MATAGAMI’S NEXT MINE, EXPERIENCED EXPLORATION TEAM, AWARD-WINNING NEW DISCOVERIES Donner Metals Ltd. is a Canadian development and exploration company focused on base and projects in Québec. Donner's flagship project is a partnership with Xstrata Corporation in the world-class Camp district, covering both the current development of a new mine and on-going exploration activities. The area is host to historical production of 8.6 billion pounds of zinc and 853 million pounds of since 1963. The Matagami project is located in the Abitibi region of central Québec and is supported by Xstrata's existing mine infrastructure, a highly experienced workforce and an operating 2,950 tonne per day mill. As well, the area is serviced by highway, power, airport, railway and town site infrastructure. The Bracemac-McLeod deposit is located 6 kilometres from Xstrata's Matagami mill complex. Mineral concentrates produced in Matagami are processed and refined at Xstrata's facilities in Rouyn-Noranda and Montréal.

Management and Directors Opportunity Highlights: David Patterson – Chairman Harvey Keats – Chief Executive Officer ! Discovery to production in 6 years Normand Champigny – President ! 4 year mine life with potential for 7+ Robin Adair – Vice-President, Exploration Ron Tessier – Vice-President, Engineering ! Strong exploration target pipeline Ken Thorsen – Director ! $5 million annual exploration budget Kerry Sparkes – Director Laurie Sadler - Director ! Experienced exploration/development teams ! Future growth in Québec

DonnerDonner Metals LtdLtd. www.donnermetals.com TSX.V: DON

Bracemac-McLeod Mine

! 35% Donner, 65% Xstrata Zinc

! Production scheduled for the beginning of Q2 2013, on budget

! Initial mine life of 4 years on current reserves of 3.7 million tonnes grading 9.6% zinc, 1.26% copper, and 28.25 g/t and 0.43 g/t

! Positive feasibility study at $0.80/lb

zinc and $2.50/lb copper Rapidly Advancing ! Low cost producer: $0.42/lb zinc Zinc-Copper Project equivalent in feasibility The Matagami Camp Advantages: ! Development one year ahead of schedule ! High margin, low capital cost ! Short time frame to production ! Upgrade/optimization of the existing ! Infrastructure in place mill with the addition of a ball mill ! Discoveries made at multiple horizons ! + 2.5 million tonnes in high-grade and ! Cumulative benefit of multiple zones on open Inferred Resources development decision ! Mining-friendly jurisdiction ! Numerous high-grade intersections outside of current resource envelope Building a Mine and Finding the Next

Construction is well advanced on the 35/65% Donner- Xstrata Bracemac-McLeod Mine, with production scheduled for the beginning of Q2 2013. There are four joint venture areas in the Matagami Project where Donner has earned a 50% interest. Xstrata Zinc has a right in each of the five joint venture areas to earn back a 15% interest by completing a feasibility study or incurring a maximum of C$20 million towards a feasibility study. The Donner-Xstrata team is actively exploring the 4,747km2 area of mutual interest in the world-class Matagami Mining Camp, utilizing similar exploration techniques to the one that resulted in the award-winning discovery of the Bracemac-McLeod deposit. To support our long-term commitment to the Matagami Camp, the Donner-Xstrata team is actively exploring the region, including follow-up work on the team’s new discoveries. Donner’s objective in the Matagami Camp is to discover and develop a supply of long-term feed for the Matagami mill. Once the Company begins receiving revenue from the Bracemac-McLeod mine, Donner intends to grow through exploration and acquisitions centered in Québec.