Department of Natural Resources
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Salt River Watershed Inventory and Assessment Document
Salt River WATERSHED INVENTORY AND ASSESSMENT DOCUMENT PREPARED BY: H. Ross Dames and Brian Todd Missouri Department of Conservation For additional information contact Fisheries Regional Supervisor Missouri Department of Conservation 2500 South Halliburton, Kirksville, MO 63501 EXECUTIVE SUMMARY The Salt River basin drains 2,914 square miles of northeastern Missouri and lies in the Dissected Till Plains physiographic region. The North Fork, South Fork, and lower Salt River sub-basins compose 32%, 42%, and 27% of the basin, respectively. Clarence Cannon Dam, located on the Salt River approximately 63 miles upstream from its confluence with the Mississippi River, forms the 18,600 acre Mark Twain Lake. There are 165 third-order and larger streams in the basin. The North Fork Salt River is the longest stream flowing about 119 miles. In the upper portion of the basin, where local relief is low, glacial till is overlain by loess deposits in most areas. In the valleys of the Middle and South fork sub-basins, streams have eroded to expose limestone bedrock and shales. In the central part of the basin around Mark Twain Lake, relief increases and exposed limestone and shales in the valley walls and streambeds are more prevalent. Till quickly shallows in the lower Salt River sub-basin as valleys become more abrupt with high relief. A relief of 440 feet is attained the lower end of the Salt River basin. Soils throughout most of the basin are typical of the Central Claypan Region, except in the extreme lower portion that is located in the Central Mississippi Valley Wooded Slopes region. -
Water-Quality Data Collected at Lake Anne, Reston, Virginia, 1997-1999
Water-Quality Data Collected at Lake Anne, Reston, Virginia, 1997-1999 Kathryn M. Conko, Margaret M. Kennedy, and Karen C. Rice U.S. GEOLOGICAL SURVEY Open-File Report 00-481 Reston, Virginia 2000 Contents ABSTRACT ..............................^^ INTRODUCTION.............................................................................................................^ FIELD DATA COLLECTION METHODS.................................................................................... 3 Precipitation................................................................................................................................. 3 Streams and Lake Water.............................................................................................................. 5 LABORATORY ANALYTICAL METHODS................................................................................ 9 Sample Analysis Trace Elements............................................................................................... 9 Precipitation.............................................................................................................................. 9 Streams and Lake Water......................................................................................................... 11 Sample Analysis Major Cations and Anions........................................................................... 12 Quality Assurance...................................................................................................................... 14 Field Collection..................................................................................................................... -
Get Outside and Thrive
GET OUTSIDE AND THRIVE THE MENTAL HEALTH BENEFITS OF SPENDING TIME OUTSIDE, NATURE AND MOVEMENT WHY DOES GETTING OUTSIDE MATTER? ¡ Researchers at Harvard Medical School have found that time spent in nature can drastically impact mental health ¡ Ecotherapy has shown a strong connection between time spent in nature and reduced stress, anxiety, and depression. ¡ Walking has been proven effective in reducing anxiety and depression, and there is further evidence that walking in nature improves those results even further. That’s because different parts of our brain activate in nature. Our mind calms, leading to physical changes including a reduction in heart rate and blood pressure and a drop is cortisol levels ¡ Nature Walks have been described as the easiest self help strategy available to support mental health. HOW MUCH TIME OUTSIDE IS NEEDED TO MAKE A DIFFERENCE? ¡ 20 minutes 3 times a week is enough to show a consistent reduction in stress as measured by cortisol levels. ¡ Any natural environment should help – the goal is to get away from the high stimulation levels of urban environments ¡ Find a time and space that works for you ¡ Consider making this a (safe) social time with family members or your support pod – evidence suggests the greatest mental health benefits come from group nature walks ¡ Any outdoor activity can help – a gentle walk, brisk hike, bike ride or run all help reduce stress levels ¡ Any green space will have a positive impact if “escape to the country” isn’t an option. WHERE CAN I GET OUTSIDE? ¡ For local walks our Lemon Road neighbourhoods are blessed with options – there are short and long trails along Pimmit Run at the back of the school property, multiple green spaces and parks in Pimmit Hills and behind the library and the High School allows walkers to use the trails around the school property and across the fields. -
RV Sites in the United States Location Map 110-Mile Park Map 35 Mile
RV sites in the United States This GPS POI file is available here: https://poidirectory.com/poifiles/united_states/accommodation/RV_MH-US.html Location Map 110-Mile Park Map 35 Mile Camp Map 370 Lakeside Park Map 5 Star RV Map 566 Piney Creek Horse Camp Map 7 Oaks RV Park Map 8th and Bridge RV Map A AAA RV Map A and A Mesa Verde RV Map A H Hogue Map A H Stephens Historic Park Map A J Jolly County Park Map A Mountain Top RV Map A-Bar-A RV/CG Map A. W. Jack Morgan County Par Map A.W. Marion State Park Map Abbeville RV Park Map Abbott Map Abbott Creek (Abbott Butte) Map Abilene State Park Map Abita Springs RV Resort (Oce Map Abram Rutt City Park Map Acadia National Parks Map Acadiana Park Map Ace RV Park Map Ackerman Map Ackley Creek Co Park Map Ackley Lake State Park Map Acorn East Map Acorn Valley Map Acorn West Map Ada Lake Map Adam County Fairgrounds Map Adams City CG Map Adams County Regional Park Map Adams Fork Map Page 1 Location Map Adams Grove Map Adelaide Map Adirondack Gateway Campgroun Map Admiralty RV and Resort Map Adolph Thomae Jr. County Par Map Adrian City CG Map Aerie Crag Map Aeroplane Mesa Map Afton Canyon Map Afton Landing Map Agate Beach Map Agnew Meadows Map Agricenter RV Park Map Agua Caliente County Park Map Agua Piedra Map Aguirre Spring Map Ahart Map Ahtanum State Forest Map Aiken State Park Map Aikens Creek West Map Ainsworth State Park Map Airplane Flat Map Airport Flat Map Airport Lake Park Map Airport Park Map Aitkin Co Campground Map Ajax Country Livin' I-49 RV Map Ajo Arena Map Ajo Community Golf Course Map -
Restonreston Horsemanship Event Celebrates Spirit News, Page 12
RestonReston Horsemanship Event Celebrates Spirit News, Page 12 Classifieds, Page 10 Classifieds, ❖ Senior Living Page 6 Samantha Thomp- son, of Reston, with Sally, a rescue horse from an auction in New Jersey. “I really Entertainment, Page 8 love that many of ❖ the horses here are getting a second chance while help- ing so many people improve their lives. It’s a perfect bal- ance for us all.” Opinion, Page 4 Lake House Probe: No Conflict of Interest News, Page 3 Requested in home 4-6-17 home in Requested Time sensitive material. sensitive Time Reston Woman Sentenced Postmaster: Attention PERMIT #322 PERMIT Easton, MD Easton, For Supporting Terrorists PAID News, Page 2 Postage U.S. PRSRT STD PRSRT Photo by Andrea Worker/The Connection www.ConnectionNewspapers.comApril 5-11, 2017 online at www.connectionnewspapers.comReston Connection ❖ April 5-11, 2017 ❖ 1 News Reston Woman Sentenced for Provid- ing Material Support to Terrorists wo women were sen- chatroom that Jama established to T tenced today for terror organize and track monthly pay- ism crimes related to ment of money to the “Hargeisa their material support of al- side,” which was used to finance Shabaab, a designated foreign ter- al-Shabaab military operations in rorist organization. the Golis Mountains in northern Muna Osman Jama, 36, of Somalia, and the “Nairobi side,” Reston, and Hinda Osman which was used to fund two al- Dhirane, 46, of Kent, Wash., were Shabaab safehouses. One of the sentenced to 12 and 11 years, re- safehouses was used by al- spectively, for conspiracy to pro- Shabaab to store weapons and to vide material support to a foreign prepare for attacks. -
Department of Natural Resources Division 20—Clean Water Commission Chapter 7—Water Quality
Rules of Department of Natural Resources Division 20—Clean Water Commission Chapter 7—Water Quality Title Page 10 CSR 20-7.010 Prevention of Pollution from Wells to Subsurface Waters of the State (Rescinded July 10, 1980) ...................................................................3 10 CSR 20-7.015 Effluent Regulations............................................................................3 10 CSR 20-7.020 Effluent Regulations (Rescinded July 10, 1980).........................................12 10 CSR 20-7.030 Water Quality Standards (Rescinded December 11, 1977).............................12 10 CSR 20-7.031 Water Quality Standards .....................................................................12 10 CSR 20-7.050 Methodology for Development of Impaired Waters List ..............................150 JASON KANDER (1/29/14) CODE OF STATE REGULATIONS 1 Secretary of State Chapter 7—Water Quality 10 CSR 20-7 Title 10—DEPARTMENT OF 4. Representative sample—a small quan- 4. Metropolitan no-discharge streams. NATURAL RESOURCES tity whose characteristics represent the nature These streams and the limitations on dis- Division 20—Clean Water Commission and volume of the whole. For permitting pur- charging to them are listed in Table F of 10 Chapter 7—Water Quality poses representative sampling shall be consis- CSR 20-7.031 Water Quality Standards; tent with 40 CFR Part 122.48. 5. Special streams—Outstanding Nation- 10 CSR 20-7.010 Prevention of Pollution 5. Toxic Unit—a measure of effluent al Resource Waters and Outstanding State from Wells to Subsurface Waters of the toxicity generally expressed as acute toxicity Resource Waters, as listed in Tables D and E State unit or chronic toxicity unit. The larger the of 10 CSR 20-7.031 (section (6) of this rule); (Rescinded July 10, 1980) toxicity unit, the greater the toxicity. -
Feeder List SY2016-17
Region 1 Elementary School Feeder By High School Pyramid SY 2016-17 Herndon High School Pyramid Aldrin ES Herndon MS - 100% Herndon HS - 100% Armstrong ES Herndon MS - 100% Herndon HS - 100% Clearview ES Herndon MS - 100% Herndon HS - 100% Dranesville ES Herndon MS - 100% Herndon HS - 100% Herndon ES Herndon MS - 100% Herndon HS - 100% Hutchison ES Herndon MS - 100% Herndon HS - 100% Herndon MS Herndon HS - 100% Langley High School Pyramid Churchill Road ES Cooper MS - 100% Langley HS - 100% Colvin Run ES Cooper MS - 69% / Longfellow MS - 31% Langley HS - 69% / McLean HS - 31% Forestville ES Cooper MS - 100% Langley HS - 100% Great Falls ES Cooper MS - 100% Langley HS - 100% Spring Hill ES Cooper MS - 67% / Longfellow MS - 33% Langley HS - 67% / McLean HS - 33% Cooper MS Langley HS - 100% Madison High School Pyramid Cunningham Park ES Thoreau MS - 100% Madison HS - 76% / Marshall HS - 24 % Flint Hill ES Thoreau MS - 100% Madison HS - 100% Louise Archer ES Thoreau MS - 100% Madison HS - 100% Marshall Road ES Thoreau MS - 63% / Jackson MS - 37% Madison HS - 63% / Oakton HS - 37% Vienna ES Thoreau MS - 97% / Kilmer MS - 3% Madison HS - 97% / Marshall HS - 3% Wolftrap ES Kilmer MS - 100% Marshall HS - 61% / Madison HS - 39% Thoreau MS Madison HS - 89% / Marshall HS - 11% Based on September 30, 2016 residing student counts. 1 Region 1 Elementary School Feeder By High School Pyramid SY 2016-17 Oakton High School Pyramid Crossfield ES Carson MS - 92% / Hughes MS - 7% / Franklin - 1% Oakton HS - 92% / South Lakes HS - 7% / Chantilly - 1% Mosby -
Historic Mills of Ozark County, Missouri the Era of Grist Mills
Historic Mills of Ozark County, Missouri The Era of Grist Mills Early Missouri settlements – no newspapers, poor roads, and slow transportation. No matter how financially independent people were, they all needed to have their grain ground for meal and flour. “Going to the mill” was a way of life and an adventure for the entire family. The Era of Grist Mills Gathering place and social center – settlers had the opportunity to become acquainted with others many miles away, and to discuss neighborhood, county, state and world news. It was common for farmers to bring their whole family and camp near the mill for two or three days waiting their turn to have their grain ground. Many romances and marriages were the result of gatherings at the mill. Mills in Ozark County, Missouri Missouri’s scenic and swift flowing Ozark streams were naturals for powering the many mills which sprang up. Some research indicates that there were 14+ mills in the area prior to the Civil War, but none remaining after. The mills discussed here were all established post Civil War Era. Mills in Ozark County, Missouri Dawt Mill Hammond Mill Hodgson Mill Rockbridge Mill Zanoni Mill Dawt Mill North Fork River Built in 1901 by Alva Hodgson The mill burned and was rebuilt in 1909 Dawt Mill Purchased by Dr. Ed Henegar Major renovation on the mill and grounds began in 1995 Dawt Mill Today Restaurants, lodging, entertainment canoe/kayak rental Hammond Mill Little North Fork River Constructed in 1905 by John W. Grudier “Hammond” vs “Almond” Hammond Mill Milling ceased in the 1940s shortly after the Bank of Hammond closed Other business buildings were sold for salvage or left to the elements All that remains (besides the mill) is the bank vault. -
Add 30 SEW Premium Sites Add 6 Two-Bedroom Cabins and Renovate Existing 12 Room Lodge Replace 6 Basic Sites with 6 Camper Cabins
Park/Site Project Cost (excluding FFE) Scope of Work Convert 28 Campsites to Sewer/Electric/Water premium sites, and connect the wastewater system to Mound Convert 28 campsites (numbers 49-76) to sites that offer 50 amp, sewer and water Big Lake State Park City/Craig $ 3,010,343 connections; connect wastewater system to Mound City/Craig Construct a new campground loop with 30 campsites next to existing Sewer/Electric/Water campground loop. Each campsite will have sewer, 50 amp Cuivre River State Park Add 30 SEW Premium Sites $ 2,327,162 electricity and water connections. Rehabilitate the existing 12 room lodge by replacing dormitory wing, upgrading Add 6 Two-Bedroom Cabins and Renovate Existing kitchen/dining area and making some structural repairs to the building. Build adequate Current River State Park 12 room lodge $ 9,900,029 electric, water, and sewer service. Add 6 full service, two bedroom cabins by lake. Dr. Edmund A. Babler State Park Convert 35 sites to SEW Premium Sites $ 2,316,766 Convert 35 (1-33, 37 & 38) sites to SEW Premium Sites Dr. Edmund A. Babler State Park Renovate Babler Lodge $ 3,170,264 Renovate lodge Construct six new cabins (2 four bedroom, 4 two bedroom) in part of the existing day use Echo Bluff State Park Add 2 Four-Bedroom Cabins and 4 Two-Bedroom Cabins $ 3,011,901 area. Add 20 new campsites that offer 50 AMP electric service, and connections for sewer and Finger Lakes State Park Add 20 SEW Premium Sites $ 2,504,654 water; cost includes upgrading the wastewater system Modify six existing basic campsites by placing camper cabins on the sites. -
Mark Twain Lake Water Control Manual Update
Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control US Army Corps of Engineers BUILDING STRONG® WATER CONTOL PLAN . Overall Objectives . Project Purposes ►Flood Control ►Hydroelectric Power Generation ►Water Supply ►Fish and Wildlife ►Recreation ►Incidental Benefits to Mississippi River BUILDING STRONG® General Objectives/Overall Plan General Objectives. Mark Twain Lake is a flood control reservoir with multiple purposes. The purposes include hydroelectric power generation, water supply, fish and wildlife and recreation. There are also incidental benefits to Mississippi River navigation. The pool at elevation 606.0 feet NGVD retains one hundred percent of available flood control storage and one hundred percent of the joint-use storage for the other project purposes, namely hydroelectric power generation, water supply, fish and wildlife and recreation. BUILDING STRONG® General Objectives/Overall Plan 1. Growing Season. Growing season typically is considered from April 1st to October 31st, but may vary depending on seasonal conditions. Growing season shall be complete when a significant amount of crops have been harvested as determined by consultation with local farming interests. Downstream conditions should be evaluated to determine the maximum release that would be non-damaging. Releases are limited to 10,000 cfs, based on downstream conditions. The maximum release will be restricted to 6,000 cfs if the stage of the Mississippi River at Louisiana and/or St. Louis is at or forecast to be at or above flood stage below elevation 615.0 feet NGVD. Releases will be reduced to 2,000 cfs 24- hrs prior to crest on the Mississippi River and may be increased 24-hrs after crest. -
Flooding in the Southern Midwestern United States, April–May 2017
Flooding in the Southern Midwestern United States, April–May 2017 Open-File Report 2018–1004 U.S. Department of the Interior U.S. Geological Survey Above: Rapid-deployment gage installation, Gasconade River near Rich Fountain, Mo., May 1, 2017. Photograph by Larry Buschmann, U.S. Geological Survey (USGS). Front cover. Top center: Floodwater at Current River at Doniphan, Mo., May 1, 2017. Photograph by Shannon Kelly, USGS. Upper left: USGS hydrologic technician inspects gage at Big River at Byrnesville, Mo., May 1, 2017. Photograph by Aaron Walsh, USGS. Upper right: USGS hydrologic technician inspects gage platform at St. Francis River near Patterson, Mo., peak flood, April 30, 2017. Photograph by Josh Keele, USGS. Bottom center: USGS hydrologic technician wading from gage at Black River near Poplar Bluff, Mo., May 1, 2017. Photograph by Jarret Ellis, USGS. Flooding in the Southern Midwestern United States, April–May 2017 By David C. Heimann, Robert R. Holmes, Jr., and Thomas E. Harris Open-File Report 2018–1004 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior RYAN K. ZINKE, Secretary U.S. Geological Survey William H. Werkheiser, Deputy Director exercising the authority of the Director U.S. Geological Survey, Reston, Virginia: 2018 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment—visit https://www.usgs.gov or call 1–888–ASK–USGS. For an overview of USGS information products, including maps, imagery, and publications, visit https://store.usgs.gov. Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. -
House Bill No. 19
FIRST REGULAR SESSION SENATE COMMITTEE SUBSTITUTE HOUSE COMMITTEE SUBSTITUTE FOR HOUSE BILL NO. 19 101ST GENERAL ASSEMBLY 0019S.03C AN ACT To appropriate money for the several departments and offices of state government, and the several divisions and programs thereof, for planning and capital improvements including but not limited to major additions and renovations, new structures, and land improvements or acquisitions, to be expended only as provided in Article IV, Section 28 of the Constitution of Missouri for the fiscal period beginning July 1, 2021 and ending June 30, 2022. Be it enacted by the General Assembly of the state of Missouri, as follows: There is appropriated out of the State Treasury, to be expended only as provided in 2 Article IV, Section 28 of the Constitution of Missouri, for the purpose of funding each 3 department, division, agency, and program described herein for the item or items stated, and for 4 no other purpose whatsoever, chargeable to the fund designated for the period beginning July 1, 5 2021 and ending June 30, 2022, as follows: Section 19.005. To the Department of Natural Resources 2 For the Division of State Parks 3 For state park and historic site capital improvement expenditures, 4 including design, construction, renovation, maintenance, repairs, 5 replacements, improvements, adjacent land purchases, installation 6 and replacement of interpretive exhibits, water and wastewater 7 improvements, maintenance and repair to existing roadways, 8 parking areas, and trails, acquisition, restoration, and marketing of 9 endangered historic properties, and expenditure of recoupments, 10 donations, and grants 11 From Department of Natural Resources Federal Fund (0140).