Notice of Determination

To: From: X Office of Planning and Research Public Agency: CSU Board of Trustees U.S. Mail: Street Address: Address: 401 Golden Shore P.O. Box 3044 1400 Tenth St., Rm 113 Long Beach, CA 90802 Sacramento, CA 95812-3044 Sacramento, CA 95814 Contact: Chia Tsai, Associate Director of Planning, PDC Phone: 408-924-8139 County Clerk County of: Lead Agency (if different from above): Address: Address:

Contact: Phone:

SUBJECT: Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code.

State Clearinghouse Number (if submitted to State Clearinghouse): 2013022045

Project Title: Spartan Athletics Center

Project Applicant: State University Board of Trustees

Project Location (include county): San Jose State University South Campus, San José, Santa Clara County

Project Description:

The proposed project consists of a new athletics center and plaza area on the east side of existing CEFCU Stadium on the San José State University’s South Campus location in San José. The project would also involve constructing a driveway to the athletics center from West Alma Boulevard. The proposed project is a minor modification to a previously approved project that would have located the athletics center on the northside of CEFCU Stadium. As lead agency, California State University Board of Trustees has prepared a CEQA Addendum for the proposed project. The CEQA Addendum is to the adopted Initial Study/Mitigated Negative Declaration that was previously prepared for the approved project on the north side of CEFCU Stadium.

This is to advise that the California State University Board of Trustees has approved the above

( X Lead Agency or Responsible Agency) described project on May 28, 2020 and has made the following determinations regarding the above described project.

The Addendum found that the proposed project would not result in a new or substantial increase in the severity of impacts beyond those analyzed and addressed in the previously adopted Initial Study/Mitigated Negative Declaration prepared for the approved project. Mitigation measures and the MMRP prepared for the adopted Initial Study/Mitigated Negative Declaration will also be applicable to the proposed project.

This is to certify that the Addendum and the previously adopted Initial Study/Mitigated Negative Declaration is available to the General Public at: San José State University, Facilities Development & Operations, One Washington Square, San José, CA 95192

Associate Director of Planning Signature (Public Agency): Title:

5/28/2020 Date: Date Received for Filing at OPR:

Authority cited: Sections 21083, Public Resources Code. Reference Section 21000-21174, Public Resources Code. Revised 2011