Hindawi Advances in Civil Engineering Volume 2021, Article ID 8898893, 12 pages https://doi.org/10.1155/2021/8898893 Research Article Design and Application of Risk Early Warning System for Subway Station Construction Based on Building Information Modeling Real-Time Model Qianlong Tang,1,2 Mingfeng Lei ,3 Binbin Zhu ,4 Limin Peng,4 Weimin Wu,4 and Chenghua Shi4 1School of Civil Engineering, Central South University, Changsha, China 2Jiangxi Transportation Vocational and Technical College, Nanchang, China 3School of Civil Engineering, Central South University, Key Laboratory of Engineering Structure of Heavy Haul Railway (Central South University), Changsha 410075, China 4School of Civil Engineering, Central South University, Changsha, China Correspondence should be addressed to Mingfeng Lei;
[email protected] and Binbin Zhu;
[email protected] Received 20 May 2020; Revised 12 January 2021; Accepted 1 March 2021; Published 19 March 2021 Academic Editor: Doddy Prayogo Copyright © 2021 Qianlong Tang et al. +is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. +e problems faced by subway stations in the construction process are more complex than those by overground buildings. +erefore, the construction risk for such structures is highly unpredictable and the risk management is difficult. Building in- formation modeling (BIM) technology has strong visualization, simulation, and integration characteristics that make it conducive to the development of a risk early warning system for underground engineering. According to the functional requirements of risk early warning for subway stations, a risk early warning system based on a BIM real-time construction model is designed in this study for a subway station construction.