Philippine Bidding Documents

Total Page:16

File Type:pdf, Size:1020Kb

Philippine Bidding Documents REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE REGIONAL OFFICE IV-B MAMBURAO, OCCIDENTAL MINDORO BIDDING DOCUMENTS FOR CONTRACT ID : 18CSEB44 CONTRACT NAME : CLUSTER SB16: Sub-Surface/Soil Exploration for various FY 2020 School Building Projects: 1) Abra de Ilog NHS-Biga Annex, Abra de Ilog, Occ. Mindoro 2) Abra de Ilog NHS, Abra de Ilog, Occ. Mindoro 3) Paluan NHS, Paluan, Occ. Mindoro 4) Looc NSOF, Looc, Occ. Mindoro 5) Cabra NHS, Lubang, Occ. Mindoro 6) Tilik NHS, Lubang, Occ. Mindoro CONTRACT LOCATION : Abra de Ilog, Paluan, Looc and Lubang, Occidental Mindoro Date of Submission of Bidding Documents : December 24, 2018 Date of Opening of Bids : December 24, 2018 Start Date for Issuance of Bidding Documents : December 5, 2018 SUBMITTED BY : CONTRACTOR / CONSULTANT Page 18 of 68 ANNEX III-1.1D Part I, Section IV. Notice of Eligibility Note: The Procuring Entity shall issue the attached Notice of Eligibility (Form DPWH-CONSL-10) to all bidders that meet the Eligibility Requirements. ________________________________________________________________________________ September 2016 DPWH Procurement Manual Volume III – Consulting Services Department of Public Works and Highways Contract ID: 18CSEB44 Contract Name: CLUSTER SB16: Sub-Surface/Soil Exploration for various FY 2020 School Building Projects: 1) Abra de Ilog NHS-Biga Annex, Abra de Ilog, Occ. Mindoro 2) Abra de Ilog NHS, Abra de Ilog, Occ. Mindoro 3) Paluan NHS, Paluan, Occ. Mindoro 4) Looc NSOF, Looc, Occ. Mindoro 5) Cabra NHS, Lubang, Occ. Mindoro 6) Tilik NHS, Lubang, Occ. Mindoro Contract Location: Abra de Ilog, Paluan, Looc and Lubang, Occidental Mindoro Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE Regional Office IV-B Mamburao, Occidental Mindoro NOTICE OF ELIGIBILITY December 13, 2018 MS. ROWENA SARREAL SANTOS TERMS CONCRETE TESTING # 19 L. Intalan St., Bagong Ilog Pasig City Dear Madam: Based on the Eligibility Check of the bidders for the 18CSEB44 - CLUSTER SB16: Sub-Surface/Soil Exploration for various FY 2020 School Building Projects: 1) Abra de Ilog NHS-Biga Annex, Abra de Ilog, Occ. Mindoro 2) Abra de Ilog NHS, Abra de Ilog, Occ. Mindoro 3) Paluan NHS, Paluan, Occ. Mindoro 4) Looc NSOF, Looc, Occ. Mindoro 5) Cabra NHS, Lubang, Occ. Mindoro 6) Tilik NHS, Lubang, Occ. Mindoro that we conducted on December 12, 2018 we are pleased to inform you that you are eligible. We are now conducting the shortlisting of eligible bidders. We shall inform you of its results as soon as possible. Very truly yours, (SIGNED) AMELIA PAZ D. VASQUEZ OIC-Chief, Planning and Design Section Chairperson, BAC for Consulting Services Received by TERMS CONCRETE TESTING ___________________________________ [Signature over Printed Name of Representative] Date _____________ DPWH-CONSL-10-2016 Department of Public Works and Highways Contract ID: 18CSEB44 Contract Name: CLUSTER SB16: Sub-Surface/Soil Exploration for various FY 2020 School Building Projects: 1) Abra de Ilog NHS-Biga Annex, Abra de Ilog, Occ. Mindoro 2) Abra de Ilog NHS, Abra de Ilog, Occ. Mindoro 3) Paluan NHS, Paluan, Occ. Mindoro 4) Looc NSOF, Looc, Occ. Mindoro 5) Cabra NHS, Lubang, Occ. Mindoro 6) Tilik NHS, Lubang, Occ. Mindoro Contract Location: Abra de Ilog, Paluan, Looc and Lubang, Occidental Mindoro Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE Regional Office IV-B Mamburao, Occidental Mindoro NOTICE OF ELIGIBILITY December 13, 2018 MR. ROLANDO C. SICCION ROLANDO C. SICCION SURVEYING OFFICE 1449-1453 AH Lacson St. Sta. Cruz, Manila Dear Sir: Based on the Eligibility Check of the bidders for the 18CSEB44 - CLUSTER SB16: Sub-Surface/Soil Exploration for various FY 2020 School Building Projects: 1) Abra de Ilog NHS-Biga Annex, Abra de Ilog, Occ. Mindoro 2) Abra de Ilog NHS, Abra de Ilog, Occ. Mindoro 3) Paluan NHS, Paluan, Occ. Mindoro 4) Looc NSOF, Looc, Occ. Mindoro 5) Cabra NHS, Lubang, Occ. Mindoro 6) Tilik NHS, Lubang, Occ. Mindoro that we conducted on December 12, 2018 we are pleased to inform you that you are eligible. We are now conducting the shortlisting of eligible bidders. We shall inform you of its results as soon as possible. Very truly yours, (SIGNED) AMELIA PAZ D. VASQUEZ OIC-Chief, Planning and Design Section Chairperson, BAC for Consulting Services Received by ROLANDO C. SICCION SURVEYING OFFICE ___________________________________ [Signature over Printed Name of Representative] Date _____________ DPWH-CONSL-10-2016 Page 20 of 68 Form DPWH-CONSL-10-2016 ANNEX III-1.1E Part I, Section V. Notice of Short List and Request for Proposals (RFP) Note: The Procuring Entity shall issue the attached Notice of Short List and Request for Proposals (RFP) (Form DPWH-CONSL-16) to all shortlisted bidders. ________________________________________________________________________________ September 2016 DPWH Procurement Manual Volume III – Consulting Services Department of Public Works and Highways Contract ID: 18CSEB44 Contract Name: CLUSTER SB16: Sub-Surface/Soil Exploration for various FY 2020 School Building Projects: 1) Abra de Ilog NHS-Biga Annex, Abra de Ilog, Occ. Mindoro 2) Abra de Ilog NHS, Abra de Ilog, Occ. Mindoro 3) Paluan NHS, Paluan, Occ. Mindoro 4) Looc NSOF, Looc, Occ. Mindoro 5) Cabra NHS, Lubang, Occ. Mindoro 6) Tilik NHS, Lubang, Occ. Mindoro Contract Location: Abra de Ilog, Paluan, Looc and Lubang, Occidental Mindoro Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE Regional Office IV-B Mamburao, Occidental Mindoro NOTICE OF SHORT LIST AND REQUEST FOR PROPOSALS (RFP) December 14, 2018 MS. ROWENA SARREAL SANTOS TERMS CONCRETE TESTING # 19 L. Intalan St., Bagong Ilog Pasig City Dear Madam: Subject: CONSULTANCY SERVICES FOR THE GEOTECHNICAL AND GEOLOGICAL SURVEYS/INVESTIGATIONS Based on our evaluation of eligible bidders for the 18CSEB44 - CLUSTER SB16: Sub- Surface/Soil Exploration for various FY 2020 School Building Projects: 1) Abra de Ilog NHS-Biga Annex, Abra de Ilog, Occ. Mindoro 2) Abra de Ilog NHS, Abra de Ilog, Occ. Mindoro 3) Paluan NHS, Paluan, Occ. Mindoro 4) Looc NSOF, Looc, Occ. Mindoro 5) Cabra NHS, Lubang, Occ. Mindoro 6) Tilik NHS, Lubang, Occ. Mindoro please be informed that you have been included in the short list of consultants for the said Contract. The following is the complete short list: 1. TERMS CONCRETE TESTING We now issue this Request for Proposals (RFP) for you to provide the following Consulting Services: Sub-Surface/ Soil Exploration. More details on the Services are provided in the Terms of Reference (TOR) included in the Bidding Documents for the Contract. DPWH-CONSL-16-2016 1 You may purchase the Bidding Documents for this Contract for a fee of ₱ 1,000.00 at DPWH, Mindoro Occidental District Engineering Office, Mamburao, Occidental Mindoro starting on December 17 – 24, 2018. You may also download the Bidding Documents from the websites of the DPWH at www.dpwh.gov.ph and the PhilGEPs at www.philgeps.gov.ph, and shall pay the fee for these Documents upon submission of your bid. We shall select the Consultant from the short list in accordance with the Quality-Cost Based Evaluation (QCBE) procedure as described in the Bidding Documents. Very truly yours, AMELIA PAZ D. VASQUEZ OIC-Chief, Planning and Design Section Chairperson, BAC for Consulting Services Received by TERMS CONCRETE TESTING _______________________________________ [Signature over Printed Name of Representative] Date _____________ DPWH-CONSL-16-2016 2 Page 22 of 68 Form DPWH-CONSL-16 ANNEX III-1.1F Part II, Section I. Instructions to Bidders (ITB) TABLE OF CONTENTS A. GENERAL ............................................................................................................................... ..23 1. Introduction ................................................................................................................................................... 23 2. Conflict of Interest ......................................................................................................................................... 23 3. Corrupt, Fraudulent, Collusive, and Coercive Practices ................................................................................ 24 4. Consultant’s Responsibilities ........................................................................................................................ 25 5. Origin of Associated Goods .......................................................................................................................... 26 6. Sub-contracts ................................................................................................................................................. 26 B. CONTENTS OF BIDDING DOCUMENTS ................................................................................... 26 7. Pre-Bid Conference ....................................................................................................................................... 26 8. Clarifications and Amendments to Bidding Documents ................................................................................ 27 C. PREPARATION OF BIDS ........................................................................................................... 27 9. Language of Bids ........................................................................................................................................... 27
Recommended publications
  • DSWD DROMIC Report #1 on the Tornado Incident in Brgy. Tubili, Paluan, Occidental Mindoro As of 09 August 2019, 6PM
    DSWD DROMIC Report #1 on the Tornado Incident in Brgy. Tubili, Paluan, Occidental Mindoro as of 09 August 2019, 6PM SUMMARY On 08 August 2019, a tornado incident occurred in Brgy. Tubili, Paluan, Occidental Mindoro. Source: DSWD-FO MIMAROPA I. Status of Affected Families / Persons A total of 42 families or 185 persons were affected by the tornado incident in Brgy. Tubili, Paluan, Occidental Mindoro (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL 1 42 185 REGION MIMAROPA 1 42 185 Occidental Mindoro 1 42 185 Paluan 1 42 185 Note: Ongoing assessment and validation Source: DSWD-FO MIMAROPA II. Status of Displaced Families / Persons There are 42 families or 185 persons who are currently staying in Apis Elementary School (see Table 2). Table 2. Number of Displaced Families / Persons Inside Evacuation Center NUMBER OF INSIDE ECs EVACUATION REGION / PROVINCE / MUNICIPALITY CENTERS (ECs) Families Persons CUM NOW CUM NOW CUM NOW GRAND TOTAL 1 1 42 42 185 185 REGION MIMAROPA 1 1 42 42 185 185 Occidental Mindoro 1 1 42 42 185 185 Paluan 1 1 42 42 185 185 Note: Ongoing assessment and validation still being conducted. Source: DSWD-FO MIMAROPA SITUATIONAL REPORT DSWD-DRMB DATE SITUATIONS / ACTIONS UNDERTAKEN • The Disaster Response Operations Monitoring and Information Center (DROMIC) of the DSWD-DRMB continues to closely coordinate with DSWD-FO 09 August 2019 MIMAROPA for significant reports on the status of affected families, assistance, and relief efforts. Page 1 of 2| DSWD DROMIC Report #1 on the Tornado Incident in Brgy.
    [Show full text]
  • Mangrove Mapping for the Verde Island Passage
    MANGROVE MAPPING FOR THE VERDE ISLAND PASSAGE This publication was prepared by Conservation International Philippines with funding from the United States Agency for International Development’s Coral Triangle Support Partnership (CTSP) (September 2011) Cover photo: This mangrove forest is part of a Marine Protected Area in Balibago, Verde Island Passage in the Philippines. Photo: © CTSP / Tory Read Mangrove Mapping for the Verde Island Passage, Philippines November 2011 USAID Project Number GCP LWA Award # LAG-A-00-99-00048-00 For more information on the six-nation Coral Triangle Initiative, please contact: Coral Triangle Initiative on Coral Reefs, Fisheries, and Food Security Interim Regional Secretariat Ministry of Marine Affairs and Fisheries of the Republic of Indonesia Mina Bahari Building II, 17th Floor Jalan Medan Merdeka Timur No 16 Jakarta Pusat 10110 Indonesia www.thecoraltriangleintitiave.org This is a publication of the Coral Triangle Initiative on Coral Reefs, Fisheries, and Food Security (CTI- CFF). Funding for the preparation of this document was provided by the USAID-funded Coral Triangle Support Partnership (CTSP). CTSP is a consortium led by the World Wildlife Fund, The Nature Conservancy, and Conservation International with funding support from the United States Agency for International Development’s Regional Asia Program. © 2011 Coral Triangle Support Partnership. All rights reserved. Reproduction and dissemination of material in this report for educational or other non-commercial purposes are authorized without any prior written permission from the copyright holders provided the source is fully acknowledged. Reproduction of material in this information product for resale or other commercial purposes is prohibited wihout written permission of the copyright holders.
    [Show full text]
  • Microfilm Publication M617, Returns from U.S
    Publication Number: M-617 Publication Title: Returns from U.S. Military Posts, 1800-1916 Date Published: 1968 RETURNS FROM U.S. MILITARY POSTS, 1800-1916 On the 1550 rolls of this microfilm publication, M617, are reproduced returns from U.S. military posts from the early 1800's to 1916, with a few returns extending through 1917. Most of the returns are part of Record Group 94, Records of the Adjutant General's Office; the remainder is part of Record Group 393, Records of United States Army Continental Commands, 1821-1920, and Record Group 395, Records of United States Army Overseas Operations and Commands, 1898-1942. The commanding officer of every post, as well ad commanders of all other bodies of troops such as department, division, brigade, regiment, or detachment, was required by Army Regulations to submit a return (a type of personnel report) to The Adjutant General at specified intervals, usually monthly, on forms provided by that office. Several additions and modifications were made in the form over the years, but basically it was designed to show the units that were stationed at a particular post and their strength, the names and duties of the officers, the number of officers present and absent, a listing of official communications received, and a record of events. In the early 19th century the form used for the post return usually was the same as the one used for regimental or organizational returns. Printed forms were issued by the Adjutant General’s Office, but more commonly used were manuscript forms patterned after the printed forms.
    [Show full text]
  • DSWD DROMIC Terminal Report on the Effects of Typhoon “QUIEL” 01 December 2019, 6PM
    DSWD DROMIC Terminal Report on the Effects of Typhoon “QUIEL” 01 December 2019, 6PM This is the final report on the effects of Typhoon Quiel when residents from coastal areas of municipality of Paluan in Province of Occidental Mindoro took evacuation due to big waves on 07 November 2019 at 2:00 PM. SUMMARY I. Status of Affected Families / Persons A total of 335 families or 1,016 persons were affected by the effects of Typhoon “Quiel” in 13 barangays in MIMAROPA (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangay Families Persons GRAND TOTAL 13 335 1,016 REGION MIMAROPA 13 335 1,016 Occidental Mindoro 13 335 1,016 Lubang 1 24 85 Paluan 4 65 240 Rizal 2 69 171 Sablayan 3 55 183 Santa Cruz 3 122 337 Source: DSWD-FO MIMAROPA II. Status of Displaced Families / Persons a. Inside Evacuation Center A total of 278 families or 804 persons took temporary shelter in thirteen (13) evacuation centers in MIMAROPA (see Table 2). Table 2. Number of Displaced Families Inside Evacuation Centers NUMBER OF NUMBER OF DISPLACED REGION / PROVINCE / EVACUATION INSIDE ECs MUNICIPALITY CENTERS (ECs) Families Persons (Actual) CUM NOW CUM NOW CUM NOW GRAND TOTAL 13 - 278 - 804 - REGION MIMAROPA 13 - 278 - 804 - Occidental Mindoro 13 - 278 - 804 - Paluan 5 - 65 - 240 - Rizal 2 - 44 - 71 - Sablayan 2 - 47 - 156 - Santa Cruz 4 - 122 - 337 - Source: DSWD-FO MIMAROPA Page 1 of 3| DSWD DROMIC Terminal Report on the Effects of Typhoon “QUIEL”, 01 December 2019, 6PM b.
    [Show full text]
  • The Philippines
    THE PHILIPPINES contemporary yacht charter 2020 1963 ITINERARY Yacht charter in the Philippines is growing slowly but surely. It is an excellent The Philippines is made up of more than 7,000 islands, surrounded by clear blue water. sailing destination for those who are looking for new and unexplored territories. It is famous for its sandy white beaches, first-class diving and water sports. With impressive The Philippines has many attractions that will surely amaze you and guarantee and varied volcanoes and dense jungle landscapes, island hopping trips in the Philippines a unique, exciting and impressive yacht charter vacation. are the perfect way to experience everything this island country has to offer. 1963 Your voyage begins at Honda Bay, offering a variety of exciting leisure Puerto Princesa is Palawan’s bustling capital and the main arrival hub by plane activities. The butterfly garden will be filled with various fascinating species, and ferry to the Island. Known as the cleanest and greenest city in the Philippines, and in the Palawan Wildlife Rescue and Conservation Center you will discover it is located in a splendid natural environment, offering beautiful beaches the local fauna. The Church of the Immaculate Conception is a famous and pristine forest hills. religious building in the heart of the old town, worth a visit. Don’t miss the Subterranean River National Park, a UNESCO World Heritage Site. DAY 1 1963 PUERTO PRINCESA Photo by paweesit on Foter.com / CC BY-ND El Nido is the main base for exploring the Bacuit Archipelago, a charming Get ready to travel through one of the most lovely, unspoilt and exciting places attraction in Palawan.
    [Show full text]
  • One Big File
    MISSING TARGETS An alternative MDG midterm report NOVEMBER 2007 Missing Targets: An Alternative MDG Midterm Report Social Watch Philippines 2007 Report Copyright 2007 ISSN: 1656-9490 2007 Report Team Isagani R. Serrano, Editor Rene R. Raya, Co-editor Janet R. Carandang, Coordinator Maria Luz R. Anigan, Research Associate Nadja B. Ginete, Research Assistant Rebecca S. Gaddi, Gender Specialist Paul Escober, Data Analyst Joann M. Divinagracia, Data Analyst Lourdes Fernandez, Copy Editor Nanie Gonzales, Lay-out Artist Benjo Laygo, Cover Design Contributors Isagani R. Serrano Ma. Victoria R. Raquiza Rene R. Raya Merci L. Fabros Jonathan D. Ronquillo Rachel O. Morala Jessica Dator-Bercilla Victoria Tauli Corpuz Eduardo Gonzalez Shubert L. Ciencia Magdalena C. Monge Dante O. Bismonte Emilio Paz Roy Layoza Gay D. Defiesta Joseph Gloria This book was made possible with full support of Oxfam Novib. Printed in the Philippines CO N T EN T S Key to Acronyms .............................................................................................................................................................................................................................................................................. iv Foreword.................................................................................................................................................................................................................................................................................................... vii The MDGs and Social Watch
    [Show full text]
  • 2019 Annual Regional Economic Situationer
    2019 ANNUAL REGIONAL ECONOMIC SITUATIONER National Economic and Development Authority MIMAROPA Region Republic of the Philippines National Economic and Development Authority MIMAROPA Region Tel (43) 288-1115 E-mail: [email protected] Fax (43) 288-1124 Website: mimaropa.neda.gov.ph ANNUAL REGIONAL ECONOMIC SITUATIONER 2019 I. Macroeconomy A. 2018 Gross Regional Domestic Product (GRDP) Among the 17 regions of the country, MIMAROPA ranked 2nd— together with Davao Region and next to Bicol Region—in terms of growth rate. Among the major economic sectors, the Industry sector recorded the fastest growth of 11.2 percent in 2018 from 1.6 percent in 2017. This was followed by the Services sector, which grew by 9.3 percent in 2018 from 8.7 percent in 2017. The Agriculture, Hunting, Fishery and Forestry (AHFF) sector also grew, but at a slower pace at 2.6 percent in 2018 from 3.0 percent in 2017 (refer to Table 1). Table 1. Economic Performance by Sector and Subsector, MIMAROPA, 2017-2018 (at constant 2000 prices, in percent except GVA) Contribution Percent 2017 2018 GRDP Growth rate Sector/Subsector GVA GVA distribution growth (in P '000) (in P '000) 2017 2018 17-18 16-17 17-18 Agriculture, hunting, 26,733,849 27,416,774 20.24 19.12 0.5 3.0 2.6 forestry, and fishing Agriculture and 21,056,140 21,704,747 15.94 15.13 0.5 4.4 3.1 forestry Fishing 5,677,709 5,712,027 4.30 3.98 0.0 -1.9 0.6 Industry sector 42,649,103 47,445,680 32.29 33.08 3.7 1.6 11.2 Mining and 23,830,735 25,179,054 18.04 17.56 1.0 -5.5 5.7 quarrying Manufacturing 6,811,537 7,304,895
    [Show full text]
  • Blessed Vicente M. Soler, Missionary in the Philippines, 1889-1906
    BLESSED VICENTE M. SOLER, MISSIONARY IN THE PHILIPPINES, 1889-1906 Emmanuel Luis A. ROMANILLOS Abstract Resumen The study narrates the missionary years of Este estudio describe la actividad misio- Blessed Vicente Soler in Antipolo, Mind- nera del beato Vicente Soler en Antipo- oro and Batangas. At the outbreak of the lo, Mindoro y Batangas. Al estallar la Philippine Revolution, Father Soler and his Revolución filipina el padre Soler y sus confreres travelled to Lucena in June 1898 compañeros viajaron a Lucena en junio to escape from the revolutionists’ clutch- de 1898 para escapar de los revoluciona- es and took a steamer to Borneo which rios y allí embarcaron en un vapor con berthed at Looc in Tablas Island where they destino a Borneo. Pero al pasar por Looc opted to stay. With eleven confreres, Father (Tablas) optaron por permanecer en Fi- Soler was soon imprisoned there. They lipinas. Muy pronto volvió a caer, junto were later taken by boat to Romblon, then con sus once compañeros, en manos de to Marinduque for incarceration at Boac los revolucionarios, que los trasladaron a and later moved to Mogpog where kind Romblón y, luego, a Marinduque. Duran- parishioners and secular priest treated them te algún tiempo fueron encarcelados en well. After various sea travels, the prisoners Boac y Mogpog, donde fueron bien tra- were taken to Tayabas and hiked from one tados por el párroco y sus feligreses. Tras town to another. After months of captivity, varias idas y venidas fueron trasladados a evasion from American forces, transfers, Batangas, donde caminaron de pueblo en exhaustion from long hikes, hunger, un- pueblo.
    [Show full text]
  • Region Penro Cenro Province Municipality Barangay
    REGION PENRO CENRO PROVINCE MUNICIPALITY BARANGAY DISTRICT AREA IN HECTARES NAMEOF ORGANIZATION TYPE OF ORGANIZATION COMPONENT COMMODITY SPECIES YEAR ZONE TENURE RIVER BASIN NUMBER OF LOA WATERSHED SITECODE REMARKS MIMAROPA Marinduque Boac Marinduque Buenavista Sihi Lone District 34.02 LGU-Sihi LGU Reforestation Timber Narra 2011 Protection 11-174001-0001-0034 MIMAROPA Marinduque Boac Marinduque Boac Tumagabok Lone District 8.04 LGU-Tumagabok LGU Agroforestry Timber and Fruit Trees Narra, Langka, Guyabano, and Rambutan 2011 Production 11-174001-0002-0008 MIMAROPA Marinduque Boac Marinduque Torrijos Sibuyao Lone District 2.00 LGU-Sibuyao LGU Agroforestry Fruit Trees Langka 2011 Production 11-174001-0003-0002 MIMAROPA Marinduque Boac Marinduque Torrijos Sibuyao Lone District 12.01 LGU-Sibuyao LGU Reforestation Timber Narra 2011 Protection Untenured 11-174001-0004-0012 MIMAROPA Marinduque Boac Marinduque Torrijos Sibuyao Lone District 7.04 LGU-Sibuyao LGU Reforestation Timber Narra 2011 Protection 11-174001-0005-0007 MIMAROPA Marinduque Boac Marinduque Torrijos Sibuyao Lone District 3.00 LGU-Sibuyao LGU Reforestation Timber Narra 2011 Protection 11-174001-0006-0003 MIMAROPA Marinduque Boac Marinduque Torrijos Sibuyao Lone District 1.05 LGU-Sibuyao LGU Reforestation Timber Narra 2011 Protection 11-174001-0007-0001 MIMAROPA Marinduque Boac Marinduque Torrijos Sibuyao Lone District 2.03 LGU-Sibuyao LGU Reforestation Timber Narra 2011 Protection 11-174001-0008-0002 MIMAROPA Marinduque Boac Marinduque Buenavista Yook Lone District 30.02 LGU-Yook
    [Show full text]
  • 1 Enhanced Health Facility Surveys to Support Malaria Control and Elimination Across Different
    medRxiv preprint doi: https://doi.org/10.1101/2020.07.07.20146225; this version posted July 8, 2020. The copyright holder for this preprint (which was not certified by peer review) is the author/funder, who has granted medRxiv a license to display the preprint in perpetuity. It is made available under a CC-BY-ND 4.0 International license . 1 1 Enhanced health facility surveys to support malaria control and elimination across different 2 transmission settings in The Philippines 3 4 Authors: Ralph A. Reyes1*, Kimberly M. Fornace2, Maria Lourdes M. Macalinao1, Beaulah L. Boncayao1, 5 Ellaine S. De La Fuente1, Hennessey M. Sabanal1, Alison Paolo N. Bareng1, Inez Andrea P. Medado3, 6 Edelwisa S. Mercado3, Jennifer S. Luchavez1, Julius Clemence R. Hafalla2, Chris J. Drakeley2, Fe 7 Esperanza J. Espino1 8 9 1. Department of Parasitology, Research Institute for Tropical Medicine, 9002 Research Drive, 10 Filinvest Corporate City, Alabang, Muntinlupa City, 1781, Metro Manila, Philippines 11 2. Faculty of Infectious and Tropical Diseases, London School of Hygiene and Tropical Medicine, 12 Keppel Street, London WC1E 7HT, United Kingdom 13 3. Molecular Biology Laboratory, Research Institute for Tropical Medicine, 9002 Research Drive, 14 Filinvest Corporate City, Alabang, Muntinlupa City, 1781, Metro Manila, Philippines * [email protected]; (+63) 8807-2631; Research Institute for Tropical Medicine, 9002 Research Drive, Filinvest Corporate City, Alabang, Muntinlupa City, Metro Manila, Philippines 1781 NOTE: This preprint reports new research that has not been certified by peer review and should not be used to guide clinical practice. medRxiv preprint doi: https://doi.org/10.1101/2020.07.07.20146225; this version posted July 8, 2020.
    [Show full text]
  • Regional Report on the Approved Construction Safety & Health Program
    REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-MIMAROPA October 2017 Date No. Company Name and Address Project Name Project Address Approved PABLO S. LABASBAS 1 CONSTRUCTION/ Brgy. Dagum, Core Local Access Road/ Municipality of Odiongan Dapawan, Odiongan, Romblon 02-Oct-17 Calbayog City R.G. FLORENTINO CONSTRUCTION Repair/ Rehabilitation of San Andres District Hospital 2 Poblacio, San Andres, Romblon 02-Oct-17 AND TRADING/ San Andres, Romblon (Painting and Flooring)/ Province of Romblon CSR CONSTRUCTION AND SUPPLY/ Construction of San Fernando Multi-Purpose Building 3 San Fernando, Romblon 02-Oct-17 Sugod, Cajidiocan, Romblon Phase 12/ Province of Romblon CSR CONSTRUCTION AND SUPPLY/ Repair/ Rehabilitation of Pandan Bridge/ Province of 4 Sta. Fe, Romblon 02-Oct-17 Sugod, Cajidiocan, Romblon Romblon CSR CONSTRUCTION AND SUPPLY/ Slope Protection of Barangay Tabin-Dagat to Ligaya/ 5 Odiongan, Romblon 02-Oct-17 Sugod, Cajidiocan, Romblon Province of Romblon CSR CONSTRUCTION AND SUPPLY/ Concreting of Poblacion to Bachawan Road/ Province of 6 Concepcion, Romblon 02-Oct-17 Sugod, Cajidiocan, Romblon Romblon HARDSHELL DESIGN AND Construction of Amphitheater Building/ Palawan State PSU Main Campus, Puerto Princesa 7 CONSTRUCTION/ 67-D Burgos St., 03-Oct-17 University City, Palawan Brgy. Masikap, Puerto Princesa City HARDSHELL DESIGN AND Construction of CBA Business Enterprise Building/ PSU Main Campus, Puerto Princesa 8 CONSTRUCTION/ 67-D Burgos St., 03-Oct-17 Palawan State University City, Palawan Brgy. Masikap, Puerto Princesa City HARDSHELL DESIGN AND Construction of Two-Storey Administration Building, 9 CONSTRUCTION/ 67-D Burgos St., PSU Quezon Campus, Palawan 03-Oct-17 Phase II/ Palawan State University Brgy.
    [Show full text]
  • Occidental Mindoro Priority-Final2.Xlsx
    Table 2. Household Population by Age Group, Sex, and City/Municipality: 2007 Age Group and City/Municipality Both Sexes Male Female OCCIDENTAL MINDORO All Ages 419,316 217,405 201,911 Under 1 10,891 5,642 5,249 1 - 4 44,654 23,279 21,375 5 - 9 56,840 29,229 27,611 10 - 14 53,828 27,862 25,966 15 - 19 42,346 22,787 19,559 20 - 24 33,335 17,491 15,844 25 - 29 31,254 16,190 15,064 30 - 34 28,168 14,700 13,468 35 - 39 26,603 13,810 12,793 40 - 44 22,288 11,664 10,624 45 - 49 18,676 9,756 8,920 50 - 54 15,038 7,792 7,246 55 - 59 11,190 5,743 5,447 60 - 64 8,455 4,158 4,297 65 - 69 6,190 3,004 3,186 70 - 74 4,549 2,140 2,409 75 - 79 2,585 1,169 1,416 80 and over 2,426 989 1,437 0-17 193,895 100,901 92,994 18 and over 225,421 116,504 108,917 ABRA DE ILOG All Ages 25,125 13,014 12,111 Under 1 823 420 403 1 - 4 3,098 1,612 1,486 5 - 9 3,537 1,810 1,727 10 - 14 3,240 1,677 1,563 15 - 19 2,334 1,237 1,097 20 - 24 1,928 986 942 25 - 29 1,913 993 920 30 - 34 1,589 848 741 35 - 39 1,584 824 760 40 - 44 1,224 652 572 45 - 49 1,093 581 512 50 - 54 823 420 403 55 - 59 587 295 292 60 - 64 503 258 245 65 - 69 354 170 184 70 - 74 243 126 117 75 - 79 141 61 80 80 and over 111 44 67 0-17 12,151 6,322 5,829 18 and over 12,974 6,692 6,282 Table 2.
    [Show full text]