DOĞUŞ CONSTRUCTION

Hilmi Burak ARASLI Business Development Director

CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 2 1. Doğuş Group 2. Doğuş Construction 3. Fields of Activities and Track Record 4. Diversification 5. Ongoing Projects 6. Recently Completed Projects

CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 3 1. DOĞUŞ GROUP DOĞUŞ GROUP

➢ Doğuş Group, founded in 1951, sets standards for a better living by being at the forefront of discoveries that shape modern life.

➢ Doğuş Group, active in seven core businesses including automotive, construction, media, tourism and services, real estate, energy and food & beverage, sustains its growth with new investments in the areas of technology, sports, and entertainment along with its current operations.

➢ With over 300 companies and more than 25.000 employees, the Group serves its customers with advanced technologies, highest brand quality and a dynamic human resource.

➢ The Doğuş Group currently partners and cooperates with some of the large global players including: Volkswagen AG and TÜVSÜD in automotive; Condé Nast (Vogue, GQ, Traveller) in media; Hyatt International Ltd. in tourism; the Latsis Group , the Kiriacoulis Group and the Adriatic Croatia International (ACI) Group in marina and nautical operations; the international Azumi Group that holds under its roof brands such as Coya, Roka, Zuma and Oblix in food & beverage and entertainment; and the South Korean SK Group in e-commerce.

➢ Doğuş Automotive has been the distributor of SCANIA since 1994 and continues to provide customized solutions and services in heavy vehicle sector by strengthening its 25-year business partnership every year.

CONSTRUCTION SUMMIT 2019 - 01.10.2019 - 5 DOĞUŞ GROUP STRUCTURE

CONSTRUCTION SUMMIT 2019 - 01.10.2019 - 6 2. DOĞUŞ CONSTRUCTION CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 8 CONSTRUCTION GROUP

• EPC contractor established in 1951, specialized in mega-infrastructure projects,

• Has been ranked among the “Top 250 International Contractors” by ENR (Engineering News Record) since 2003.

• “Best Place to Work” and “Occupational Health and Occupational Safety” awards in 2014 and “Best Place to Work” award 2017.

• More than 209 ongoing and completed projects amounting up to USD 27,2 bn in value

▪ 21 Dams and HEPPs capable of producing 3350 MW of electricity ▪ 1.515 km Roads ▪ 200 km Subways and Tunnels ▪ 43 km Bridges and Viaducts ▪ 3.000.000 m² Buildings ▪ Environmental Projects, Ports, Marinas, Irrigation Projects, Sewage Systems, Office Buildings, Shopping and Leisure Centers, Residential and Industrial Buildings

• Presence in , Qatar, Oman, , , Morocco, Kazakhstan, Saudi Arabia and India.

• 6916 Total Employees (September 2019)

CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 9 REGIONAL COVERAGE

1. DOĞUŞ Construction & Trade Inc. Head Office (TURKEY) 2. DOĞUŞ Construction Branch & DOĞUŞ EOOD (L.L.C) & Representative Office (BULGARIA) 3. DOĞUŞ Construction Private Ltd. (INDIA) 4. DOĞUŞ L.L.P & DOĞUŞ Construction Branch (KAZAKHSTAN) 5. DOĞUŞ SARL (LLC) & DOĞUŞ ES (Branch) (MOROCCO) 6. DOĞUŞ Construction L.L.C. (OMAN) 7. DOĞUŞ Construction Branch (QATAR) 8. DOĞUŞ Construction Branch (SAUDI ARABIA) 9. DOĞUŞ Construction L.L.C & DOĞUŞ Commercial Representative Office (UKRAINE) 10. DOĞUŞ Construction Branch (TANZANIA)

CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 10 THE FIRSTS AND THE MOSTS

1971 Hasan Uğurlu Dam and HEPP Project is the FIRST dam and HEPP Project implemented in Turkey solely by Turkish workers, technicians, engineers, contractors and financial institutions.

1984 Marib Dam Project is the FIRST dam project implemented in abroad by a Turkish Contractor.

Edirne-Kınalı Motorway Project is the FIRST project implemented by a Turkish Contractor with the procurement of 1988 foreign finance and without joint ventures.

2002 Casablanca Tanger Motorway Project is the FIRST project that is awarded to a Turkish Contractor in the Kingdom of Morocco.

Otogar-Kirazlı-Başakşehir Rail Mass Transportation System is the LARGEST project implemented by a Turkish 2005 Contractor in a single contract.

CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 11 THE FIRSTS AND THE MOSTS

2007 Kiev Dnieper Bridge Project is the LARGEST project implemented by a Turkish company in Ukraine.

2008 Project is the LARGEST infrastructure project implemented in Bulgaria.

Üsküdar-Ümraniye-Çekmeköy Metro Project is the FIRST ever automated driverless and the LARGEST metro line of 2012 Turkey that is awarded to a sole contractor in Turkey. It is also the FIRST metro of Turkey to have Platform Screen Gates System.

Ankara-Sivas Railway, Viaducts Between Kayaş-Kırıkkale is the FIRST Project where MSS (Movable Scaffolding System) Ongoing was employed for the FIRST time in Turkey and which involves the construction of 4 viaducts with a total length of 6.151 m which are going to be the tallest high-speed train viaducts of Turkey.

Ongoing Kömürhan Connection Tunnel and Bridge is the 4th single pylon cable-stayed bridge of the World.

CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 12 STRATEGIES

To increase market share in the current regions already operating while exploring the new opportunities in new regions.

Through strong relationships with partners focusing on negotiating projects in international markets.

Interested in infrastructure projects with limited competition that requires arrangement of sophisticated project finance for the Client through international markets.

Interested in the projects with secured financing from sources such as EIB, EBRD, WB, IFC, JBIC, PHARE Programs, EU Funds, Arab Fund and Strong Clients.

Share risks with partners and partnerships with other international and local contractors.

Broaden range of projects: EPC projects, environmental projects and marine works O&G projects.

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 13 FIELDS OF ACTIVITIES & 3. TRACK RECORD FIELDS OF ACTIVITIES

➢ Metros, Railways & Tunnels ➢ Motorways & Bridges ➢ Energy ➢ Marine & Geotechnical Works ➢ Superstructure Projects ➢ Environmental Projects METROS, RAILWAYS & TUNNELS

➢ 14 Projects ➢ 67 Stations ➢ 192.000 m Tunnels ➢ 7.125 m long Viaducts ➢ 60.000.000 m³ Earthworks ➢ 3.500.000 m³ Concrete

CONSTRUCTION SUMMIT 2019 09.10.2019 16 MOTORWAYS & BRIDGES

➢ 34 Projects ➢ 1.515 km Roads ➢ 30.500 m Tunnels ➢ 10.900 m long Bridges ➢ 20.600 m long Viaducts ➢ 335.000.000 m³ Earthworks ➢ 5.150.000 m³ Concrete

CONSTRUCTION SUMMIT 2019 09.10.2019 17 ENERGY

➢ 27 Projects ➢ 3.350 MW Installed Capacity ➢ 6.280.000.000 kWh Annual Power Generation ➢ 6.400.000.000 m³ Reservoir Volume ➢ 18.500 m Tunnels ➢ 17.500.000 m³ Concrete

CONSTRUCTION SUMMIT 2019 09.10.2019 18 MARINE & GEOTECHNICAL WORKS

➢ 6 Projects ➢ 3.150 m Jetties ➢ 30.000 m Piles ➢ 195.000 m² Marine Area ➢ 61.000 m³ Concrete

CONSTRUCTION SUMMIT 2019 09.10.2019 19 SUPERSTRUCTURE PROJECTS

➢ 28 Projects ➢ 5.300.000 m² Total Construction Area (including metro stations)

CONSTRUCTION SUMMIT 2019 09.10.2019 20 ENVIRONMENTAL PROJECTS

➢ 10 Projects ➢ 1.485.000 m³ Earthworks ➢ 798.000 m³/day Water Treatment Capacity ➢ 220.000 m Pipelines

CONSTRUCTION SUMMIT 2019 09.10.2019 21 4. DIVERSIFICATION DIVERSIFICATION CIS , UKRAINE and INDIA 1.356 Million $ NORTHEAST Metro, Road, Motorway, 538 Million $ Bridge, Viaduct and Metro, Road, Airport Projects Motorway, Bridge and Viaduct Projects

TURKEY 14.797 Million $ Metro, Railway, Road, NORTH AFRICA Motorway, Bridge, 2.242 Million $ Viaduct, Dam and Energy, Road, Motorway, Port Projects, Buildings Bridge, Viaduct Projects and Other Projects and Buildings

MIDDLE EAST 1.977 Million $ Motorway, Bridge and Viaduct Projects

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 23 MAJOR PROJECTS IN THE LAST 10 YEARS

Treatment Plants and Buildings Other 7% 2% Ports and Airports 7%

Dams and Energy Metros, Railways and 12% Tunnels 48%

Metros, Railways and Tunnels Roads and Motorways Dams and Energy Ports and Airports Roads and Motorways Buildings 24% Treatment Plants and Other

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 24 5. ONGOING PROJECTS ONGOING PROJECTS (International)

➢ QATAR Construction and Upgrade of Rayyan Road

➢ SAUDI ARABIA Project Aldara Hospital and Medical Center

➢ INDIA Line III, Package UGC-03

➢ BULGARIA Extension Project, Line III Lot 4

Metro Rehabilitation (Cable & Ventilation)

➢ LIBYA Al Tahadi University Complex ONGOING PROJECTS (Turkey)

➢ Çekmeköy-Sancaktepe-Sultanbeyli and Sarıgazi-Taşdelen-Yenidoğan Metro Construction and Electromechanical Works ➢ Ankara-İzmir High Speed Railway, Infrastructure Works of Afyon-Uşak (Banaz) Section ➢ Eminönü-Alibeyköy Tram Line Construction and Electromechanical Works ➢ Petkim Container Port ➢ Tokat-Niksar Road ➢ Ankara-Sivas Railway, Section between Kayaş-Kırıkkale, Viaducts V7-V9-V10-V15 ➢ Kayaş-Yerköy High Speed Railway, Superstructure and Electromechanical Works ➢ Kaynarca-Karasu-Kocaali Road ➢ Kılavuzlu Irrigation Main Channel, Section 1 ➢ Kömürhan Bridge Connection Tunnel and Road ➢ Mavi Tünel Potable Water Transmission Pipeline ➢ Ergene Basin Deep Marine Discharge ➢ Afyon Alkaloids Factory Water Treatment Plant ➢ Construction of Wholesales Market Building Complex ➢ Tuzla Advanced Biological Wastewater Treatment Plant ➢ Torbalı(Excluded)-Ödemiş-Çatal-Tire Railway Line Signalization and Telecommunication Works ➢ Malatya-Elazığ State Road, Construction of Velipalas Landslide ONGOING PROJECTS

Construction and Upgrade of Rayyan Road

Project Value: USD 1,208 Bn Employer: ASHGHAL Finance: Guaranteed By Employer Project Details : • Total Length of the Road: 10,7 km, 4x4 Lane • No. of Interchanges: 6 • 4 underpasses • 1 tunnel (36 mt depth, Qatar’s the longest tunnel ever built) • 1 viaduct and 1 bridge • 23 substations • 1 pump station • Excavation: 3.000.000 m³ • Concrete: 1,3 Mil m3 • Fill: 570.000 m³ • Asphalt: 745.000 m²

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 28 ONGOING PROJECTS

Çekmeköy-Sancaktepe-Sultanbeyli and Sarıgazi- Taşdelen-Yenidoğan Metro Construction and Electromechanical Works Çekmeköy Station Yenidoğan Station

Project Value: USD 642 Mn Doğuş Share : 60% Employer: Istanbul Metropolitan Municipality Finance: Guaranteed by Municipality Project Details : • Civil and Electromechanical Works • Procurement, Installation and Commissioning Works Sancaktepe Station • Length of the Main Line: 17,85 km TBM - NATM • 6 TBMs (3 Herrenknecht + 3 CRCHI) • 14 Stations and Depot Area Civil and Sultanbeyli Station Electromechanical Works

CONSTRUCTION SUMMIT 2019- 9.10.2019 - 29 ONGOING PROJECTS

Riyadh Metro Project

Project Value : USD 425 Mn Employer: Bechtel – Almabani – CCC Civil Works JV Finance: Guaranteed by Employer Project Details : • Total Length of Tunnels: 16.500 m (2x8) • Tunnel Inner Diameter: 9,20 m • Excavation Diameter: TBM – 10,30 m • Grouting Works • Piling Works (1F8 – 1F8 Portal – 1B3 – 1F5) • Olaya 1B3 Station Concrete Works • Supply and installation of trackworks

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 30 ONGOING PROJECTS

Sofia Metro Extension Project, Line III Lot 4

Project Value: USD 115 Mn Doğuş Share : 60 % Employer: Metropoliten EAD Finance: Guaranteed by Employer (OP Transport ) Project Details : • Line Length, 6720 m • 5,987 m of TBM tunnel, Dia.: 9.39 m, • 6 station crossing

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 31 ONGOING PROJECTS

Mumbai Metro Line III, Package UGC-03

Project Value: USD 399 Mn Doğuş Share : 50 % Employer: The Mumbai Metro Rail Corporation Limited (MMRC) Finance: JICA Project Details : • 3,7 km of TBM tunnel • 1,4 km of Cut & Cover Tunnel • No. of Stations: 5 - Cut & Cover • No. of TBM: 2 (Robbins)

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 32 ONGOING PROJECTS

Ankara-İzmir High Speed Railway, Infrastructure Works of Afyon-Uşak (Banaz) Section

Project Value: USD 329 Mn Doğuş Share : 50 % Employer: Turkish State Railways (TCDD) Finance: Guaranteed by Employer Project Details : • Line Lenght: 81,5 km • Tunnel Lenght: 5,457 m (9 no.s) • Max speed: 250km/h • Double lines, electrified (25 kV, 50 Hz AC) • Standard railway gauge (1435 mm)

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 33 ONGOING PROJECTS

Ankara-Sivas Railway, Section between Kayaş- Kırıkkale, Viaducts V7-V9-V10-V15

Project Value: USD 116 Mn Employer: Turkish State Railways (TCDD) Finance: Guaranteed by Employer Project Details : • Construction of 4 viaducts: Viaduct #7 (1.80 km, Max Column Height: 53,90 m) Viaduct #9 (1.44 km, Max Column Height: 43,65 m) Viaduct #10 (1.54 km, Max Column Height: 88,60 m) Viaduct #15 (1.44 km, Max Column Height: 64,50 m) • Total length of 6.22 km

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 34 ONGOING PROJECTS

Kayaş-Yerköy High Speed Railway, Superstructure and Electromechanical Works

Project Value: USD 201 Mn Employer: Turkish State Railways (TCDD) Finance: Guaranteed by Employer Project Details : • Route Length: 151,92 km. • Subballast Supply & Laying:585.557 m3 • Ballast Supply & Laying: 770.860 m3 • Track work with ballast (Single Line): 275.262 line-m • Track work without ballast: 56.116 line-m • Electrification, signaling, telecommunication and support works.

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 35 ONGOING PROJECTS Temporary Acceptance Stage

Petkim Container Port

Project Value: USD 41 Mn Employer: Petlim Limancılık Ticaret A.Ş. - Aliağa / İzmir Finance: Guaranteed by Employer Project Details : • Sheet Pile Quay and Wall Construction Project by Using Dolphin • Construction of Sheet Pile Quay: 700 m • Steel Pipe Driving Works: 19,005 m • C40 Concrete: 4.288 m3 • C30 Concrete: 30.620 m3

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 36 ONGOING PROJECTS

Kılavuzlu Irrigation Main Channel, Section 1

Project Value: USD 94 Mn Employer: : Turkish State Hydraulic Works General Directorate (DSİ) Finance: Guaranteed by Employer Project Details : • Main transmission channel: 46,83 km • Conventional Tunnel: L: 500 m; Dia.: 7 m • TBM Tunnel: L: 5,450 m; Dia.: 6 m • Interception channel: 24 pcs; L: 32,821 m • Open excavation: 25.221.000 m3 • Spreading sand-gravel: 335.900 m3 • Spreading geo-textile: 1.150.000 m2 • Channel pavement concrete: 171.750 m3

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 37 ONGOING PROJECTS

Kaynarca-Karasu-Kocaali Road

Project Value: USD 107 Mn Employer: Turkish State Highways General Directorate (KGM) Finance: Guaranteed by Employer Project Details : • Length of the Road: 25 km • Total Length of the Tunnel: 1.075 m

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 38 ONGOING PROJECTS

Kömürhan Bridge Connection Tunnel and Road

Project Value: USD 88 Mn Doğuş Share : 50 % Employer: Turkish State Highways General Directorate (KGM) Finance: Guaranteed by Employer Project Details : • Tunnel length (NATM) : 2x2.411 km • Tunnel diameter : 5,30 m • Bridge length : 660 m; span : 380 m

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 39 ONGOING PROJECTS

Tokat–Niksar Road

Project Value: USD 180 Mn Doğuş Share : 50 % Employer: Turkish State Highways General Directorate (KGM) Finance: Guaranteed by Employer Project Details : • 49 km of road construction • 2x2 Lane • Km: 0+000-48+962 section • 125 Engineering Structures

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 40 ONGOING PROJECTS

Mavi Tünel Potable Water Transmission Pipeline

Project Value: USD 52 Mn Employer: General Directorate of State Hydraulic Works Finance: Guaranteed by Employer Project Details: • Total pipeline lenght : 59.014 km • Service Road : 23,6 km

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 41 ONGOING PROJECTS

Ergene Basin Deep Marine Discharge

Project Value: USD 26 Mn Employer: Çorlu Deri Organize Sanayi Bölgesi Finance: Guaranteed by Employer Project Details : • Construction of Collecting Lines • Supply of Steel Pipes and Reinforced Concrete Works: 8.500 tons of sheet, 4.665 m of steel pipe, 7.500 m3 of concrete • Construction of tunnels and steel pipes with the diameter of 2.200 mm • Deep marine discharge at the depth of • 4.500 m

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 42 ONGOING PROJECTS

Afyon Alkaloids Factory Water Treatment Plant

Project Value: USD 9 Mn Employer: Turkish Grain Board General Directorate (TMO) Finance: Guaranteed by Employer Project Details : • Construction of wastewater treatment plant • Treatment of highly polluted wastewater from Afyon Alcolaids Factory (AAF), using integrated membrane bioreactor (MBR) and nanofiltration (NF) systems • Operation of the plant for 1 (one) year

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 43 ONGOING PROJECTS

Construction of Wholesales Market Building Complex Project Value: USD 99 Mn Doğuş Share : 60 % Employer: Emlak Planlama Finance: Guaranteed by Employer Project Details : • Statical, mechanical, electrical, substructure and landscaping works • Total Land Area: 322.002,81 m2 • Total Construction Area: 109.819,03 m2

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 44 6. RECENTLY COMPLETED PROJECTS RECENTLY COMPLETED PROJECTS

➢ UKRAINE Boryspil State International Airport

➢ BULGARIA Sofia Metro Extension Project, Line II Lot 1

➢ KAZAKHSTAN East-West Roads Project, Section between Almaty-Khorgos, Lot 1-2

➢ TURKEY Üsküdar-Ümraniye-Çekmeköy Metro Construction and Electromechanical Works STAR Refinery Marine Works Istanbul Otogar-Bağcılar Rail Mass Transportation System Boyabat Dam and HEPP Artvin Dam and HEPP RECENTLY COMPLETED PROJECTS

Üsküdar-Ümraniye- Çekmeköy Metro and E&M Works

Project Value: EUR 676 Mn Employer: Istanbul Metropolitan Municipality Finance: EIB (EUR 479 mn), rest by Export Kreditnamnden (EKN) arranged by contractor , guaranteed by Municipality Project Details : • Civil and E&M works • Tunnel works include • 26,4 km EPM – TBM (TBM Diameter: 6.56 m) • 19,2 km NATM • 2.189 m Cut & Cover • 16 Underground stations and depot area civil and electromechanical works

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 47 RECENTLY COMPLETED PROJECTS

Boryspil State International Airport RECENTLY COMPLETED PROJECTS

Project Value: USD 443 Mn Doğuş Share : 37,5 % Employer: BIA-Boryspil International Airport State Enterprise Finance: 49% JBIC, 51% Ukraine State Budget Project Details : • Airport Development Project • 100.000 m2 terminal building • 200.000 m2 Apron

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 48 RECENTLY COMPLETED PROJECTS

Sofia Metro Extension Project, Line II Lot 1

Project Value: USD 296 Mn Employer: Metropoliten EAD Finance: 75% Funds, 25% Sofia Municipality Project Details : • Length of Alignment: 3,8 km • Tunnel Inner Diameter: 8,43 m • No. of Stations: 4 • Electromechanical Works

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 49 RECENTLY COMPLETED PROJECTS

East-West Roads Project, Section between Almaty- Khorgos, Lot 1-2 1-2 Project Value: USD 283 Mn Doğuş Share : 50 % Employer: Ministry of Transport and Communications of the Republic of Kazakhstan Finance: World Bank (IBRD) Project Details : Lot 1: km 0 - 50 Almaty – Khorgos / Motorway Lot 2: km 50 – 111,7 Almaty – Khorgos / Motorway Total length: 111,7 km No. of lanes: 4 (2x2)

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 50 RECENTLY COMPLETED PROJECTS

Istanbul Otogar-Bağcılar Rail Mass Transportation RECENTLY COMPLETED PROJECTS System

Project Value: USD 1.324 Mn Doğuş Share : 50 % Employer: İETT General Directorate Finance: Guaranteed by Municipality of Istanbul Project Details : • E&M works • Procurement of trains • 5 stations (Otogar – Bagcilar) • 11 stations (Bagcilar – Olympic Village) • Tunnel with (23x2) 46 km length, radius circular cross section with TBM method • EKN credit used • Many Swedish branded components are used in the project

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 51 RECENTLY COMPLETED PROJECTS

STAR Refinery Marine Works

Project Value: USD 225 Mn Doğuş Share : 50 % Employer: TSGI Finance: Guaranteed by Employer Project Details : • Engineering works, Environmental Studies and Construction Works • Jetty Construction : 1.178 m • Steel Pipe Piles • Adding Works : 807 no.s • Driving Works : 14.518 m • Remedial internal boring/drilling : 4.069 m • Reclamation Length : 1200 m • Stone Column Installation: 104.382 m • Bored Pile Installation (Ø1200 mm): 35.641 m • Bored Pile Installation (Ø1200 mm):15.840 m

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 52 RECENTLY COMPLETED PROJECTS

Artvin Dam and HEPP

Project Value: USD 583 Mn Employer: Doğuş Electricity Generation and Trading Co. Finance: Equity and Credit Project Details : • Type: Arch Concrete Gravity • Height of the Dam: 180 m • Installed Capacity: 2 x 170 MW = 340 MW • Concrete Volume: 950.000 m3 • Annual Power Generation: 1.026.000.000 kWh

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 53 RECENTLY COMPLETED PROJECTS

Boyabat Dam and HEPP

Project Value: USD 677 Mn Employer: UDD-Boyabat Enerji Üretim ve Ticaret Limited Şirketi Finance: Guaranteed by Employer Project Details : • Type: Concrete Gravity • Height of the Dam: 195 m • Concrete Volume: 2.700.000 m3 • Installed Capacity: 513 MW • Annual Power Generation: 1.500.000.000 kWh

CONSTRUCTION SUMMIT 2019 - 9.10.2019 - 54 "The joy and happiness of doing something that will benefit your country and your people, will rekindle your potential energy and set you on the right course, in the direction of your goals."

Ayhan Şahenk Founder and Eternal Leader of Doğuş Group

CONSTRUCTION SUMMIT 2019 - 09.10.2019 - 55 www.dogusinsaat.com.tr