Region IV-B 15,509,307,000 550 Projects

Total Page:16

File Type:pdf, Size:1020Kb

Region IV-B 15,509,307,000 550 Projects Annual Infrastructure Program Revisions Flag: (D)elisted; (M)odified; (R)ealigned; (T)erminated Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Region IV-B 15,509,307,000 550 projects GAA 2016 MFO-1 8,580,858,000 209 projects Marinduque District Engineering Office 733,810,000 50 projects MARINDUQUE (LONE DISTRICT) Network Development - Improvement/Widening of National Roads - Secondary 165003015100073 Marinduque Circumferential Rd - K0015+000- K0016+010 - Road P00005468LZ-CW1 Road Widening Lane Km 2.000 30,000,000 Marinduque District Widening Engineering Office / Marinduque District Engineering Office 165003015100074 Mogpog-Balanacan Port Rd - K0013+000- K0013+650 - Road P00005469LZ-CW1 Road Widening Lane Km 1.300 19,500,000 Marinduque District Widening Engineering Office / Marinduque District Engineering Office Network Development - Off-Carriageway Improvement including drainage 165003015600080 Mogpog-Balanacan Port Rd - K0008+-1060 - K0008+-393 - Off- P00003330LZ-CW1 Off-Carriageway Square meters 2,668 18,615,000 Marinduque District Carriageway Improvement: Shoulder Paving / Construction Improvement: Shoulder Engineering Office / Paving / Construction Marinduque District Engineering Office Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges 165003016000050 Bantay Br. (B00037MQ) along Dr Damian Reyes Rd (Boac Side) - P00002045LZ-CW1 Replacement of Bridge Square meters 583 63,750,000 Region IV-B / Region IV-B Replacement of Bridge Asset Preservation of National Roads - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary 165003014900048 Tigwi-Dampulan-Lipata-Yook-Buenavista Rd - K0094+359 - K0094+ P00002989LZ-CW1 Construction of Lineal meters 586 2,650,000 Marinduque District 652 - Construction of Drainage Structure along Road Drainage Structure Engineering Office / along Road Marinduque District Engineering Office Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary 165003014300082 Tigwi-Dampulan-Lipata-Yook-Buenavista Road, K0096+833 - K0097+ P00009024LZ-CW1 Rehabilitation of Lane Km 0.410 5,500,000 Marinduque District 040 - Rehabilitation of Concrete Road Concrete Road Engineering Office / Marinduque District Engineering Office 3/29/2017 9:43:32 AM Page 1 of 61 Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Secondary 165003014200060 Marinduque Circumferential Rd - K0004+000 - K0004+600, K0005+ P00000930LZ-CW1 Construction of Lane Km 1.896 28,725,000 Marinduque District 300 - K0005+486, K0005+670 - K0005+832, - Construction of Concrete Road Engineering Office / Concrete Road Marinduque District Engineering Office 165003014200061 Marinduque Circumferential Rd (S00001MQ) - K0057+000 - K0057+ P00009021LZ-CW1 Construction of Lane Km 1.674 25,361,000 Marinduque District 837 - Construction of Concrete Road Concrete Road Engineering Office / Marinduque District Engineering Office Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) - Secondary 165003013900056 Marinduque Circumferential Rd - K0018+000 - K0019+000, K0027+ P00000379LZ-CW1 Rehabilitation of Lane Km 10.470 39,786,000 Marinduque District 786 - K0029+000, K0061+000 - K0062+000, K0064+000 - K0065+ Concrete Road Engineering Office / 000, K0072+000 - K0073+000 - Rehabilitation of Concrete Road Marinduque District Engineering Office Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary 165003015800112 Dr Damian Reyes Rd (Boac Side) - K0022+258 - K0024+013 - P00004460LZ-CW1 Construction of Lane Km 3.752 56,280,000 Region IV-B / Region IV-B Construction of Concrete Road Concrete Road 165003015800113 Dr Damian Reyes Rd (Torrijos Side) - K0045+141 - K0047+639, K0047 P00004461LZ-CW1 Construction of Lane Km 6.406 104,955,000 Region IV-B / Region IV-B +699 - K0047+800, K0053+163 - K0053+343, K0053+602 - K0054+ Concrete Road 000 - Construction of Concrete Road Mindoro Occidental District Engineering Office 3,493,077,000 97 projects OCCIDENTAL MINDORO (LONE DISTRICT) Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary 165003014600059 Jct MWCR (Sn Isidro)-Penal Colony-Jct Yapang Rd - K0302+000 - P00006125LZ-CW1 Construction of Road Square meters 7,000 80,000,000 Region IV-B / Region IV-B K0303+000 - Construction of Road Slope Protection Structure Slope Protection Structure 165003014600060 Jct MWCR (Bagong Silang)-Cabacao Div Rd - K0426+000 - K0426+ P00006124LZ-CW1 Construction of Road Square meters 2,700 31,500,000 Mindoro Occidental 300 - Construction of Road Slope Protection Structure Slope Protection District Engineering Office Structure / Mindoro Occidental District Engineering Office Network Development - Improvement/Widening of National Roads - Secondary 165003015100071 Mindoro West Coastal Rd - K0238+711- K0239+000, K0320+550- P00005470LZ-CW1 Road Widening Lane Km 6.676 100,000,000 Region IV-B / Region IV-B K0322+600, K0381+700- K0382+674 - Road Widening 3/29/2017 9:43:32 AM Page 2 of 61 Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Network Development - Off-Carriageway Improvement including drainage 165003015600081 Mamburao-Airport Rd - K0407+-364 - K0407+259 - Off-Carriageway P00003331LZ-CW1 Off-Carriageway Square meters 2,492 17,396,000 Mindoro Occidental Improvement: Shoulder Paving / Construction Improvement: Shoulder District Engineering Office Paving / Construction / Mindoro Occidental District Engineering Office 165003015600082 Mindoro West Coastal Rd - K0233+216 - K0235+000 - Off- P00003332LZ-CW1 Off-Carriageway Square meters 7,020 49,000,000 Mindoro Occidental Carriageway Improvement: Shoulder Paving / Construction Improvement: Shoulder District Engineering Office Paving / Construction / Mindoro Occidental District Engineering Office 165003015600083 Sn Jose-Caminawit Port Rd - K0238+462 - K0239+709 - Off- P00003333LZ-CW1 Off-Carriageway Square meters 3,741 34,810,000 Mindoro Occidental Carriageway Improvement: Shoulder Paving / Construction Improvement: Shoulder District Engineering Office Paving / Construction / Mindoro Occidental District Engineering Office 165003015600199 Jct TLLR-Binacas Rd - K0014+540 - K0015+410 - Off-Carriageway P00003608LZ-CW1 Off-Carriageway Square meters 3,424 13,610,000 Mindoro Occidental Improvement: Shoulder Paving / Construction Improvement: Shoulder District Engineering Office Paving / Construction / Mindoro Occidental District Engineering Office 165003015600200 Jct TLLR-Burol Rd - K0008+-271 - K0008+255 - Off-Carriageway P00003609LZ-CW1 Off-Carriageway Square meters 2,104 14,677,000 Mindoro Occidental Improvement: Shoulder Paving / Construction Improvement: Shoulder District Engineering Office Paving / Construction / Mindoro Occidental District Engineering Office 165003015600201 Jct TLLR-Tumibo-Lubang-Binacas Rd - K0001+625 - K0002+380, P00003610LZ-CW1 Off-Carriageway Square meters 2,756 9,699,000 Mindoro Occidental K0005+309 - K0005+330 - Off-Carriageway Improvement: Shoulder Improvement: Shoulder District Engineering Office Paving / Construction Paving / Construction / Mindoro Occidental District Engineering Office 165003015600202 Tagbac-Lubang-Looc Rd - K0000+774 - K0001+417, K0009+055 - P00003612LZ-CW1 Off-Carriageway Square meters 3,892 27,170,000 Mindoro Occidental K0009+391 - Off-Carriageway Improvement: Shoulder Paving / Improvement: Shoulder District Engineering Office Construction Paving / Construction / Mindoro Occidental District Engineering Office Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges 165003016000004 Pandurucan Br. (B00078MR) along Mindoro West Coastal Rd - P00002088LZ-CW1 Replacement of Bridge Square meters 1,377 150,500,000 Central Office / Region IV-B Replacement of Bridge 165003016000051 Caguray Br. (B00168MR) along Mindoro Oriental/Occidental East P00002047LZ-CW1 Replacement of Bridge Square meters 970 106,000,000 Region IV-B / Region IV-B Coastal Rd - Replacement of Bridge 165003016000053 Pinamanaan Br. (B00076MR) along Mindoro West Coastal Rd - P00002089LZ-CW1 Replacement of Bridge Square meters 549 60,000,000 Region IV-B / Region IV-B Replacement of Bridge 165003016000054 Libis Br. (B00001CA) along Libis Lighthouse-Buli Lighthouse Rd - P00002090LZ-CW1 Replacement of Bridge Square meters 293 32,000,000 Mindoro Occidental Replacement of Bridge District Engineering Office / Mindoro Occidental District Engineering Office 3/29/2017 9:43:32 AM Page 3 of 61 Operating Unit/ Revisions UACS PAP Project Component Decsription Project Component ID Type of Work Target Unit Target Allocation Implementing Office Flag Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges from 1
Recommended publications
  • DSWD DROMIC Report #1 on the Tornado Incident in Brgy. Tubili, Paluan, Occidental Mindoro As of 09 August 2019, 6PM
    DSWD DROMIC Report #1 on the Tornado Incident in Brgy. Tubili, Paluan, Occidental Mindoro as of 09 August 2019, 6PM SUMMARY On 08 August 2019, a tornado incident occurred in Brgy. Tubili, Paluan, Occidental Mindoro. Source: DSWD-FO MIMAROPA I. Status of Affected Families / Persons A total of 42 families or 185 persons were affected by the tornado incident in Brgy. Tubili, Paluan, Occidental Mindoro (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL 1 42 185 REGION MIMAROPA 1 42 185 Occidental Mindoro 1 42 185 Paluan 1 42 185 Note: Ongoing assessment and validation Source: DSWD-FO MIMAROPA II. Status of Displaced Families / Persons There are 42 families or 185 persons who are currently staying in Apis Elementary School (see Table 2). Table 2. Number of Displaced Families / Persons Inside Evacuation Center NUMBER OF INSIDE ECs EVACUATION REGION / PROVINCE / MUNICIPALITY CENTERS (ECs) Families Persons CUM NOW CUM NOW CUM NOW GRAND TOTAL 1 1 42 42 185 185 REGION MIMAROPA 1 1 42 42 185 185 Occidental Mindoro 1 1 42 42 185 185 Paluan 1 1 42 42 185 185 Note: Ongoing assessment and validation still being conducted. Source: DSWD-FO MIMAROPA SITUATIONAL REPORT DSWD-DRMB DATE SITUATIONS / ACTIONS UNDERTAKEN • The Disaster Response Operations Monitoring and Information Center (DROMIC) of the DSWD-DRMB continues to closely coordinate with DSWD-FO 09 August 2019 MIMAROPA for significant reports on the status of affected families, assistance, and relief efforts. Page 1 of 2| DSWD DROMIC Report #1 on the Tornado Incident in Brgy.
    [Show full text]
  • Mangrove Mapping for the Verde Island Passage
    MANGROVE MAPPING FOR THE VERDE ISLAND PASSAGE This publication was prepared by Conservation International Philippines with funding from the United States Agency for International Development’s Coral Triangle Support Partnership (CTSP) (September 2011) Cover photo: This mangrove forest is part of a Marine Protected Area in Balibago, Verde Island Passage in the Philippines. Photo: © CTSP / Tory Read Mangrove Mapping for the Verde Island Passage, Philippines November 2011 USAID Project Number GCP LWA Award # LAG-A-00-99-00048-00 For more information on the six-nation Coral Triangle Initiative, please contact: Coral Triangle Initiative on Coral Reefs, Fisheries, and Food Security Interim Regional Secretariat Ministry of Marine Affairs and Fisheries of the Republic of Indonesia Mina Bahari Building II, 17th Floor Jalan Medan Merdeka Timur No 16 Jakarta Pusat 10110 Indonesia www.thecoraltriangleintitiave.org This is a publication of the Coral Triangle Initiative on Coral Reefs, Fisheries, and Food Security (CTI- CFF). Funding for the preparation of this document was provided by the USAID-funded Coral Triangle Support Partnership (CTSP). CTSP is a consortium led by the World Wildlife Fund, The Nature Conservancy, and Conservation International with funding support from the United States Agency for International Development’s Regional Asia Program. © 2011 Coral Triangle Support Partnership. All rights reserved. Reproduction and dissemination of material in this report for educational or other non-commercial purposes are authorized without any prior written permission from the copyright holders provided the source is fully acknowledged. Reproduction of material in this information product for resale or other commercial purposes is prohibited wihout written permission of the copyright holders.
    [Show full text]
  • Estimation of Local Poverty in the Philippines
    Estimation of Local Poverty in the Philippines November 2005 Republika ng Pilipinas PAMBANSANG LUPON SA UGNAYANG PANG-ESTADISTIKA (NATIONAL STATISTICAL COORDINATION BOARD) http://www.nscb.gov.ph in cooperation with The WORLD BANK Estimation of Local Poverty in the Philippines FOREWORD This report is part of the output of the Poverty Mapping Project implemented by the National Statistical Coordination Board (NSCB) with funding assistance from the World Bank ASEM Trust Fund. The methodology employed in the project combined the 2000 Family Income and Expenditure Survey (FIES), 2000 Labor Force Survey (LFS) and 2000 Census of Population and Housing (CPH) to estimate poverty incidence, poverty gap, and poverty severity for the provincial and municipal levels. We acknowledge with thanks the valuable assistance provided by the Project Consultants, Dr. Stephen Haslett and Dr. Geoffrey Jones of the Statistics Research and Consulting Centre, Massey University, New Zealand. Ms. Caridad Araujo, for the assistance in the preliminary preparations for the project; and Dr. Peter Lanjouw of the World Bank for the continued support. The Project Consultants prepared Chapters 1 to 8 of the report with Mr. Joseph M. Addawe, Rey Angelo Millendez, and Amando Patio, Jr. of the NSCB Poverty Team, assisting in the data preparation and modeling. Chapters 9 to 11 were prepared mainly by the NSCB Project Staff after conducting validation workshops in selected provinces of the country and the project’s national dissemination forum. It is hoped that the results of this project will help local communities and policy makers in the formulation of appropriate programs and improvements in the targeting schemes aimed at reducing poverty.
    [Show full text]
  • Culion Municipality
    BASELINE REPORT ON COASTAL RESOURCES for Culion Municipality September 2006 Prepared for: PALAWAN COUNCIL FOR SUSTAINABLE DEVELOPMENT Palawan Center for Sustainable Development Sta. Monica Heights, Puerto Princesa City, Palawan, Philippines 5300 Email: [email protected] Tel.: (63-48) 434-4235, Fax: 434-4234 Funded through a loan from : JAPAN BANK FOR INTERNATIONAL COOPERATION Prepared by: PACIFIC CONSULTANTS INTERNATIONAL in association with ALMEC Corporation CERTEZA Information Systems, Inc. DARUMA Technologies Inc. Geo-Surveys & Mapping, Inc. Photo Credits: Photos by PCSDS and SEMP-NP ECAN Zoning Component Project Management Office This report can be reproduced as long as the convenors are properly acknowledged as the source of information Reproduction of this publication for sale or other commercial purposes is prohibited without the written consent of the publisher. Printed by: Futuristic Printing Press, Puerto Princesa City, Philippines Suggested Citation: PCSDS. 2006. Baseline Report on Coastal Resources for Culion, Municipality. Palawan Council for Sustainable Development, Puerto Princesa City, Palawan TABLE OF CONTENTS List of Tables v List of Figures vii List of Plates x List of Appendices xi EXECUTIVE SUMMARY xii CHAPTER I: CORAL REEFS 1 1.0 Introduction 1 2.0 Materials and Methods 6 3.0 Survey Results 7 4.0 Discussions 10 5.0 Summary 12 6.0 Recommendations 12 CHAPTER II: REEF FISHES 13 7.0 Introduction 13 8.0 Materials and Methods 13 9.0 Results 14 10.0 Discussions 21 11.0 Conclusions and Recommendations 22 CHAPTER III: SEAGRASSES
    [Show full text]
  • Microfilm Publication M617, Returns from U.S
    Publication Number: M-617 Publication Title: Returns from U.S. Military Posts, 1800-1916 Date Published: 1968 RETURNS FROM U.S. MILITARY POSTS, 1800-1916 On the 1550 rolls of this microfilm publication, M617, are reproduced returns from U.S. military posts from the early 1800's to 1916, with a few returns extending through 1917. Most of the returns are part of Record Group 94, Records of the Adjutant General's Office; the remainder is part of Record Group 393, Records of United States Army Continental Commands, 1821-1920, and Record Group 395, Records of United States Army Overseas Operations and Commands, 1898-1942. The commanding officer of every post, as well ad commanders of all other bodies of troops such as department, division, brigade, regiment, or detachment, was required by Army Regulations to submit a return (a type of personnel report) to The Adjutant General at specified intervals, usually monthly, on forms provided by that office. Several additions and modifications were made in the form over the years, but basically it was designed to show the units that were stationed at a particular post and their strength, the names and duties of the officers, the number of officers present and absent, a listing of official communications received, and a record of events. In the early 19th century the form used for the post return usually was the same as the one used for regimental or organizational returns. Printed forms were issued by the Adjutant General’s Office, but more commonly used were manuscript forms patterned after the printed forms.
    [Show full text]
  • ADDRESSING ILLEGAL WILDLIFE TRADE in the PHILIPPINES PHILIPPINES Second-Largest Archipelago in the World Comprising 7,641 Islands
    ADDRESSING ILLEGAL WILDLIFE TRADE IN THE PHILIPPINES PHILIPPINES Second-largest archipelago in the world comprising 7,641 islands Current population is 100 million, but projected to reach 125 million by 2030; most people, particularly the poor, depend on biodiversity 114 species of amphibians 240 Protected Areas 228 Key Biodiversity Areas 342 species of reptiles, 68% are endemic One of only 17 mega-diverse countries for harboring wildlife species found 4th most important nowhere else in the world country in bird endemism with 695 species More than 52,177 (195 endemic and described species, half 126 restricted range) of which are endemic 5th in the world in terms of total plant species, half of which are endemic Home to 5 of 7 known marine turtle species in the world green, hawksbill, olive ridley, loggerhead, and leatherback turtles ILLEGAL WILDLIFE TRADE The value of Illegal Wildlife Trade (IWT) is estimated at $10 billion–$23 billion per year, making wildlife crime the fourth most lucrative illegal business after narcotics, human trafficking, and arms. The Philippines is a consumer, source, and transit point for IWT, threatening endemic species populations, economic development, and biodiversity. The country has been a party to the Convention on Biological Diversity since 1992. The value of IWT in the Philippines is estimated at ₱50 billion a year (roughly equivalent to $1billion), which includes the market value of wildlife and its resources, their ecological role and value, damage to habitats incurred during poaching, and loss in potential
    [Show full text]
  • DSWD DROMIC Terminal Report on the Effects of Typhoon “QUIEL” 01 December 2019, 6PM
    DSWD DROMIC Terminal Report on the Effects of Typhoon “QUIEL” 01 December 2019, 6PM This is the final report on the effects of Typhoon Quiel when residents from coastal areas of municipality of Paluan in Province of Occidental Mindoro took evacuation due to big waves on 07 November 2019 at 2:00 PM. SUMMARY I. Status of Affected Families / Persons A total of 335 families or 1,016 persons were affected by the effects of Typhoon “Quiel” in 13 barangays in MIMAROPA (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangay Families Persons GRAND TOTAL 13 335 1,016 REGION MIMAROPA 13 335 1,016 Occidental Mindoro 13 335 1,016 Lubang 1 24 85 Paluan 4 65 240 Rizal 2 69 171 Sablayan 3 55 183 Santa Cruz 3 122 337 Source: DSWD-FO MIMAROPA II. Status of Displaced Families / Persons a. Inside Evacuation Center A total of 278 families or 804 persons took temporary shelter in thirteen (13) evacuation centers in MIMAROPA (see Table 2). Table 2. Number of Displaced Families Inside Evacuation Centers NUMBER OF NUMBER OF DISPLACED REGION / PROVINCE / EVACUATION INSIDE ECs MUNICIPALITY CENTERS (ECs) Families Persons (Actual) CUM NOW CUM NOW CUM NOW GRAND TOTAL 13 - 278 - 804 - REGION MIMAROPA 13 - 278 - 804 - Occidental Mindoro 13 - 278 - 804 - Paluan 5 - 65 - 240 - Rizal 2 - 44 - 71 - Sablayan 2 - 47 - 156 - Santa Cruz 4 - 122 - 337 - Source: DSWD-FO MIMAROPA Page 1 of 3| DSWD DROMIC Terminal Report on the Effects of Typhoon “QUIEL”, 01 December 2019, 6PM b.
    [Show full text]
  • The Philippines
    THE PHILIPPINES contemporary yacht charter 2020 1963 ITINERARY Yacht charter in the Philippines is growing slowly but surely. It is an excellent The Philippines is made up of more than 7,000 islands, surrounded by clear blue water. sailing destination for those who are looking for new and unexplored territories. It is famous for its sandy white beaches, first-class diving and water sports. With impressive The Philippines has many attractions that will surely amaze you and guarantee and varied volcanoes and dense jungle landscapes, island hopping trips in the Philippines a unique, exciting and impressive yacht charter vacation. are the perfect way to experience everything this island country has to offer. 1963 Your voyage begins at Honda Bay, offering a variety of exciting leisure Puerto Princesa is Palawan’s bustling capital and the main arrival hub by plane activities. The butterfly garden will be filled with various fascinating species, and ferry to the Island. Known as the cleanest and greenest city in the Philippines, and in the Palawan Wildlife Rescue and Conservation Center you will discover it is located in a splendid natural environment, offering beautiful beaches the local fauna. The Church of the Immaculate Conception is a famous and pristine forest hills. religious building in the heart of the old town, worth a visit. Don’t miss the Subterranean River National Park, a UNESCO World Heritage Site. DAY 1 1963 PUERTO PRINCESA Photo by paweesit on Foter.com / CC BY-ND El Nido is the main base for exploring the Bacuit Archipelago, a charming Get ready to travel through one of the most lovely, unspoilt and exciting places attraction in Palawan.
    [Show full text]
  • Behind the Scenes
    ©Lonely Planet Publications Pty Ltd 467 Behind the Scenes SEND US YOUR FEEDBACK We love to hear from travellers – your comments keep us on our toes and help make our books better. Our well-travelled team reads every word on what you loved or loathed about this book. Although we cannot reply individually to your submissions, we always guarantee that your feed- back goes straight to the appropriate authors, in time for the next edition. Each person who sends us information is thanked in the next edition – the most useful submissions are rewarded with a selection of digital PDF chapters. Visit lonelyplanet.com/contact to submit your updates and suggestions or to ask for help. Our award-winning website also features inspirational travel stories, news and discussions. Note: We may edit, reproduce and incorporate your comments in Lonely Planet products such as guidebooks, websites and digital products, so let us know if you don’t want your comments reproduced or your name acknowledged. For a copy of our privacy policy visit lonelyplanet.com/ privacy. their advice and thoughts; Andy Pownall; Gerry OUR READERS Deegan; all you sea urchins – you know who Many thanks to the travellers who used you are, and Jim Boy, Zaza and Eddie; Alexan- the last edition and wrote to us with der Lumang and Ronald Blantucas for the lift helpful hints, useful advice and interesting with accompanying sports talk; Maurice Noel anecdotes: ‘Wing’ Bollozos for his insight on Camiguin; Alan Bowers, Angela Chin, Anton Rijsdijk, Romy Besa for food talk; Mark Katz for health Barry Thompson, Bert Theunissen, Brian advice; and Carly Neidorf and Booners for their Bate, Bruno Michelini, Chris Urbanski, love and support.
    [Show full text]
  • One Big File
    MISSING TARGETS An alternative MDG midterm report NOVEMBER 2007 Missing Targets: An Alternative MDG Midterm Report Social Watch Philippines 2007 Report Copyright 2007 ISSN: 1656-9490 2007 Report Team Isagani R. Serrano, Editor Rene R. Raya, Co-editor Janet R. Carandang, Coordinator Maria Luz R. Anigan, Research Associate Nadja B. Ginete, Research Assistant Rebecca S. Gaddi, Gender Specialist Paul Escober, Data Analyst Joann M. Divinagracia, Data Analyst Lourdes Fernandez, Copy Editor Nanie Gonzales, Lay-out Artist Benjo Laygo, Cover Design Contributors Isagani R. Serrano Ma. Victoria R. Raquiza Rene R. Raya Merci L. Fabros Jonathan D. Ronquillo Rachel O. Morala Jessica Dator-Bercilla Victoria Tauli Corpuz Eduardo Gonzalez Shubert L. Ciencia Magdalena C. Monge Dante O. Bismonte Emilio Paz Roy Layoza Gay D. Defiesta Joseph Gloria This book was made possible with full support of Oxfam Novib. Printed in the Philippines CO N T EN T S Key to Acronyms .............................................................................................................................................................................................................................................................................. iv Foreword.................................................................................................................................................................................................................................................................................................... vii The MDGs and Social Watch
    [Show full text]
  • Blessed Vicente M. Soler, Missionary in the Philippines, 1889-1906
    BLESSED VICENTE M. SOLER, MISSIONARY IN THE PHILIPPINES, 1889-1906 Emmanuel Luis A. ROMANILLOS Abstract Resumen The study narrates the missionary years of Este estudio describe la actividad misio- Blessed Vicente Soler in Antipolo, Mind- nera del beato Vicente Soler en Antipo- oro and Batangas. At the outbreak of the lo, Mindoro y Batangas. Al estallar la Philippine Revolution, Father Soler and his Revolución filipina el padre Soler y sus confreres travelled to Lucena in June 1898 compañeros viajaron a Lucena en junio to escape from the revolutionists’ clutch- de 1898 para escapar de los revoluciona- es and took a steamer to Borneo which rios y allí embarcaron en un vapor con berthed at Looc in Tablas Island where they destino a Borneo. Pero al pasar por Looc opted to stay. With eleven confreres, Father (Tablas) optaron por permanecer en Fi- Soler was soon imprisoned there. They lipinas. Muy pronto volvió a caer, junto were later taken by boat to Romblon, then con sus once compañeros, en manos de to Marinduque for incarceration at Boac los revolucionarios, que los trasladaron a and later moved to Mogpog where kind Romblón y, luego, a Marinduque. Duran- parishioners and secular priest treated them te algún tiempo fueron encarcelados en well. After various sea travels, the prisoners Boac y Mogpog, donde fueron bien tra- were taken to Tayabas and hiked from one tados por el párroco y sus feligreses. Tras town to another. After months of captivity, varias idas y venidas fueron trasladados a evasion from American forces, transfers, Batangas, donde caminaron de pueblo en exhaustion from long hikes, hunger, un- pueblo.
    [Show full text]
  • Palawan Liner Shipping Developmentak Routes Report
    LINER SHIPPING ROUTE STUDY FINAL REPORT VOLUME IX PALAWAN LINER SHIPPING DEVELOPMENTAK ROUTES REPORT November 1994 Submitted to United States Agency for International Development Manila, Philippines Support for Development Program 11: Philippine Sea Transport Consultancy Project No. 492-0450 Prepared by Nathan Associates Inc. under Contract No. 492-0450-C-00-2157-00 The Liner Shipping Route Stutly (LSRS) and the MARINA and SHIPPERCON STUDY (MARSH Study) were conducted, during 1993-1994, under the Philippine Sea Transport Consultancy (PSTC). The Final Report of the LSRS comprises 14 volumes and the Final Report of the MARSH Study comprises 5 volumes. This technical assistance was made possible through the support provided by the Office of Program Economics, United States Agency for International Development (USAID) Mission in the Philippines. The views, expressions and opinions contained in this and other volumes of the LSRS Final :Report are those of the authors and of Nathan Associates, and do not necessarily reflect the views of USAID. 1. INTRODVCTION 1 Development Route Reports Palawan Island & Ports PALSDERR Developmental Route Proposals Organization of PALSDERR- 2. PALAUAN INTERISLAND SHIPPING EiERVICES & PORT TRAFFIC 9 3. CARGO SERVICE STANDARDS 21 Fishery Products Livestock 4. PASSENGER SERVICE STANDARDS 25 5. PUERTO PRINCESA-CEBU LINER SH1:PPING DEVELOPHENTAL ROUTE Liner Service Options Market Analysis PALSDERR Procedure 30 Puerto Princesa 1991-1993 Cargo Flows 32 Trade with Cebu Trade with Manila Puerto Princesa-Cebu-Air Passenger Traffic 35 Economic Analysis 37 6. PALAWAN-ZAHBOANGA LINER SHIPPING DEVELOPHENTAL ROUTE Liner Service Options Market Analysis Sulu Sea Service Option 40 Cagayan de Tawi Tawi Opt ion 4 1 Eccirlomic Analysis 42 7.
    [Show full text]