18.0 References

Total Page:16

File Type:pdf, Size:1020Kb

18.0 References MACTAQUAC PROJECT: FINAL COMPARATIVE ENVIRONMENTAL REVIEW (CER) REPORT 18.0 REFERENCES 18.1 LITERATURE CITED Acharya, B. S., J. Rasmussen, and J. Eriksen. 2012. Grassland carbon sequestration and emissions following cultivation in a mixed crop rotation. Agriculture, Ecosystems & Environment, 153, 33-39. Acker, S.A., T.J. Beechie, and P.B. Shafroth. 2008. Effects of a natural dam-break flood on geomorphology and vegetation on the Elwha River, Washington, U.S.A. Northwest Science 82, 210–223 (Special Issue). Acres (Acres Consulting Services Limited). 1975. Electric Power and Water Management in the Saint John River Basin. Prepared for The Saint John River Basin Board, Niagara Falls, Canada, December 1975. In collaboration with the New Brunswick Electric Power Commission, Fredericton, New Brunswick. Allen, P. M. 2005. The Oxbow Site 1984: Metepenagiag Mi’kmaq Nation, Miramichi, New Brunswick. New Brunswick Manuscripts in Archaeology No. 39. Archaeological Services, Heritage Branch, Culture and Sport Secretariat, Fredericton, New Brunswick. Amsden, B.L., L. Kruger, and R. Stedman. 2011. The Creation and Maintenance of Sense of Place in a Tourism Dependent Community. December 2011. ANB (Ambulance New Brunswick). 2014. About ANB. Available online at: http://www.ambulancenb.ca/en-us/about/Pages/services.aspx. Last accessed on March 13, 2015. Anderson, T. W., R. W. Mathewes, and C. E. Schweger. 1989. Holocene Climatic Trends in Canada with Special Reference to the Hypsithermal Interval. In Quaternary Geology of Canada and Greenland, edited by R. J. Fulton, pp. 520–528. Geology of Canada No. 1. Geological Survey of Canada, Ottawa, Ontario. Archaeological Services. 2012. Guidelines and Procedures for Conducting Professional Archaeological Assessments in New Brunswick. Archaeological Services, New Brunswick Department of Tourism, Heritage and Culture, Fredericton, New Brunswick. Archaeological Services. 2015. Archaeological Potential Map for the Mactaquac Project. PDF Map received April 13, 2015. Archaeological Services, New Brunswick Department of Tourism, Heritage and Culture, Fredericton, New Brunswick. Army Cadet History. No Date. Available online at: http://www.armycadethistory.com/IslandPark_main. htm. Last accessed on March 30, 2015. ASHA (American Speech-Language Hearing Association). 2015. Noise. Available online at: http://www.asha.org/public/hearing/Noise/. Last accessed on April 15, 2015. August 2016 18-1 MACTAQUAC PROJECT: FINAL COMPARATIVE ENVIRONMENTAL REVIEW (CER) REPORT Australian Bureau of Statistics. 2002. Social Capital and Social Well Being, A Discussion Paper. August, 2002. Available online at: http://www.oecd.org/innovation/research/2380806.pdf. Bastedo, J. 2006. Canadian Shield. The Canadian Encyclopedia. Historica Foundation, 2007. 1 Sep 2007. Available online at: http://www.thecanadianencyclopedia.com. Last accessed on May 1, 2015. BC Hydro. 2012. Site C Clean Energy Project, Environmental Impact Assessment, Volume 2, Appendix K, Technical Data Report: Microclimate, prepared by RWDI Air Inc., Document Number 06-110. Bednarek, A.T. 2001. Undamming Rivers: a Review of the Ecological Impacts of Dam Removal. Environmental Management 27(6):803-814. Bégin, Y., L. Sirois, L. Cournoyer, and J. Frydecki. 1998. Analyse dendroécologique des effets climatiques du réservoir Robert‐Bourassa sur l'environnement forestier, Québec nordique, Centre d'études nordiques, Université Laval pour Hydro‐Québec, 125 pp In Hydro‐Québec. 2006. Hydro‐Québec, Complexe de La Romaine; Étude d'impact sur l’environnement. Submitted December 2006. Betts, M. 2000. A Conservation Network for the Appalachian Hardwood Forest of the Saint John River Valley. Nature Trust of New Brunswick. Available online at: http://www.elements.nb.ca/theme/ millennium/matt/betts.htm Last accessed on May 8, 2015. Bird Studies Canada & Nature Canada. 2004-10. Important Bird Areas of Canada Database. Bird Studies Canada, Available on-line at: http://www.ibacanada.ca/site.jsp?siteID=NB010&lang=EN. Last accessed on April 30, 2015. Bisset, K. 2012. New Brunswick Wants to Cut the Number of School Districts by Half. Available online at: http://ipolitics.ca/2012/01/11/new-brunswick-wants-to-cut-the-number-of-school-districts-by- half/. Last accessed on June 25, 2015. Blackwell, B.F. and F. Juanes. 1998. Predation of Atlantic salmon smolts by striped bass after dam passage. North American Journal of Fisheries Management 18:936–938. Blair, S. E. 2004. Ancient Wolastoq'kew Landscapes: Settlement and Technology in the Lower Saint John River Valley, Canada. Unpublished Ph.D. dissertation, Department of Anthropology, University of Toronto, Toronto, Ontario. Born, S. and K.D. Genskow. 1998. Socioeconomic and Institutional Dimensions of Dam Removals: The Wisconsin Experience. Environmental management Volume 22, No.3, pp. 359-370. Bradbury, C., M.M. Roberge, and C.K. Minns. 1999. Life History Characteristics of Freshwater Fishes Occurring in Newfoundland and Labrador, with Major Emphasis on Lake Habitat Characteristics. Can. MS Rep. Fish. Aquat. Sci. 2485. Bradley, J. W., A. E. Spiess, R. A. Boisvert, and J. Boudreau. 2008. What’s the Point?: Modal Forms and Attributes of Paleoindian Bifaces in the New England-Maritimes Region. Archaeology of Eastern North America 36:119–172. August 2016 18-2 MACTAQUAC PROJECT: FINAL COMPARATIVE ENVIRONMENTAL REVIEW (CER) REPORT Bray, D. and H. Xie. 1993. A regression method for estimating suspended sediment yields for ungauged watershed in Atlantic Canada. Department of Civil Engineering – University of New Brunswick and Washburn Gillis Associates Ltd., Fredericton, NB. Published by the Canadian Journal of Civil Engineering 20, 82-87 (1993). Brett, J.R. 1956. Some principles in the thermal requirements of fishes. Quarterly Review of Biology. 31: 75–87. Brittain, J. E. and S.J. Saltveit. 1989. A review of the effect of river regulation on mayflies (ephemeroptera), Regul. Riv. 3, 191–204. Brodhead, J. R. 1855. Documents Relative to the Colonial History of the State of New York, Vol. IX. Weed, Parsons, and Company, Albany, New York. Brooks, C. and L. deMarsh. 2011. Traditional Ecological Knowledge and the State of the Saint John River Basin. Samaqan Nuhkmoss (Water Grandmother): my experience and perspective as a Wolastoqew returning to Wolastoq (the Saint John River Valley). In: The Saint John River: A State of the Environment Report. Canadian Rivers Institute, New Brunswick. July 2011. Brown, R.S., A.H. Colotelo, B.D. Pflugrath, C.A. Boys, L.J. Baumgartner, Z.D. Deng, L.G.M. Silva, C.J. Brauner, M. Mallen-Cooper, O. Phonekhampeng, G. Thorncraft, and D. Singhanouvong. 2014. Understanding barotrauma in fish passing hydro structures: a global strategy for sustainable development of water resources. Fisheries 39(3): 108-122. Bruton, M.N. 1985. The Effects of Suspensoids on Fish. Hydrobiologia, 125, 221-241. Bunt, C.M., T. Castro-Santos, and A. Haro. 2012. Performance of fish passage structures at upstream barriers to migration. River research and applications. 28:457-478. Burrows R. and M. Cormier. 2010. Birding in New Brunswick. Goose Lane Editions. Fredericton, New Brunswick. CAIT (Climate Analysis Indicators Tool). 2015. Climate Analysis Indicators Tool, Version 2.0. (Washington, DC: World Resources Institute, 2015. Available online at: http://cait2.wri.org/. Last accessed on April 9, 2015). Camargo, J. A. and N. J. Voelz. 1998. Biotic and abiotic changes along the recovery gradient of two impounded rivers with different impoundment use. Environmental Monitoring and Assessment 50:143–158. Carignan R. and D. R. S. Lean. 1991. Regeneration of dissolved substances in a seasonally anoxic lake: The relative importance of processes occurring in the water column and in the sediments, Limnology and Oceanography, 36, doi: 10.4319/lo.1991.36.4.0683. Carleton Ground Search & Rescue Inc. (CGSR). No Date. Carleton Ground Search & Rescue Inc. website. Available online at: http://www.cgsr.ca/. Last accessed on March 16, 2015. August 2016 18-3 MACTAQUAC PROJECT: FINAL COMPARATIVE ENVIRONMENTAL REVIEW (CER) REPORT Carter, B.C.1952. The American goldeneye in central New Brunswick. Unpublished M. Sc. Thesis, Univ. of Maine, Orono. 121 pp. Cited in Choate 1973. Castro-Santos, T. and A. Haro. 2003. Quantifying migratory delay: a new approach of survival analysis methods. Canadian Journal of Fisheries and Aquatic Sciences 60:986–996. Catling, P. 2002. Pygmy snaketail (Ophiogomphus howei), new to Canada. Argia, 14(3): 11–12. Caywood, L. R. 1969. Excavations at Fort Meductic, New Brunswick. Manuscript Report No. 123. National Historic Parks and Sites Branch, Department of Indian and Northern Affairs, Ottawa, Ontario. CBC. 2014. “Nackawic fire chief says all department gear is damaged”. Canadian Broadcasting Corporation (CBC). July 24, 2014. Available online at: http://www.cbc.ca/news/canada/new- brunswick/nackawic-fire-chief-says-all-department-gear-is-damaged-1.2715959. Last accessed on March 13, 2015. CCME (Canadian Council of Ministers of the Environment). 1998–2001. Canadian Environmental Quality Guidelines Summary Table – Sediment Quality Guidelines for the Protection of Aquatic Life. Available online at: http://st-ts.ccme.ca/. Last accessed on May 14, 2015. CCME. 1991–2009. Canadian Environmental Quality Guideline Summary Table- Soil Quality Guidelines for the Protection of Environmental and Human Health. Available online at: http://st- ts.ccme.ca/en/index.html. Last accessed May 14, 2015. CCME (Canadian Council of Ministers of the Environment). 1999. Canadian Environmental
Recommended publications
  • Public Comments Received for the Wolfden Zoning Petition
    PUBLIC COMMENTS RECEIVED FOR THE WOLFDEN ZONING PETITION ZP 779, Pickett Mountain Mine, T6 R6 WELS 02/04/2021 through 06/22/2021 Maine Land Use Planning Commission Maine Department of Agriculture, Conservation and Forestry The Maine Land Use Planning Commission is accepting public comment on the zoning petition filed by Wolfden Mt. Chase, LLC. to allow for development of the Pickett Mountain Mine in T6 R6 WELS. Public comments will be accepted until 10 days following the close of the public hearing for the petition. The public hearing has not yet been scheduled. A public notice for the hearing will be issued later this year in accordance with the Commission’s Rules of Practice, 01-672 CMR 4. Written comments received on the Wolfden Zoning Petition for the Pickett Mountain Mine will be posted periodically on the LUPC webpage. Information on changes to the webpage and other notifications to interested persons will be distributed through the Maine GovDelivery system. For more information on the review process, filing public comments, and signing-up for notifications, visit the LUPC webpage at: https://www.maine.gov/dacf/lupc/projects/wolfden/wolfden_rezoning.html. From: Anne Winchester To: LUPC, Wolfden Rezoning Subject: Rezoning request Date: Friday, February 05, 2021 11:55:11 AM EXTERNAL: This email originated from outside of the State of Maine Mail System. Do not click links or open attachments unless you recognize the sender and know the content is safe. Dear LUPC, Please deny Wolfden’s request to rezone the territory around Pickett Mtn. Wolfden is woefully lacking in resources, experience, and reserves to mine here or anywhere else.
    [Show full text]
  • KENNEBEC SALMON RESTORATION: Innovation to Improve the Odds
    FALL/ WINTER 2015 THE NEWSLETTER OF MAINE RIVERS KENNEBEC SALMON RESTORATION: Innovation to Improve the Odds Walking thigh-deep into a cold stream in January in Maine? The idea takes a little getting used to, but Paul Christman doesn’t have a hard time finding volunteers to do just that to help with salmon egg planting. Christman is a scientist with Maine Department of Marine Resource. His work, patterned on similar efforts in Alaska, involves taking fertilized salmon eggs from a hatchery and planting them directly into the cold gravel of the best stream habitat throughout the Sandy River, a Kennebec tributary northwest of Waterville. Yes, egg planting takes place in the winter. For Maine Rivers board member Sam Day plants salmon eggs in a tributary of the Sandy River more than a decade Paul has brought staff and water, Paul and crews mimic what female salmon volunteers out on snowshoes and ATVs, and with do: Create a nest or “redd” in the gravel of a river waders and neoprene gloves for this remarkable or stream where she plants her eggs in the fall, undertaking. Finding stretches of open stream continued on page 2 PROGRESS TO UNDERSTAND THE HEALTH OF THE ST. JOHN RIVER The waters of the St. John River flow from their headwaters in Maine to the Bay of Fundy, and for many miles serve as the boundary between Maine and Quebec. Waters of the St. John also flow over the Mactaquac Dam, erected in 1968, which currently produces a substantial amount of power for New Brunswick. Efforts are underway now to evaluate the future of the Mactaquac Dam because its mechanical structure is expected to reach the end of its service life by 2030 due to problems with the concrete portions of the dam’s station.
    [Show full text]
  • RESETTING the SWITCH on ITS Headlines for a Refit Extraction of Minerals and Gases.” Look at What the Business Case Actually Is, Dept
    D16 Pages 33-48:Layout 5 12/13/10 11:14 AM Page 2 E D D 7.75 7.875 7.875 New Brunswick In 1983, the Point solutions that work. As for the potential of The Mactaquac Dam is Lepreau generating Brunswick. In particular, the expansion of a hydroelectric dam built SPECIAL REPORT station was the first the natural gas sector in an environmentally building a second nuclear reactor, this is an on New Brunswick’s CANDU 6 nuclear idea that is on my desk, for sure. But I think Saint John River. It reactor in the world to responsible manner will be promoted. New generates approximately achieve commercial regulations will be developed under the everyone understands that we’re going to 20 per cent of New operation. In recent Brunswick’s power. years, it’s made Petroleum Act to govern the exploration and have to reset the whole process and take a Photo courtesy NB RESETTING THE SWITCH ON ITS headlines for a refit extraction of minerals and gases.” look at what the business case actually is, Dept. of Energy. that is both years behind schedule and Of course, none of this will be easy, as and move forward from there. The key thing millions of dollars Craig Leonard told Atlantic Business we have to remember in New Brunswick is over budget. The refurbishment is Magazine in an interview not long ago. The that Lepreau, itself, is a great asset.” expected to be Apart from this, however, Leonard and completein 2012. province’s new Minister of Energy and the Photo courtesy NB Minister responsible for the Energy other energy experts in New Brunswick Dept.
    [Show full text]
  • First Quarter Report
    FIRST QUARTER REPORT YEAR-TO-DATE RESULTS For the period ended June 30, 2018 NEW BRUNSWICK POWER CORPORATION OPERATIONAL HIGHLIGHTS Energy providers across the world are experiencing unprecedented change. Some of the global trends driving this change include– climate change, changes in customer expectations and behaviours, digitalization, aging infrastructures, competition, and more. As a result, NB Power is compelled to conduct business differently in order to help ensure adequate energy supply, meet customer expectations, integrate renewable resources, and provide low and stable rates. NB Power remains committed to meeting the needs of New Brunswickers in a safe, reliable and cost effective way. In recent years, New Brunswick has seen a rise in the frequency and intensity of extreme weather events. Spring 2018 brought historic flood levels to New Brunswick impacting thousands of homes, cottages and businesses. During the almost three-week long flood, NB Power personnel worked closely with New Brunswick Emergency Measures Organization to ensure customers’ safety and then worked diligently to reconnect customers once it was safe to do so. Although water can be a low cost source of energy for NB Power, when it comes in high volumes over short periods of time, like this spring, it cannot be used efficiently to generate electricity. NB Power is reviewing the impact of extreme weather events on its infrastructure and operations and is taking many steps to harden and improve its system to protect electricity supply for customers. NB Power is committed to helping all New Brunswickers with their energy use to help save money and reduce their energy needs.
    [Show full text]
  • Annual Report 2019
    2019/20 ANNUAL REPORT NEW BRUNSWICK POWER CORPORATION SUBMISSION LETTER June 2020 Honourable Mike Holland Minister of Natural Resources and Energy Development Province of New Brunswick PO Box 6000 Fredericton NB E3B 5H1 Minister, I am pleased to submit the Annual Report of New Brunswick Power Corporation for the fiscal year ended March 31, 2020 in compliance with Section 42 of the Electricity Act. Ed Barrett Chair, Board of Directors On the cover Power system operators like Nicole Cleghorn at our Energy Control Centre in Marysville help keep the transmission system running reliably, no matter the hour of the day. The Energy Control Centre is the energy hub for the province and keeps every business, hospital and home in New Brunswick connected. TABLE OF CONTENTS 1 Message from the Chairman 3 Message from the President 5 Governance 10 Report on Performance 23 Management’s Discussion and Analysis 47 Consolidated Financial Statements 114 Statistical Overview NEW BRUNSWICKERS POWERING NEW BRUNSWICK NB Power maintains one of the most diverse generation fleets in North America, with a combined total generating capacity of 3,790 MW plus additional installed capacity of 329 MW of wind and 259 MW of other renewable capacity provided by third parties through Purchase Power Agreements (PPAs). NB Power is responsible for the generation, reaching its highest peaks in the cold winter transmission, and distribution of electricity that months. To meet the wide swing in demand and powers the lives and livelihoods of more than make sure New Brunswickers have the power 400,000 customers across New Brunswick. they need when they need it, NB Power maintains standby generation with extra capacity.
    [Show full text]
  • Rivers at Risk: the Status of Environmental Flows in Canada
    Rivers at Risk: The Status of Environmental Flows in Canada Prepared by: Becky Swainson, MA Research Consultant Prepared for: WWF-Canada Freshwater Program Acknowledgements The authors would like to acknowledge the valuable contributions of the river advocates and professionals from across Canada who lent their time and insights to this assessment. Also, special thanks to Brian Richter, Oliver Brandes, Tim Morris, David Schindler, Tom Le Quesne and Allan Locke for their thoughtful reviews. i Rivers at Risk Acronyms BC British Columbia CBM Coalbed methane CEMA Cumulative Effects Management Association COSEWIC Committee on the Status of Endangered Wildlife in Canada CRI Canadian Rivers Institute DFO Fisheries and Oceans Canada EBF Ecosystem base flow IBA Important Bird Area IFN Instream flow needs IJC International Joint Commission IPP Independent Power Producer GRCA Grand River Conservation Authority LWR Low Water Response MOE Ministry of Environment (Ontario) MNR Ministry of Natural Resources (Ontario) MRBB Mackenzie River Basin Board MW Megawatt NB New Brunswick NGO Non-governmental organization NWT Northwest Territories P2FC Phase 2 Framework Committee PTTW Permit to Take Water QC Quebec RAP Remedial Action Plan SSRB South Saskatchewan River Basin UNESCO United Nations Environmental, Scientific and Cultural Organization US United States WCO Water Conservation Objectives ii Rivers at Risk Contents Rivers at Risk: The Status of Environmental Flows in Canada CONTENTS Acknowledgements .......................................................................................................................................
    [Show full text]
  • Return of the Wolastoq
    Vol. 8 No. 9 A publication of the NB Media Co-op June 2017 nbmediacoop.org Return of the Wolastoq: NB Refugee Clinic Giving a river back its name supports refugees By TRACY GLYNN navigate the law By TRACY GLYNN No One Is Illegal Fredericton organized a Borderless Solidarities Workshop on May 6 in Fredericton. The NB Media Co-op interviewed one of the participants, Akram Ben Salah, the executive director of the NB Refugee Clinic, to find out what his organization is doing to support refugees settling in New Brunswick. NBMC: What does the NB Refugee Clinic (NBRC) do? How long has it been around? Akram Ben Salah: The NBRC offers free legal assistance and representation to persons making applications to stay as refugees or on other types of humanitarian or risk- based grounds, who cannot afford to hire a private lawyer. Our work includes preparing and submitting the claims, performing mock hearings and representation during the actual hearings as well as assistance with work permit applications for asylum seekers and permanent residence applications for all clients whose claims were successful and approved. The Clinic opened its doors in Moncton to the public on October 17, 2016. Since then, we have been receiving clients on a regular basis. Before the Clinic opened, there were no organizations in New Brunswick offering free legal assistance. Our clients cannot afford to hire a lawyer and because of that, without our services, they often had to go through the process without proper guidance or representation. NBMC: What specific refugee and/or immigration policies need to change in Canada? Wolastoq Grand Council Chief Ron Tremblay (right) with Harry LaPorte (left, former Wolastoq Grand Council Chief) with members of the Wolastoq First Nations walking across the old train bridge in Fredericton to the traditional Akram Ben Salah: The Province of New Brunswick longhouse erected across the street from the New Brunswick Legislature in 2013.
    [Show full text]
  • The Following Pages Contain Links to Videos
    The following pages contain links to videos. Most are related to shale gas. There are a few links to other to items related to governments, oil spills, pipelines etc. Links to these videos from the all the PDF files linked to from the doc Dons PDF Files. They also can be found at https://6d7ad352d6bc296a468e63f5b74324c51bfc9d11.googledrive.com/host/0B3QWw x_US206WG1ocHAxdUtNRjA/ These links all worked at the time when the PDF files were created. Some may not work now. Video Links Julia Linke asked questions to Bruce Northrup Minister of Natural Resources!!!! From August 2011 http://www.youtube.com/watch?v=yHdSjvzt7Dg Julia Linke continues asking questions to Bruce Northrup Minister of Natural Resources http://www.youtube.com/watch?v=-xrqsZBozb8 Julia Linke final questions with Bruce Northrup Minister of Natural Resources http://www.youtube.com/watch?v=cN3I4mPdxPI Jessica Ernst in NB – 8 parts http://www.youtube.com/watch?v=P1g0iJblMc0 http://www.youtube.com/watch?v=h8GlaXjzmBI&feature=related http://www.youtube.com/watch?v=tx-2INlsJ9A&feature=related http://www.youtube.com/watch?v=FyYo3_iPcAU&feature=related http://www.youtube.com/watch?v=NbqnolxkpIo&feature=related http://www.youtube.com/watch?v=ghkc5ayaxGI&feature=related http://www.youtube.com/watch?v=aJDjdNmhzJA&feature=related http://www.youtube.com/watch?v=mw6cnrAUFZU&feature=related Dr. Ingraffea Moncton 3parts http://www.youtube.com/watch?v=sD7koag4QqE http://www.youtube.com/watch?v=5jRBG4rCg7E http://www.youtube.com/watch?v=vf5kRupscu8 Dr. Ingraffea Hampton 2 parts http://www.youtube.com/watch?v=SjdhiZJCyzU http://www.youtube.com/watch?v=oPVWY96tIxg Dr.
    [Show full text]
  • Wabanaki Textiles, Clothing, and Costume. Bruce J. Bourque and Laureen A
    Uncommon Threads: Wabanaki Textiles, Clothing, and Costume. Bruce J. Bourque and Laureen A. LaBar. Augusta, ME: Maine State Museum with the University of Washington Press, 2009. 192 pp.* Reviewed by Rhonda S. Fair In May of 2009, the Maine State Museum launched an exhibit of 100 Wabanaki objects; Bruce Bourque and Laureen LaBar curated the exhibit and wrote the companion book, Uncommon Threads: Wabanaki Textiles, Clothing, and Costume. Much more than a catalog of the objects on display, this book provides an examination of the history, art, and culture of the Maritime Peninsula’s indigenous population. After a very brief introduction, Bourque and LaBar divide their subject matter into four chapters, the first of which provides an overview of the Native peoples of the Maritime Peninsula. Though related to other Algonquian-speaking tribes along the eastern seaboard, the Wabanaki differed in some significant ways. For instance, the Wabanaki groups did not practice agriculture based on corn, beans, and squash, preferring instead to hunt and gather a significant portion of their diet. As did other Native peoples on the coast, they had early contact with Europeans, first with fishermen and fur traders, and later, with colonists and soldiers. Also like their neighbors, the Iroquois, the Wabanki formed a coalition of affiliated tribal groups. Frank Speck described this as the Wabanaki Confederacy. He observed that the Penobscot, Passamaquoddy, Maliseet, and Micmac had an identifiable national identity and met in common to discuss matters that would impact the confederacy as a whole. Agreements by the confederacy were documented not by written words, but with woven shell beads, or wampum.
    [Show full text]
  • People of the Dawnland and the Enduring Pursuit of a Native Atlantic World
    UNIVERSITY OF OKLAHOMA GRADUATE COLLEGE “THE SEA OF TROUBLE WE ARE SWIMMING IN”: PEOPLE OF THE DAWNLAND AND THE ENDURING PURSUIT OF A NATIVE ATLANTIC WORLD A DISSERTATION SUBMITTED TO THE GRADUATE FACULTY in partial fulfillment of the requirements for the Degree of DOCTOR OF PHILOSOPHY By MATTHEW R. BAHAR Norman, Oklahoma 2012 “THE SEA OF TROUBLE WE ARE SWIMMING IN”: PEOPLE OF THE DAWNLAND AND THE ENDURING PURSUIT OF A NATIVE ATLANTIC WORLD A DISSERTATION APPROVED FOR THE DEPARTMENT OF HISTORY BY ______________________________ Dr. Joshua A. Piker, Chair ______________________________ Dr. Catherine E. Kelly ______________________________ Dr. James S. Hart, Jr. ______________________________ Dr. Gary C. Anderson ______________________________ Dr. Karl H. Offen © Copyright by MATTHEW R. BAHAR 2012 All Rights Reserved. For Allison Acknowledgements Crafting this dissertation, like the overall experience of graduate school, occasionally left me adrift at sea. At other times it saw me stuck in the doldrums. Periodically I was tossed around by tempestuous waves. But two beacons always pointed me to quiet harbors where I gained valuable insights, developed new perspectives, and acquired new momentum. My advisor and mentor, Josh Piker, has been incredibly generous with his time, ideas, advice, and encouragement. His constructive critique of my thoughts, methodology, and writing (I never realized I was prone to so many split infinitives and unclear antecedents) was a tremendous help to a graduate student beginning his career. In more ways than he probably knows, he remains for me an exemplar of the professional historian I hope to become. And as a barbecue connoisseur, he is particularly worthy of deference and emulation.
    [Show full text]
  • 2021/22 BUSINESS PLAN April 2021 TABLE of CONTENTS
    2021/22 BUSINESS PLAN April 2021 TABLE OF CONTENTS About NB Power ................................................................................................................................................. 1 Mandate ........................................................................................................................................................... 1 Our Plan ............................................................................................................................................................... 3 Strategic Excellence Areas ................................................................................................................................. 5 Safety Excellence ............................................................................................................................................ 6 Customer Excellence ...................................................................................................................................... 7 Organizational Excellence ............................................................................................................................. 8 Reliability Excellence ...................................................................................................................................... 9 Environmental Excellence ........................................................................................................................... 11 Attachment A – Measure Definitions ............................................................................................................
    [Show full text]
  • John Gilbert Pre-Filed Testimony
    CURRICULUM VITAE NAME: JOHN C. GILBERT ADDRESS: Home: 80 Gardenview Drive Islandview, NB E3E 1A3 Work: J. D. Irving, Limited 300 Union Street Saint John, NB E2L 4M7 TELEPHONE: Home: 506-459-7916 Work: 506-632-7777 DATE OF BIRTH: November 12, 1952 EDUCATION: 1967 – 1970 Fredericton High School Fredericton, New Brunswick 1970 – 1975 Bachelor of Science in Forestry, Wildlife Option University of New Brunswick Fredericton, New Brunswick Related Course Work: Genetics, Invertebrate Zoology, Organic Chemistry, Meteorology and Forest Meteorology, Plant Taxonomy, Dendrology, Vertebrate Zoology, Animal Physiology, Photogrammetry and Aerial Photo Interpretation, Soil Science, Statistics, Biometery, Animal Ecology, Parasitology, Mammalogy, Environmental Zoology, Logging Systems, Statistical Methods, Remote Sensing, Forest Ecology, Engineering Graphics, Wildlife Management, Ornithology, Forest Economics, Forest Management, Forest Policy and Administration, Regional Resource Development, Silviculture, Forest Entomology, Fire Science. Thesis: The Use of Antimycin “A” to Control Unwanted Fish Species in a New Brunswick Lake EMPLOYMENT HISTORY: Summers: New Brunswick Department of Natural Resources 1970 - 1974 Fish and Wildlife Branch – summer student. Work performed included hydrographic, chemical and biological sampling of most of New Brunswick’s major drainage systems. April 1975 – Project Manager – Applied Research April 1979 New Brunswick Department of Natural Resources Fish and Wildlife Branch Curriculum Vitae – John Gilbert cont. Project Manager supervising a five-person team whose discipline included Province-wide Fisheries Development and Applied Research encompassing: angling opportunity development, lake reclamation, fish and aquatic insect population analysis, fish habitat improvement projects, aquaculture – investigation of salmonoid culture in private and public hatcheries, development of computer compatible field techniques, fish growth and production studies and water quality analysis.
    [Show full text]