clarrie Hermes Drive. An onsite intersection to Bus Stop 5169. inspection may help to justify the priority. Eastern verge between Kitchener St and Hindmarsh CP 20/07/06 Off-road Garran Woden Valley 24 Concrete - Widening 700 2.5 393,800.00 49.00 Dr. The desireline on the south-eastern verge of the CP 19/10/67 Off-road Ngunnawal Gungahlin Newlop Street - Horse Park Drive Newlop - Horse Park - Overall roundabout leading 25 Concrete - New 20 1.5 6,400.00 49.00 to a pram ramp. Formal footpath running on the eastern side of CP 20/05/12 Off-road Lyneham North Canberra Oliver Street 26 Concrete - New 305 1.5 82,400.00 48.00 Oliver Street connecting to Goodwin Street CP 19/10/86 Off-road Dickson North Canberra Stockdale Street Southern verge between Dooring Street. 27 Concrete - New 351 1.5 94,800.00 48.00 (1) Southern verge of Lithgow Street between Wiluna Street and Canberra Avenue; (2) Northern CP 20/07/07 Off-road Fyshwick South Canberra Lithgow Street & Wiluna Street 28 Concrete - New 700 1.5 157,500.00 48.00 verge of Lithgow Street from BP to the Ipswich Street intersection running toward Wiluna Street. (1) Southern verge of Currong St S between Anzac CP 20/08/26 Off-road Reid North Canberra Currong Street South & Boolee Street Parade and Boolee St; (2) Eastern verge of Boolee St 29 Concrete - Widening 800 2 288,000.00 48.00 between Currong St S and Cooyong St. From Wimmera Street diagonally cut through the open space, then Well Station Rd, then open space CP 20/10/18 Off-road Harrison Gungahlin Open Space btwn Wimmera St & Mapleton 30 Concrete - New 400 2 144,000.00 47.00 and connect to Mapleton Ave (Follow the desireline). Existing path upgrade between Girrahween Street CP 19/04/10 Off-road Braddon North Canberra Torrens Street 31 Concrete - Widening 890 1.8 288,400.00 47.00 and Ipima Street Southern verge between Hoskins Street and CP 20/12/09 Off-road Mitchell Gungahlin Well Station Drive 32 Concrete - New 698 2 251,300.00 47.00 Flemington Road. Follow the obvious ‘desire path’ between Southern CP 20/09/04 Off-road Holt Belconnen Starke Street Cross Drive and Blackham Street, running parallel to 33 Concrete - New 130 1.5 35,100.00 46.00 Starke Street in Holt. Good area to provide additional AT Southern verge between Drakeford Dr to Laurens facilites that link to existing off road CP 20/09/90 Off-road Oxley Tuggeranong (D) Taverner Street 34 Asphalt - New 985 2.5 295,500.00 46.00 Street Underpass. network and many bus stops, both local and rapid networks. Eastern verge of Blackman Crescent from Fulton St to Lachlan St, including the outer ring near CP 20/09/121 Off-road Macquarie Belconnen Blackman Crescent playground in the middle. Initially included on 35 Concrete - New 900 1.5 253,100.00 46.00 2019/20 project but crossed off by active travel office because of Access road. Next to YMCA in , diagonally connect to existing footpath on Bowman Street. Initially CP 17/01/23 Off-road Macquarie Belconnen Jamison Centre Post Office 36 Concrete - Widening 22 2 7,900.00 46.00 included on 2019/20 program but crossed off because of access road by active travel office. On western verge of Caley Crescent between CP 20/02/18 Off-road Narrabundah South Canberra Caley Crescent Goyder Street and bus stop # 3292, connecting to 37 Concrete - New 34 1.5 14,200.00 46.00 existing F/P on Goyder Street. Well worn goat tracks exist From Kingsford Smith Drive to underpass east of CP 15/07/10 Off-road Scullin Belconnen Southern Cross Drive - I 38 Concrete - New 1500 1.5 417,000.00 45.00 everywhere in the immediate Chewings Street (southern side). environs Create connection from the F/P next to 114 Blamey CP 19/11/21 Off-road Campbell North Canberra Blamey Crescent 39 Concrete - New 6 1.8 1,900.00 45.00 Crescent to the F/P on the kerbside. Ideally is to construct a cycling path between CP 17/05/18 Off-road Bruce Belconnen Haydon Drive 40 Asphalt - New 1880 3 812,200.00 45.00 Ginninderra Drive and Belconnen Way off-road. From Solong Street through the reservoir going CP 20/09/117 Off-road Lawson Belconnen Stockman Avenue around the lake to Aikman Dr/Ginninderra Dr 41 Asphalt - New 1130 2.5 678,000.00 45.00 intersection. Western verge from Lysaght Street to Sandford CP 18/01/21 Off-road Mitchell Gungahlin Brookes Street Street. Comms team will determine the future 42 Concrete - New 520 1.5 140,400.00 45.00 needs of the community. On road cycle lanes are only provided if it is safe to do so. The Off-road cycling going northbound from Taverner requested location would require CP 18/02/09 Off-road Wanniassa Tuggeranong Drakeford Drive Northbound 43 Asphalt - Widening 540 1.5 121,500.00 45.00 Street to Athllon Drive. extensive capital upgrades to widen the bridge over Molonglo River and/or blast rock embankment. Upgrade the existing western verge from Gurrange CP 20/10/24 Off-road Ngunnawal Gungahlin Wanganeen Avenue 44 Concrete - Widening 920 1.8 298,100.00 45.00 Avenue to intersection crossing. F/P from Mapleton Avenue to Nullarbor Avenue, CP 15/02/10 Off-road Harrison Gungahlin Well Station Track including two F/P toward Wimmera Street and 45 Asphalt - New 780 3 337,000.00 44.00 Katoomba Street. Northern verge of National Circuit from Canberra CP 20/02/09 Off-road Forrest South Canberra National Circuit Avenue to Forrest Primary School, following the 46 Concrete - New 320 2 96,000.00 44.00 desireline. Upgrade the existing F/P on northern verge CP 19/10/02 Off-road Phillip Woden Valley 47 Concrete - Widening 290 1.8 117,400.00 44.00 between Callam Street and Ainsworth Street. Off-road cycling lane going southbound from CP 18/02/09 Off-road Wanniassa Tuggeranong Drakeford Drive Southbound 48 Asphalt - Widening 715 1.5 160,900.00 44.00 Athllon Drive to Taverner Street. Northern verge of Taverner Street covering from CP 20/07/21 Off-road Wanniassa Tuggeranong Taverner Street 49 Concrete - New 1000 2 360,000.00 44.00 Forlonge Street to Erindale Drive. On/off road cycling link from bus stop # 1342 to CP 20/04/12 Off-road Kambah Tuggeranong Drakeford Drive 50 Concrete - New 194 1.8 70,400.00 44.00 Marconi Crescent intersection. Southern verge of southern cross drive from Coulter A-FP 13/05/06 Off-road Page Belconnen Southern Cross Drive - II Drive to underpass east of Chewings Street 51 Concrete - New 910 1.5 225,200.00 43.00 (southern side).

F/P connection on northern verge of Chauvel Street CP 21/01/02 Off-road Campbell North Canberra Chauvel Street from Vasey Crescent to open space behind 80 120 Concrete - New 102 1.5 29,500.00 34.00 Vasey Cres. G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/05/33 Off-road Pearce Woden Valley Macfarland Crescent Open Space 121 Concrete - New 501 1.5 135,300.00 34.00 requests\Community Paths Reports- Suburbs\Pearce\CP 17-05-33 Macfarland St F/P connection from Bus Stop # 4793 (Opposite to CP 19/10/53 Off-road Giralang Belconnen William Slim Drive 122 Concrete - New 52 3 32,800.00 34.00 Chuculba Cres) to existing MCR near the underpass. CP 20/04/19 Off-road Torrens Woden Valley Batchelor Street 123 Asphalt - New 40 2 9,600.00 33.00 CP 20/02/23 Off-road Fyshwick South Canberra Dairy Road 124 Concrete - New 32 1.5 8,600.00 33.00 Request to install community path widening along Bandjalong Crescent. Paths are old, cracked and CP 20/07/14 Off-road Aranda Belconnen Bandjalong Crescent 125 Concrete - Widening 3000 2 1,080,000.00 33.00 narrow. This is made worse by the significant amount of shrubbery and tree overgrowth. Basis for request is from MIN 15/0968. It is alleged that the footpaths have become slanted towards CP 15/07/11 Off-road McKellar Belconnen Dumas Street the road. In actuality, construction at the time 126 Concrete - New 1080 1.5 321,600.00 33.00 McKellar was established (1983) resulted in non- compliant driveways and footpaths. CP 13/12/03 Off-road Kingston South Canberra Eyre Street 127 Concrete - New 400 2.5 180,000.00 33.00 CP 20/02/38 Off-road Red Hill South Canberra Quiros Street 128 Concrete - New 744 1.5 200,900.00 33.00 CP 20/02/10 Off-road Kingston South Canberra Howitt Street 129 Concrete - Widening 1020 1.5 286,900.00 33.00 CP 20/07/22 Off-road Forrest South Canberra Somers Crescent and Talbot Street CP 15-07-22 and CP 14/11/07 130 Concrete - New 700 1.5 189,000.00 33.00 A-FP 13/04/13 Off-road Cook Belconnen Dexter Street 131 Concrete - New 565 1.5 139,800.00 33.00 The request is for installation of the community path on the eastern side of Bugden Avenue CP 19/07/10 Off-road Fadden Tuggeranong Bugden Aveune between Coyne Street and Fihelly Street in Fadden. 132 Concrete - New 610 1.5 137,200.00 33.00 The request originated with concern in several years ago. there is an alternative route for Bellerive residents to access off-road CP 15/05/10 Off-road Lyons Woden Valley Launceston Street 133 Concrete - New 230 1.5 62,100.00 33.00 path around Lyons oval from Ulverstone Street Ministerial - existing path, minimum 1 2. Aim to Upgrade path if funds availalbe from CP 17-08-23 Off-road Ainslie North Canberra Lister Crescent 134 Concrete - New 345 1.8 93,200.00 33.00 upgrade to 1.5m path Schools program CP 20/02/19 Off-road Belconnen Belconnen Joynton Smith Drive 135 Concrete - New 133 2 52,900.00 33.00 CP 15-12-09 Off-road Belconnen Maribyrnong Avenue 136 Concrete - New 0 1.5 3,000.00 33.00 CP 20/04/14 Off-road Narrabundah South Canberra Matina Street - Wambool Street 137 Concrete - New 90 1.5 26,300.00 33.00 CP 20-09-71 Off-road Yarralumla South Canberra Weston Street, Yarralumla 138 Concrete - New 100 1.5 27,000.00 33.00 CP 19/08/33 Off-road Fadden Tuggeranong Bugden Avenue 139 Concrete - New 45 2.5 16,900.00 33.00 G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/05/30 Off-road Kingston South Canberra Jardine Street 140 Concrete - Widening 36 1.5 9,700.00 32.00 requests\Community Paths Reports- Suburbs\Kingston\CP 17-05-30 Jardine St Kingston CP 20-08-02 Off-road Harrison Gungahlin Drummer Street 141 Concrete - New 35 1.5 9,400.00 32.00 Request to community path connection on Kett CP 19-10-91 Off-road Kambah Tuggeranong 8 Kett Street, Kambah Street from Burns Club to the fathers parking 142 Concrete - New 43 1.5 11,600.00 32.00 located at the end of Kett Street. CP 14/06/05 Off-road Conder Tuggeranong Michael Holt Crescent Upgrade old wooden bridge and approaching paths 143 Concrete - New 7 2.5 302,600.00 32.00 Western verge of Avenue running CP 19/04/21 Off-road Symonston South Canberra Jerrabomberra Avenue from Goyder Street to abandoned bus stop 144 Concrete - New 920 2 331,200.00 32.00 opposite to Sir Harold Raggatt Drive. CP 15/02/09 Off-road Harrison Gungahlin off Katoomba Street and Wimmera Street 145 Asphalt - New 500 2.5 165,000.00 32.00 crosses Wells Station Track (heritage) Widening laneway parallel of Maribyrnong Ave Path widening request. Required few CP 20/06/04 Off-road Kaleen Belconnen Maribyrnong Ave 146 Asphalt - Widening 626 2 180,300.00 32.00 between Oakover Cct to Ashburton Cct, Kaleen kerm ramps CP 20/07/05 Off-road Ngunnawal Gungahlin GURRANG AV, NGUNNAWAL CP 17/11/06 147 Concrete - New 950 1.5 256,500.00 32.00 CP 16/08/08 Off-road Torrens Woden Valley Parkin Street Reassessed 13 March 2018 148 Concrete - New 300 2 103,500.00 32.00 CP 16/11/24 Off-road IsabellaPlains Tuggeranong Isabella Drive 149 Concrete - New 530 1.5 143,100.00 32.00 CP 20/02/24 Off-road Barton South Canberra Menindee Drive Open Space 150 Asphalt - New 435 2.5 157,600.00 32.00 CP 20-08-13 Off-road Red Hill South Canberra Esperance Street 151 Concrete - New 465 1.5 125,600.00 32.00 (1) Inner ring verge between Erldunda Circuit; (2) CP 20/08/19 Off-road Hawker Belconnen Kulgera Street Desireline on Kulgera St running parallel to the 152 Concrete - New 451 1.5 121,800.00 32.00 Hawker Primary School. Proposed path will improve connection withing CP 19-10-96 Off-road Downer North Canberra Cole Street, Downer existing path leading from the bus stop located on 153 Concrete - New 380 1.5 102,600.00 32.00 Bradfield Street and footpath along Cadell Street. There is a small section of existing community path and refuge island. It is recommended to upgrade and repair. A wooden bollard was found on one CP 20/02/21 Off-road Campbell North Canberra Northcott Drive - II 154 Asphalt - New 230 2 74,200.00 32.00 verge which requires removal for extra spacing from desktop assessment. Additionally, a guide sign and tree t

G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/02/07 Off-road Macquarie Belconnen Bennelong Crescent requests\Community Paths Reports- 225 Concrete - New 1004 1.5 281,100.00 29.00 Suburbs\Macquarie\CP 17-02-07 Bennelong Crescent Difficult to deliver because of barely CP 20/04/04 Off-road Higgins Belconnen Northmore Crescent 226 Concrete - New 588 1.5 178,000.00 29.00 sufficient space. CP 19/12/06 Off-road Mawson Woden Valley Debenham Street Western verge entire length 227 Concrete - New 645 1.5 188,700.00 29.00 Concrete shared path on south side next to the kerb CP 20/05/11 Off-road Dunlop Belconnen Ginninderra Drive - III from the underpass near Jonsson Court to Florey 228 Concrete - New 850 1.8 275,400.00 29.00 Drive. Eastern verge from Southern Cross Drive to FP 13/08/01 Off-road Florey Belconnen Kingsford Smith Drive 229 Concrete - New 500 1.5 112,500.00 29.00 underpass near St Francis Xavier College. Older suburb with no paths CP 17-09-08 Off-road Gordon Tuggeranong Sid Barnes Crescent Reqeust for path 230 Concrete - New 670 1.5 150,800.00 29.00 constructed, street is off main collector with no through traffic. CP 20-02-26 Off-road Red Hill South Canberra Fortitude Street 231 Concrete - New 556 1.5 150,100.00 29.00 Site visited on 17-02-20. The Entire length of outer verge extending from the proposed path seems feasible, but CP 20/02/29 Off-road Torrens Woden Valley Parsons St 232 Concrete - New 510 1.5 137,700.00 29.00 existing footpaths. potentially requires tree removal and minor earth work. CP 14/12/09 Off-road Weston Mather Street 233 Concrete - New 265 1.5 65,600.00 29.00 CP 20/03/07 Off-road Flynn Belconnen Dobinson Place 234 Concrete - New 230 2 69,000.00 29.00 CP 20/02/40 Off-road Macquarie Belconnen Roberts St/Brooks St 235 Concrete - New 163 1.5 44,000.00 29.00 Off-road Ainslie North Canberra Campbell Street 236 Concrete - New 35 1.5 9,900.00 29.00 CP-16-09-08 Off-road Turner North Canberra McKay Lane 237 Concrete - New 121 1.5 32,700.00 29.00 Was listed on 2013 Kaleen Plan. No sign of CP 19/11/27 Off-road Kaleen Belconnen Shannon Circuit Open Space 238 Asphalt - New 1074 2.5 421,900.00 29.00 construction at this point. A worn dirt path/desire line suggesting a demand for a more substantial path. The resident suggests CP 20/06/17 Off-road Kambah Tuggeranong Murrumbidgee Country Club Access that this path is continued down past the 239 Concrete - New 1500 1.5 405,000.00 29.00 Murrumbidgee Country Club to Kambah Pool providing access and amenity for local residents. CP 20-09-54 Off-road IsabellaPlains Tuggeranong Hadleigh Circuit 240 Concrete - New 150 1.5 40,500.00 29.00 insufficient width and poor condition noticed by maintenance personel responding to a Ministerial the existing path is in poor condition CP 14/09/10 Off-road Narrabundah South Canberra Open space in between Matina Street & Ko 241 Asphalt - New 900 1.8 291,600.00 28.00 request concerning the connecting path from and only 1 2m wide Tungun Street. G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/05/07 Off-road Macquarie Belconnen Birch Place 242 Concrete - New 61 1.5 16,500.00 28.00 requests\Community Paths Reports- Suburbs\Macquarie\CP 17-05-07 Birch Street Off-road Wanniassa Tuggeranong Athllon Drive 243 Concrete - New 60 2.5 25,800.00 28.00 To provide missing sections to complete footpaths Off-road Gilmore Tuggeranong Emily Bulcock Crescent 244 Concrete - New 510 1.5 124,500.00 28.00 on one verge. Ministerial request as part of complaint about CP 15/11/01 Off-road Scullin Belconnen Hargrave Street 245 Concrete - New 400 1.5 108,000.00 28.00 street lighting outage. CP 15-03-03 Off-road Weston Weston Creek Bunny Street 246 Concrete - New 423 1.5 114,200.00 28.00 Missing link for on road cycle network, current road carriageway not supportive of cycle lanes. Cycle CP 17-07-17 On-road Calwell Tuggeranong Tharwa Drive On-Road Cycle Lanes 247 Asphalt - New 5400 1.5 1,413,600.00 28.00 Requires road duplication lanes will need to be part of future duplication works. G:\Roads ACT\SPD\Capital Works Development\Requests\Community Path CP16/10/07 Off-road Hughes Woden Valley Kitchener Street 248 Concrete - New 115 1.5 61,000.00 28.00 requests\Community Paths Reports- Suburbs\Hughes\Cp 16-10-07 Kitchener Street The request is for installation of the community CP 20/04/01 Off-road Page Belconnen Hillebrand Street 249 Concrete - New 443 1.5 99,700.00 28.00 path on Hillebrand Street, Page Request to off-road cycling path to connect Dixon CP 19/08/24 Off-road Duffy Weston Creek Cotter Road & John Gorton Drive 250 Asphalt - New 240 2.5 86,400.00 28.00 Drive with John Gorton Drive G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/05/26 Off-road Farrer Woden Valley Beasley Street 251 Concrete - New 165 2 59,400.00 28.00 requests\Community Paths Reports- Suburbs\Farrer\CP 17-05-26 Beasley Street Farrer G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/10/04 Off-road Page Belconnen Coulter Drive - Western Verge 252 Concrete - New 187 1.5 50,500.00 28.00 requests\Community Paths Reports- Suburbs\Page\CP 17-10-04 Coulter Drive Page From bus stop #6006 to existing footpath running CP 20/09/116 Off-road Harrison Gungahlin Well Station Drive 253 Concrete - New 127 2 45,700.00 28.00 behind Ormiston Circuit and Albatross Crescent. CP 20/12/02 Off-road Greenway Tuggeranong Mortimer Lewis Drive From Tuggeranong Dog Park to Bibb Pl 254 Concrete - New 110 2 43,600.00 28.00 Verge is responsibility of body Eastern verge from House 3, tying in with the CP 18/01/16 Off-road Isaacs Woden Valley Shepherdson Place 255 Concrete - New 35 1.5 7,900.00 28.00 corporate - block is unit title existing footpath on Julia Flynn Avenue. development Request to community path widening on Jaeger CP 20-09-78 Off-road Bruce Belconnen JAEGER CIRCUIT 256 Concrete - Widening 1150 2 414,000.00 28.00 Circuit, Bruce CP 19-07-05 Off-road Narrabundah South Canberra 62-52 Sturt Avenue 257 Concrete - New 127 1.5 34,300.00 28.00 Concrete shared path on south side from Hugh CP 20/05/11 Off-road Dunlop Belconnen Ginninderra Drive - I McKay Crescent open space to Kerrigan Street and 258 Concrete - New 555 1.8 180,800.00 28.00 Archdall Street Northern verge from Chauvel Street to Truscott CP 21/01/08 Off-road Campbell North Canberra Holmes Crescent Street, connecting to the future footpath on 259 Concrete - New 875 1.5 263,900.00 28.00 Chauvel Street. From the bus stop # 1117 connects to the on-road cycling facilities present on CP 19/10/16 Off-road Richardson Tuggeranong Johnson Drive 260 Concrete - New 732 1.5 214,100.00 28.00 Merging Lane Northbound with connection to Fullerton Crescent. CP 20/04/17 Off-road Chifley Woden Valley MacFarland Crescent 261 Concrete - New 50 1.5 14,600.00 28.00 Off-road Red Hill South Canberra Penrhyn Street & Fishburn Street 262 Concrete - New 550 1.5 141,100.00 28.00 CP 15/12/02 Off-road Campbell North Canberra Godfrey Street 263 Concrete - New 420 1.5 113,400.00 28.00 Providing community path on one side of the road CP 14/09/15 Off-road Lyons Woden Valley Tarraleah Crescent 264 Concrete - New 335 1.5 84,100.00 27.00 from Tooms Place to Launceston Street. G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/05/08 Off-road Bruce Belconnen College Street 265 Concrete - New 315 1.5 85,000.00 27.00 requests\Community Paths Reports- Suburbs\Bruce\CP 17-05-08 College Street G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/04/33 On-road Lyneham North Canberra Ellenborough Street 266 Asphalt - New 233 2 67,100.00 27.00 requests\Community Paths Reports- Suburbs\Lyneham\CP 17-04-33 Ellenborough St The request is for installation of the community path on the parkland between 24 and 16 Lumeah CP 19-10-46 Off-road Narrabundah South Canberra 22 Lumeah St Street and two (2) kerb ramps with connecting path 267 Concrete - New 186 1.5 51,800.00 27.00 one in adjacent 24 and another one in adjacent 9 Lumeah Street Narrabundah. CP 19-08-47 Off-road Yarralumla South Canberra Schlich Street, Yarralumla 268 Concrete - New 196 1.5 52,900.00 27.00 Easy link to provide to connect to main off-road CP 17-12-14 Off-road Stirling Weston Creek Wittenoom Crescent 269 Concrete - New 20 1.5 4,500.00 27.00 network. Playground path link to local community path Logical reqeust to connect CP 18-01-09 Off-road Spence Belconnen Hancock Street Playground 270 Concrete - New 35 1.5 7,900.00 27.00 network playground to path network. CP 19/12/12 Off-road Weston Weston Creek Mahony Court 271 Concrete - New 30 1.5 6,800.00 27.00 CP 16-07-03 Off-road Fyshwick South Canberra Ipswich Street 272 Concrete - New 858 1.5 231,700.00 27.00 The request is for installation of the community CP 19-10-81 Off-road IsabellaPlains Tuggeranong Johnson Drive path along Johnson Drive form Ellerston Ave to 273 Asphalt - New 480 2 165,200.00 27.00 Moonbi Cres, Isabella Plains. Request to widen existing community path CP 20-10-28 Off-road Weston Weston Creek Unwin Street 274 Concrete - Widening 580 2 208,800.00 27.00 connection on Unwin Street, Weston. CP 17-10-10 Off-road Conder Tuggeranong Loureiro Street 275 Concrete - New 535 1.5 120,400.00 27.00 Between House 69 and 71 Denny Street (provide CP 20/05/05 Off-road Latham Belconnen 69 - 71 Denny Street steps) to the shared path running along Ginninderra 276 Other 70 1.5 100,000.00 27.00 Creek Off-road Gungahlin Gungahlin Anthony Rolfe Ave (Wizard Crossing) 277 Concrete - New 35 1.5 15,400.00 27.00 CP 16-11-30 Off-road Ngunnawal Gungahlin Shoalhaven Avenue and Paul Coe Crescent Northern Verge 278 Concrete - New 40 1.5 14,800.00 27.00 CP 16/11/26 Off-road Ngunnawal Gungahlin Shoalhaven Avenue/Paul Coe Crescent Southern Verge 279 Concrete - New 40 1.5 14,800.00 27.00 CP 20/05/07 Off-road Nicholls Gungahlin May Mills Close Playground 280 Concrete - New 85 1.5 23,000.00 27.00 Request to connect 3 Dann Close with the existing CP 19-10-97 Off-road Garran Woden Valley Dann Close 281 Concrete - New 80 1.5 21,600.00 27.00 path along Palmer Street. Extension from the existing F/P runnning on the CP 17/04/06 Off-road Macgregor Belconnen Southern Cross Drive Access Road 282 Concrete - New 266 1.5 71,800.00 27.00 kerbside, covering the bus stop. Footpath request next to the kerbside on eastern CP 20/05/20 Off-road Holt Belconnen Chave Street side between Southern Cross Drive and Moyes 283 Concrete - New 310 1.5 83,700.00 27.00 Crescent MIN16/0855 Off-road Weetangera Belconnen Mathieson Crescent 284 Concrete - New 175 1.5 47,200.00 26.00 CP 20-09-55 Off-road Wanniassa Tuggeranong Corner of Sulwood Drive/Athllon Drive 285 Concrete - New 750 2 270,000.00 26.00 The proposed works include a short missing Off-road Forrest South Canberra Empire Circuit community path, 4 pram ramps and a refugee area 286 Asphalt - New 12 1.5 9,200.00 26.00 on the tear drop island. Required bollards to protect car CP 20/01/05 Off-road Belconnen Belconnen Macdermott Place 287 Asphalt - New 20 2 4,800.00 26.00 access CP 20-04-08 Off-road Mitchell Gungahlin Gungahlin Drive Slipway 288 Concrete - New 11 2.5 5,000.00 26.00 Off-road Watson North Canberra Shirley Street - Part 1 Pat 1 of the request CP14/03/14. 289 Concrete - New 10 1.5 2,200.00 26.00 CP 16-07-26 Off-road Hughes Woden Valley Webster Street 290 Other 2 1.5 1,500.00 26.00 CP 15/07/09 Off-road Scullin Belconnen McIntosh Street 291 Concrete - New 400 1.5 110,000.00 26.00 F/P connection to Federal Hwy from open space in CP 20/11/28 Off-road Downer North Canberra 13 - 15 Banfield Street 292 Concrete - New 80 1.5 21,600.00 26.00 between 13 & 15 Banfield Street. To provide missing community path on western CP 14/05/10 Off-road Deakin South Canberra Empire Circuit 293 Concrete - New 285 1.5 65,100.00 26.00 verge. CP17-02-10 Off-road Nicholls Gungahlin connection from off road to on road north 294 Concrete - New 45 1.5 62,200.00 26.00 G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/02/03 Off-road Lyneham North Canberra Lewin St 295 Concrete - New 269 1.5 72,600.00 26.00 requests\Community Paths Reports- Suburbs\Lyneham\CP 17-02-03 Lewin St Lyneham Investigation started on 25/10/2018. Report has CP 20/02/17 Off-road Aranda Belconnen Darambal St 296 Concrete - New 313 1.5 84,500.00 26.00 been updated on 14/02/20. CP 14/08/02 Off-road Gungahlin Gungahlin Wizard Street 297 Concrete - New 192 1.5 47,500.00 26.00 The major issue of delivering this proposal is insufficient space at this stage. An alternative CP 20/04/10 Off-road Downer North Canberra Swinden Street proposal to establish the aim will be pedestrian 298 Concrete - New 147 1.5 46,300.00 26.00 crossings and/or refuge island on major intersection which seems more feasible existing paths are narrow, poor CP 14/12/07 Off-road Waramanga Weston Creek off Nemarang Crescent 299 Concrete - Widening 700 2 231,000.00 25.00 condition and missing in some locations CP 20-02-35 Off-road Fisher Weston Creek Ballarat Street 300 Concrete - New 888 1.5 239,800.00 25.00 CP 19-11-36 Off-road Stirling Weston Creek Streeton Drive 301 Concrete - New 625 1.8 202,500.00 25.00 Landscaping and service relocation (i.e. Electricity CP 20/04/10 Off-road Downer North Canberra Bull Street pole and transformers) are definitely needed to 302 Concrete - New 114 1.5 35,900.00 25.00 accommodate the proposed concrete footpath. CP 20-08-17 Off-road Ngunnawal Gungahlin Colleano St 303 Concrete - New 100 1.5 27,000.00 25.00 Off-road Red Hill South Canberra Discovery Street 304 Concrete - New 390 1.5 122,800.00 25.00 G:\RA\COMMON\CP_Requests\Community Paths CP 17/11/01 Off-road Lyons Woden Valley Derwent Street Reports- Suburbs\Lyons\CP 17-11-01 Derwent St 305 Concrete - New 585 1.5 131,600.00 25.00 Lyons According to a constituent, a new footpath could link with the path at the bottom of Collocott CP 20/08/08 Off-road Oxley Tuggeranong Collocott Crescent, Oxley 306 Concrete - New 400 1.5 108,000.00 25.00 Crescent allowing better access to Tuggeranong Town Centre for Oxley residents. Development of residential estate terminated path at block boundary. Request is to extend the path to CP 15/03/04 Off-road Lyneham North Canberra Cossington Smith Crescent teh community path network across an urban open 307 Concrete - New 45 1.5 13,200.00 25.00 space. Amenity woudl likely be utilized by a small handful of people. G:\RA\SPD\Capital Works Development\Requests\Community Path CP 16/07/16 Off-road Dickson North Canberra Rosevear Place requests\Community Paths Reports- 308 Concrete - New 3 1.5 800.00 25.00 Suburbs\Dickson\CP 17-02-08 Rosevear Place, Dickson The request is for installation of the community path on Alsop Close, Phillip, to allow pedestrians CP 19/12/05 Off-road Phillip Woden Valley Alsop Close and cyclists easy and safe access to a main north / 309 Concrete - New 65 1.5 17,600.00 25.00 south bound foot / cycle path from a residential area. CP 20/03/02 Off-road Weston Weston Creek Meldrum Street/Gruner Street 310 Concrete - New 82 1.5 18,400.00 25.00 Request to community path connection on Jenke CP 20-09-105 Off-road Kambah Tuggeranong Jenke Circuit, Kambah 311 Concrete - New 88 1.5 23,800.00 25.00 Circuit Kambah along storage facility wall Connection from the playground on the hill to the CP 20/09/05 Off-road Chapman Weston Creek Chauvel Circle 312 Concrete - New 300 1.5 94,800.00 25.00 existing footpath from Darwinia Ter. Connection between Trinity Christian School CP 19/10/36 Off-road Wanniassa Tuggeranong Trinity Christian School eastern carpark and the existing cycling path 313 Asphalt - New 85 2.5 63,800.00 25.00 running along Erindale Dr. MIN S2019/1309 Off-road Weetangera Belconnen Morton St, Smith St and Kinleyside Cres 314 Concrete - New 1400 1.5 316,000.00 25.00 Open space path request, however Open space path request, however land is not CP 17/11/16 Off-road Deakin South Canberra Beale Crescent 315 Concrete - New 160 1.5 43,200.00 25.00 land is not Territory, it is NCA for Territory, it is NCA for future Embassy site future Embassy site Southern verge from Templeton Street to Lyttleton CP 19/09/01 Off-road Cook Belconnen Biffin Street Crescent, incl connection to the underpass next to 316 Concrete - New 716 1.5 197,300.00 25.00 Cook Neighbourhood Oval. (1) southern verge from Hurley Street to the entire CP 19/09/06 Off-road Mawson Woden Valley Aurora Close inner ring in the southern end; (2) western verge 317 Concrete - New 566 1.5 186,300.00 25.00 extend to the entire inner ring in the northern end. Request to install community path along Taylor Street, Ngunnawal. Failing that, it has said the CP 20/07/15 Off-road Ngunnawal Gungahlin 43 Taylor Street 318 Concrete - New 550 1.5 148,500.00 24.00 guttering on the other side of the street is too steep for her to use to get up. Southern verge of Cambridge Street running from CP 19/09/05 Off-road Cook Belconnen Cambridge Street 319 Concrete - New 407 1.5 115,900.00 24.00 Lyttleton Crescent to Aston Crescent southern end. CP 16/06/08 Off-road Belconnen Belconnen McElhone Street 320 Concrete - New 80 1.5 31,600.00 24.00 CP 16/01/11 Off-road Kambah Tuggeranong Arnold Place 321 Concrete - New 25 1.5 6,800.00 24.00 CP 18-03-04 Off-road Calwell Tuggeranong Downard Street - Duggan Street Pave desire line from bus stop 322 Concrete - New 40 1.5 10,800.00 24.00 Missing link The gradient is 13% , so maybe with Desireline digaonally connect to the existing the addition of a handrail, the CP 20/11/17 Off-road Wanniassa Tuggeranong Rylah Crescent Carpark 323 Concrete - New 25 2 9,000.00 24.00 footpath behind Wanniassa Park and Ride carpark. adjacent path towards Athlon dr is 12%

G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/04/25 Off-road Fyshwick South Canberra Tennant Street 395 Concrete - New 150 1.5 40,500.00 20.00 requests\Community Paths Reports- Suburbs\Fyshwick\CP 17-04-25 Tennant St Off-road Gilmore Tuggeranong May Maxwell Street 396 Concrete - New 325 1.5 75,100.00 20.00 Path is for short cut across verge, CP 17-11-11 Off-road Cook Belconnen Lyttleton Crescent Path is for short cut across verge, steep grade 397 Concrete - New 5 1.5 1,100.00 20.00 steep grade CP 20-02-43 Off-road Lyons Woden Valley Swan Place Underpass new link 398 Concrete - New 8 2 2,900.00 20.00 CP 20-02-43 Off-road Lyons Woden Valley Swan Place Underpass widening 399 Concrete - Widening 12 1.5 3,200.00 20.00 G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/06/01 Off-road Higgins Belconnen Hudson Street 400 Concrete - New 191 1.5 51,600.00 20.00 requests\Community Paths Reports- Suburbs\Higgins\CP 17-06-01 Hudson Street CP 20/09/57 Off-road Kaleen Belconnen Alberga Street, Kaleen 401 Concrete - New 165 1.5 44,600.00 20.00 CP 18-01-05 Off-road Yarralumla South Canberra Guilfoyle Street Missing link 402 Concrete - New 85 1.5 19,100.00 20.00 Obvious missing link Would wait for road duplication to provide any CP 18-02-05 Off-road Monash Tuggeranong Fisk Street measures. Reqeust appears to be from corner 403 Concrete - New 110 1.5 24,800.00 20.00 resident wanting shortcut to ped bridge. Southern verge of Clem Hill Street from house 27 to CP 20/08/14 Off-road Gordon Tuggeranong Clem Hill Street 404 Concrete - New 65 1.5 21,000.00 20.00 29, infilling the missing section of the entire street. Off-road Ngunnawal Gungahlin off Mirrabei Drive 405 Concrete - New 22 1.5 5,000.00 20.00 Pedestrian walkway - support path CP 17-08-24 Off-road Ngunnawal Gungahlin Tangari Street Pedestrian walkway, with no current path. 406 Concrete - New 40 1.5 9,000.00 20.00 request CP 20/02/05 Off-road Kaleen Belconnen Snowy Place - Turon Place 407 Concrete - New 17 2 7,100.00 20.00 G:\Roads ACT\SPD\Capital Works Development\Requests\Community Path CP16-10-14 Off-road Evatt Belconnen Callaghan Street 408 Concrete - New 585 1.5 158,000.00 20.00 requests\Community Paths Reports- Suburbs\Evatt\CP 16-10-14 Callaghan Street Proposed path will improve connection within CP 20-02-12 Off-road Kambah Tuggeranong Dale Circuit 409 Concrete - New 394 1.5 106,400.00 20.00 existing path network CP 19/09/05 Off-road Cook Belconnen Aston Crescent Entire eastern verge of Aston Crescent. 410 Concrete - New 258 1.5 69,700.00 19.00 From the southern side of Hindmarsh Drive & Palmer Street intersection, following the desireline CP 19/10/50 Off-road O'Malley Woden Valley Dunoon Street 411 Concrete - New 247 1.5 72,200.00 19.00 to Dunoon Street. Then runs on the northern verge connecting to Culgoa Circuit. CP 16/06/39 Off-road Florey Belconnen Cooksey Place 412 Concrete - New 128 1.5 28,800.00 19.00 Off-road Latham Belconnen Macrossan Cres Request for new path 413 Concrete - New 863 1.5 233,000.00 19.00 CP 15/12/03 Off-road Campbell North Canberra Gellibrand Street 414 Concrete - New 640 1.8 207,400.00 19.00 Off-road Kambah Tuggeranong Ashby Circuit 415 Concrete - New 622 1.5 167,900.00 19.00 CP 20/05/09 Off-road Waramanga Weston Creek 23 Adinda Street 416 Concrete - New 12 1.5 3,200.00 19.00 A Ministerial request for a new footpath to be constructed between 10 and 14 Conlon Crescent to construct a new path leading to the fire trail. The CP 20-09-97 Off-road Theodore Tuggeranong 10-14 Conlon Crescent, Theodore 417 Other 55 1.5 0.00 19.00 STEPS REQUIRED existing foot track is covered by gravel and has steep unstable steps at the beginning and of the track. T Eastern verge from Tay St to Federal Hwy, infilling CP 13/06/05 Off-road Watson North Canberra Antill Street the missing link and potentially upgrade the existing 418 Concrete - New 65 1.5 16,100.00 19.00 F/P. G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/09/07 Off-road Banks Tuggeranong Wilhelmi Crescent 419 Concrete - New 43 1.5 11,600.00 19.00 requests\Community Paths Reports- Suburbs\Banks\CP 17-09-07 Wilhelmi Crescent CP 19/09/14 Off-road Hackett North Canberra Rivett Street 420 Concrete - New 50 1.5 11,200.00 19.00 CP 20-05-04 Off-road Moncrieff Gungahlin Bellhouse Crescent Open Space 421 Concrete - New 14 2 4,200.00 19.00 Off-road Scullin Belconnen Levien Street 422 Concrete - New 550 1.5 142,300.00 19.00 Off-road Red Hill South Canberra Investigator Street 423 Concrete - New 390 1.5 122,800.00 19.00 If warranted, a footpath would only Request is for footpath construction on both sides be constructed on one side of the Off-road Higgins Belconnen Rich Street 424 Concrete - New 420 1.5 117,400.00 19.00 of street and on Rich Place. street, and Rich Place would be bypassed. G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17-01-15 Off-road Kaleen Belconnen Warrego Circuit 425 Concrete - New 384 1.5 103,700.00 19.00 requests\Community Paths Reports- Suburbs\Kaleen\CP 17-01-05 Warrego Cct Kaleen F/P covering (1) eastern verge of Whitfeld Street; CP 19/10/22 Off-road Monash Tuggeranong Whitfeld Street & Upton Street (2) northern verge of Upton Street from Clive Steele 426 Concrete - New 441 1.5 129,000.00 19.00 Avenue to Ashley Drive. Northern verge of Basedow Street from Hawker CP 19/08/06 Off-road Torrens Woden Valley Basedow Street 427 Concrete - New 310 1.5 87,700.00 19.00 Street to Gouger Street. Path appears to have been removed as part of a Reinstatement of path should be CP 17-12-10 Off-road Garran Woden Valley Gilmore Crescent 428 Concrete - New 166 1.5 37,400.00 18.00 development and not reinstated. done. CP15-02-19 Off-road Monash Tuggeranong Beirne Street contacted the enquirer on 02/06/2016 429 Concrete - New 600 1.5 174,000.00 18.00 The paths designed for this area are quite extensive. CP16-10-04 Off-road Giralang Belconnen Giralang Primary School The Northrop Report DR Report (Community Paths 430 Concrete - New 550 2 198,000.00 18.00 2017/18) estimated cost to be $965,244. (i) Extension from the bus stops (#4174 & #4176) to CP 19/08/25 Off-road Evatt Belconnen Moynihan Street the nearest pram ramps; (ii) Bus stop # 4176 431 Concrete - New 140 1.5 43,000.00 18.00 connect to De Lissa Street across the open space CP 15/06/05 Off-road Spence Belconnen Somerville Street 432 Concrete - New 520 1.5 142,400.00 18.00 Request to community path connection on CP 19-04-23 Off-road Red Hill South Canberra Borrowdale Street, Red Hill 433 Concrete - New 500 1.5 135,000.00 18.00 Borrowdale Street. Off-road Bonner Gungahlin Mumshirl Street 434 Concrete - New 60 1.5 14,500.00 18.00 G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17-02-12 Off-road Kambah Tuggeranong Chirnside Circuit 435 Concrete - New 67 1.5 18,100.00 18.00 requests\Community Paths Reports- Suburbs\Kambah\CP 17-02-12 Chirnside Cct CP 19/10/90 Off-road Lawson Belconnen Rouseabout Street 436 Concrete - New 65 1.5 17,600.00 18.00 CP 20-09-57 Off-road Kaleen Belconnen Lyndon St and Brunswick CCT 437 Concrete - New 1200 1.5 324,000.00 18.00 CP 15-08-02 Off-road Lyneham North Canberra Cossington Smith Crescent 438 Concrete - Widening 19 1.5 5,100.00 18.00 Connecting the existing footpath on south-eastern CP 20/09/122 Off-road Harrison Gungahlin De Bortoli Street Intersection verge of De Bortoli St/Anthony Rolfe Ave 439 Concrete - New 18 1.5 5,900.00 18.00 intersection to the kerbside following the desireline. Local access street, limited CP 18-03-13 Off-road Waramanga Weston Creek Yiman Street Path request 440 Concrete - New 605 1.5 177,000.00 18.00 community drivers Request to community path connection on Rapanea Street, Rivett. Additionally, in order to link CP 19-08-01 Off-road Rivett Weston Creek Rapanea Street, Rivett requested path with the existing path network it is 441 Concrete - New 798 1.5 215,500.00 18.00 proposed to implement community path on Mirbelia Cresent too. Upgrade the existing footpath on Stirling Avenue CP 19/10/24 Off-road Watson North Canberra Stirling Avenue which provide access to the Farmer Market to cater 442 Concrete - Widening 110 1.5 33,200.00 18.00 the foot traffic. The path alignment may need to consider the current location of utilities on the proposed area CP 20/04/18 Off-road Ngunnawal Gungahlin Noongale Court (e.g. transformers, streetlights etc.) and trees. In 443 Concrete - New 195 1.5 52,600.00 17.00 addition to this, the illegal parking on street is another issue to need to be addressed. Request to community path connection on northern CP 19-11-34 Off-road Calwell Tuggeranong 5 Hollway Street 444 Concrete - New 165 1.5 44,600.00 17.00 side of Hollway Street, Calwell G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/07/17 Off-road Hughes Woden Valley Coxen Street 445 Concrete - New 460 1.5 124,200.00 17.00 requests\Community Paths Reports- Suburbs\Hughes\CP 17-07-17 Coxon Street Hughes Older street, no through catchment, limited Advise also to CP for tree trimming CP 18-01-01 Off-road Chapman Weston Creek Rene Street attractors. Sight distance would be improved with 446 Concrete - New 470 1.5 105,800.00 17.00 program tree trimming. Request to community path connection on CP 20-11-23 Off-road Kaleen Belconnen Onkaparinga Crescent, Kaleen 447 Concrete - New 1380 1.5 372,600.00 17.00 Onkaparinga Crescent CP 20-02-11 Off-road Pearce Woden Valley Gepp Place 448 Concrete - New 60 1.5 16,200.00 17.00 G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/03/29 Off-road Nicholls Gungahlin Kangaroo Close 449 Concrete - New 41 1.5 11,100.00 17.00 requests\Community Paths Reports- Suburbs\Nicholls\CP 17-03-29 Kangaroo Close Follow the existing shared path near Traynor Court and directly connect to new Melba Wetlands. CP 20/09/101 Off-road Melba Belconnen Off Traynor Court 450 Asphalt - New 210 2.5 1,575,600.00 17.00 Footbridge/culvert along with railing will be required. Off-road Watson North Canberra Irvine Street 451 Concrete - New 400 1.5 90,000.00 17.00 The request is for installation of the community CP 19-09-25 Off-road Yarralumla South Canberra Alexandrina Drive path around Burley Griffin Sea Scouts , 452 Concrete - New 290 1.5 65,200.00 17.00 Alexandrina Drive, Yarralumla CP 19-11-31 Off-road Scullin Belconnen Little Place 453 Concrete - New 320 1.5 86,400.00 17.00 Request to community path connection on Clarke CP 18-09-02 Off-road Spence Belconnen Clark Close, Spence 454 Concrete - New 271 1.5 73,200.00 17.00 Close, Spence CP 15/06/29 Off-road Flynn Belconnen Barber Crescent 455 Concrete - New 820 1.5 221,400.00 17.00 Installation of the community path on both side of Boobialla Street O'Connor, from the T intersection CP 19/10/15 Off-road O'Connor North Canberra Boobialla Street 456 Concrete - New 800 1.5 210,000.00 17.00 at Miller Street to its intersection with Clianthus Street. (i) Northern verge of Briggs Street; (ii) Outer ring of CP 19/08/44 Off-road Downer North Canberra Briggs Street & Banfield Street 457 Concrete - New 753 1.5 203,300.00 17.00 Banfield Street. From the shared path from Kavangal Circuit open CP 19/10/55 Off-road Ngunnawal Gungahlin Kavangal Circuit Open Space space to the shared path behind Harold Blair 458 Other 28 2.5 300,000.00 17.00 Crescent across the open channel. Footpath on the inner side from Dalley Crescent to CP 19/10/65 Off-road Latham Belconnen Solomon Crescent 459 Concrete - New 370 1.5 101,900.00 17.00 existing footpath near House 28.

CP 19-08-23 Off-road Ngunnawal Gungahlin KARDANG STREET 495 Concrete - New 275 1.5 74,200.00 15.00 CP 19/09/03 Off-road Lyneham North Canberra Claxton Crescent Entire outer ring verge of Claxton Crescent. 496 Concrete - New 343 1.5 95,600.00 15.00 Earthwork is needed to flatten and reinforce the foundation before path implementation. Currently the base CP 20/04/07 Off-road Cook Belconnen Open space between Mackellar Crescent and Wybalena Grove 497 Asphalt - New 18 2.5 7,000.00 14.00 is heavily eroded. Additional streetlight should be added if possible for better conspicuity and safety concern. CP 17/06/15 Off-road Holt Belconnen Pickworth Street 498 Concrete - New 540 1.5 145,800.00 14.00 On the northern verge from Kaipu Place to Gadali CP 19/09/23 Off-road Ngunnawal Gungahlin Milari Street 499 Concrete - New 164 1.5 44,300.00 14.00 Crescent Entire outer ring verge to connect with the footpath CP 16-08-01 Off-road Wanniassa Tuggeranong Lansell Circuit 500 Concrete - New 707 1.5 190,900.00 14.00 on eastern side of Ashley Dr CP 16-10-20 Off-road Aranda Belconnen Arabana Street 501 Concrete - New 680 1.5 183,600.00 14.00 G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/04/21 Off-road Holt Belconnen Lindrum Crescent 502 Concrete - New 882 1.5 238,100.00 14.00 requests\Community Paths Reports- Suburbs\Holt\CP 17-04-21 Lindrum Crescent G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/07/03 Off-road Palmerston Gungahlin Figg Place 503 Concrete - New 55 1.5 14,800.00 14.00 requests\Community Paths Reports- Suburbs\Palmerston\CP 17-07-13 Figg Place CP 16/05/06 Off-road Pearce Woden Valley Parkhill Street 504 Concrete - New 330 1.5 92,100.00 14.00 Off-road Hackett North Canberra Madigan Street 505 Concrete - New 250 1.5 61,900.00 14.00 Off-road Theodore Tuggeranong Mackerras Crescent 506 Concrete - New 40 1.5 9,900.00 14.00 CP16-08-17 Off-road Franklin Gungahlin Kilmeny Close 507 Concrete - New 20 1.5 5,400.00 14.00 G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/08/15 Off-road Kaleen Belconnen Liffey Circuit 508 Concrete - New 19 1.5 5,100.00 14.00 requests\Community Paths Reports- Suburbs\Kaleen\CP 17-08-15 Liffey Circuit, Kaleen CP 20-09-91 Service Faciliti Oxley Tuggeranong Off Newman-Morris Cct 509 Concrete - New 20 1.5 5,400.00 14.00 CP 16-10-05 Off-road Mitchell Gungahlin Dacre Street 510 Concrete - New 500 1.5 137,000.00 13.00 Western verge between Essington Street and Callan CP 17/06/03 Off-road Mitchell Gungahlin Vicars Street 511 Concrete - New 557 1.5 150,400.00 13.00 Street. Southern verge from Templestowe Ave to cul-se- CP 19/10/68 Off-road Conder Tuggeranong Eaglemont Retreat 512 Concrete - New 377 1.5 101,800.00 13.00 dec of Eaglemont Retreat. A new footpath connecting existing footpaths Off-road Hackett North Canberra Maitland Street 513 Concrete - New 200 1.5 48,000.00 13.00 ending near Dakin Place and Steele Street. Off-road Fadden Tuggeranong Appel Crescent 514 Concrete - New 1250 1.5 285,200.00 13.00 Request to community path connection adjacent 88 CP 20-09-112 Off-road Giralang Belconnen Baracchi Cres 515 Concrete - New 14 1.5 3,800.00 13.00 Baracchi Cres to open space path, Giralang Off-road Giralang Belconnen Gum Street 516 Concrete - New 90 1.5 22,200.00 13.00 request for crossing at bus stop not approved due to adverse grade and proximity to refuge crossing. CP 15/06/08 Off-road Kaleen Belconnen Ellenborough Street 517 Concrete - New 40 1.5 13,800.00 13.00 Footpath along Ellenbourgough Street would alow similar route. G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/03/28 Off-road Conder Tuggeranong Richardson Cct and Mentone View requests\Community Paths Reports- 518 Concrete - New 57 1.5 15,400.00 13.00 Suburbs\Conder\CP 17-03-29 Richardson cct and Mentone View G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/10/14 Off-road Chapman Weston Creek Lipman Street requests\Community Paths Reports- 519 Concrete - New 92 1.5 24,800.00 13.00 Suburbs\Chapman\CP 17-10-14 Lipman St, Chapman Follow the desire line from 13-15 Drevermann CP 20/09/64 Off-road Farrer Woden Valley Off Drevermann Street 520 Concrete - New 290 1.5 78,300.00 13.00 Street to Dorsche Street Intersection. G:\RA\SPD\Capital Works Development\Requests\Community Path CP17/01/03 Off-road Holt Belconnen Drake-Brockman Drive 521 Asphalt - New 2042 1.5 441,100.00 13.00 requests\Community Paths Reports- Suburbs\Holt\CP 17-01-03 Drake Brockman Dr Holt Off-road Ngunnawal Gungahlin Shara Place 522 Concrete - New 36 1.5 8,500.00 13.00 CP 17/04/35 Off-road Forrest South Canberra Arthur Circle 523 Concrete - New 19 1.5 7,100.00 13.00 CP 14/09/12 Off-road Chapman Weston Creek Beaumont Close 524 Concrete - New 630 1.5 155,900.00 13.00 CP15/10/03 Off-road Yarralumla South Canberra Clarke Street 525 Concrete - New 380 1.5 102,600.00 13.00 Off-road Hackett North Canberra Madigan Street 526 Concrete - New 460 1.5 113,800.00 13.00 Request to community path connection on Nott CP 19-04-12 Off-road Fraser Belconnen Nott Street, Fraser 527 Concrete - New 623 1.5 168,200.00 12.00 Street. CP 14/11/23 Off-road Chapman Weston Creek Rafferty Street 528 Concrete - New 365 1.5 90,300.00 12.00

G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/04/10 Off-road Monash Tuggeranong Sulwood and Erindale Drive requests\Community Paths Reports- 558 Asphalt - New 2260 2 650,900.00 7.00 Suburbs\Monash\CP 17-04-10 Sulwood and Erindale Dr Main issue likley to be SW, so have CP 18-02-16 Off-road Kambah Tuggeranong Ivo Whitton Circuit Wants pedestrian walkway paved or SW fixed. 559 Asphalt - New 47 1.5 10,600.00 5.00 also sent to RM to investigate G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/10/11 Off-road Downer North Canberra Briggs St 560 Concrete - New 72 1.5 19,400.00 5.00 requests\Community Paths Reports- Suburbs\Downer\CP 17-10-11 Briggs St, G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/04/17 Off-road Franklin Gungahlin Donald Horne Cct 561 Concrete - New 109 1.5 29,400.00 5.00 requests\Community Paths Reports- Suburbs\Franklin\CP 17-04-17 Donald Horne Circuit G:\RA\SPD\Capital Works Development\Requests\Community Path CP 17/01/15 Off-road Jerrabomberra South Canberra Canberra Avenue 562 Concrete - New 640 1.5 172,800.00 2.00 requests\Community Paths Reports- Suburbs\Jerrabomberra\CP 17-01-15 Canberra Ave