Project Report
Total Page:16
File Type:pdf, Size:1020Kb
UPDATED FORM – I of PROPOSED 0.70 MTPA INTEGRATED STEEL PLANT At Orvakal Mega Industrial Hub of APIIC, Govt. of A.P At Guttapadu Village, Orvakal Mandal, Kurnool District – 518 010, Andhra Pradesh. TO MANUFACTURE 5,50,000 TPA OF TMT BARS 70,000 TPA OF ALLOY STEEL BARS 20,000 TPA OF PIG IRON 60,000 TPA OF STRUCTURAL STEEL PRODUCTS JANUARY – 2017 PROJECT PROPONENT ENVIRONMENT CONSULTANT JAI RAJ ISPAT LTD., B.S. ENVI-TECH PVT. LTD., Plot No.8, Phase III, I.D.A., Secunderabad, Telangana. Jeedimetla, Hyderabad – 500 055, NABET Accreditation: NABET/EIA1316/RA002 Telangana. FORM 1 (As Per New Notification of M.O.E.F dated 1-12-2009 vide SO 3067 (E)) (I) Basic Information S. Item Details No 1 Name of the Project/s 0.70 MTPA Integrated Steel Plant by M/s. JAI RAJ ISPAT LIMITED 2 S. No. in the schedule 3(a) 3 Proposed capacity/ area/ length/ 0.70 Million Tonnes Per Annum (MTPA) tonnage to be handled/ command Integrated Steel Plant area/ lease area/number of wells Description of Annual to be drilled plant Production Capacity TMT Rebar Mill 5,50,000 T Alloy Steel Bar 70,000 T Pig Iron 20,000 T Structural Steel 60,000 T Products Sinter Plant 7,98,990 T Blast Furnace 5,39,000 T Steel Melting Shop 5,13,393 T Power Plant 5940 MW Air Separation Plant 77,000 T Lime Calcination 56,000 T Plant 4 New/ expansion/ modernization New 5 Existing capacity/ Area etc. Not Applicable. 6 Category of Project i.e. ‘A’ or ‘B’ Category ‘A’ 7 Does it attract the general Not Applicable. condition? If yes please specify. 8 Does it attract the specific The proposed project is being developed in condition? If yes please specify. Orvakal Mega Industrial Hub (OMIH), Andhra Pradesh Industrial Infrastructure Corporation (APIIC), Govt. of Andhra Pradesh (A.P). 9 Location Orvakal Mega Industrial Hub (OMIH), Andhra Pradesh Industrial Infrastructure Corporation (APIIC), Govt. of A.P. 2 Location Map of the proposed project site is given in Annexure – 1. 10 km Radius Map of Survey of India (SOI) toposheet of the project site is given in Annexure – 1A. Google Earth Image of the proposed project is given in Annexure – 1B. The APIIC, Govt. of A.P master plan of the OMIH is given in Annexure – 1C. Photograph of the proposed project site is given in Annexure – 1D. Plot/ Survey/ Khasra No The APIIC, Govt. of A.P has identified about 400 Acres (Approx.) of land in the OMIH. The details of survey numbers and the extent of the identified land is given below Village Survey Extent Name Numbers (Acres and cents) Phase 1 (Block I) Guttapadu (V) 274 (part) 204.50 Guttapadu (V) 276 (part) 10.15 Guttapadu (V) 275 4.10 Total 218.75 Phase 1 (Block II) Guttapadu (V) 274 195.25 Guttapadu (V) 277/1, 4.42 277/2 Guttapadu (V) 279 1.48 Guttapadu (V) 280 1.48 Total 202.63 Sub-Total 218.75 + 202.63 = 421.38 (Approx.) Villages Guttapadu Tehsil/Mandal Orvakal District Kurnool State Andhra Pradesh 10 Nearest railway station/ airport Kurnool Railway Station – 20.7 km - NNW along with distance in Km. Dupadu Railway Station - 15.3 km – W Hyderabad (Shamshabad Airport) – 176.9 km – N 3 11 Nearest town, city, district Orvakal 1.9 km – NE headquarters along with distance Guttapadu Village 0.6 km – E in kms. H.Konthalapadu 0.1 km - SW Village Kurnool District 20.0 km – NW 12 Village panchayaths, Zilla Guttapadu Village, Orvakal Mandal, Kurnool parishad, Municipal Corporation, District, Andhra Pradesh. Pincode: 518 010. Local body (Complete postal addresses with telephone nos. to be given) 13 Name of the applicant Mr. Patibanda Srinivasa Kumar 14 Registered address Plot No.8, Phase III, I.D.A., Jeedimetla, Hyderabad – 500055, Telangana. 15 Address for correspondence Name Mr. Patibanda Srinivasa Kumar Designation (Owner /Partner/ General Manager (Finance) CEO) Address Plot No.8, Phase III, I.D.A., Jeedimetla, Hyderabad – 500055, Telangana. Pin code 500055 E- mail [email protected] Telephone no. +9140-23191234 Fax no. +9140-23198464 16 Details of Alternative sites Not Applicable, since the proposed project is examined, if any, location of these being located in industrial hub. The sites should be shown on a topo proposed industrial hub is being developed sheet. by APIIC, Govt. of A.P. Please refer APIIC, Govt. of A.P master plan is given in Annexure – 1C. 17 Interlinked projects No. 18 Whether separate application of No. interlinked project has been submitted? 19 If yes, date of submission Not Applicable. 20 If no, reason Not Applicable. 21 Whether the proposal involves Not Applicable. approval/ clearance under: if yes, details of the same and their status to be given. 4 (a) The Forest (Conservation)Act, 1980 (b) The Wild Life (Protection)Act, 1972 (c) The CRZ Notification, 1991 22 Whether there is any Government Yes, the proposed project is part of OMIH Order/ Policy relevant/ relating to being developed by APIIC, Govt. of A.P. the site? Provisional allotment letter from APIIC, Govt. of A.P. to M/s. Jai Raj Ispat Ltd., is given in Annexure – 2. 23 Forest land involved (hectares) Nil 24 Whether there is any litigation Nil. pending against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case No (c) Orders/ directions of the court, if any and its relevance with the proposed project. 25 Expected cost of the project Rs. 1451 Crores (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes Details thereof (with No. Confirmation /No approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes The proposed land for the project is in land use, land cover or part of the OMIH being developed topography including increase by APIIC, Govt. of AP. The land is in intensity of land use (with stony scrub with patches of single respect to local land use plan) crop cultivation (rain fed), which will be converted into industrial activity. 1.2 Clearance of existing land, Yes The land is stony scrub with vegetation and buildings? patches of single crop cultivation (rain fed). There are no buildings 5 and habitation on the proposed site. 1.3 Creation of new land uses? Yes The existing land will be converted for industrial purpose. 1.4 Pre-construction investigations Yes Geo-technical investigations will be e.g. bore holes, soil testing? done for designing the various building and structures. 1.5 Construction works? Yes Construction work will commence after receipt of all statutory clearances and closure of project funding. 1.6 Demolition works? No No demolition work. 1.7 Temporary sites used for Yes A temporary site office along with construction works or housing labour colony will be developed for of construction workers? undertaking construction activity. 1.8 Above ground buildings, Yes The steel plant units have structures or earthworks buildings and other above ground including linear structures, cut structures. and fill or excavations 1.9 Underground works including No Not Applicable. mining or tunneling? 1.10 Reclamation works? No Not Applicable. 1.11 Dredging? No Not Applicable. 1.12 Offshore structures? No Not Applicable. 1.13 Production and manufacturing Yes The Integrated Steel Plant will processes? produce the following finished products. TMT Bars. Alloy Steel Bars. Pig Iron steel Structural Steel Products The process flow chart of the Integrated Steel Plant is given in Annexure – 3. 1.14 Facilities for storage of goods or Yes Sheds will be constructed for materials? storing materials. 1.15 Facilities for treatment or Yes Suitable facilities for treatment and disposal of solid waste or liquid disposal will be created. effluents? 6 1.16 Facilities for long term housing Yes Will be provided of operational workers? 1.17 New road, rail or sea traffic Yes APIIC, Govt. of A.P will propose new during construction or road and rail corridor for this operation? proposed OMIH. 1.18 New road, rail, air, water borne Yes APIIC, Govt. of A.P will propose new or other transport infrastructure road, railway corridor, airport, including new or altered routes water reservoir etc, for this and stations, ports, airports proposed OMIH. etc? 1.19 Closure or diversion of existing Yes No closure of existing routes is transport routes or planned. The project will increase infrastructure leading to the traffic movement by rail/road. changes in traffic Movements? 1.20 New or diverted transmission Yes The power supply to the project will lines or pipelines? be taken from the nearest grid. 1.21 Impoundment, damming, Yes There are two dried out minor culverting, realignment or other seasonal streams passing through changes to the hydrology of the plant site as per SOI toposheet. watercourses or aquifers? 1.22 Stream crossings? Yes As mentioned above 1.23 Abstraction or transfers of water Yes There is one dug well in the plant form ground or surface waters? site. Water will be supplied by APIIC. 1.24 Changes in water bodies or the No None land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes There will be transport of personnel materials for construction, and material. operation or decommissioning? 1.26 Long-term dismantling or No Not Applicable. decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes There will be influx of people either temporarily or during construction and operation.