From Explorer to Producer High Grade Zinc and Copper
Total Page:16
File Type:pdf, Size:1020Kb
FROM EXPLORER TO PRODUCER HIGH GRADE ZINC AND COPPER Donner Metals' [TSX.V: DON] flagship project is a partnership with Glencore Xstrata in the world-class Matagami Mining Camp district, covering current THE PROJECT production and development of a new mine, and ongoing exploration activities. Status: Producing, ongoing exploration and development. Location: Abitibi region of central Québec. Infrastructure: 3000 tonne per day mill, highway, power, airport, railway, townsite Production commenced May 15, 2013 and workforce. T MINE On budget and on schedule Distance from mill: 6 km 35% Donner, 65% Glencore Xstrata • Addition of a ball mill Mineral processing: Mineral concentrates are processed and refined at Glencore • Xstrata’s facilities in Rouyn-Noranda and Valleyfield, near Montréal. • New high-grade intersections • Ongoing regional exploration • at $0.80/lb zinc and $2.50/lb copper Ongoing drilling designed to extend • mine life Positive feasibility study economics • • ADVANTAGES Objective: Donner’s objective in the Matagami Camp is to discover and develop a supply of long-term feed for the onsite June 28, 2013 Matagami mill. To help meet this objective 63,000 metres of drilling is scheduled for 2013, 35,000 metres of which is THE STATS proximal to current reserves at the McLeod Deep deposit. THE MATAGAMI CAMP Joint Ventures: There are six joint venture areas in the Matagami Project. Donner Metals has earned a 50% interest in all joint venture areas. Glencore Xstrata earned an additional 15% interest in the South Flank and Bracemac-McLeod JVs by Reserves ~255M completing a bankable feasibility study on Bracemac-McLeod. • High margin, low capital cost 3.73 million tonnes: 9.6% zinc, Market Cap: ~17M 1.26% copper, 28.25 g/t silver, 0.43 Shares Outstanding: • Production underway g/t gold Fully Diluted: ~284M 52 week range: 0.06-0.205 • Infrastructure in place Inferred Resources 2.63 million tonnes: 8.79% zinc, 4 year life of mine • Discoveries made at multiple horizons 1.31% Cu, 38.84 g/t Ag, 1.06 g/t Au • Cumulative benefit of multiple zones on development decision • Mining-friendly jurisdiction • 63,000 metres of drilling planned for 2013, including 35,000 metres at McLeod deposit Mineral claims and licences: 686 km2 DONNERMETALS.COM TSX: DON.V THE METALS THE BRACEMAC-McLEOD MINE THE TEAM Donner Metals Ltd is lead by a Production Commenced May 15, 2013 highly experienced exploration and development team. 3000 tonne per day capacity mill David Patterson Positive feasibility study economics at Chairman $0.80/lb zinc, and $2.50/lb copper Harvey Keats Chief Executive Officer Initial four year life of mine Normand Champigny 35,000 metres of drilling in 2013 at McLeod President and CFO Deep to potentially extend mine life to 7+ Robin Adair years Vice-President, Exploration Reserves Ron Tessier Vice-President, Engineering 3.73 million tonnes: 9.6% zinc, 1.26% copper, 28.25 g/t silver, 0.43 g/t gold Ken Thorsen Director Inferred Resources Laurie Sadler 2.63 million tonnes: 8.79% zinc, 1.31% Director copper, 38.84 g/t Ag, 1.06 g/t gold Kerry Sparkes CONTACT US Director Montréal office Vancouver office Toll Free: 1 800 909-8311 1 Place Ville Marie, suite 2001 Suite 2480 - 1055 West Georgia Email : [email protected] Montréal, QC H3B 2C4 St. Vancouver, BC V6E 0B6 Tel. 514 286-1565 Tel. 604 683-0564 donnermetals.com DONNERMETALS.COM TSX: DON.V.